Search NASA⌕ Search

SEARCH · Search NASA

Results for “day of launch processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Position paper on the potential of inadvertent weather modification of the Florida Peninsula resulting from neutralization of space shuttle solid rocket booster exhaust clouds

A concept of injecting compounds into the exhaust cloud was proposed to neutralize the acidic nature of the low-level stabilized ground cloud (SGC) was studied. The potential Inadvertent Weather Modification caused by exhaust cloud characteristics from three hours to seven days after launch was studied. Possible effects of the neutralized SGC in warm and cloud precipitation processes were discussed. Based on a detailed climatology of the Florida Peninsula, the risk for weather modification under a variety of weather situations was assessed.

Bollay, E.↗

STS utilization planning

The paper shows how NASA plans to utilize the Shuttle to carry a wide variety of payloads. Topics covered include: Shuttle Transportation System (STS) description and capabilities, payload integration and manifesting payload business today, and NASA-JSC user services. Consideration is given to the flight assignment process and flight manifest which is a listing of flights with their attendant launch dates, payload names, days on-orbit, altitude, inclination, and crew required. Additional data such as weight, center of gravity, payload-on-orbit capability, and launch windows are checked to see if the manifest is still valid. The STS traffic model is described along with the small self-contained payloads.

Bauch, G. T.↗

Wind Lidar Edge Technique Shuttle Demonstration Mission: Anemos

A NASA mission is planned to demonstrate the technology for a wind lidar. This will implement the direct detection edge technique. The Anemos instrument will fly on the Space Transportation System (STS), or shuttle, aboard a Hitchhiker bridge. The instrument is being managed by the Goddard Space Flight Center as an in-house build, with science leadership from the GSFC Laboratory for Atmospheres, Mesoscale Atmospheric Processes Branch. During a roughly ten-day mission, the instrument will self calibrate and adjust for launch induced mis-alignments, and perform a campaign of measurements of tropospheric winds. The mission is planned for early 2001. The instrument is being developed under the auspices of NASA's New Millennium Program, in parallel with a comparable mission being managed by the Marshall Space Flight Center. That mission, called SPARCLE, will implement the coherent technique. NASA plans to fly the two missions together on the same shuttle flight, to allow synergy of wind measurements and a direct comparison of performance.

Leete, Stephen J.↗

TPSAS-NF1676L-11132-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful, and, in most cases, results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

TPSAS-NF1676L-11021-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful and in most cases results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

The Extended Duration Orbiter Regenerable CO2 Removal System

A new carbon dioxide scrubber system is undergoing development for extended duration orbiter (EDO) missions. The EDO requirements of missions up to 18 days and the capability for future missions up to 30 days necessitated the development and implementation of a regenerative CO2 removal process. This new system will reduce the launch weight and stowage volume as compared to the present method of CO2 removal, lithium hydroxide, which is stowed in canisters. The selected design, called the Regenerable CO2 Removal System (RCRS), uses a solid amine material to adsorb carbon dioxide and water vapor and periodically desorb these to space vacuum. The RCRS, which is located below the middeck floor, interfaces with the orbiter's cabin Atmospheric Revitalization System and is adjustable from four to seven crewmembers. The RCRS is designed to automatically cycle the beds from absorb to vacuum-desorb every 30 minutes. Also incorporated into the design are features such consumable recovery, external leak protection, trace contaminant control and automatic control logic operation.

Ouellette, Fred A.↗

STS-114: Discovery Mission Status Briefing (incl. Statement from Cmdr. Collins and Crew)

Commander Eileen Collins and crew briefly thanked everyone who worked hard to get the Shuttle back in space, and dedicated the mission to the Columbia crew as she bids their first "good night" to the Mission Control Room in Houston. Video continues with the Mission Status Briefing by Phil Engelauf, STS-114 Mission Operations Representative, and John Shannon, Manager of the Space Shuttle Operations and Integration. Phil noted that launching and ascent had gone extremely well, the crews and the flight control team performed well and the vehicle performed exceptionally as well. The launch is the beginning of a 12 day mission period. John details the tasks of the Engineering team processing the radar data taken during ascent and checking frame by frame the imagery from both on vehicle imagery and ground imagery. John further detailed the two debris event from ascent video clips of tile loss and an unidentified material falling off from the external tank; the release of TYVEK covers, and bird impact on the external tank nose cone. Tile shearing, tile damage, tile repair, landing gear door seals, repair capabilities, debris assessment, safety, inspections criteria, data acquisitions and data analysis were topics covered with the News media.

