Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Engaging with Utilities and Key Stakeholders [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the interconnection process for distributed energy resources and how to engage well with utilities. The workshop will be held on March 25, 2026.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

SHASTA-HELP: Hydrogen Estimator for Logistical Planning Tool

Underground reservoirs offer a promising option for medium- and long-term hydrogen storage that could potentially be safer and more cost-effective than surface alternatives. Currently, there are three underground hydrogen storage (UHS) facilities in the United States, which operate solely in salt caverns and store hydrogen primarily for industrial purposes. Salt formations favorable for geologic storage are geographically limited in the U.S. If a hydrogen economy is to develop, expansion of UHS to other geologic formations such as depleted gas fields and saline aquifers will be necessary to increase the availability of hydrogen storage. While research into the feasibility of storing hydrogen in these formations is ongoing, tools and methodologies are needed for characterizing the hydrogen storage potential in these reservoirs. We introduce the Hydrogen Estimator for Logistical Planning (HELP) tool from the Subsurface Hydrogen Assessment, Storage, and Technology Acceleration (SHASTA) project (https://edx.netl.doe.gov/shasta). SHASTA-HELP is a suite of web-based tools that have numerous capabilities for UHS project planning.

Haeri, Foad↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

Patterns, drivers, and a predictive model of dam removal cost in the United States

Given the burgeoning dam removal movement and the large number of dams approaching obsolescence in the United States, cost estimating data and tools are needed for dam removal prioritization, planning, and execution. We used the list of removed dams compiled by American Rivers to search for publicly available reported costs for dam removal projects. Total cost information could include component costs related to project planning, dam deconstruction, monitoring, and several categories of mitigation activities. We compiled reported costs from 455 unique sources for 668 dams removed in the United States from 1965 to 2020. The dam removals occurred within 571 unique projects involving 1–18 dams. When adjusted for inflation into 2020 USD, cost of these projects totaled $\$1.522$ billion, with per-dam costs ranging from $\$1$ thousand (k) to $\$268.8$ million (M). The median cost for dam removals was $\$157$k, $\$823$k, and $\$6.2$M for dams that were< 5 m, between 5–10 m, and > 10 m in height, respectively. Geographic differences in total costs showed that northern states in general, and the Pacific Northwest in particular, spent the most on dam removal. The Midwest and the Northeast spent proportionally more on removal of dams less than 5 m in height, whereas the Northwest and Southwest spent the most on larger dam removals > 10 m tall. We used stochastic gradient boosting with quantile regression to model dam removal cost against potential predictor variables including dam characteristics (dam height and material), hydrography (average annual discharge and drainage area), project complexity (inferred from construction and sediment management, mitigation, and post-removal cost drivers), and geographic region. Dam height, annual average discharge at the dam site, and project complexity were the predominant drivers of removal cost. The final model had an R 2 of 57% and when applied to a test dataset model predictions had a root mean squared error of $\$5.09$M and a mean absolute error of $\$1.45$M, indicating its potential utility to predict estimated costs of dam removal. We developed a R shiny application for estimating dam removal costs using customized model inputs for exploratory analyses and potential dam removal planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

Assessment of Survey Results from Advanced Reactor Industry Domain Experts on Nonlinear Soil-Structure Interaction Analysis Software Verification and Validation

The seismic load case has a significant impact on the design and cost of nuclear power plants. Given the need to substantially reduce cost, advanced reactor designers are looking to leverage numerical tools that enable seismic analysis of an integrated vessel/support/structure/soil system. Modern nonlinear analysis tools provide a solution, capturing dynamic coupling between components (including soil-structure interaction (SSI)) concurrent with nonlinear behavior in one or more parts of the system. Although these methods have a rich history of technical development and implementation, software quality assurance (SQA) following nuclear industry standards remains a significant burden for those wishing to adopt such methods for advanced reactor design and licensing. To reduce the SQA burden, this project will develop the guidance for SQA verification and validation (V&V) of coupled nonlinear SSI analysis tools, to include a test matrix of software features and test problems to support commercial grade dedication (CGD). The guidance is intended to be technology-neutral: supporting designers of all advanced reactors. To maximize the value of the project to reactor designers, the project team performed focused surveys of and interviews with advanced reactor designers. Additionally, the project surveyed members of the broader industry involved in reactor design and licensing. The aggregated industry feedback consists of written survey responses, live polling responses, focused interviews, and informal feedback provided after outreach presentations, collectively referred to as “survey results”. Herein, the survey results are reported, reviewed, and assessed to inform follow-on project activities. The survey results confirmed the familiarity of the industry with the coupled nonlinear SSI analysis. They also affirm the project need based upon the expressed intent to (1) incorporate nonlinear features and (2) pursue the coupled nonlinear SSI analysis to reduce seismic demands and construction costs. All reactor designers indicated their intent to incorporate two or more nonlinear features, and all reactor designer respondents opined that the coupled nonlinear SSI analysis would allow for the optimization of the reactor design and construction. However, the programmatic challenges, whether real or perceived, present a significant barrier to reactor designers. The barrier most commonly identified by the reactor designer population was regulatory risk, with 70% citing this as a reason not to pursue the approach. The perceived regulatory risk identified by the reactor designers underscores the importance of regulator engagement and dialogue in this project. Additionally, half of the reactor designers identified cost and lack of guidance as a deterrent. The survey results also provide insights to tailor specific aspects of the guidance document and test matrix. The project plans to prepare both a formal referenceable guidance document and a collaborative, web-based test matrix and problem set. The project will focus on more complete test problem definitions for the prioritized nonlinear features over shallower problem descriptions for a larger set of features. The nonlinearities prioritized as high based upon survey feedback include fluid-structure interaction and seismic isolation and energy dissipation devices. The nonlinearities prioritized as intermediate include nonlinear geomaterials, nonlinear concrete, nonlinear steel, and interface/contact nonlinearity. Deep embedment and the associated nonlinear phenomena are assigned the lowest priority based upon survey feedback.

