Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site closure requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

System Model Calculations for the Active Trenches of the Low-Level Burial Grounds, Hanford Site, Washington

Two lined trenches (Trench 31 and 34) located within the 200 West Low-Level Burial Ground (LLBG) area of the U.S. Department of Energy’s (DOE) Hanford Site are designated for permanent disposal of low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW). In accordance with DOE O 435.1, Radioactive Waste Management, radioactive waste shall be managed and disposed in a manner that is protective of worker, public health and safety, and the environment. DOE O 435.1 requires a site-specific radiological performance assessment (PA) that includes calculations of potential releases and subsequent doses to members of the public for a period of 1,000 years after closure of a low-level waste (LLW) disposal facility. The purpose of this environmental calculation file (ECF) is to document the various dose calculations performed to support DOE’s LLBG PA. The dose assessments are performed to evaluate the potential exposure of an all-pathway representative person to radionuclide contaminants of potential concern (COPCs) that may be released from the LLBG Trenches 31 and 34 to the point of calculation (POC) located at the outer edge of a 100 m buffer zone surrounding the trench boundary. This ECF uses inputs from other ECFs and their associated model package reports (MPRs) supporting the LLBG PA. The five major objectives of this ECF are to present the results of the following: (1) Deterministic dose assessments for both groundwater and atmospheric exposure scenarios; (2) Radon-222 (Rn-222) flux emanating at the surface from the disposed wastes; (3) Uncertainty analyses of the groundwater pathway annual dose due to uncertainty in input parameters; (4) Sensitivity analyses of the input parameters that could potentially impact the fate and transport of the contaminants and doses; (5) Doses arising from inadvertent intruder exposure scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

KOMPASS-II: Compaction of Crushed salt for Safe Containment – Phase 2

Long-term stable sealing elements are a basic component in the safety concept for a possible repository for heat-emitting radioactive waste in rock salt. The sealing elements will be part of the closure concept for drifts and shafts. They will be made from a welldefinied crushed salt in employ a specific manufacturing process. The use of crushed salt as geotechnical barrier as required by the German Site Selection Act from 2017 /STA 17/ represents a paradigm change in the safety function of crushed salt, since this material was formerly only considered as stabilizing backfill for the host rock. The demonstration of the long-term stability and impermeability of crushed salt is crucial for its use as a geotechnical barrier. The KOMPASS-II project, is a follow-up of the KOMPASS-I project and continues the work with focus on improving the understanding of the thermal-hydraulic-mechanical (THM) coupled processes in crushed salt compaction with the objective to enhance the scientific competence for using crushed salt for the long-term isolation of high-level nuclear waste within rock salt repositories. The project strives for an adequate characterization of the compaction process and the essential influencing parameters, as well as a robust and reliable long-term prognosis using validated constitutive models. For this purpose, experimental studies on long-term compaction tests are combined with microstructural investigations and numerical modeling. The long-term compaction tests in this project focused on the effect of mean stress, deviatoric stress and temperature on the compaction behavior of crushed salt. A laboratory benchmark was performed identifying a variability in compaction behavior. Microstructural investigations were executed with the objective to characterize the influence of pre-compaction procedure, humidity content and grain size/grain size distribution on the overall compaction process of crushed salt with respect to the deformation mechanisms. The created database was used for benchmark calculations aiming for improvement and optimization of a large number of constitutive models available for crushed salt. The models were calibrated, and the improvement process was made visible applying the virtual demonstrator.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Analytical Services for the Hanford Site Radionuclide NESHAP Program

This document is a summary of the point source analytical requirements used to demonstrate compliance for the Department of Energy (DOE) Hanford Site operations with 40 Code of Federal Regulations (CFR) Part 61, “National Emission Standards for Hazardous Air Pollutants,” (NESHAP) Subpart H, “National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities,” and the Washington Administrative Code (WAC) 246-247, “Radiation Protection – Air Emissions.” This reference collects information from multiple source documents and is not intended to create, supersede, replace or over-ride any existing contractual, DOE, federal or state statutes, regulations, compliance agreements, orders, permits, licenses or other requirements. The requirement source document governs where any difference may exist. The Hanford Mission Integration Solutions (HMIS) Environmental organization has been contracted by DOE to manage and report data collected from the sampling and monitoring of radioactive air emissions point sources, colloquially called stacks. The Environmental organization coordinates the analyses and reporting of samples collected at various facilities across the Hanford Site. These facilities operate approximately 52 stacks that require sampling, monitoring or estimating radioactive air emissions. The stacks are operated by Bechtel National, Inc. (BNI), Central Plateau Cleanup Company (CPCCo), Hanford Tank Waste Operations & Closure (H2C), Hanford Laboratory Management and Integration (HLMI), and Pacific Northwest National Laboratory (PNNL). Stack samples from CPCCo, HLMI and H2C facilities are collected by the operating contractor staff, delivered to HMIS, and then shipped to an offsite contracted laboratory for analyses. The field and laboratory sample data uploaded into the Sample Management and Analytical Results Tracking (SMART) database are used to calculate sample volumes and concentrations. Sample concentrations are evaluated for compliance with federal and state regulations, permits, and license requirements. The SMART database also calculates total curies released for sampled point sources and stacks. Point source effluent concentrations and releases are published annually in publicly available reports. The BNI and PNNL operate several DOE-Hanford Field Office (HFO) stacks subject to the requirements of 40 CFR 61, Subpart H and WAC 246-247. The concentrations, curies released and dose modeling evaluation for these stacks are included in the DOE-HFO annual radionuclide NESHAP report. The sample collection, analyses and emissions estimates for these stacks are outside the scope of HMIS contracted responsibilities and not addressed further in this document.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures, Nevada National Security Site, Nevada, Revision 0

