Search NASA⌕ Search

SEARCH · Search NASA

Results for “REFERENCE OBJECTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Investigation of Active Life Balancing to Recondition Li-ion Battery Packs for 2nd Life

An investigation is presented into the application of active life balancing battery management systems to recondition inhomogeneous Li-ion battery packs and achieve homogeneity in capacity for second life. This paper proposes a life balancing objective map, which controls the state of charge references for each cell in a battery pack based on its capacity relative to other cells. The impacts of life balancing objective maps on the reconditioning time and overall pack capacity fade are considered. Moreover, the proposed approach accounts for various load and environmental effects, including depth-of-discharge, battery pack temperature, number of cycles per day, and cells’ resting time at various states of charge. The study results in a battery pack with convergent capacities achieved in minimal time, while curtailing overall capacity fade. Simulation results for a battery pack with sixteen series connected 75 Ah Kokam NMC cells with 3.6% initial capacity imbalance are presented, indicating a reconditioning time of 1.34 months with a final capacity imbalance of 0.1% and an overall capacity fade of 0.005%.

47 OTHER INSTRUMENTATION↗

An Ultra-Stable Reference Electrode as In-Situ System Diagnostics Tool for Redox Flow Batteries - CRADA 634 (Abstract)

The objective of the proposed project is to develop and demonstrate an ultra-stable reference electrode (RE) technology as an in-situ system diagnostics tool integrated in kW scaled commercial vanadium redox flow battery (VRFB) stacks for long-duration energy storage (LDES) applications and to advance its commercialization, with expected cell reliability enhancement in stack life increase of 6-10 % and levelized cost of storage (LCOS) reduction of 5-8 %. In this project, PNNL will partner with Stryten Energy LLC, with a total budget of $250K and 50% cost share for one year.

25 ENERGY STORAGE↗

The Application of Quaternions to Strap-Down MEMS Sensor Data

We describe the mathematical transformations required to convert the data recorded using typical 6-axis microelectromechanical systems (MEMS) sensor packages (3-axis rate gyroscopes and 3-axis accelerometers) when attached to an object undergoing a short duration loading event, such as blast loading, where inertial data alone are sufficient to track the object motion. By using the quaternion description, the complex object rotations and displacements that typically occur are translated into the more convenient earth frame of reference. An illustrative example is presented where a large and heavy object was thrown by the action of a very strong air blast in a complex manner. The data conversion process yielded an accurate animation of the object’s subsequent motion.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Black hole–neutron star mergers: The first mass gap and kilonovae

Observations of X-ray binaries indicate a dearth of compact objects in the mass range from ~2 –5 M ⊙ . The existence of this (first mass) gap has been used to discriminate between proposed engines behind core-collapse supernovae. From LIGO/Virgo observations of binary compact remnant masses, several candidate first mass gap objects, either neutron stars (NSs) or black holes (BHs), were identified during the O3 science run. Motivated by these new observations, we study the formation of BH-NS mergers in the framework of isolated classical binary evolution, using population synthesis methods to evolve large populations of binary stars (Population I and II) across cosmic time. We present results on the NS to BH mass ratios (q = M NS /M BH ) in merging systems, showing that although systems with a mass ratio as low as q = 0.02 can exist, typically BH-NS systems form with moderate mass ratios q = 0.1 –0.2. If we adopt a delayed supernova engine, we conclude that ~30% of BH-NS mergers may host at least one compact object in the first mass gap (FMG). Even allowing for uncertainties in the processes behind compact object formation, we expect the fraction of BH-NS systems ejecting mass during the merger to be small (from ~0.6 –9%). In our reference model, we assume: (i) the formation of compact objects within the FMG, (ii) natal NS/BH kicks decreased by fallback, (iii) low BH spins due to Tayler-Spruit angular momentum transport in massive stars. We find that ≲1% of BH-NS mergers will have any mass ejection and about the same percentage will produce kilonova bright enough to have a chance of being detected with a large (Subaru-class) 8 m telescope. Interestingly, all these mergers will have both a BH and an NS in the FMG.