42 ENGINEERING↗

TCCSP Task 6 Risk Assessment Report

For this Risk Assessment Plan, TCCSP has conducted a site-based risk assessment that quantifies the risk of CO 2 and/or brine leakage as a result of CO 2 injection at TCCSP. The risk assessment covers project planning, construction, injection, post-injection periods and closure of TCCSP. Key technical and non-technical Project risks are identified as part of the Risk Workshop and include a thorough evaluation of related scenarios. Mitigation strategies for the identified risk scenarios are defined to develop a scientifically sound, and community acceptable CO 2 storage Project.

58 GEOSCIENCES↗

Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment

The Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment Project was initiated in 2013 between Plug Power and U. S. Department of Energy Fuel Cell Technologies Office (DOE). The project plan included development and deployment of fifteen fuel cell powered units for two years at an airport to understand the feasibility and economic viability of hydrogen powered GSE. Project participants were the Department of Energy, Plug Power, and FedEx. The Memphis, TN airport is the hub of FedEx’s freight operation and was selected as the site for the demonstration portion of the project.

08 HYDROGEN↗

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Updated Baseline Cost Model for Hydropower (2023)

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.

13 HYDRO ENERGY↗

Advanced Mixed Mode Combustor for Hydrogen F-Class Retrofit (Final Report)

This objective of this project was to develop a retrofittable combustor module for the GE Vernova Operations LLC (GE Vernova, GEV) frame 7F gas turbine (GT) that would allow operation on blends of hydrogen in Natural Gas (NG) between 0% and 100%. The new system was to be part of a package that retained current cycle performance while limiting the increase in NOx emissions to the equivalent of 25ppm (parts per million by volume dry at 15% O2, ppmvd15) with consideration for the impact of hydrogen fuel on the O2 correction. The expectation was that with the addition of Axial Fuel Staging (AFS), turndown within emission compliance would be extended to below 20% GT load. The original project plan included three budget periods (BPs): BP1 spanning October 1, 2022 through August 31, 2024; BP2 spanning September 1, 2024 through December 31, 2025; and BP3 spanning January 1, 2026 through September 30, 2026. The project was terminated early by the DOE on October 10, 2025 about three months prior to the end of BP2. BP3 activities were therefore cancelled. The program was on track to meet all objectives prior to the DOE termination. This Final Report covers work completed during BP1 and BP2 prior to the program termination.

08 HYDROGEN↗

Design options for a superconducting ion linac

Following a review of the design options for a superconducting ion linac, we present here an alternative design for the pre-stripper section of the superconducting driver linac for the rare isotope science project (RISP) of the Institute for Basic Science in Korea. The proposed alternative design takes advantage of the recent accelerator developments at Argonne, namely for the recent ATLAS intensity and efficiency upgrade and the Fermilab proton improvement plan project (PIP-II). In particular, the state-of-the-art performance of quarter-wave (QWRs) and half-wave resonators (HWRs), the integrated steering correctors and cold beam position monitors (BPMs) for a compact cryomodule design. In order to simplify the design and avoid frequency transitions, we used two types of QWRs at 81.25 MHz while the baseline design has QWRs at 81.25 MHz and HWRs at 162.5 MHz. The new QWR types were optimized for β ~0.05 and ~0.11, respectively, and corrected for beam steering effects. Nine cryomodules are required to reach the stripping energy of 18.5 MeV/u for uranium beam. An alternative radio-frequency quadrupole (RFQ) design was also developed. It is optimized with the multi-harmonic buncher (MHB) to produce a much smaller longitudinal emittance, offering much needed flexibility for beam tuning and more tolerance to errors. Following the lattice design optimization, end-to-end beam dynamics simulations including most important sources of machine error were performed. The results showed that the design is robust and tolerant to errors with no beam loss observed for typical machine errors.

43 PARTICLE ACCELERATORS↗

Thermal Analysis of Thermal Shield for PIP-II SSR1 Cryomodule

Fermilab's PIP-II project plans to enhance the onsite accelerator into the world's most intense neutrino beam, bringing Fermilab into the next generation of particle accelerators. The five different types of cryomodules are vital parts of the PIP-II project and each requires numerous engineering analyses to prove operation. For example, the thermal shield of the Single Spoke Resonator-1 (SSR1) cryomodule required a thermal analysis to ensure the design was operating as intended before fabrication commenced. The thermal shield is cooled by the supercritical helium inside of the extrusion and must remain between 45 and 80 Kelvin. The main purpose of the thermal shield is to intercept different high heat loads and thermal radiation and prevent them from reaching the more sensitive internal components. Finite Element Analysis (FEM) was used to determine temperature estimates of the thermal shield based on the location of a variety of heat sources. Results determined temperatures exceeding the design limit around the crucial component of the current leads. Due to superconducting properties, the areas around the current leads cannot surpass 68 Kelvin. Different solutions to the critical high-temperature areas will be proposed. These solutions range from changing the properties of the helium flow to designing an attachment for the thermal shield. Each proposition works as a viable solution, however, each proposition also has its own set of advantages and disadvantages that are described for further design consideration.

43 PARTICLE ACCELERATORS↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