Source record↗

Modeling

A prediction of the future population of satellites, satellite fragments, and assorted spacecraft debris in Earth orbit can be reliably made only after three conditions are satisfied: (1) the size and spatial distributions of these Earth-orbiting objects are established at some present-day time; (2) the processes of orbital evolution, explosions, hypervelocity impact fragmentation, and atmospheric drag are understood; and (3) a reasonable traffic model for the future launch rate of Earth-orbiting objects is assumed. The theoretician will then take these three quantities as input data and will carry through the necessary mathematica and numerical analyses to project the present-day orbital population into the future.

Zook, H. A.↗

Earth-Atmospheric Coupling During Strong Earthquakes by Analyzing MODIS Data

Interactions between the Earth and the atmosphere during major earthquakes (M greater than 5) are the subject of this investigation. Recently a mechanism has been proposed predicting the build-up of positive ground potentials prior to strong earthquake activity. Connected phenomena include: transient conductivity of rocks, injection of currents, possibly also electromagnetic emission and light emission from high points at the surface of the Earth. To understand this process we analyze vertical atmospheric profiles, land surface and brightness (temperature) data, using the Moderate Resolution Imaging Spectroradiometer (MODIS) onboard NASA's Terra satellite launched in December 1999. MODIS covers the entire Earth every 1-2 days in 36 wavelength bands (20 visible and 16 infrared) at different spatial resolutions (250 m, 500 m, and 1 km). Using MODIS data we look for correlations between the atmospheric dynamics and solid Earth processes for the January 2001 strong earthquakes in San Salvador and India. As part of the build-up of positive grounds potential, an IR luminescence is predicted to occur in the 8-12 micrometer band. We use the MODIS data to differentiate between true "thermal" signals and IR luminescence. Indeed, on the basis of a temporal and spatial distribution analysis, a thermal anomaly pattern is found that appears to be related to the seismic activity. Aerosol content and atmospheric instability parameters also change when ground charges build up causing ion emission and leading to a thin aerosol layer over land. We analyze the aerosol content, atmospheric pressure, moisture profile and lifted index. Anomalous trends have been identified in few days prior to the main shocks. The significance of this observation should be explored further using other data sets.

Ouzounov, Dimitar↗

Applications of triggered lightning to space vehicle operations

Kennedy Space Center (KSC) and the USAF Eastern Space Missile Center (ESMC) covering an area of 25 x 40 km are frequently called America's Spaceport. This title is earned through the integration, by labor and management, of many skills in a wide variety of engineering fields to solve many technical problems that occur during the launch processing of space vehicles. Weather is one of these problems, and although less frequent in time and duration when compared to engineering type problems, has caused costly and life threatening situations. This sensitivity to weather, especially lightning, was recognized in the very early pioneer days of space operations. The need to protect the many v\facilities, space flight hardware, and personnel from electrified clouds capable of producing lightning was a critical element in improving launch operations. A KSC lightning committee was formed and directed to improve lightning protection, detection, and measuring systems and required that all theoretical studies be confirmed by KSC field data. Over the years, there have been several lightning incidents involving flight vehicles during ground processing as well as launch. Subsequent investigations revealed the need to improve these systems as well as the knowledge of the electrical atmosphere and its effects on operations in regard to cost and safety. Presented here is how, KSC Atmospheric Science Field Laboratory (AFSL), in particular Rocket Triggered Lightning, is being used to solve these problems.

