Full Life Cycle Mach 6 Nozzle Testing at Long Duration
AETC 2022 Full Life Cycle Mach 6 Nozzle Testing at Long Duration Capability Challenge: Langley 8-Foot High Temperature Tunnel (HTT)
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
AETC 2022 Full Life Cycle Mach 6 Nozzle Testing at Long Duration Capability Challenge: Langley 8-Foot High Temperature Tunnel (HTT)
Evaluations of thermal properties and resistance to microbial growth concluded that 50% Propylene Glycol (PG)-based fluid and 50% de-ionized water mixture was desirable for use as a fluid within a vehicle s thermal control loop. However, previous testing with a commercial mixture of PG and water containing phosphate corrosion inhibitors resulted in corrosion of aluminum within the test system and instability of the test fluid. This paper describes a follow-on long duration testing and analysis of 50% Propylene Glycol (PG)-based fluid and 50% de-ionized water mixture with inorganic corrosion inhibitors used in place of phosphates. The test evaluates the long-term fluid stability and resistance to microbial and chemical changes
A long duration test is in progress for comparing various methods of attaching interconnects to solar cells for near-earth-orbit spacecraft. This JPL- and NASA-sponsored project has been cycling modules at between -80 C and + 80 C since June 1983. As of April 1984, 29,000 cycles have been completed, and the cycling is continuing. Modules include examples of parallel gap and ultrasonic welding and of soldering as fabricated by the Space and Communications Group, Hughes Aircraft Company and by Spectroblab. Evaluation of module integrity has been made at periodic intervals. No measurable degradation has been detected to date.
Ion thrusters are low thrust, high specific impulse devices with required operational lifetimes on the order of 10,000 to 100,000 hr. The NEXT ion thruster is the latest generation of ion thrusters under development. The NEXT ion thruster currently has a qualification level propellant throughput requirement of 450 kg of xenon, which corresponds to roughly 22,000 hr of operation at the highest throttling point. Currently, a NEXT engineering model ion thruster with prototype model ion optics is undergoing a long duration test to determine wear characteristics and establish propellant throughput capability. The NEXT thruster includes many improvements over previous generations of ion thrusters, but two of its component improvements have a larger effect on thruster lifetime. These include the ion optics with tighter tolerances, a masked region and better gap control, and the discharge cathode keeper material change to graphite. Data from the NEXT 2000 hr wear test, the NEXT long duration test, and further analysis is used to determine the expected lifetime of the NEXT ion thruster. This paper will review the predictions for all of the anticipated failure mechanisms. The mechanisms will include wear of the ion optics and cathode s orifice plate and keeper from the plasma, depletion of low work function material in each cathode s insert, and spalling of material in the discharge chamber leading to arcing. Based on the analysis of the NEXT ion thruster, the first failure mode for operation above a specific impulse of 2000 sec is expected to be the structural failure of the ion optics at 750 kg of propellant throughput, 1.7 times the qualification requirement. An assessment based on mission analyses for operation below a specific impulse of 2000 sec indicates that the NEXT thruster is capable of double the propellant throughput required by these missions.
Environmental tests were performed on packaging test structures designed and manufactured for ESA and CNES by 3D PLus ELectronics. The design provided circuit elements that acted as thermal, mechanical and moisture sensors. Other design features showed the compatibility of the packaging with chip passives, bare electronic dice and plastic encapsulated microcircuits packaged together in an innovative, stacked multichip module. The NASA GSFC testing augmented long duration testing on the same units carried out by ESA and CNES. The NASA portion demonstrated packaging stability over temperature, in moisture, with voltage stress, in shock and in vibration environments.