The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CAU 572 were met. To achieve this, the following actions were performed: • Corrective action investigation (CAI) activities were performed from August 2020 through May 2023, as set forth in the SAFER Plan for CAU 572; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. • Corrective actions were completed during decontamination and demolition (D&D) and disposal activities, and were performed from August 2022 through September 2025.

54 ENVIRONMENTAL SCIENCES↗

Annual Summary Report (FY 2025) Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for fiscal year (FY) 2025 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1, Radioactive Waste Management. The ASR follows the guidance in DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Postclosure Groundwater Monitoring and Inspection Report, Central Nevada Test Area, Subsurface Corrective Action Unit 443

This report presents the groundwater monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) from the Central Nevada Test Area (CNTA), Nevada, Site, Subsurface Corrective Action Unit (CAU) 443 in Nye County, Nevada (Figure 1). The CNTA is the site of an underground nuclear test in 1968 that resulted in residual contamination near the detonation depth of 3200 feet (ft); the contamination requires long-term monitoring. Responsibility for the environmental restoration and long-term monitoring was transferred from DOE’s National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The environmental restoration and site closure process were completed in 2015 in accordance with the amended 1996 Nevada Federal Facility Agreement and Consent Order (FFACO) (State of Nevada et al. 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The Closure Report, Central Nevada Test Area, Subsurface Corrective Action, Unit 443 (DOE 2018), also called the Closure Report, originally was completed in January 2016 and revised in October 2018; it describes LM’s plan for long-term postclosure monitoring. This includes monitoring of the radioisotopes of interest and water elevations, inspecting the site and maintaining the institutional controls (ICs), evaluating and reporting data, and documenting the site’s records and data management processes (DOE 2018).

54 ENVIRONMENTAL SCIENCES↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiative Closure Experiments at a Cloud-Free Desert Site, Nevada, as Part of MISR Algorithm Validation

Radiative closure experiments involving a comparison between surface-measured spectral irradiance and the surface irradiance calculated according to a radiative transfer code at a desert site in Nevada under clear skies, yield the result that agreement between the two requires presence of an absorbing aerosol component with an imaginary refractive index equal to 0.03 and a 50:50 mix by optical depth of small and large particles with log-normal size distributions.

MISR experiment field observations calibration dat↗

National Wind Tunnel Complex (NWTC)

The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.

Source record↗

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 577 AREA 5 CHROMIUM CONTAINING WASTE DISPOSAL CELLS

Report will be submitted to the state of Nevada Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019. The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste cells and documentation of that closure through FFACO-type documents (NDEP 2019). As stipulated in Paragraph 5C of the SA, a Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) was prepared that identified and evaluated risks and corrective action alternatives (CAAs) for CAU 577, provided the plan for implementing the recommended CAA, and presented the post-closure plan (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Southern Hemisphere Polar Infrared Radiation Experiment (SHIRE) Field Campaign Report

An extended-range atmospheric emitted radiance interferometer (AERI) instrument to be deployed to Scott Base (78 S, 166 E) in McMurdo Sound, Antarctica for the purpose of synergizing with the National Aeronautics and Space Administration (NASA) Polar Radiant Energy in the Far-InfraRed Experiment (PREFIRE) satellite mission (https://prefire.ssec.wisc.edu/), examining the closure of atmospheric thermal emission, and providing validation for PREFIRE. The PREFIRE mission is the first satellite mission to map Earth’s spectrally resolved thermal emission, from 5 to 50 microns, over seasonal to annual timescales. These new observations represent the beginning of an intensive examination of the nature of thermal emission from Earth (emission from both the surface and atmosphere). A primary requirement of the PREFIRE mission is to provide validation of the retrieved variables. Numerous field sites in the Arctic (such as the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) North Slope of Alaska observatory and Summit Station, Greenland) have existing instrumentation to facilitate validation, leaving an observational gap in Antarctica. Through SHIRE, we propose to establish a temporary, intensive measurement site in Antarctica to ensure that both poles are suitably represented, and benefit from this state-of-the art science. This will also allow Arctic and Antarctic atmospheric radiative states to be compared and contrasted. For SHIRE specifically, we also propose further objectives to examine the spectrally resolved thermal radiative closure of the polar atmosphere and the historical changes in Antarctic radiative forcing, using previous Antarctic field campaigns, such as the ARM West Antarctic Radiation Experiment (AWARE).