Jafferis, William↗

Architecture in Mission Integration, Choreographing Constraints

In any building project the Architect's role and skill is to balance the client's requirements with the available technology, a site and budget. Time, place and resources set the boundaries and constraints of the project. If these boundaries are correctly understood and respected by the Architect they can be choreographed into producing a facility that abides by those constraints and successfully meets the clients needs. The design and assembly of large scale space facilities whether in orbit around or on the surface of a planet require and employs these same skills. In this case the site is the International Space Station (ISS) which operates at a nominal rendezvous altitude of 220 nautical miles. With supplies to support a 7 day mission the Shuttle nominally has a cargo capacity of 35,000 pounds to that altitude. Through the Mission Integration process the Launch Package Management Team choreographs the constraints of ascent performance, hardware design, cargo, rendezvous, mission duration and assembly time in order to meet the mission objective.

Jones, Rod↗

Emerging satellite observations for diurnal cycling of ecosystem processes

Diurnal cycling of plant carbon uptake and water use, and their responses to water and heat stresses, provide direct insight into assessing ecosystem productivity, agricultural production and management practices, carbon and water cycles, and feedbacks to the climate. Temperature, light, atmospheric water demand, soil moisture and leaf water potential vary over the course of the day, leading to diurnal variations in stomatal conductance, photosynthesis and transpiration. Earth observations from polar-orbiting satellites are incapable of studying these diurnal variations. Here, we review the emerging satellite observations that have the potential for studying how plant functioning and ecosystem processes vary over the course of the diurnal cycle. The recently launched ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) and Orbiting Carbon Observatory-3 (OCO-3) provide land surface temperature, evapotranspiration (ET), gross primary production (GPP) and solar-induced chlorophyll fluorescence data at different times of day. New generation operational geostationary satellites such as Himawari-8 and the GOES-R series can provide continuous, high-frequency data of land surface temperature, solar radiation, GPP and ET. Future satellite missions such as GeoCarb, TEMPO and Sentinel-4 are also planned to have diurnal sampling capability of solar-induced chlorophyll fluorescence. We explore the unprecedented opportunities for characterizing and understanding how GPP, ET and water use efficiency vary over the course of the day in response to temperature and water stresses, and management practices. We also envision that these emerging observations will revolutionize studies of plant functioning and ecosystem processes in the context of climate change and that these observations and findings can inform agricultural and forest management and lead to improvements in Earth system models and climate projections.

Plant functioning↗

Project APEX: Advanced Phobos Exploration. Manned mission to the Martian moon Phobos

The manned exploration of Mars is a massive undertaking which requires careful consideration. A mission to the moon of Mars called Phobos as a prelude to manned landings on the Martian surface offers some advantages. One is that the energy requirements, in terms of delta 5, is only slightly higher than going to the Moon's surface. Another is that Phobos is a potential source of water and carbon which could be extracted and processed for life support and cryogenic propellants for use in future missions; thus, Phobos might serve as a base for extended Mars exploration or for exploration of the outer planets. The design of a vehicle for such a mission is the subject of our Aerospace System Design course this year. The materials and equipment needed for the processing plant would be delivered to Phobos in a prior unmanned mission. This study focuses on what it would take to send a crew to Phobos, set up the processing plant for extraction and storage of water and hydrocarbons, conduct scientific experiments, and return safely to Earth. The size, configuration, and subsystems of the vehicle are described in some detail. The spacecraft carries a crew of five and is launched from low Earth orbit in the year 2010. The outbound trajectory to Mars uses a gravitational assisted swing by of Venus and takes eight months to complete. The stay at Phobos is 60 days at which time the crew will be engaged in setting up the processing facility. The crew will then return to Earth orbit after a total mission duration of 656 days. Both stellar and solar observations will be conducted on both legs of the mission. The design of the spacecraft addresses human factors and life science; mission analysis and control; propulsion; power generation and distribution; thermal control; structural analysis; and planetary, solar, and stellar science. A 0.5 g artificial gravity is generated during transit by spinning about the lateral body axis. Nuclear thermal rockets using hydrogen as fuel are selected to reduce total launch mass and to shorten the duration of the mission. The nuclear systems also provide the primary electrical power via dual mode operation. The overall spacecraft length is 110 meters and the total mass departing from low Earth orbit is 900 metric tons.

