Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Digital-Twin-Enabling Technologies for Online Condition Monitoring of Nuclear Power Plant Components

Online condition monitoring is an area of active research that may enable optimized scheduling, maintenance, and safety of nuclear power plant components, reducing unnecessary derates while simultaneously improving operational capacity. Digital twins (DTs) are one avenue to conduct online condition monitoring and are currently being explored by national laboratories and universities alike. DTs for online condition monitoring are, in essence, state concurrent models that emulate a physical process which predicts a parameter and compares it against a measured value. A DT’s goal is to provide additional insights by combining and interpreting various sources of information for preventative maintenance scheduling optimization or early fault detection. DTs for condition monitoring are projected to be valuable for meeting requirements under 10 CFR 50.55a, “Codes and Standards,” and 10 CFR 50.65, “Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants”. However, DT technologies are still under significant development, and the process for developing a DT for condition monitoring has not been formalized. Therefore, in this work, we present an initial framework for developing a DT, discuss and review the various challenges and considerations for DT deployment, and identify the opportunities that a DT can improve. The presented framework is intended to help developers formulate a strategy when approaching DT development for condition monitoring. In conclusion, a DT use case for a reactor coolant pump is presented to demonstrate the proposed framework.

advanced sensor instrumentation↗

Stakeholder Questionnaire on Fish Passage Facilities at U.S. Hydropower Developments

To mitigate the environmental impacts of hydropower dams on fish populations in rivers, fish passage infrastructure may be required by regulatory authorities or recommended by state or federal agencies to allow migratory fish to pass hydropower barriers and complete their life histories. However, information on the location, types, and characteristics of fish passage infrastructure is incomplete at the national scale. This lack of information limits understanding of current fish passage capabilities and hinders efforts to anticipate future passage requirements during project licensing or relicensing. To address this knowledge gap, researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. As part of this effort, a stakeholder questionnaire was created and deployed to solicit information on fish passage infrastructure, including engineering characteristics, operational schedules, targeted species, and costs. This online questionnaire was designed to allow respondents to provide highly detailed information regarding fish passage capabilities at U.S. hydropower developments as efficiently as possible. The questionnaire improved database coverage and accuracy by providing valuable development- or passage-specific stakeholder knowledge that is not otherwise publicly available. However, questionnaire response rates were low, and stakeholders showed a preference for providing data via the spreadsheet template. This is likely because most stakeholders had high-level knowledge about fish passage existence and type at many features, and few stakeholders had highly detailed, feature-specific knowledge of fish passage infrastructure, cost, operational scheduling, and capabilities. Nonetheless, the development and deployment of the stakeholder questionnaire advanced the project in several fundamental ways, and a similar questionnaire may be valuable for future database expansion via targeted dissemination to stakeholders with confirmed knowledge of detailed fish passage information at specific hydropower projects.

13 HYDRO ENERGY↗

GDE-55115 Rev 1 Dome Scheduling Application

This document describes how a reactor developer applies for time in the Demonstration of Microreactor Experiments (DOME) facility. It also describes how applications are evaluated to develop the annual and outyear DOME schedule. The application process assumes that testing in DOME is funded by the applicant, and may be superseded by government-funded projects to accommodate government priorities.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Safety, Security, and Nuclear Operations for Advanced Reactors

The traditional separation between safety, security, and operations teams has created significant barriers to achieving optimal outcomes. When security considerations are introduced late in the design process, they often conflict with already-established architectural, operational, or engineering parameters. Retrofitting security measures can lead to increased costs, schedule delays, and compromises in security effectiveness. For instance, the need to retrofit physical barriers or surveillance systems often results in trade-offs that could have been avoided with earlier input from security professionals. Delayed integration can also affect regulatory processes and result in licensing delays. Security reviews conducted at later stages frequently identify gaps that necessitate significant redesign efforts, impacting not only scope, schedule, and budget, but also adding risk and lowering stakeholder confidence in the project. This paper aims to address these challenges by identifying practical opportunities for integrating security considerations seamlessly with design and operations teams throughout the entire lifecycle of nuclear facilities—from conceptual design to commissioning and beyond. The research emphasizes the value of early and continuous collaboration among stakeholders to ensure that security measures are robust, operationally effective, and cost-efficient. By examining case studies, analyzing past incidents, and leveraging best practices from other high-security industries, this study highlights actionable strategies for bridging the gap between safety, security, and operations teams.

