Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric cooperatives”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Small Hydropower Interconnection Best Practices Guidelines and Templates

The process for development of a hydropower project can be a convoluted and lengthy process involving numerous federal, state, and local agencies and encompass a plethora of stakeholders that other renewable project development processes may not have to consider. Additionally, the process may vary depending on who the owner/operator is, such as private, nonutility companies; private utility companies; municipalities; electric cooperatives; private citizens; and state and federal government agencies.

13 HYDRO ENERGY↗

Hybrid Power Plants for Energy Resilience: A Case Study

As renewable energy technologies are increasingly adopted, they pose an opportunity to improve the sustainability and resilience of distributed grids, especially when their design and operation is coordinated as a hybrid power plant. When included in hybrid power plants, distributed wind turbines in particular have the potential to enhance the resilience of distributed grids in areas with good wind resource, due to their ability to provide more consistent generation and ancillary services as compared to photo-voltaic (PV) solar panels. Despite this benefit, U.S. distributed wind adoption is lower than other comparable renewable energy technologies. In this study, we seek to demonstrate how hybrid power plants that include distributed wind turbines can contribute to distribution grid resilience by meeting loads (especially critical loads) more consistently, increasing reserve capacity, and providing value to customers during outages. To demonstrate these contributions, we integrate three separate frameworks and apply them to a case study in a rural electric cooperative in Iowa. Through this case study, we simulate and compare hybrid power plant design and operation during two hazard events: a tornado that causes a 48-hour distribution outage and a winter weather event that causes a 6-hour generation outage. The inclusion of a hybrid power plant that leverages 1) increased battery duration and 2) advanced forecasting and dispatch strategies that reserve capacity leading up to a hazard event best reduce lost loads as well as diesel consumption that would otherwise be used to meet those loads during short- and long-duration hazard events. Depending on the hybrid power plant capacity and operation, we find that the outage mitigation value of a hybrid power plant (measured in value to customers to avoid an outage and avoided lost revenues for the utility) is significant in both hazard events; adding wind, solar, and battery assets to the existing system adds about $50-$100M in avoided lost load and at least $4-$8k in utility value in the tornado hazard event, and $570k-$2.2M in avoided lost load and at least $220-$650 in utility value in the winter hazard scenario. In both the tornado and winter hazard scenarios, optimizing the operation of the hybrid system for resilience can lend similar value as increasing battery duration by 5 MWh for the lower capacity systems considered.

17 WIND ENERGY↗

Guidance for Grid Resilience Decisions in Rural Minnesota

This report assesses the hazard landscape of the state of Minnesota, identifies weather hazards that are most impactful to the distribution system, includes a statewide assessment of household access to services dependent on reliable power, reviews resilience planning activities of electric utilities in Minnesota, and presents analysis of distribution grid performance in the face of extreme weather events with data from seven electric cooperatives dispersed throughout outstate Minnesota. This information is synthesized to provide considerations for resilience investment prioritization.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancing Power Resilience for Remote Communities: A Comprehensive Renewable Energy Solution for Itbayat Island

The island of Itbayat, Philippines, faces significant challenges in maintaining a reliable and resilient power supply due to its current reliance on a vulnerable power distribution system managed by a local electric cooperative. The existing infrastructure, which includes diesel generators and a radial network configuration with some above-ground lines, is highly susceptible to frequent typhoons and adverse weather conditions. These factors, combined with inadequate staffing and high operational costs, result in frequent power outages that disrupt daily life and hinder economic development. This white paper proposes a comprehensive solution to enhance the resilience and reliability of Itbayat's power system by integrating renewable energy sources, specifically solar photovoltaic (PV) systems, battery storage, and a microgrid controller. The proposed solution aims to reduce dependency on diesel fuel, optimize energy use, and provide a sustainable and robust power supply for the island. Key components of the solution include: 1. Solar PV Installation: Deploying solar PV panels to harness abundant solar energy, reducing reliance on diesel fuel. 2. Battery Storage Systems: Installing battery storage to store excess solar energy and ensure a continuous power supply during low solar generation periods. 3. Microgrid Controller: Implementing a microgrid controller to manage and optimize the integration of solar PV, battery storage, and existing diesel generators. The proposed solution addresses several critical issues, including system vulnerability, generator dependency, and operational inefficiencies. By adopting this innovative approach, Itbayat Island can achieve a more resilient, efficient, and sustainable energy infrastructure, ensuring a stable power supply for its residents and enhancing overall energy security.