79 ASTRONOMY AND ASTROPHYSICS↗

Progress and Technology Assessment of Melt-Cast Ceramic Waste Forms

The Savannah River National Laboratory (SRNL) conducted research from FY2011 – FY2020 to develop ceramic waste forms to treat High-Level Waste (HLW) resulting from reprocessing of commercial Used Nuclear Fuel (UNF) as part of the Department of Energy (DOE) office of Nuclear Energy (NE) Fuel Cycle Technologies (FCT) research program. The objective of the research was to develop a reference ceramic waste form and process technology needed to immobilize the combined HLW raffinate stream, including undissolved solids and soluble technetium, and potentially the TRU waste stream resulting from reprocessing processes. This report compiles the relevant literature produced under, and pertinent to, the program objectives and provides a perspective on the technology development as well as prospects for future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Object Proxy Patterns for Accelerating Distributed Applications

Workflow and serverless frameworks have empowered new approaches to distributed application design by abstracting compute resources. However, their typically limited or one-size-fits-all support for advanced data flow patterns leaves optimization to the application programmer—optimization that becomes more difficult as data become larger. The transparent object proxy, which provides wide-area references that can resolve to data regardless of location, has been demonstrated as an effective low-level building block in such situations. Here we propose three high-level proxy-based programming patterns—distributed futures, streaming, and ownership—that make the power of the proxy pattern usable for more complex and dynamic distributed program structures. We motivate these patterns via careful review of application requirements and describe implementations of each pattern. As a result, we evaluate our implementations through a suite of benchmarks and by applying them in three meaningful scientific applications, in which we demonstrate substantial improvements in runtime, throughput, and memory usage.

Distributed Computing↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR)-5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory in support of the development and qualification of tri-structural isotropic low-enriched fuel for use in high-temperature gas-cooled reactors. The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR-5/6/7 experiment were to: • Irradiate reference-design fuel particles to support fuel qualification. • Establish operating margins for the fuel, beyond normal operating conditions. • Provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective was to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR-5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast flux trap of the ATR with a planned duration of 500 effective full-power days. The northeast flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B–168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full-power days. Final burnup values, on a per-compact basis, ranged from 5.66 to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples had failed (the bottom three capsules lost all thermocouples). During the first five cycles (162B – 165A), the fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8–10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to a maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented a fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particles failed in Capsule 3, which was considered possible because the experiment was designed to operate beyond the high-temperature gas-cooled reactor normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to the lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, Cycle 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on the absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR) 5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of the development and qualification of tri-structural isotropic (TRISO) low enriched fuel for use in high-temperature gas-cooled reactors (HTGR). The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR 5/6/7 experiment were to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel, beyond normal operating conditions. 3. Provide irradiated-fuel performance data and irradiated-fuel samples for post irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective is to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast (NE) flux trap of the ATR with a planned duration of 500 effective full-power days (EFPDs). The NE flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B?168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 EFPDs. Final burnup values, on a per-compact basis, ranged from 5.66% to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples (TC) had failed (the bottom three capsules lost all TCs). During the first five cycles (162B ? 165A), fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8?10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to the maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particle failures in Capsule 3, which was considered possible at the start of the irradiation, since the experiment was designed to operate beyond the high-temperature gas-cooled reactor (HTGR) normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Exhibit D Scope of Work and Technical Specifications MOX Rod Reduction

PROJECT/PROGRAM GOALS AND OBJECTIVES: The Los Alamos National Laboratory (LANL), here after referred to as the CONTRACTOR, plans to provide NQA-1 service and support for the disposition of PF-4 basement inventory of Areva fuel rods. These fuel rods need to be reduced in length for proper shipping and disposition. The objective of this acquisition is to enter into an agreement with a SUBCONTRACTOR that shall provide expertise, materials, input for procurement of specialized tooling to be identified, and mockups for size reduction and FS65 disposition. Handling and size reduction of the Areva rods would take place at LANL. Physical work at LANL will be performed by the CONTRACTOR’s field execution team, portions of this work will have expertise provided by the SUBCONTRACTOR. As cited below via an add alternative and supplemental site visit(s) to LANL the CONTRACTOR may request the SUBCONTRACTOR to ship the necessary transportation, handling and packaging equipment at the SUBCONTRACTOR’s location to the CONTRACTOR’s facility for size reduction activities at LANL by the CONTRACTOR’s self-perform field execution team. In addition, the SUBCONTRACTOR shall provide subject matter expertise to CONTRACTOR personnel cutting the mockup Areva Fuel Rod at LANL as a rehearsal prior to CONTRACTOR cutting the actual MOX Fuel Rod if this add alternative is exercised.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Synthetic Reference-based Transition Optimal Control of Inverter for Surge-Current-Free Rapid Interface to Grid