A 6U hybrid propulsion module is presented. It is designed to be used as a stage for a 6U CubeSat with a combined wet mass up to 25 kg. Hybrid rocket propulsion is utilized because it is responsive, high performance, capable of multiple burns and safe/non-toxic. Hybrid rockets employ a solid fuel and liquid or gaseous oxidizer. In this case, the fuel is PolyMethyl MethAcrylate and the oxidizer is gaseous oxygen. This propellant combination produces an Isp of greater than 300 seconds. The gaseous oxidizer simplifies the design and is used in dual mode with cold gas thrusters for attitude control. In general, hybrid propulsion is higher performance and higher thrust than conventional options considered for CubeSats (e.g. monopropellants), making it ideal for larger manuevers such as plane changes. The Attitude Control System has been sized to ensure that the CubeSat can be controlled under the thrust loads of the propulsion system. A hybrid rocket motor of this size is currently being tested at the Jet Propulsion Laboratory. Thirty-four successful tests have been completed at JPL with this propellant combination during the last 2.5 years. Current tests include long duration tests (> 95 seconds) and multiple starts (five). These tests and applicability to potential mission requirements will be discussed. Future test plans to move the motor into a vacuum facility to achieve a Technology Readiness Level of 5 by the end of September 2018 will be discussed, and an overview of the proposed TRL 5 to 6 maturity plan will also be presented.
Partial discharges cause progressive deterioration of insulating materials working in high voltage conditions and may lead ultimately to insulator failure. Experimental findings indicate that deterioration increases with the number of discharges and is consequently proportional to the magnitude and frequency of the applied voltage. In order to obtain a better understanding of the mechanisms of deterioration produced by partial discharges, instrumentation capable of individual pulse resolution is required. A new computer-based partial discharge detection system was designed and constructed to conduct long duration tests on sample capacitors. This system is capable of recording large number of pulses without dead time and producing valuable information related to amplitude, polarity, and charge content of the discharges. The operation of the system is automatic and no human supervision is required during the testing stage. Ceramic capacitors were tested at high voltage in long duration tests. The obtained results indicated that the charge content of partial discharges shift towards high levels of charge as the level of deterioration in the capacitor increases.
The NASA Glenn Research Center (GRC) has been testing high-efficiency free-piston Stirling convertors for potential use in radioisotope power systems (RPSs) since 1999. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower, Inc., and the NASA GRC. This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. As reliability is paramount to a RPS capable of providing spacecraft power for potential multi-year missions, GRC provides direct technology support to the ASRG flight project in the areas of reliability, convertor and generator testing, high-temperature materials, structures, modeling and analysis, organics, structural dynamics, electromagnetic interference (EMI), and permanent magnets to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. Convertor and generator testing is carried out in short- and long-duration tests designed to characterize convertor performance when subjected to environments intended to simulate launch and space conditions. Long duration testing is intended to baseline performance and observe any performance degradation over the life of the test. Testing involves developing support hardware that enables 24/7 unattended operation and data collection. GRC currently has 14 Stirling convertors under unattended extended operation testing, including two operating in the ASRG Engineering Unit (ASRG-EU). Test data and high-temperature support hardware are discussed for ongoing and future ASC tests with emphasis on the ASC-E and ASC-E2.
The thruster component of the Ascendant Sub-kW Transcelestial Electric Propulsion System successfully completed a propellant throughput demonstration of 72 kg Xe in a long-duration wear test planned to eventually exceed 100 kg. The thruster has been operated for a total of 5450 h over three operating conditions: 3287 h at 300 V – 1000 W, 1745 h at 500 V – 1000 W, and 417 h at 400 V – 600 W. A total of 1.2 MN-s of impulse has been demonstrated to date. Thrust, telemetry, and temperature measurements periodically recorded at four operating conditions spanning 200 – 500 V and 200 – 1000 W revealed constant performance across the full test duration. The erosion of the downstream faces of the thruster was observed to be higher than anticipated after the first 5032 h of thruster operation. This issue was traced to the application of sub-nominal magnetic field strengths throughout the LDWT, caused by an electrical-related ground-support equipment issue, which resulted in a downstream shift of the discharge plasma and enhanced erosion of the thruster’s pole covers. Nevertheless, the thruster performance and operational behaviour remained unaffected. High-fidelity plasma simulations of the erosion of the thruster’s downstream faces, supported by prior short-duration wear testing, suggest a theoretical lifetime capability of >30 kh, corresponding to propellant throughput of >450 kg Xe and a total impulse of >7 MNs, at the 300 V – 1000 W operating condition. The test was voluntarily paused after 68 kg Xe and 72 kg Xe throughput, respectively, to take these erosion measurements at the 500 V and 400 V operating conditions before the test was resumed at a different operating condition.