Zineddin, Dr. Z. [ORNL] (ORCID:0009000848740725)↗

Open Architecture for Cost Savings in Advanced Nuclear Reactors

Recently, nuclear power plant build projects in the West have run over budget due to high capital costs and schedule overruns. Compared to other sources of energy, nuclear power plants have higher capital costs. Reactors are often different at every site, resulting in a lack of standardization. Nuclear is expected to compete with other low carbon sources of energy which have lower capital costs making it essential for nuclear to develop ways of reducing costs. Strategies such as standardization, learning rates, modularization, and schedule reduction in advanced reactors can reduce nuclear costs by about 40%. Standardization as a way of cutting capital costs has been explored even in large nuclear power plants. Standardization of certain plant components can result in lower component and installation costs and higher learning from experience. Standardization can be achieved by adopting a criterion of key performance indicators and general design principles for a specific system or component such as the balance of plant. Modularization allows the construction of certain components of SMRs in a factory, which saves time, increases productivity, and encourages higher learning rates. Production learning decreases the time and the cost related to an activity. The potential for modularized components of advanced reactors to be manufactured in factories makes it conducive to achieving higher learning rates. Developing large-capacity nuclear programs through sequential builds cultivates a higher learning rate, which in effect may reduce schedule overruns. Open architecture has been identified as a way to drive standardization among advanced reactor designs and result in cost savings. Open architecture (OA) is defined as a design enabling a diverse supply chain by defining and publishing requirements of systems or equipment in functional and/or interface terms, utilizing technical standards in widespread use. Currently, the nuclear industry’s approach is to use closed architecture, making most designs proprietary. However, collaboration between various advanced reactor vendors and suppliers utilizing the concept of open architecture can result in modular and standardized architecture of subsystems or subcomponents of a nuclear power plant. Completely standardizing nuclear power plants may be impossible, however, certain common subsystems amongst the various reactor designs could be standardized and/or access a wider supply chain and leverage existing learning from other sectors. Open architecture will save time and allocate resources to the parts of the plants that have the most unique features. A key advantage of open architecture is its ability to improve production learning across advanced reactors (AR) types in the industry, by providing and utilizing the same kind of component. Sodium fast reactor (SFR), High Temperature Gas Reactor (HTGR) and Molten Salt Reactor (MSR) are the advanced reactors considered for this project. This paper aims to determine the cost savings in advanced reactor programs due to open architecture learning rate. This work is an extension of work done on light water reactor small modular reactors; the cost methodology was utilized to investigate the impact of open architecture on advanced reactors with a particular focus on sodium fast reactors. The cost data on sodium fast reactors used in the model presented the most adequate information required for the analysis.

Advanced Nuclear Reactors↗

ADVANCED CONSTRUCTION TECHNOLOGY INITIATIVE (ACTI)

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, The National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) program aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

lumicap v0.1

Automated HDR luminance imaging system designed for daylighting research and building science. It controls a fisheye-lens camera to capture time-lapse bracket sequences, merges them into calibrated HDR images, and runs a full post-processing pipeline — all unattended. Features: - Scheduled LDR bracket capture via gphoto2 - HDR merging with vignetting, ND filter, and fisheye projection corrections - Illuminance and luminance meter integration (Konica Minolta T-10A, LS-100/150) - Daylight glare probability (DGP) and solar position computation - Automated false-color rendering, JPEG thumbnails, and daily time-lapse video - CSV data logging per timestep Uses: - Long-term monitoring of daylight conditions in buildings - Glare analysis for occupant comfort research - Solar irradiance and sky luminance studies Advantages: - End-to-end automation — capture, calibration, analysis, and archiving run without manual intervention - Built on the proven Radiance toolchain, ensuring photometrically accurate HDR output - Hardware-agnostic meter support via serial auto-detection - Lightweight — no GUI overhead, deployable on a headless Raspberry Pi or similar embedded system

Wang, Taoning [Lawrence Berkeley National Laborato↗

Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)

Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.