14 SOLAR ENERGY↗

Uinta Basin CarbonSAFE II: Storage Complex Feasibility (Final Report)

The primary objective of this CarbonSAFE Phase II project was to establish the technical and commercial feasibility of a commercial-scale CO 2 geological storage complex for Deseret Power Electric Cooperative Bonanza Power Plant and other CO 2 sources in the northeast Uinta Basin, Utah, with the goal to securely store at least 50 million metric tons of captured CO 2 and accelerate CO 2 capture, utilization, and storage (CCUS) deployment. The project team established high-potential technical and commercial feasibility for a storage site within the east Uinta Basin (Utah), in the Cretaceous sandstones (Frontier, Dakota, and Buckhorn), Entrada Sandstone, Nugget Sandstone, and/or Weber Sandstone southwest of the Bonanza coal-fired power plant. This project collected and analyzed state-of-the-art data to characterize the storage complex consistent with Environmental Protection Agency (EPA) permitting standards. The team conducted extensive analog studies, outcrop mapping, and data sampling, which largely contributed to understanding the subsurface lithology and facies. Existing data were obtained and assessed from Utah Division of Oil, Gas, and Mining (DOGM), Utah Geological Survey (UGS), Colorado Geological Survey (CGS), U.S. Geological Survey (USGS), and EPA. These data were analyzed using state-of-the-art CCUS technologies for Societal Considerations, Site Characterization, Modeling and Simulations, Risk Assessment, Management and Monitoring, potential Underground Injection Control (UIC) Class VI Well Permitting, and Technical/Economic Feasibility. Through these high-resolution data collection and feasibility studies, this project was expected to provide a reference for initiating Underground Injection Control (UIC) and other commercial-scale geological storage permitting processes in the Western United States, ultimately contributing to the nation's decarbonization goals through low-risk, cost-effective commercial-scale carbon capture, utilization, and storage (CCUS) projects.

42 ENGINEERING↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Valuation of Distributed Wind in an Isolated System

Remote communities are increasingly adopting renewable energy, such as wind, as they transition away from diesel energy generation. It is important to understand the benefits and costs of wind energy to isolated systems so that decision-makers can optimize their choices in these communities. There are few examples of valuation of wind energy as a distributed resource and numerous differences in valuation approaches, especially in the inclusion of environmental and economic impacts. We apply a distributed wind valuation framework to calculate the benefits and costs of wind in St. Mary’s, Alaska, to the local electric cooperative and to society, finding that the project does not have a favorable benefit-to-cost ratio unless societal benefits are included, in which case the benefit-to-cost ratio is nearly double. Government funding is important to reducing the initial capital expenditures of this wind project and will likely be the case for projects with similar characteristics. Additional fuel savings benefits are potentially possible for this project through technological additions such as energy storage and advanced controls.

17 WIND ENERGY↗

FLISR in the Presence of DERs ADMS Test Bed Use Case

Fault location, isolation, and restoration (FLISR) is one of the distribution automation applications that utilities are most interested in. It operates groups of switches on distribution feeders to improve the reliability of power delivery after localizing outages. FLISR is an essential function for enabling a self-healing grid, and it directly affects grid reliability and resilience. The presence of DERs brings both new opportunities and challenges for FLISR applications. For instance, some DERs can work as backup generation sources and help energize local networks so more switching options can be achieved with the coordination of FLISR operations; however, the existence of DERs also brings new challenges. The bidirectional power flow resulting from DERs might require dynamic changes to protective devices' fault current settings, and thus the FLISR application will need to dynamically adjust its operations in coordination with the dynamic protection settings. Also, some FLISR applications make their service restoration decisions and close tie-switches based on predefined rules; however, the presence of DERs and their impact on altering net loads on the local feeder network are not considered. For this use case, the project team is using the FLISR application of the Survalent ADMS operating on a real-time simulation of a feeder from Central Georgia EMC, a cooperative electric utility. The performance of the FLISR application is being evaluated for different locations and combinations of DERs, including grid-forming battery energy storage systems.

ADMS↗

Resilience with Renewables

This presentation is intended for the DOE Better Buildings Sustainable Corrections Infrastructure Partnership (SCIP) program webinar series. It will explain the INL Resilience Framework, discuss how to apply it for building managers, and give examples of the ways batteries can aid in resilience by walking through a case study conducted for Iowa Lakes Electric Cooperative.

17 WIND ENERGY↗

Using Cyber-Informed Engineering for Cyber Defense Workbook

This workbook was prepared for a detailed workshop in Cyber-Informed Engineering. It is designed to provide an audience of electrical cooperative engineering staff with an opportunity to practice leveraging the principles of Cyber-Informed Engineering for a hypothetical system upgrade. This workbook contains material describing the fictional project, information about Cyber-Informed Engineering, hands-on exercises, and a copy of the slides presented during the workshop. It can stand alone as a CIE resource.

