Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Generation and Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

CRiSPPy: An advanced hydropower scheduling tool for the Colorado River Storage Project

The Western Area Power Administration (WAPA) plays a vital role in delivering reliable and cost-effective hydroelectric power to millions of customers across the western United States. The Colorado River Storage Project (CRSP) carries out WAPA’s mission in Arizona, Utah, Colorado, New Mexico, Nevada, Wyoming and Texas. Achieving this mission requires effective management of the Colorado River system, and depends on the use of advanced analytical tools and modeling methodologies. For many years, CRSP has relied on the Generation and Transmission Maximization Superlite (GTMax SL) model for its mid-term and long-term hydroscheduling needs. However, the evolving energy market, power system operations, environmental rules, and hydrology conditions, coupled with advancements in computational capabilities, have necessitated the development of a more modern and robust solution. This report introduces the Colorado River Storage Project Python-based (CRiSPPy) model, a new, advanced hydropower scheduling tool developed to address CRSP ever-evolving challenges. CRiSPPy represents a significant leap forward in our ability to model and optimize the operation of the Colorado River system. It incorporates state-of-the-art optimization algorithms, enhanced data management capabilities, and an advanced graphical user interface, providing WAPA CRSP personnel with unprecedented insights and decision-making support. This document details the development, capabilities, and implementation of CRiSPPy. It is intended to serve as a comprehensive resource for WAPA staff, stakeholders, and anyone interested in the future of hydropower scheduling in the Colorado River Basin. We are confident that CRiSPPy will enhance WAPA's mission while adapting to the challenges of a dynamic and increasingly complex environment. The version of CRiSPPy described in this report is the version 2.3. New versions of CRiSPPy will be developed as the tool keeps evolving to address CRSP challenges.

13 HYDRO ENERGY↗

Net Present Value Optimization of a Natural Gas Combined Cycle Plant with CO 2 Capture using a Water-Lean Solvent Considering Transient Electricity Price for Multiple Regions

Global CO 2 emissions are increasing at about a 1.5% rate per year. Fossil fuel-based plants are one of the main contributors to this rise. In the power generation industry, fossil fuel plants are dominant, and many plants are under development. In this study, a natural gas combined cycle (NGCC) power plant with postcombustion capture using a leading water-lean solvent is considered. For optimal design and operating schedule, large-scale dynamic optimization is undertaken for net present value (NPV) optimization. The first principle dynamic model of NGCC is developed, including a model of the highly efficient H-class gas turbines. For computational tractability of the dynamic optimization problem, a reduced-order model is developed by using the Hankel singular value decomposition. A waterlean solvent, N-(2-ethoxyethyl)-3-morpholinopropan-1-amine, is used for carbon capture. A model of the capture system is developed in Aspen Plus, which is used to develop a reduced-order model by using ALAMO, a machine learning software. In addition, a reduced model of the CO 2 compression system with a dehydration unit is also considered. The integrated system is used for NPV optimization by using the Python-based PYOMO platform. The PCC process is analyzed for three configurations-conventional packed bed, rotating packed bed (RPB), and a combination of RPB and direct contact cooler. The NPV optimization is performed for 14 regional markets by considering year-long clustered and continuous locational marginal price data with a 1 h interval. Optimization results show that the PCC can achieve 90% CO 2 capture with a positive NPV for six regions. Sensitivity studies conducted by using the PCC configurations indicate that the process is economically feasible for 9 regions out of 14 regional electricity markets with NPV values in the range of 33−540 $MM.

cabon capture↗

Real-Time Dispatcher for a Distributed Energy Resource Power Plant to Provide Grid Services [SWR-25-17]

This software dispatches the aggregated power of a distributed energy resource (DER) plant located on an electrical distribution network. It is designed to provide the following services to the grid in real-time: (i) voltage support of the distribution network, (ii) virtual power plant at the substation with power factor support, and (iii) operating reserves for automatic generator control for the transmission system. This dispatcher integrates with the local power plant controller and utilizes the battery energy storage system (BESS) to smooth the volatile net power output from the DERs. It can also integrate with a day-ahead scheduler to strategically charge and discharge.