17 WIND ENERGY↗

Data Acquisition and Control for Marine Energy Devices: Cost Considerations

This document discusses the process involved with developing a data acquisition system specifically in the context of applications for Marine Renewable Energy (MRE) technologies however, much of what is presented is applicable to applications requiring data acquisition in general. The detail on the process is provided to highlight the critical steps and needs for a successful measurement campaign and to understand what can impact the overall outcome, cost, and schedule. The process presented is an amalgamation of best practices, lessons learned, recommendations, and prudent technical project planning and management. Data acquisition systems may be tightly integrated with or into the device under measurement and it often has its own dependencies that must be met. Therefore, early consideration and planning for the data acquisition system are stressed throughout this document.

13 HYDRO ENERGY↗

Polarimetry-Enhanced Imaging towards Autonomous Solar Field and Receiver Inspections

During the typical operation of a Concentrating Solar Power (CSP) plant, a large portion of the energy (~45%) can be lost due to various imperfect conditions, such as blocking, shading, mirror soiling, tracking and canting errors, etc. It is necessary to develop efficient and effective field inspection technology to optically survey and characterize a CSP field, which can be used as an input for autonomous control, maintenance scheduling and spot repair whenever necessary to maximize the overall efficiency of the plant. In this project, We aim to apply polarimetric imaging for CSP collector and receiver inspection and develop polarimetric drone cameras (via integrating polarimetric imagers onto drones) for autonomous field inspection in CSP plants.

14 SOLAR ENERGY↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Exascale workflow applications and middleware: An ExaWorks retrospective

Exascale computers offer transformative capabilities to combine data-driven and learning-based approaches with traditional simulation applications to accelerate scientific discovery and insight. However, these software combinations and integrations are difficult to achieve due to the challenges of coordinating and deploying heterogeneous software components on diverse and massive platforms. Here, we present the ExaWorks project, which addresses many of these challenges. We developed a workflow Software Development Toolkit (SDK), a curated collection of workflow technologies that can be composed and interoperated through a common interface, engineered following current best practices, and specifically designed to work on HPC platforms. ExaWorks also developed PSI/J, a job management abstraction API, to simplify the construction of portable software components and applications that can be used over various HPC schedulers. The PSI/J API is a minimal interface for submitting and monitoring jobs and their execution state across multiple and commonly used HPC schedulers. We also describe several leading and innovative workflow examples of ExaWorks tools used on DOE leadership platforms. Furthermore, we discuss how our project is working with the workflow community, large computing facilities, and HPC platform vendors to address the requirements of workflows sustainably at the exascale.

97 MATHEMATICS AND COMPUTING↗

Controls Status for Fermilab’s PIP-II Project

Testing of Cryomodule first articles at PIP-II's on-site Cryomodule Test Facility (CMTF), where EPICS based controls are already being used, has been invaluable to the project. In addition to validating hardware and controls components, it has provided opportunities to build buy-in and illicit meaningful feedback early-on. A device naming convention has also been significantly refined with an internal working group and the PIP-II integration team. Compressed air and Process Control Water (PCW) systems have been installed, and operations has been engaged in Phoebus display development in preparation for a transition to operations for these systems by 2026. Cryoplant hardware has been put in place, and collaboration between controls and PIP-IIs cryo group for IOC and display development is well underway for commissioning of cryoplant systems to begin early 2026. The project has also received beneficial occupancy of the High-Bay Building in October 2025, keeping us on schedule for Warm Front End commissioning to begin in 2027.

