Search NASA⌕ Search

SEARCH · Search NASA

Results for “capital cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Corrosion of Stainless and Carbon Steel in Aqueous Piperazine for CO2 Capture

Current obstacles that prevent commercial implementation of amine-scrubbing CO2 capture are the high costs. Reducing capital costs by appropriate selection of construction materials, which requires knowledge of material corrosion performance for the process, will improve the economic feasibility of this technology. Corrosion was evaluated in three pilot plant campaigns using aqueous piperazine with the Advanced Stripper (PZAS). 316L stainless steel (SS) experienced higher corrosion than 304 SS and 2205 duplex SS, and the corrosion rate showed strong dependence on the temperature. 304 and 2205 performed well at all locations and should be good construction materials for PZAS. Degraded PZ exacerbated 316L corrosion, and removal of PZ degradation products using a carbon adsorption bed significantly reduced corrosion. Carbon steel (CS) corrosion showed a weak temperature effect because the corrosion was more dependent on the protective siderite film. The protectiveness of the films was related to fluid velocity. Ni-based alloys corroded in PZ, and the rate increased with temperature. Corrosion of C1010 CS and SS (304, 316L, 430) was measured at absorber and water wash conditions on the bench-scale. Corrosion rate decreases with increasing PZ. 8 With more than 0.003 m PZ in solution, CS has acceptable corrosion performance. Corrosion of CS increases with increasing partial pressure of CO2, suggesting loading is another dominant parameter for carbon steel corrosion. Temperature has a less significant effect than PZ concentration and loading. CS corrosion increases with increasing flow velocity at both absorber and water wash conditions. SS had little corrosion at this lower temperature. Performance of siderite (FeCO3) protective films on CS was studied at representative stripper conditions on the bench-scale. Siderite films can deposit on the surface of CS in CO2-loaded PZ solution at temperatures >100 °C and protect CS from corrosion. The protection may fail in degraded PZ. Ethylenediamine (EDA) is one of the major contributors for the loss of film protectiveness or can be the surrogate for the effect of PZ degradation on siderite film protection. A link between protectiveness and the apparent density of siderite films was discovered. The apparent density of siderite films decreases with increasing flow velocity and decreasing CO2 loading, resulting in higher corrosion of CS.

Liu, Ching-Ting↗

Advancing Pumped Thermal Energy Storage Performance and Cost Using Silica Storage Media

Pumped Thermal Energy Storage (PTES) is an electricity storage system that is suitable for long-duration energy storage (10-1000 h) due to its low marginal cost of energy capacity. We present a techno-economic model of a PTES system that uses particle thermal energy storage. Particles have low costs and can be operated over a wide temperature range leading to increased efficiency and reduced costs compared to other PTES designs. We show how the round-trip efficiency, specific power output, capital cost, and levelized cost of storage (LCOS) depend on parameters such as the pressure ratio, heat exchanger approach temperature and pressure loss, and maximum temperature. We compare particle-PTES (P-PTES) performance to PTES which uses liquid thermal energy storage - i.e. molten salt hot storage and methanol cold storage (MS-PTES). We find that using silica particles for storage advances PTES technology: P-PTES can be operated at higher maximum temperatures than MS-PTES. Furthermore, P-PTES can achieve lower approach temperatures in the heat exchangers than MS-PTES without increasing capital costs, because P-PTES uses direct-contact heat transfer in fluidized bed heat exchangers. As a result, we find that P-PTES systems achieve higher round-trip efficiency than MS-PTES (66 % versus 57 %) and lower LCOS (e.g. 0.115 +- 0.03 $/kWhe versus 0.171 +- 0.04 $/kWhe for 10 h discharge). The low cost of particles and containment means that P-PTES can provide long-duration energy storage at low capital cost per unit energy capacity. For example, the total capital cost per unit energy reduces from 245 $/kWhe at 10 h to 38 $/kWhe at 100 h. These costs are considerably lower than MS-PTES (72 $/kWhe at 100 h) and also outcompete current and future Li-ion battery system projections (100-265 $/kWhe).

