Search NASA⌕ Search

SEARCH · Search NASA

Results for “Vehicle to grid service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Cybersecurity for Electric Vehicle Charging Infrastructure

As the U.S. electrifies the transportation sector, cyberattacks targeting vehicle charging could impact several critical infrastructure sectors including power systems, manufacturing, medical services, and agriculture. This is a growing area of concern as charging stations increase power delivery capabilities and must communicate to authorize charging, sequence the charging process, and manage load (grid operators, vehicles, OEM vendors, charging network operators, etc.). The research challenges are numerous and complicated because there are many end users, stakeholders, and software and equipment vendors interests involved. Poorly implemented electric vehicle supply equipment (EVSE), electric vehicle (EV), or grid operator communication systems could be a significant risk to EV adoption because the political, social, and financial impact of cyberattacks — or public perception of such — would ripple across the industry and produce lasting effects. Unfortunately, there is currently no comprehensive EVSE cybersecurity approach and limited best practices have been adopted by the EV/EVSE industry. There is an incomplete industry understanding of the attack surface, interconnected assets, and unsecured inter faces. Comprehensive cybersecurity recommendations founded on sound research are necessary to secure EV charging infrastructure. This project provided the power, security, and automotive industry with a strong technical basis for securing this infrastructure by developing threat models, determining technology gaps, and identifying or developing effective countermeasures. Specifically, the team created a cybersecurity threat model and performed a technical risk assessment of EVSE assets across multiple manufacturers and vendors, so that automotive, charging, and utility stakeholders could better protect customers, vehicles, and power systems in the face of new cyber threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges and Opportunities in Decarbonizing the U.S. Energy System

The United States has pledged to develop a 100% carbon-free electric power system by 2035 and a net-zero-emissions economy by 2050. While important advancements have been made in the scale, performance, and economics of clean energy technologies, meeting the nation's ambitious goals will not only require their deployment at scale, but also additional innovation and effective integration of different solutions. Technological developments across the broad suite of low-carbon energy solutions are advancing rapidly, with ongoing innovations in renewable electricity generation, industrial processes, and energy-saving technologies and services, including LED lighting, induction heating, electric vehicles, energy storage solutions, and mobility as a service, plus smart devices, controls, and more efficient and smart buildings. Combining renewable electricity with biotic and abiotic pathways to produce chemicals, fuels, and materials promises to deliver new solutions. Grid-interactive buildings and communities, integrating transportation infrastructure and vehicles, are likely to be significant components of any zero-carbon energy strategy. Low-carbon industrial manufacturing will also make strong contributions to a net-zero economy. While the technical prospects appear promising, variations in the state of infrastructure, jurisdictional and social equity, pollution, economic and socio-cultural constraints, energy resource availability, and supply chain dynamics found in different locations present a range of challenges and demand customized solutions. This paper provides a critical review and offers new insights into the technical, infrastructure, analytic, political, and economic challenges faced in translating the nation's ambitious net-zero-emissions goals into feasible and reliable implementation action plans.

circular economy↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Eaton High Impact Project (Cooperative Research and Development Final Report)

The NREL team will partner with Eaton to evaluate control strategies for managing Electric bus (E-bus) fleets for grid services. NREL will develop a replicable platform for evaluating EV fleet management and quantifying benefits from grid services. The proposal will cover the technology areas of solar, energy storage, mobility, and buildings.