Source record↗

Traceable random numbers from a non-local quantum advantage

The unpredictability of random numbers is fundamental to both digital security and applications that fairly distribute resources. However, existing random number generators have limitations—the generation processes cannot be fully traced, audited and certified to be unpredictable. The algorithmic steps used in pseudorandom number generators are auditable, but they cannot guarantee that their outputs were a priori unpredictable given knowledge of the initial seed. Device-independent quantum random number generators can ensure that the source of randomness was unknown beforehand, but the steps used to extract the randomness are vulnerable to tampering. Here we demonstrate a fully traceable random number generation protocol based on device-independent techniques. Our protocol extracts randomness from unpredictable non-local quantum correlations, and uses distributed intertwined hash chains to cryptographically trace and verify the extraction process. This protocol forms the basis for a public traceable and certifiable quantum randomness beacon that we have launched. Over the first 40 days of operation, we completed the protocol 7,434 out of 7,454 attempts—a success rate of 99.7%. Each time the protocol succeeded, the beacon emitted a pulse of 512 bits of traceable randomness. The bits are certified to be uniform with error multiplied by actual success probability bounded by 2−64. Further, the generation of certifiable and traceable randomness represents a public service that operates with an entanglement-derived advantage over comparable classical approaches.

97 MATHEMATICS AND COMPUTING↗

A Strategy to Integrate Probabilistic Risk Assessment into Design and Development Processes for Aerospace Based pon Mars Exploration Rover Experiences

This paper will discuss the Probabilistic Risk Assessment (PRA) effort and its involvement with related activities during the development of the Mars Exploration Rover (MER). The Rovers were launched 2003.June.10 (Spirit) and 2003.July.7 (Opportunity), and both have proven very successful. Although designed for a 90-day mission, the Rovers have been operating for over two earth years. This paper will review aspects of how the MER project integrated PRA into the design and development process. A companion paper (Development of the Mars Exploration Rover PRA) will describe the MER PRA and design changes from those results.

Probabilistic Risk Assessment (PRA)↗

Solar Particle Induced Upsets in the TDRS-1 Attitude Control System RAM During the October 1989 Solar Particle Events

The three large solar particle events, beginning on October 19, 1989 and lasting approximately six days, were characterized by high fluences of solar protons and heavy ions at 1 AU. During these events, an abnormally large number of upsets (243) were observed in the random access memory of the attitude control system (ACS) control processing electronics (CPE) on-board the geosynchronous TDRS-1 (Telemetry and Data Relay Satellite). The RAM unit affected was composed of eight Fairchild 93L422 memory chips. The Galileo spacecraft, launched on October 18, 1989 (one day prior to the solar particle events) observed the fluxes of heavy ions experienced by TDRS-1. Two solid-state detector telescopes on-board Galileo, designed to measure heavy ion species and energy, were turned on during time periods within each of the three separate events. The heavy ion data have been modeled and the time history of the events reconstructed to estimate heavy ion fluences. These fluences were converted to effective LET spectra after transport through the estimated shielding distribution around the TDRS-1 ACS system. The number of single event upsets (SEU) expected was calculated by integrating the measured cross section for the Fairchild 93L422 memory chip with average effective LET spectrum. The expected number of heavy ion induced SEU's calculated was 176. GOES-7 proton data, observed during the solar particle events, were used to estimate the number of proton-induced SEU's by integrating the proton fluence spectrum incident on the memory chips, with the two-parameter Bendel cross section for proton SEU'S. The proton fluence spectrum at the device level was gotten by transporting the protons through the estimated shielding distribution. The number of calculated proton-induced SEU's was 72, yielding a total of 248 predicted SEU'S, very dose to the 243 observed SEU'S. These calculations uniquely demonstrate the roles that solar heavy ions and protons played in the production of SEU's during the October 1989 solar particle events.

Croley, D. R.↗

Making or Breaking a Rover: System Engineering Parameters On-Board the Mars 2020 Perseverance Rover

On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.

Roth, Brian↗

Making or Breaking a Rover- Systems Engineering Parameters On-Board the Mars 2020 Perseverance Rover

On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.

Roth, Brian↗