25 ENERGY STORAGE↗

Design, scaling and cost evaluations of circulating fluidized-bed systems for biomass pyrolysis

To generate updated and transparent capital cost estimates for biomass fast pyrolysis equipment, refinery fluidized catalytic cracking design and sizing principles are examined and extended to pyrolysis of woody biomass. Capital costs for the sized equipment are estimated with process-industry software. A one-dimensional flow simulation with pyrolysis kinetics is leveraged to validate the fluidization conditions and thermal energy balance. After successful sizing and a system cost estimate of $\$$2.8 M (in 2016 US$\$$) at the biorefinery scale of 1000 metric tons per day (MTD), these methods were exercised for even smaller equipment at the distributed pyrolysis scale with modifications to the process design constraints, and not directly comparable with the 1000 MTD case, arriving at capital cost estimates of $\$$1.2 M for a 500 ton/day system and $\$$0.9 M for a 200 ton/day system. Here in this work, It is noted that this work only estimates purchased equipment costs at the ±50% accuracy level; there are significant other custom factors applicable to each installation based on location, maturity, scale, complexities during installation, engineering and licensing costs, etc. that need to be added on to these estimates to derive investment costs.

09 BIOMASS FUELS↗

Cost and size estimates for an electrochemical bulk energy storage concept

Preliminary capital cost and size estimates were made for an electrochemical bulk energy storage concept. The electrochemical system considered was an electrically rechargeable flow cell with a redox couple. On the basis of preliminary capital cost estimates, size estimates, and several other important considerations, the redox-flow-cell system emerges as having great promise as a bulk energy storage system for power load leveling. The size of this system would be less than 2 percent of that of a comparable pumped hydroelectric plant. The capital cost of a 10-megawatt, 60- and 85-megawatt-hour redox system is estimated to be $190 to $330 per kilowatt. The other important features of the redox system contributing to its load leveling application are its low adverse environmental impact, its high efficiency, its apparent absence of electrochemically-related cycle life limitations, and its fast response.

Warshay, M.↗

Towards standardized nuclear reactors: Seismic isolation and the cost impact of the earthquake load case

We report nuclear energy has a key role to play in global decarbonization. Impediments to the widespread deployment of reactors are their projected high capital cost and levelized cost of energy, and time required to analyze, design, license, construct, and commission them. The earthquake load case is a key cost driver for a new build nuclear plant, because near-surface soils and seismic hazard are different at each site, requiring site-specific analysis, design, engineering, qualification, licensing, and regulatory review, essentially making every design First-of-a-Kind (FoaK). To enable deployment at the scale needed for deep decarbonization, the cost and time impact of the seismic load case must be significantly mitigated, and plants must be standardized. Seismic base isolation has been proven to considerably reduce the earthquake response of structures and equipment but has yet to be applied to a nuclear power plant in the United States, in part because the financial impacts, positive or negative, are not known. Because there are no recent non-proprietary data to characterize the influence of the seismic load case on capital cost, it is difficult to confidently quantify the financial benefits of seismic isolation. Scheme-level designs of two fundamentally different advanced reactor buildings were developed to assemble cost data on the influence of the seismic load case. Both buildings were equipped with three bespoke pieces of safety-related equipment and analyzed for incremented levels of earthquake shaking to quantify the seismic penalty on equipment, in terms of vessel weights and horizontal accelerations. Using analysis results, a questionnaire was developed and transmitted to nuclear utilities, reactor developers, engineers, and equipment suppliers to collect cost data on engineering and fabrication costs for these unique pieces of safety-class equipment. Synthesis of the cost data showed that the seismic load case significantly affects the capital cost (sum of engineering and fabrication cost) of safety-class equipment, with engineering costs being comparable to fabrication costs. Standardization of safety-class equipment is made possible by seismic isolation, that is, equipment designed for minimal seismic robustness can resist earthquake shaking at a site of much higher seismic hazard. The average reduction in the capital cost of the safety-related equipment, enabled by seismic isolation, is a factor of two for FoaK equipment and a factor of five for standardized equipment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Manufacturing Cost Analysis for PEM Electrolyzers and Perspectives for Future Cost Reduction