33 ADVANCED PROPULSION SYSTEMS↗

Understanding the Charging Flexibility of Shared Automated Electric Vehicle Fleets

The combined anticipated trends of vehicle sharing (ride-hailing), automated control, and powertrain electrification are poised to disrupt the current paradigm of predominately owner-driven gasoline vehicles with low levels of utilization. Shared, automated, electric vehicle (SAEV) fleets offer the potential for lower cost and emissions and have garnered significant interest among the research community. While promising, unmanaged operation of these fleets may lead to unintended negative consequences. One potentially unintended consequence is a high quantity of SAEVs charging during peak demand hours on the electric grid, potentially increasing the required generation capacity. This research explores the flexibility associated with charging loads demanded by SAEV fleets in response to servicing personal mobility travel demands. Travel demand is synthesized in four major United States metropolitan areas: Detroit, MI; Austin, TX; Washington, DC; and Miami, FL. In each of these four cities, SAEV simulations are performed using local projected electricity prices from the Regional Energy Deployment System (ReEDS) for a handful of supply side scenarios. A coordinated charging model is introduced that seeks to reduce fleet charging costs in response to time-varying electricity prices and increasing shares of personal trip demand served (between 1% and 25% of all metro trips served by the SAEV fleet). Simulation results are presented across various scenarios assuming fleetwide coordination to minimize charging energy costs while constrained by offering adequate mobility service to fleet customers. The results indicate that the SAEV charging load is highly flexible; energy costs were shown to reduce between 13% and 46% across a wide range of simulated scenarios. In addition, these savings were realized without detrimentally impacting the fleet’s ability to service trips.

autonomous vehicle↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Systemwide Considerations for Electrification of Transportation in Islands and Remote Locations

Electric vehicles (EVs) represent an important socio-economic development opportunity for islands and remote locations because they can lead to reduced fuel imports, electricity storage, grid services, and environmental and health benefits. This paper presents an overview of opportunities, challenges, and examples of EVs in islands and remote power systems, and is meant to provide background to researchers, utilities, energy offices, and other stakeholders interested in the impacts of electrification of transportation. The impact of uncontrolled EV charging on the electric grid operation is discussed, as well as several mitigation strategies. Of particular importance in many islands and remote systems is taking advantage of local resources by combining renewable energy and EV charging. Policy and economic issues are presented, with emphasis on the need for an overarching energy policy to guide the strategies for EVs growth. The key conclusion of this paper is that an orderly transition to EVs, one that maximizes benefits while addressing the challenges, requires careful analysis and comprehensive planning.

33 ADVANCED PROPULSION SYSTEMS↗

Impact of Transportation Electrification on the System's Dynamic Frequency Response

Transportation electrification is an integral component of the energy decarbonization transition. This paper investigates the impact of distributed energy resources (DERs), including distributed photovoltaics (DPV) and electric vehicles (EVs), in the primary frequency response of the power grid. Increasing DER adoption poses challenges to maintaining grid frequency stability. However, DERs' ability to provide fast frequency regulation services-primary frequency response (PFR) and secondary frequency response (SFR)-can be exploited to recover the frequency after an N-1 contingency event in the system. This paper also investigates the importance of a droop control strategy through dynamic models of DPV and EV to provide the primary frequency regulation services following the contingency event. A dynamic EV model, based on the PVD1 model Western Electricity Coordinating Council (WECC) introduced, has been used for the simulation. Further, DERs' primary frequency response is studied for five different cases of DER penetration levels after the system is exposed to the generator trip. Additionally, different frequency regulation capacities of EVs are analyzed. The studies show that an increment in DERs capacity providing effective PFR can improve the system frequency nadir and stabilize the frequency faster after the generation trip contingency.

distributed energy resources↗

Impact of Transportation Electrification on the System's Dynamic Frequency Response: Preprint

Transportation electrification is an integral component of the energy decarbonization transition. This paper investigates the impact of distributed energy resources (DERs), including distributed photovoltaics (DPV) and electric vehicles (EVs), in the primary frequency response of the power grid. Increasing DER adoption poses challenges to maintaining grid frequency stability. However, DERs' ability to provide fast frequency regulation services-primary frequency response (PFR) and secondary frequency response (SFR)-can be exploited to recover the frequency after an N-1 contingency event in the system. This paper also investigates the importance of a droop control strategy through dynamic models of DPV and EV to provide the primary frequency regulation services following the contingency event. A dynamic EV model, based on the PVDl model Western Electricity Coordinating Council (WECC) introduced, has been used for the simulation. Further, DERs' primary frequency response is studied for five different cases of DER penetration levels after the system is exposed to the generator trip. Additionally, different frequency regulation capacities of EVs are analyzed. The studies show that an increment in DERs capacity providing effective PFR can improve the system frequency nadir and stabilize the frequency faster after the generation trip contingency.