Comden, Joshua [National Renewable Energy Laborato↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

Pricing Strategy of Electric Vehicle Aggregators Based on Locational Marginal Price to Minimize Photovoltaic (PV) Curtailment

The global climate crisis demands urgent action to mitigate global warming. Using renewable energy sources, such as solar and wind power, for electricity generation is crucial. This shift from centralized to distributed power systems, however, brings challenges, including voltage fluctuations and renewable energy curtailment. The rapid growth of the electric vehicle (EV) industry adds complexity, increasing overall electricity demand and straining the power supply during peak charging times. This paper proposes a scheduling strategy for EV aggregators to reduce renewable energy curtailment and stabilize grid operation by strategically scheduling EV charging. Using Multi -Agent Transport Simulation (MATSim), a traffic simulation tool, EV driving data in Denver, Colorado, USA, were modeled. The EV aggregator adjusts charging fees based on locational marginal prices, encouraging EVs to charge at different stations according to pricing. Simulations on an IEEE 33-bus system with distributed energy resources and EV charging stations validate the proposed algorithm, demonstrating its effectiveness in reducing curtailment by 12.55% and stabilizing grid operation.

33 ADVANCED PROPULSION SYSTEMS↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Machine Learning–Based Condition Monitoring of a Circulating Water System of a Canadian Nuclear Plant

With the need to maintain long-term reliable energy using nuclear power plants, there is an underlying demand to ensure that the maintenance of plant components and systems is also done in an efficient and cost-effective manner. One way to achieve this is by moving from time-based maintenance to condition-based maintenance. The research presented in this paper focuses on applying statistical and machine-learning-based methods to capture anomalies within data for fault detection to further develop into condition monitoring. This paper focuses on system data for a circulating water system (CWS) of a pressurized heavy-water reactor for detecting anomalies. The different methodologies used for detecting and capturing anomalies in the CWS data are matrix profile, density-based spatial clustering of applications with noise (DBSCAN), and support vector machines (SVMs). Matrix profile and DBSCAN are used to distinguish between normal data and anomalous data. This paper presents a hybrid method using DBSCAN and SVM when a portion of the data is used for DBSCAN to generate clusters. This portion of data is then used to train the SVM along with the clusters generated by DBSCAN as output. SVM is then tested on unseen data as a predictive tool, which can work in real time to categorize data points as either normal or anomalous. This paper presents results that show the high accuracies of DBSCAN and SVM in capturing anomalies within the data for a CWS for fault detection. Thus, the maintenance plan would be focused on component condition rather than a time-based schedule by switching to an automated system to identify and predict faults within a CWS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Intelligent industrial demand response to increase grid flexibility and reliability: A review

The rapid transition toward renewable energy has introduced challenges in grid stability due to the intermittency of non-dispatchable sources like solar and wind. Industrial Demand Response (IDR) offers a promising, cost-effective solution that adjusts energy consumption patterns to align with supply, increases renewable utilization, and reduces costs. This review provides an updated analysis of IDR, sorting technologies into five categories: energy storage, scheduled energy usage, operational flexibility, on-site generation, and intelligent operations. Energy storage solutions, while requiring little flexibility, often have the longest payback periods. While slightly better, on-site generation also has longer payback periods, ranging from 5 to 20 years or more. Scheduled energy usage, operational flexibility, and intelligent operations allow significant peak reduction at lower capital costs but require greater flexibility. While 15–20 % peak reduction is within the range of all five categories, scheduled energy use and on-site energy generation are shown to have reductions of up to 70–80 % in select scenarios. Combining multiple IDR strategies from these five categories maximizes both financial and operational benefits. Synergistic approaches are shown to enhance grid stability while reducing costs. As the grid evolves, IDR will enable a more flexible, renewable-powered future that will benefit industrial facilities and the broader energy system.

Demand flexibility↗

Valuing EV Managed Charging for Bulk Power Systems

When and where electric vehicle (EV) charging occurs has significant implications for power systems supporting widespread EV adoption, especially with high shares of wind and solar generation. This study extends previous works by leveraging detailed simulation models for EV adoption, EV use, EV charging, and bulk power system operations, and by linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This technical potential study focuses on how the value of EV managed charging (EVMC) changes depending on charging flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and managed charging participation rate. We show that naively aggregating EV charging flexibility from individual vehicles into megawatt-scale resources grossly overestimates the flexibility of the fleet, because such aggregate models can unrealistically pair, e.g., one already-fully-charged vehicle's ability to increase load with another already-charging vehicle's ability to accept more charge, effectively requesting a charging rate that is infeasible for the latter vehicle. We find per-vehicle bulk system value is highest at low participation rates for all dispatch mechanisms. Factoring in production cost savings, avoided firm capacity savings, and combustion-related power sector emissions savings, we estimate the value of EVMC at low participation rates (5%) to be $33/vehicle-year to $69/vehicle-yr for within-session charging flexibility and $40/vehicle-yr to $120/vehicle-yr for within-week charging flexibility in an envisioned 2038 New England power system and monetary value reported in 2016 U.S. dollars. At 100% participation, per-vehicle value declines to $25/vehicle-yr to $31/vehicle-yr for within-session charging flexibility and to $29/vehicle-yr to $36/vehicle-yr for within-week charging flexibility; however, 100% participation yields the highest total system savings.