Electrolyzer capital costs strongly influence the total levelized cost of hydrogen production and have implications for hydrogen deployment. Current electrolyzer costs are high, and large cost reductions may be needed to achieve competitive hydrogen costs and targets. Understanding pathways for cost reduction via R&D and deployment is a critical research area for informed energy planning and enabling hydrogen use. This work presents bottom-up cost estimates of polymer electrolyte membrane (PEM) electrolyzer systems tied to design specifications and discusses perspectives for cost reduction opportunities based on ongoing research. We use a detailed manufacturing and process model for a 1 MW PEM electrolyzer stack and balance of plant (BOP) for rigorous cost estimation. This allows for robust estimates of component and manufacturing costs and examination of key cost contributors. Stack costs are dominated by material costs such as iridium and platinum catalysts, especially at high manufacturing rates; power electronics and hydrogen purification equipment are the largest contributors to BOP cost. At higher manufacturing rates, better equipment utilization could reduce stack costs significantly, and we estimate that experience and bulk purchasing will allow for cost reductions to some BOP components. Still, many well-established BOP technologies and stack material costs are less likely to see significant cost reductions at high manufacturing rates. As such, manufacturing scale is limited in how much it can reduce electrolyzer costs, and additional advances for cost reduction may be needed to achieve cost targets. It will likely take many combined strategies to achieve significant cost reductions for electrolyzers and enable low-cost hydrogen production. We can use our manufacturing cost model to quantify potential cost reductions from the considerations described above and demonstrate pathways to lower cost electrolyzers. This allows for better understanding of cost reduction strategies and enables more informed research, development, and deployment for electrolyzers.

cost↗

Reference Station Design for Heavy-Duty Vehicles

Five alternative design configurations for a heavy-duty hydrogen refueling truck stop are detailed in this work. Each of the station concepts provides fast, 5-minute, 50 kg fills of up to 4 vehicles simultaneously, with a station capacity of 4200 kg/day. Two on-site production stations using PEM electrolysis are considered: one with off-peak production of the daily capacity; and one with on-demand production of hydrogen during vehicle refueling. Three delivered liquid hydrogen station concepts are considered: one with the same, high-pressure cascade storage system for dispensing as the electrolysis supplied stations, with low-pressure vaporization of the liquid hydrogen and pressurization via a compressor; and two with on-demand pressurization: one by low-pressure vaporization and compressors; and one with a cryogenic pump and high-pressure vaporization. Design, economic, and operational considerations for each of the components needed in these station concepts is provided. Of all the station concepts, the delivered liquid station with a low-pressure vaporizer and a cascade dispensing system has the lowest capital costs and equipment footprint, but the second highest operating costs primarily due to high costs for liquid hydrogen delivery. The lowest operating cost station is that with on-site production via PEM electrolysis at off-peak hours with a cascade delivery system. The low-pressure buffer storage system and electrolyzers have a large footprint and considerable capital costs, but could result in a low total cost of ownership, depending on the design timeline. The liquid hydrogen station with a cryo-pump has moderate capital costs, the lowest operating costs of the three delivered hydrogen stations, and the same small equipment footprint as the delivered liquid, cascade dispensing system. As cryogenic pumping technology improves and the capital costs for these pumps decreases, this station concept will become even more favorable. Three-dimensional renderings of the five station concepts provide station designers with a starting point for the development of heavy-duty refueling stations.

08 HYDROGEN↗

Performance and Cost Potential for Direct-Fired Supercritical CO2 Natural Gas Power Plants

Direct-fired supercritical CO2 (sCO2) power cycles are being explored as an attractive alternative to natural gas combined cycle (NGCC) plants with carbon capture and storage (CCS). Therefore, understanding their performance and cost potential is important for the commercialization of the technology. This study presents the techno-economic optimization results of natural gas-fired, utility-scale power plants based on the direct sCO2 power cycle, which are lacking in public literature. To identify the optimum plant configuration, the study considered multiple cases with varying levels of thermal integration with the plant air separation unit (ASU). Several design variables for each power cycle configuration were identified and optimized to minimize the levelized cost of electricity (LCOE) for each case. The optimization design variables include the sCO2 cooler outlet temperatures, recuperator approach temperatures, and pressure drops. High fidelity models for recuperators, coolers, and turbines were developed and used to capture the impact of design variables on plant efficiency and capital costs. The optimization was conducted using a combination of manual sensitivity analyses and automated derivative-free optimization algorithms available under NETL’s Framework for Optimization and Quantification of Uncertainty and Sensitivity platform. The optimized direct sCO2 power plants offered similar or slightly higher plant efficiencies than the reference NGCC plants based on the F-class gas turbine with CCS. The LCOE of the optimized direct sCO2 plants is 13 to 17% higher than the reference NGCC plants with CCS due to high capital costs associated with the ASU and sCO2 power block, though there is significant room for improvement due to the high uncertainty in component capital costs for these new plants. Recuperators make up over 50% of the sCO2 power block costs. Consequently, any research and development efforts to reduce the recuperator capital costs will benefit the technology’s commercialization. The study also presents preliminary results showing the impact of co-firing landfill gas and natural gas on plant efficiency, LCOE, and CO2 emissions.