ADVANCED PROPULSION SYSTEMS↗

Computational Aeroelastic Analysis of Ares Crew Launch Vehicle Bi-Modal Loading

A Reynolds averaged Navier-Stokes analysis, with and without dynamic aeroelastic effects, is presented for the Ares I-X launch vehicle at transonic Mach numbers and flight Reynolds numbers for two grid resolutions and two angles of attack. The purpose of the study is to quantify the force and moment increment imparted by the sudden transition from fully separated flow around the crew module - service module junction to that of the bi-modal flow state in which only part of the flow reattaches. The bi-modal flow phenomenon is of interest to the guidance, navigation and control community because it causes a discontinuous jump in forces and moments. Computations with a rigid structure at zero zero angle of attack indicate significant increases in normal force and pitching moment. Dynamic aeroelastic computations indicate the bi-modal flow state is insensitive to vehicle flexibility due to the resulting deflections imparting only very small changes in local angle of attack. At an angle of attack of 2.5deg, the magnitude of the pitching moment increment resulting from the bi-modal state nearly triples, while occurring at a slightly lower Mach number. Significant grid induced variations between the solutions indicate that further grid refinement is warranted.

Massey, Steven J.↗

Commercial building loads providing ancillary services In PJM

The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

MacDonald, Jason↗

Plug-in Electric Vehicle Charging Response Characterization for Grid Integration: Implications for Smart Charge Management

The rapid expansion of plug-in electric vehicles (PEVs) has created a unique challenge for electrical grids due to their significant power demand. At the same time, PEVs also create a unique opportunity to ease their own burden on the power grid, as they create a growing fleet of distributed energy resources capable of providing grid services such as demand response, frequency regulation, and renewable balancing. For aggregators and grid operators to effectively integrate PEVs into grid management, it is essential to first understand and characterize how they would respond in such situations. This study examines 25 models of PEVs across 25 makes, spanning model years from 2013 to 2025, to characterize their responses to the basic controls used in vehicle-grid integration (VGI): stopping, starting, and modulating the charge rate. Each vehicle was tested in a controlled laboratory setting to evaluate its performance in response to varying the maximum allowable current via the SAE J1772 control pilot signal, as well as its response to wake-up commands outlined in SAE J1772. Results show measurable differences across vehicle makes in the accuracy, latency, and precision with which PEVs respond to changes in ampacity, as well as varying sleep and wake-up behavior. The test results show that all vehicles respond to changes in ampacity, though with varying accuracy, precision, latency, and resolution. Wake-up behavior also differs across makes and models. These findings indicate that effective grid integration strategies must account for these differences. The results provide a foundation for understanding current vehicle behavior and advancing smart-charging methods while also highlighting the need for further testing, broader standardization, and manufacturer collaboration to ensure the successful integration of PEVs into the electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Open Communication Networks on Load Frequency Control with Plug-in Electric Vehicles by Cyber-Physical Dynamic Co-Simulation: Preprint

With the increasing electrification of the transportation sector, vehicle to grid (V2G) control technologies are promising to improving system frequency stability. However, these control technologies might require non-traditional communication supports. This paper investigates the impacts of electric vehicles (EVs) V2G on power system frequency regulation considering communication variations through transmission-distribution-communication (TDC) dynamic simulation. The simulation model is built based on our previously developed open-source transmission-and-distribution (T&D) dynamic co-simulation framework. Here, we add the communication variation functions (i.e. delay and packet loss) to complete the TDC simulation framework. In the case studies, practical communication variation scenarios are considered when the system experiencing an N-1 generation trip contingency. The considered scenarios include communication delay and packet loss using both homogeneous and heterogeneous assumptions. The delay and packet loss rate are the same in all communication channels in the homogeneous case but varies in the heterogeneous case. The results show the communication delay has an obvious impact on the frequency recovery compared to the communication packet drop. The impacts of the standard deviations of communication delay time and packet drop rate are not significant. The outcomes of this work can help improve the EV frequency regulation services and provide robust and effect supports to the grid.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