Crisp, Dan [Fermilab]↗

DISH-STARS™ Commercialization (Abstract)

The goal of this project is to aggressively support the near-term commercialization of a new technology platform – based on the integration of solar concentrators and micro- and meso-channel process technology (MMPT) – that was evaluated and identified as a strong candidate for near-term commercialization at EERE’s inaugural Lab-Corps program during early FY2016. Known as STARS, for Solar Thermochemical Advanced Reactor System, or Dish-STARS™ when paired with parabolic dish concentrators, STARS is a promising energy-related technology developed at the Pacific Northwest National Laboratory (PNNL) that efficiently converts solar energy into chemical energy. Combined with economies through hardware mass production, the efficiency of Dish-STARS™ provides a near-term opportunity for the production of renewable electricity, fuels and chemicals. This proposed CRADA project supports the commercialization of Dish-STARS™ in these important ways: The project will support the cooperative development of Dish-STARS™ by the DOE national laboratory and private partners, including the startup company, STARS Corporation, that is being established by the PNNL Lab-Corps team that evaluated STARS on behalf of EERE. The project will provide important transition funding at the time that the previous DOE SunShot project, which has supported Dish-STARS™ development from Technology Readiness Level 3 (TRL 3) to TRL 6, is scheduled to end.

14 SOLAR ENERGY↗

Best Practices for Regulatory Engagement and Relationship Building – 26129

In the initiation of a new project or facility, the management team should begin to engage with appropriate regulators, early and often. However, if this did not occur and new issues arise, new challenges develop, or regulatory impacts become a concern, the regulatory engagement process should be reconsidered and reevaluated. Regulators are key in the siting, construction, and continued operations of a new facility. Municipalities often seek to attract new initiatives, projects, or facilities that will have a significant positive impact on the community. Even though this is typically the goal, there are many hurdles along the path that may cause negative impacts leading to regulatory concerns and hurdles that may delay or stop work. Additionally, early and frequent engagement with regulators can have a significant positive impact on the successful siting, permitting, and construction of a facility, including meeting needed schedules that are important to economic viability. Further, it is essential for ongoing operations for regulators to be effectively and meaningfully engaged throughout the life of the project or facility due to the potential of changing factors during the construction and/or operation. Regular and consistent engagement builds relationships and helps ensure that potential topics of concern are addressed early before they become problems. In this paper, we will discuss best practices in engaging with regulators, how to initiate effective regulatory interactions, and building lasting relationships.

Jacobs, Stephanie [Savannah River National Laborat↗

Argonne Leadership Computing Facility 2024 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every goal set by DOE for the calendar year (CY) 2024. In CY 2024, the ALCF operated Polaris, an AMD and NVIDIA-based Hewlett Packard Enterprise (HPE) Apollo 6500 Gen10+ system that provides a powerful platform for breakthrough science and prepares applications and workloads for Aurora, Argonne National Laboratory’s Intel-HPE exascale computer. Since going into production in August 2022, Polaris has supported research teams from the DOE Exascale Computing Project (ECP), which concluded in 2024, and from ALCF’s Aurora Early Science Program (ESP). Polaris delivered a total of 2555.7K node-hours to 17 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) 2024 projects and 601.6K node-hours to ASCR Leadership Computing Challenge (ALCC) projects (12 of which were awarded during the 2023–2024 ALCC year and 11 of which were awarded during the 2024–2025 ALCC year), as well as providing substantial time for Director’s Discretionary (DD) projects (966.2K node-hours). As Table ES.1 shows, Polaris performed exceptionally well in terms of overall availability (97.7 percent), scheduled availability (99.6 percent), and utilization (94.7 percent; Table 2.1). In CY 2024, ALCF supported more than 2,000 users. As of March 18, 2025, ALCF’s users have published 254 papers in peer-reviewed journals and technical proceedings.

97 MATHEMATICS AND COMPUTING↗