Pidaparti, Sandeep↗

Performance and Cost Potential for Direct-Fired Supercritical CO2 Natural Gas Power Plants

Direct-fired supercritical CO2 (sCO2) power cycles are being explored as an attractive alternative to natural gas combined cycle (NGCC) plants with carbon capture and storage (CCS). Therefore, understanding their performance and cost potential is important for the commercialization of the technology. This study presents the techno-economic optimization results of natural gas-fired, utility-scale power plants based on the direct sCO2 power cycle, which are lacking in public literature. To identify the optimum plant configuration, the study considered multiple cases with varying levels of thermal integration with the plant air separation unit (ASU). Several design variables for each power cycle configuration were identified and optimized to minimize the levelized cost of electricity (LCOE) for each case. The optimization design variables include the sCO2 cooler outlet temperatures, recuperator approach temperatures, and pressure drops. High fidelity models for recuperators, coolers, and turbines were developed and used to capture the impact of design variables on plant efficiency and capital costs. The optimization was conducted using a combination of manual sensitivity analyses and automated derivative-free optimization algorithms available under NETL’s Framework for Optimization and Quantification of Uncertainty and Sensitivity platform. The optimized direct sCO2 power plants offered similar or slightly higher plant efficiencies than the reference NGCC plants based on the F-class gas turbine with CCS. The LCOE of the optimized direct sCO2 plants is 13 to 17% higher than the reference NGCC plants with CCS due to high capital costs associated with the ASU and sCO2 power block, though there is significant room for improvement due to the high uncertainty in component capital costs for these new plants. Recuperators make up over 50% of the sCO2 power block costs. Consequently, any research and development efforts to reduce the recuperator capital costs will benefit the technology’s commercialization. The study also presents preliminary results showing the impact of co-firing landfill gas and natural gas on plant efficiency, LCOE, and CO2 emissions.

Pidaparti, Sandeep↗

Design optimization of an additively manufactured prototype recuperator for supercritical CO 2 power cycles

Supercritical CO 2 (sCO 2 ) power cycles are being developed due to their potential for high efficiency and reduced capital cost. It is necessary that these recuperators operate at high pressures and temperatures, up to 30 MPa and 900 K, with effectiveness values > 95% and pressure drops <1% to achieve high cycle efficiencies. Moreover, it is also necessary to have reasonable cost recuperators to control the capital costs of the sCO 2 power cycles. In this study, a Plate Pin-Fin (PPF) heat exchanger has been proposed as an sCO 2 recuperator. This preliminary recuperator design leverages capabilities enabled by additive manufacturing. Although the PPF design has characteristics similar to those of a plate heat exchanger, small diameter and relatively long fins are used to increase surface area, enhance heat transfer, and provide structural support for the partition plates that separate the fluid streams. Existing correlations for heat transfer and pressure drop were adapted for the PPF heat exchanger. These correlations were implemented in a 1D analytical model and used for the optimization of a 5-kW th high temperature recuperator for an indirect sCO 2 cycle by varying the design parameters to minimize the quantity of material required. A 3D conjugate heat transfer numerical simulations were conducted to validate the heat transfer and pressure loss correlations. A steepest descent method was used to minimize heat exchanger mass for a 5-kW prototype recuperator subject to a maximum specified pressure drop. Additionally, the design analysis indicated that an optimum PPF recuperator would be attained for the minimum allowable pin transverse spacing, minimum pin width, minimum pin height and near maximum cell aspect ratio. Moreover, at a low material requirement of 0.216 kg/kW and a pressure drop, which is almost five times lower than the allowable pressure drop design target, the optimized PPF heat exchanger has the high potential to be an alternative to a printed circuit heat exchanger, which is a conservative design basis for the current state-of-the-art sCO 2 recuperators.