EVs@Scale: NextGen Profiles EVSE Characterization 2025

As part of the U.S. DOE EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles [NGP]) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. Electric Vehicle Service Equipment (EVSE) characterization involves testing over a wide range of DC charging currents and voltages during nominal and off-nominal conditions. This testing allows for a better understanding of the impact that high-power charging will have on the electric grid. A common set of standard test plans, procedures, and data requirements were applied to the characterization in this document with minor updates and improvements. This report covers all conductive characterization activities performed between October 2024 and September 2025 on the Delta Electronics 350KW Electric Vehicle Charging System, consisting of power cabinet model EIDN-U350KTA01 and dispenser model EIDD-U350SSUUAEG-350.Key Findings include: Output regulation, Efficiency and power factor, Load management, Grid Resilience, Smart Charge Management (SCM) performance, Thermal control system performance, Multi-port simultaneous charging performance, and Selected performance comparisons with other EVSEs characterized in the NextGen Profiles project. Hot and cold temperature testing was not conducted on the Delta 350KW due to laboratory limitations. Future research could include continued testing the Delta hardware under off-nominal temperature conditions including multi-port/multi-session simultaneous charge testing, in addition to collecting data on other high-power conductive chargers to augment.

25 ENERGY STORAGE↗

Accelerating the Design of Space Vehicles

One of NASA's key goals is to increase the safety and reduce the cost of space transportation. Thus, a key element of NASA's new Integrated Space Transportation Plan is to develop new propulsion, structures, and operations for future generations of reusable launch vehicles (RLVs). As part of this effort to develop the next RLV, the ClCT Program's Computing, Networking, and Information Systems (CNIS) Project is developing and demonstrating collaborative software technologies that use the collective power of the NASA Grid to accelerate spacecraft design. One of these technologies, called AeroDB, automates the execution and monitoring of computational fluid dynamics (CFD) parameter studies on the NASA Grid. About the NASA Grid The NASA Grid, or Information Power Grid,. is being developed to leverage the distributed resources of NASA's many computers. instruments, simulators, and data storage systems. The goal is to use these combined resources to sdve difficult NASA challenges, such as iimulating the entire flight of a space vehicle from ascent to descent.To realize the vision of the NASA Grid, the CNIS Project is developing the software framework and protocols for building domain-specific environments and interfaces, new Grid services based on emerging industry standards, and advanced networking and computing testbeds to support new Grid-based applications such as AeroDB.

Laufenberg, Larry↗

Evaluating the Impact of Managed EV Charging for Reliable Operation of Bulk Power Systems with High Non-Dispatchable Generation

The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.

14 - SOLAR ENERGY↗

The Technical and Economic Potential of Hydrogen within the United States

Hydrogen markets have an opportunity to grow as its value as an energy intermediate increases. Hydrogen’s estimated serviceable consumption potential in the United States is 106 MMT/yr which is a ten-fold increase over the current market size. That opportunity is driven primarily by increased demands for metals refining, biofuel and hydrocarbon production, supplementing the natural gas system, seasonal storage for the electricity grid, and fuel cell electric vehicles. The U.S. has many renewable, nuclear, and fossil resources that each could meet that demand itself. The economic potential, which considers both costs to produce hydrogen and willingness of applications to pay for it, is 22 to 41 MMT/yr. The range is impacted by factors that impact the cost to produce including the price of natural gas and the cost of electrolyzers. It is also impacted by competition to provide the same services as hydrogen including electrification.

electrolysis↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