42 ENGINEERING↗

Clean Energy to Communities: Gap Region Outreach Project

The Clean Energy to Communities (C2C) program provides expertise and tools to local and regional governments, Tribes, community-based organizations, municipal utilities, and rural electric cooperatives to help them achieve their clean energy goals. The U.S. Department of Energy (DOE) launched C2C in 2022, following engagement with more than 150 stakeholders representing 95 communities in 40 states and 6 Tribes. The program offers three levels of support: expert match, peer-learning cohorts, and in-depth partnerships. In its first year, C2C worked with over 150 communities. To ensure broad participation, the National Renewable Energy Laboratory (NREL) examined regional representation. This analysis revealed that four regions are under-represented in program participation: Gulf South, Appalachia, Midwest, and Northern Plains. To help address these gaps, NREL led an effort to identify barriers faced by potential C2C participants from these regions and develop strategies to facilitate participation. This document summarizes findings from this effort and provides recommendations for program changes.

C2C↗

Factors Affecting Override Behavior during Demand Flexibility from High-Resolution Smart Thermostat Data

In this study, we delineate key weather and demographic predictors of override behavior in residential buildings during connected thermostats demand response events. Anticipating and reducing overrides is critical to demand flexibility (DF) program success. We use high- dimensional fixed effects linear regression techniques on a large ecobee dataset for about 5,000 enrolled households in the United States. We identify critical weather (indoor and outdoor temperature), building (housing type), and occupant (previous DF overrides and previous DF event exposure) factors influencing the override patterns of customers during thermostat demand response. We also differentiate DF events by season to understand the different indoor and outdoor conditions that might influence seasonal override rates. We found significant differences in override rates between building types, with single-family semi-detached homes generally having the highest overrides. Having a history of overrides was additionally a critical factor in predicting occupant response to future DF events. Understanding these override differences is necessary for rural electric cooperatives and emerging DF programs without access to large DR historical data. Overall, we provide critical information on technical and local demographic characteristics that may be correlated to building type to influence strategies to reduce overrides and improve the adoption of DF technologies.

connected thermostats (CTs)↗

Commercial-Scale Front-End Engineering Design (Feed) Study for MTR’s Membrane CO 2 Capture Process

This is the final report for a DOE sponsored project (DE-FE00031846) where MTR, Sargent & Lundy (S&L), Trimeric Corporation (Trimeric), in cooperation with Basin Electric Power Cooperative (BEPC), and Electric Power Research Institute (EPRI), completed a full-scale Front End Engineering and Design (FEED) study to evaluate the retrofit of MTR’s membrane-based post-combustion carbon dioxide (CO2) capture technology to the BEPC Dry Fork Station (DFS) Unit 1. The capture plant is designed to treat the entire flue gas flow from DFS; it is estimated that this system will capture 6,560 tonnes per day (TPD) of carbon dioxide. The overall goal of the project was to develop an AACE Level 2 Capital Cost Estimate with an accuracy of ±15% to demonstrate the economic feasibility of constructing and operating the MTR CO2 capture plant.

01 COAL, LIGNITE, AND PEAT↗

Findings on subtask 1.6 – basin electric carbon storage research project: novel monitoring techniques

The Energy & Environmental Research Center (EERC) led a study to validate novel and emerging technologies as commercial monitoring techniques for application in carbon dioxide (CO 2 ) injection operations. This applied research was conducted at Basin Electric Power Cooperative’s (Basin Electric’s) active CO 2 -injection operations in Beulah, North Dakota, in two phases. The EERC previously completed a set of baseline (preinjection) activities in Phase 1, which included 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; and 5) advanced wellbore-monitoring methods.

54 ENVIRONMENTAL SCIENCES↗

Battery Electric Vehicle Eco-Cooperative Adaptive Cruise Control in the Vicinity of Signalized Intersections

This study develops a connected eco-driving controller for battery electric vehicles (BEVs), the BEV Eco-Cooperative Adaptive Cruise Control at Intersections (Eco-CACC-I). The developed controller can assist BEVs while traversing signalized intersections with minimal energy consumption. The calculation of the optimal vehicle trajectory is formulated as an optimization problem under the constraints of (1) vehicle acceleration/deceleration behavior, defined by a vehicle dynamics model; (2) vehicle energy consumption behavior, defined by a BEV energy consumption model; and (3) the relationship between vehicle speed, location, and signal timing, defined by vehicle characteristics and signal phase and timing (SPaT) data shared under a connected vehicle environment. The optimal speed trajectory is computed in real-time by the proposed BEV eco-CACC-I controller, so that a BEV can follow the optimal speed while negotiating a signalized intersection. The proposed BEV controller was tested in a case study to investigate its performance under various speed limits, roadway grades, and signal timings. In addition, a comparison of the optimal speed trajectories for BEVs and internal combustion engine vehicles (ICEVs) was conducted to investigate the impact of vehicle engine types on eco-driving solutions. Lastly, the proposed controller was implemented in microscopic traffic simulation software to test its networkwide performance. The test results from an arterial corridor with three signalized intersections demonstrate that the proposed controller can effectively reduce stop-and-go traffic in the vicinity of signalized intersections and that the BEV Eco-CACC-I controller produces average savings of 9.3% in energy consumption and 3.9% in vehicle delays.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