42 ENGINEERING↗

An economic analysis of the role of materials, system engineering, and performance in electrochemical carbon dioxide conversion to formate

The development of technologies that utilize carbon dioxide is important to mitigating climate change. The electrochemical reduction of carbon dioxide is one technology that can utilize greenhouse gasses that would be otherwise be emitted to the atmosphere by producing chemicals and fuels from carbon dioxide and electricity. Significant progress has been made in the experimental performance of carbon dioxide reduction systems with novel catalyst designs, new materials, and systems engineering; however, no work has linked such changes in stack design and materials to capital costs for the stack itself. In this study, we present an analysis that accounts for and analyzes the impacts of alternative materials and system architectures on manufactured costs of carbon dioxide reduction stacks, thus providing a framework to understand exactly how these advances impact the at-scale capital costs of these systems. Specifically, we consider the impact that the addition of a catholyte buffer layer has on an electrolyzer reducing carbon dioxide to formate, finding that the cost of manufacturing this part only increases stack costs by about $30/m 2 at high manufacturing rates, while previous work finds that this part improves system performance. This work shows that the links between system performance, materials, and costs are nonlinear, and that achieving low-cost scalability requires optimization of not just performance parameters but also the use of low-cost and highly scalable materials. These results bridge experimental and techno-economic analysis of processes for carbon dioxide reduction, informing researchers by providing a quantifiable estimate of the impact of advances in electrochemical carbon dioxide reduction technology on manufactured stack capital costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Seismic Isolation of Major Advanced Reactor Systems for Economic Improvement and Safety Assurance

Advanced reactor concepts currently under development in the United States [e.g., the High-Temperature Gas Reactor (HTGR) of X-Energy and the Molten Chloride Fast Reactor (MCFR) of TerraPower] are striving to improve the economics of nuclear power primarily by using passively and ‘walk-away’ safe technologies in the reactor. The recently published report, ‘Future of Nuclear Energy in a Carbon-Constrained World’ by the Massachusetts Institute of Technology Energy Institute (MIT EI) has shown that a significant contributor to the capital cost of NPPs is the ‘civil works’ i.e., the construction of the balance of plant (BoP: all SSCs except those involved in power generation, e.g., reactor vessel) such as the buildings, containment dome, foundation, etc., which amount to almost half of the overnight capital cost. The report suggests that using advanced construction technologies such as seismic isolation and high-performance concrete to significantly reduce the capital costs of advanced reactors. This report demonstrates the application of two cost-cutting solutions on advanced reactor designs that are currently under development. These solutions include, (1) seismic base isolation, and (2) risk- and cost-based seismic design optimization including seismic isolation of individual components.

42 ENGINEERING↗

Scenarios of Nuclear Energy Use in the United States for the 21st Century

The uncertainty in the cost of nuclear energy coinciding with efforts to address climate change are contributing to the uncertainty in the future role of nuclear energy in the US electricity system and the response to addressing global climate change. Sensitivity cases of alternative nuclear capital costs, ranging from 2600 to 6600 $\$ $/kW, were investigated with scenarios of alternative carbon mitigation policies, including 50, 100, and 150 $\$ $/tCO 2 carbon tax cases and economy-wide net-zero goals by 2050, 2060, and 2070 for the US. The resulting US nuclear power capacity ranged from 130 to 240 GW in 2050 and 90 to 450 GW in 2100 from nuclear cost sensitivity cases without carbon mitigation policies. Imposing policies to achieve the decarbonization of electricity and net-zero emission goals increased the range of nuclear power capacity from 190 to 460 GW in 2050 and 210 to 850 GW by 2100, where the range is from the low and high nuclear cost cases. Carbon penalties beyond 100 $\$ $/tCO 2 had a diminishing role on the expansion of nuclear power as the electricity sector becomes fully decarbonized. The 50 $\$ $/tCO 2 tax had the nuclear capital cost equivalency of 1000 $\$ $/kW reduction, while the 100 $\$ $/tCO 2 tax had the equivalency of 2000 $\$ $/kW reduction. Net-zero goals increased the contribution of nuclear power due to the increase in total electricity demand, but the delay in the timing of net-zero did not significantly affect the role of nuclear in the long-term. All net-zero goals were similar in their energy system impact with resulting carbon tax levels reaching 300 $\$ $/tCO 2 . Electricity is fully decarbonized in the net-zero scenarios and carbon pricing beyond 100 to 150 $\$ $/tCO 2 had little influence on the additional deployment of nuclear power. Regardless of the carbon policy, however, nuclear capital cost reductions had a clear and pronounced impact on the expanded deployment of nuclear power under all scenarios.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Highly Efficient Magnetocaloric Natural Gas Liquefaction (Final Report)