ADVANCED PROPULSION SYSTEMS↗

Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multilayer Silicon Carbide Composite Material Technology for High-Temperature Concentrated Solar-Thermal Power Components

In 2012, the U.S Department of Energy defined aggressive targets to achieve lower component costs and higher system efficiencies for concentrated solar-thermal power (CSP), and this, in turn, has led to the exploration of technology options that can operate at higher temperatures [1]. These next-generation CSP options, referred to as Generation 3 (a.k.a. Gen3), are targeting temperatures at or above 700 °C for the energy being delivered to the power cycle, and the more challenging plant conditions have necessitated a review and selection of alternative receiver heat transfer fluids as well as a search for materials that can meet the associated high-temperature component requirements. Nickel-based alloys are currently being considered, but these generally experience a significant drop in strength at temperatures > 775 °C [2] and may not be able to achieve corrosion and other lifetime requirements. Furthermore, these alloys are expensive, frequently have cost and schedule volatility, and offer little potential for lower cost at high production volumes. As an alternative, Ceramic Tubular Products, LLC (CTP) has developed a multilayer silicon carbide composite that can complement or replace alloys currently being considered for these Gen3 CSP applications.

14 SOLAR ENERGY↗

Impact of Hydrological Data on Power System Operational Studies: Preprint

Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

A bilevel multistage stochastic self-scheduling model with indivisibilities for trading in the continuous intraday electricity market

In this paper, we study the profit maximization problem of a virtual power plant trading in the continuous intraday electricity market. Our virtual power plant model is compatible with renewable, and thermal assets, covering a range of virtual power plants currently participating in energy markets. We model the trading problem as a bilevel multistage stochastic program. The upper level of the problem accounts for the profit maximization of the virtual power plant with explicit modeling of the technical constraints of the operational status of the thermal power plant including minimum start-up and shut-down times, ramp-up and ramp-down rates, and minimum generation level. The upper level also decides which continuous and indivisible (fill-or-kill) orders are submitted to the market. The lower-level problem accounts for the clearing of the continuous intraday market, i.e., matching of buy and sell orders. Because of the presence of fill-or-kill orders, the lower-level problem is mixed-integer, which prevents its direct conversion to a single-level problem using duality. In order to solve this challenging problem, we develop a convex-hull extended formulation for the lower-level problem, apply duality theory to obtain a single-level stochastic equivalent formulation, and employ McCormick envelopes to turn the problem into a multistage stochastic mixed-integer linear problem, which we solve using the stochastic dual dynamic integer programming algorithm. We conduct numerical experiments and analyze the optimal trading behavior of a virtual power plant trading in an ideal continuous market without arbitrage.

Bilevel multistage stochastic programming problem↗

Leverage modern artificial intelligence (AI) enabled systems for waste reduction

Manufacturing industries continue to face challenges in reducing waste, as upstream strategies such as source reduction and product redesign require a deeper understanding of processes compared to conventional recycling methods. Recent advancements in artificial intelligence (AI) and machine learning (ML) have opened new opportunities to integrate modern computational techniques with traditional waste minimization strategies. This paper explores AI-enabled approaches for product redesign, source reduction, and recycling that can significantly reduce waste generation while improving efficiency and sustainability. AI-driven material substitution and lightweighting in product design enable discovery of novel materials with optimized properties, reducing waste without compromising performance. Reinforcement learning models optimize process parameters, raw material specifications, and machine sequencing to minimize production losses, while Industrial Internet of Things (IIoT) systems paired with AI analytics enhance real-time waste tracking, predictive maintenance, and quality inspection. Furthermore, AI-based demand forecasting and production planning reduce overproduction and excess inventory, as demonstrated in industrial applications. In recycling, ML-powered pattern recognition and robotic sorting technologies achieve higher accuracy in waste segregation, directly improving recycling efficiency. Complementary solutions such as smart bins and AI-enabled waste pickup scheduling optimize collection logistics, reducing both costs and emissions. Although implementation requires upfront investment in infrastructure and training, the long-term benefits include higher material efficiency, reduced waste, improved product quality, and stronger sustainability outcomes across the supply chain. By leveraging AI-enabled systems, manufacturers can align waste minimization efforts with circular economy principles, creating scalable solutions for both industry and society.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