This article addresses the problem of the transition between objective functions in optimal control for power inverters when switching between standalone and grid-connected modes. The work proposes the use of a synthetic reference during the transition between the corresponding objective functions. Moreover, the authors aim to show that a transition function can be imposed and controlled externally from the main optimal control routine. In the end, the simulation results demonstrate the importance of properly applying the proposed strategy for a smooth transition between the operating modes with minimal surge current. These results contrast with the strategies found in the literature where the smooth transition comes with the price of a few grid cycles to sync.

Roig Greidanus, Mateo D.↗

Oak Ridge National Laboratory Technical Input for the Nuclear Regulatory Commission Review of the 2017 Edition of ASME Section III, Division 5, ‘High Temperature Reactors’

To assist the Nuclear Regulatory Commission in its decision making on endorsement of the American Society for Mechanical Engineers Boiler and Pressure Vessel Code Section III, Division 5 (2017 Edition) for development of advanced non-light water reactors, the following Division 5 portions were reviewed: Article HBB-2000 Material; Article HCB-2000 Material; Article HGB-2000 Material; Mandatory Appendix HBB-I-14 Tables and Figures; and, Nonmandatory Appendix HBB-U Guidelines for Restricted Material Specifications to Improve Performance in Certain Service Applications. In addition to the 2017 Edition, the same parts of the 2019 Edition have also been reviewed as indicated in various sections of the report. This review was conducted by a collaboration of national laboratory and private sector participants with significant industrial experience, including some heavy lifting and deep diving from Clarus Consulting, LLC., all intended to achieve an objective, independent, and practical perspective. The report provides recommendations, descriptions of the evaluation methods, and the source references for the data used. To build confidence required for endorsement of the Code, this review was conducted as a verification and validation of the above Code contents. The objective of verification is to ensure that the Code is free of error – direct or implied; contains the information needed for its use, including proper coverage of the Code-specified materials for the intended application, and completeness and adequacy of references to other portions of the Code. The objective of validation is to authenticate that the Code tabulations and graphs represent design inputs consistent with what are determined using rules and methods specified by the Code. The authentication process used data that were assembled and/or generated independent of Code development, while the methods of analysis followed Code-specified methods where appropriate. The designated portions for this review cover the five alloys codified for high temperature reactor applications in Division 5, i.e. 316 SS, 304 SS, 800H, 2¼Cr-1Mo, and 9Cr-1Mo-V, regarding their general requirements, permitted specifications and design stress intensity values for pressure-retaining applications, deterioration in service, fatigue acceptance test, permissible weld materials, tensile and yield strength, expected minimum stress-to-rupture values (including for Alloy 718), weld stress rupture factors, permissible materials for bolting use, and restricted specifications in certain service applications. Additionally, stress intensity values for bolting materials including 316 SS, 304 SS and alloy 718 were reviewed. Analysis and discussion are also provided on contents outside of these designated Code portions where it was deemed relevant and necessary to develop a technically sound understanding of issues relating to the designated portions. Due to unavailability of sufficient test data on welds during the review period, the weld stress rupture factors in Tables HBB-I-10.14A to E, which cover a total of ten tables for the five alloys welded with twenty-eight different weld metals (some with similar properties), have been deferred to a future review effort. The review identified mainly two types of issues. The first type includes instances where the Code is found factually incomplete or incorrect, such as obsolete materials specifications listings, missing tabulation of stresses for bolting. Changes to the Code are recommended in these cases. The second type of issue includes instances where the Code tabulations and graphs are found to be less conservative than the review analysis results. In these cases, recommendations are made for further review and consideration where the difference in conservatism exceeds 10%, which is our threshold for questioning technical adequacy, meriting a risk assessment by the Nuclear Regulatory Commission and/or reactor designers. It is noted that this effort has been executed using all available data and established methods of analysis, including methods and criteria specified and used by the Code. As such, the findings that are presented in quantitative detail, in a format for convenient comparison with the Code, and with identification of where further review is recommended, should provide a sound technical basis for decisions about quantifying the implications of the reduced design margins and technical adequacy/inadequacy to form a basis for conditioning specific Code tabulation values on endorsement. Recommendations for specific changes to the Code, however, entail design conservatism considerations beyond the scope of this review effort, and are not made in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Exponential Decay in the Sensitivity Analysis of Nonlinear Dynamic Programming