Over the twelve-month project the following achievements were accomplished: • Liquefication of methane as primary component of natural gas was accomplished with a magnetocaloric liquefier (MCL) prototype. This was the first time an MCL was used to liquefy methane. • Improved MCL designs were completed. • Cooling to 135 K from room temperature was achieved for the first time in a single MCL stage with dual, reciprocating four-layer regenerators. • Techno-economic analysis for a multi-stage 5 tonne/day magnetocaloric liquefier was completed. The detailed thermodynamic analysis of this MCL design showed a figure of merit (FOM) of 0.6 was achievable. This is a ~2x improvement over current state of the art. • Cost of an efficient 5 tonne/day LNG multi-stage liquefier was projected to be ~$\$$3.1 MM for the 5 tonne/day MCL with achievable design assumptions. • Market study of U.S. merchant LNG demand by energy sector was completed showing that at beginning of 2019, total use was ~2.5 million gallons/day primarily in three sectors that was filled by ~20 small companies in the merchant LNG supply business producing ~2.3 million gpd. These data exclude LNG produced at dedicated peak shaving and large export plants. • Business case for MCL technology based on LNG market study was completed showing the high FOM feature of MCL reduces cost of plant power, and lower capital cost reduces debt repayment and plant depreciation operating expenses. However, today’s demand for U.S. merchant LNG in most sectors is satisfied with conventional technology. Further, with today’s extremely low natural gas (NG) feedstock costs (e.g., ~$\$$1.8/MMBtu), the cost of fuel for NG gensets and for LNG feedstock is already very low. Therefore, possible new merchant LNG liquefier plant developers anticipating demand growth in the transportation, industrial, and electricity generation sectors do not obtain sufficient cost benefits to adopt new, commercially unproven MCL technology. • Other market factors such as remoteness from existing NG pipelines, or unfilled or unsatisfied applications such as boil-off gas re-liquefaction in LNG vessels, or policy factors such as some form of emissions-related fees may make lower capital costs and higher FOM of MCL technology attractive for new small-scale (~50 tonne/day) LNG plants. Two potentially attractive niche markets for MCL technology were identified: i) re-liquefaction of boil-off gas from large LNG transport vessels where severe transport conditions are problematic for conventional technology; and ii) providing LNG in distributed-scale plants that eliminate road transport costs to meet diverse, smaller-scale, distributed LNG bunkering fuel demands. By eliminating significant cryogenic tanker delivery costs and create an attractive cost-savings benefit with small-scale MCL plants.

03 NATURAL GAS↗

Decarbonization of the Electric Power Sector and Implications for Low-Cost Hydrogen Production from Water Electrolysis

Increasing development of wind and solar generation in the power sector can create economic opportunities for the deployment of water electrolyzers that produce hydrogen. Temporal variation in the marginal cost of energy in future decarbonized grids can make it favorable for electrolyzers to dispatchably ramp hydrogen production up and down in response to low- and high-cost times. Using this strategy, low-cost hydrogen production is enabled by electrolyzers that are low-capital cost and tolerant to frequent on/off cycling. Ramping down hydrogen production to a designated turndown ratio can avoid performance degradation caused by on/off cycling by not shutting the electrolyzer completely off. This comes with a slight cost penalty which can be minimized if the turndown ratio is low (i.e., the system ramps down hydrogen production to close to zero). These results suggest that electrolyzers integrated into future power systems are likely to benefit from the ability to ramp operation up and down quickly and operate in a standby mode. This analysis forms a basis for comparative tradeoffs between electrolyzer capital cost, operating strategy, and system durability and demonstrates the importance of considering all three factors in technoeconomic analysis.

capital cost↗