54 ENVIRONMENTAL SCIENCES↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

54 ENVIRONMENTAL SCIENCES↗

Tank 11H Low Temperature Aluminum Dissolution and Inhalation Dose Potential Analyses at Savannah River Site – 26018

Currently, there is approximately 34 million gallons of high-level radioactive tank waste in the Tank Farm at the Savannah River Site (SRS). The ultimate goal of operations at the Tank Farm is to remove the high level waste (HLW) from the tanks followed by stabilization of the waste through vitrification of the HLW into glass or grouting the decontaminated waste into saltstone. After bulk removal of the HLW consisting of sludge, saltcake, and supernatant, further efforts are made to reduce the residual waste present in the tank in order to declare preliminary cease waste removal (PCWR) signifying completion of HLW removal. These reduction efforts can include tank washing to remove soluble salts and radioisotopes and dissolution of solids including aluminum. Aluminum in the form of gibbsite and boehmite is relatively insoluble in water. Through addition of aqueous sodium hydroxide, the aluminum can be dissolved at mild temperatures. In order for the waste tank to meet closure mode requirements of the Concentration, Storage, and Transfer Facilities (CSTF), which includes the Tank Farm, Documented Safety Analysis (DSA), a component of the safety basis, the inhalation dose potential (IDP) and the radiolytic hydrogen generation rate of the stored waste must be demonstrated to be lower than their respective designated limits. These parameters are calculated from measured radiochemical analyses of isotopes that emit a high amount of radioactivity including Cs-137, Sr-90, Pu-238, Pu-239, Pu-240, Pu-241, Am-241, and Cm-244. Following the low temperature aluminum dissolution (LTAD) process, Tank 11H slurry samples were pulled from the tank and sent to Savannah River National Laboratory (SRNL) to measure the extent of aluminum dissolution, hydroxide concentration, densities of slurry and supernatant, weight percent solids analyses, and radionuclide activities. The analyses of the composite sample found that approximately 90% of the total aluminum in the slurry was dissolved, indicating successful reduction of the insoluble aluminum in the waste tank. Additionally, the weight percent insoluble solids (slurry basis) measurement of the composite sample was found to be approximately 1%, demonstrating that minimal solids still remain in the tank. Finally, the radiochemical analyses of the composite sample determined that the waste contents of the tank met the IDP and radiolytic hydrogen generation rate requirements of the CSTF DSA. These measurements have shown that the LTAD process in Tank 11H was successful in waste reduction efforts and a positive step towards declaring PCWR and tank closure at SRS.

Dekarske, John [Savannah River National Laboratory↗

International Nuclear Security Nuclear Material Accounting and Control Kit Participant Guides

You work at a facility that stores large amounts of nuclear material in varying containerizations. Management has just approved the establishment of a tamper indicating device program in order to cut down on the effort required to conduct inventories, and to enhance overall control of nuclear materials within the site boundary. You have been assigned, along with your colleagues, to conduct an initial assessment to determine the ideal TID types to be used at your facility. You will apply TIDs to a variety of apparatuses that are representative of the closure mechanisms on different containers and entry points to rooms and vaults onsite.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Testing of Crystalline Silicotitanate to Support Tank-Side Cesium Removal System Operations - 20458

The direct feed of waste from the Hanford tank farms to the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant requires an intermediate treatment step that prepares the waste for vitrification. Washington River Protection Solutions (WRPS) selected a near-tank treatment system known as the Tank-Side Cesium Removal (TSCR) system to perform the required intermediate treatment functions. The approach in the TSCR system is to filter waste supernatant with a sintered metal dead-end filter and then use a series of ion exchange columns to remove cesium; this system has several similarities to the Tank Closure Cesium Removal system that has been deployed on the Savannah River Site. The ion exchange media proposed for use is crystalline silicotitanate (CST), which is a non-elutable media with a high affinity for cesium. Because the media is non-elutable, loaded columns will be blown down with compressed air, moved into interim storage, and replaced with new columns when cesium capacity is reached. The assumed extent and rate of drying that could be achieved in the TSCR column geometry lacked confirmation by experimental data. In addition, once the columns are loaded with cesium, they generate flammable gases (primarily hydrogen) via radiolysis acting on any resident liquids, i.e., moisture, remaining in the media bed. An assessment of available information on CST concluded that gas generation data that bounds expected operational conditions were needed to support the TSCR system safety basis and planned operations. Working with WRPS, Pacific Northwest National Laboratory (PNNL) designed and conducted testing with CST media to address the need for (a) representative in-column drying data, and (b) bounding flammable gas generation data. Drying testing was performed using a full-height column with a diameter of approximately 2 inches with injected air at temperatures of 18 deg. C and 30 deg. C. Gas generation testing was conducted in an engineered bunker that allowed simultaneous irradiation of up to eight samples at a time. These two experimental approaches used at PNNL for the CST testing are summarized and the major outcomes are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