In this report, we study the sensitivity of discrete-time dynamic programs with nonlinear dynamics and objective to perturbations in the initial conditions and reference parameters. Under uniform controllability and boundedness assumptions for the problem data, we prove that the directional derivative of the optimal state and control at time $k$, $x^*_k$, and $u^*_k$, with respect to the reference signal at time $i$, $d_i$, will have exponential decay in terms of $|k-i|$ with a decay rate $\rho$ independent of the temporal horizon length. The key technical step is to prove that a version of the convexification approach proposed by Verschueren et al. can be applied to the KKT conditions and results in a convex quadratic program with uniformly bounded data. In turn, Riccati techniques can be further employed to obtain the sensitivity result, borne from the observation that the directional derivatives are solutions of quadratic programs with structure similar to the KKT conditions themselves. We validate our findings with numerical experiments on a small nonlinear, nonconvex, dynamic program.

97 MATHEMATICS AND COMPUTING↗

Improved Transient Stability Analysis of Multi-loop Droop-Controlled Grid Forming Inverters with Current Reference Limiter

Grid-forming control is regarded as a promising technology for achieving high levels of renewable energy integration in future power grids. To fulfill this role, grid-forming devices is expected to possess fault ride through capability. This paper focuses on the transient stability of a droop control-based grid-forming inverter that utilizes current reference saturation as a current limiting strategy. The objective of this work is to investigate the fault recovery process of the grid-forming inverter and analyze the criterion for transitioning the inverter out of the current limiting mode. The theoretical analysis in this study is validated through time-domain simulations, which compare the results obtained using the circuit current limiting method and the d-axis priority-based current limiting method. Various operational conditions are considered to comprehensively evaluate the performance of the grid-forming inverter during a three-phase short circuit scenario. The simulation results confirm the effectiveness of the proposed theoretical approach.

Lyu, Xue↗

Automatic Search of Cataclysmic Variables Based on LightGBM in LAMOST-DR7

The search for special and rare celestial objects has always played an important role in astronomy. Cataclysmic Variables (CVs) are special and rare binary systems with accretion disks. Most CVs are in the quiescent period, and their spectra have the emission lines of Balmer series, HeI, and HeII. A few CVs in the outburst period have the absorption lines of Balmer series. Owing to the scarcity of numbers, expanding the spectral data of CVs is of positive significance for studying the formation of accretion disks and the evolution of binary star system models. At present, the research for astronomical spectra has entered the era of Big Data. The Large Sky Area Multi-Object Fiber Spectroscopy Telescope (LAMOST) has produced more than tens of millions of spectral data. the latest released LAMOST-DR7 includes 10.6 million low-resolution spectral data in 4926 sky regions, providing ideal data support for searching CV candidates. To process and analyze the massive amounts of spectral data, this study employed the Light Gradient Boosting Machine (LightGBM) algorithm, which is based on the ensemble tree model to automatically conduct the search in LAMOST-DR7. Finally, 225 CV candidates were found and four new CV candidates were verified by SIMBAD and published catalogs. This study also built the Gradient Boosting Decision Tree (GBDT), Adaptive Boosting (AdaBoost), and eXtreme Gradient Boosting (XGBoost) models and used Accuracy, Precision, Recall, the F1-score, and the ROC curve to compare the four models comprehensively. Experimental results showed that LightGBM is more efficient. The search for CVs based on LightGBM not only enriches the existing CV spectral library, but also provides a reference for the data mining of other rare celestial objects in massive spectral data.