The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster has been the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this effort, a series of wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This work presents a summary of the results obtained during the Long Duration Wear Test (LDWT), which was the third in this wear test series. The LDWT accumulated approximately 3,570 hours of operation and had the overall goal to identify and correct design or facility issues prior to the flight qualification campaign. Thruster performance, stability, and plume properties were invariant throughout the duration of the LDWT and consistent with measurements acquired during previous HERMeS performance and wear characterizations. Average erosion rates of a carbon-carbon composite pole cover were found to match those measured with graphite to within the empirical uncertainty while the previously observed time-dependence of pole cover erosion rates was linked to changes in pole cover roughness. Azimuthal variations in keeper wear rate were observed including deposition on one of the azimuthal-facing sides of the keeper mask. This strongly suggests the presence of an azimuthal component in the process driving keeper erosion.
The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster has been the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this effort, a series of wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This work presents a summary of the results obtained during the Long Duration Wear Test (LDWT), which was the third in this wear test series. The LDWT accumulated approximately 3,570 hours of operation and had the overall goal to identify and correct design or facility issues prior to the flight qualification campaign. Thruster performance, stability, and plume properties were invariant throughout the duration of the LDWT and consistent with measurements acquired during previous HERMeS performance and wear characterizations. Average erosion rates of a carbon-carbon composite pole cover were found to match those measured with graphite to within the empirical uncertainty while the previously observed time-dependence of pole cover erosion rates was linked to changes in pole cover roughness. Azimuthal variations in keeper wear rate were observed including deposition on one of the azimuthal-facing sides of the keeper mask. This strongly suggests the presence of an azimuthal component in the process driving keeper erosion.
The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster has been the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this effort, a series of wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This work presents a summary of the results obtained during the Long Duration Wear Test (LDWT), which was the third in this wear test series. The LDWT accumulated approximately 3,570 hours of operation and had the overall goal to identify and correct design or facility issues prior to the flight qualification campaign. Thruster performance, stability, and plume properties were invariant throughout the duration of the LDWT and consistent with measurements acquired during previous HERMeS performance and wear characterizations. Average erosion rates of a carbon-carbon composite pole cover were found to match those measured with graphite to within the empirical uncertainty while the previously observed time-dependence of pole cover erosion rates was linked to changes in pole cover roughness. Azimuthal variations in keeper wear rate were observed including deposition on one of the azimuthal-facing sides of the keeper mask. This strongly suggests the presence of an azimuthal component in the process driving keeper erosion.
The system described in this report is an improved testing rig designed to enhance measurement flexibility, provide a compact oven footprint, and reduce costs for parallel oven-testing silicon carbide (SiC) integrated circuit devices at 500 °C for long durations (greater than 100 h). The testing rig design was characterized in terms of the ovens’ internal and external temperatures, system noise, and the leakage properties of their substrate/inner boards, where the devices under test (DUTs) reside. The test rig employs a National Instruments (NI) Peripheral Component Interconnect eXtensions for Instrumentation (PXI) measurement system, room-temperature pin-switching/customizing boards, and high-temperature compact ovens.
NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.
NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.
NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.
Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.
Atomic oxygen degradation is one of several major threats to the durability of spaceborne systems in low Earth orbit. Ground-based simulations are conducted to learn how to minimize the adverse effects of atomic oxygen exposure. Assessing the fluence of atomic oxygen in test chambers such as a plasma asher over long periods of time is necessary for accurate determination of atomic oxygen exposure. Currently, an atomic oxygen susceptible organic material such as Kapton is placed next to samples as a witness coupon and its mass loss is monitored and used to determine the effective atomic oxygen fluence. However, degradation of the Kapton witness coupons occurs so rapidly in plasma ashers that for any long term test many witness coupons must be used sequentially in order to keep track of the fluence. This necessitates opening vacuum to substitute fresh coupons. A passive dosimetry technique was sought to monitor atomic oxygen exposure over longer periods without the need to open the plasma asher to the atmosphere. This paper investigates the use of spectrophotometric analysis of durable IR transparent witness coupons to measure atomic oxygen exposure for longer duration testing. The method considered would be conductive to making in situ measurements of atomic oxygen fluence.