79 ASTRONOMY AND ASTROPHYSICS↗

Accumulation of trace elements in soil and fauna within a site historically contaminated with coal combustion residues

Legacy contaminants tied to energy production are a worldwide concern. Coal combustion residues (CCRs) contain high concentrations of potentially toxic trace elements such as arsenic (As), mercury (Hg), and selenium (Se), which can persist for decades after initial contamination. Coal combustion residue disposal methods, including aquatic settling basins and landfills, can facilitate environmental exposure through intentional and accidental releases. Wildlife exposed to CCRs can experience numerous deleterious effects, such as on development, reproduction, and survival. In the current study, we quantified and compared concentrations of As, Hg, Se, and strontium (Sr) within soils and target fauna (three vertebrate and three invertebrate taxa) from a CCR-contaminated site and a reference site within the U.S. Department of Energy’s Savannah River Site, South Carolina, United States. Our objectives were to (1) compare current concentrations of tested elements in soil and resident fauna to levels from our reference site, (2) assess natural attenuation of elements in soils by comparing current concentrations to historic levels, and (3) evaluate the biomagnification potential of the elements measured via body burden and trophic position correlations among fauna. Here, element concentrations were higher in contaminated soils than reference soils; however, concentrations in 2022 were unchanged from concentrations measured in 2003, suggesting no natural attenuation of tested elements. Additionally, target fauna had elevated As, Se, and Sr levels in comparison to reference samples. A positive correlation was observed in southern toads between Sr concentrations and trophic position, as assessed by nitrogen stable isotope ratios, suggesting potential for biomagnification of Sr within our study system. Collectively, our results demonstrate that legacy contaminants are still present and bioaccumulate in a diversity of taxa in a CCR-contaminated site that has not received effluents in more than 50 years, suggesting monitoring programs in CCR-contaminated sites should be maintained long term in the absence of remediation.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

An exact inversion method for extracting orientation ordering by small-angle scattering

Here, we outline a nonparametric inversion strategy for determining the orientation distribution function (ODF) of sheared interacting rods using small-angle scattering techniques. With the presence of direct inter-rod interaction and fluid mechanical forces, the scattering spectra are no longer characterized by the azimuthal symmetry in the coordinates defined by the principal directions of simple shear conditions, which severely compounds the reconstruction of ODFs based on currently available methods developed for dilute systems. Using a real spherical harmonic expansion scheme, the real-space ODFs are uniquely determined from the anisotropic scattering spectra and their numerical accuracy is verified computationally. Our method can be generalized to extract ODFs of uniaxially anisotropic objects under different flow conditions in a properly transformed reference frame with suitable basis vectors.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Computational Modeling of CO2 Capture By Novel PIM-RU in a Fluidized Bed Riser

The interest in carbon capture, storage, and utilization (CCUS) has increased significantly in the past few decades as it can help mitigate the threat of global warming caused by substantial increase in CO2 emissions due to anthropogenic activities. Although several CO2 capture technologies have been developed, porous solid sorbents, which adsorb CO2 by physisorption, are considered promising candidates for post-combustion CO2 capture because of the easier recovery of adsorbed CO2 and high material stability. Some prominent types of porous solid sorbents are metal-organic frameworks (MOFs), Zeolite, mesoporous silica, and polymer-based sorbents (e.g., polymers with intrinsic microporosity or PIM). Oak Ridge National Laboratory (ORNL) recently developed a novel PIM-based sorbent, referred to here as PIM-RU. The main objective of this work is to investigate the CO2 capture performance of this sorbent using computational fluid dynamics (CFD). While process configuration and reactor design are open questions, a fluidized bed riser was selected as the contactor type for this study.

Aziz, Hossain↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