Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Spokane Eco-District Campus Performance Under Alternative Electricity Rates: Benefits for virtual power plant participants and suppliers

Here, the respective benefits for virtual power plant participants and suppliers are revealed and compared under alternative electricity rate structures, including conventional large commercial electricity rates, large commercial electricity rates with special rates for demand-side generation, and dynamic hourly transactive prices. These three scenarios were explored using the capabilities of the Eco-District campus, a virtual power plant in Spokane, Washington, that is supplied electricity by Avista Utilities. The Eco-District Campus was modeled to host solar power generation, battery energy storage, and thermal energy resources that must be coordinated with building heating and cooling needs. First, the electricity supplier’s costs for energy, infrastructure, and energy losses were modeled. Then, the virtual power plant’s performance was modeled while presuming that its manager would minimize its costs under its electricity rate structure. The demand charges of conventional commercial electricity rates managed monthly peak, as would be expected, but hourly dynamic transactive pricing resulted in a striking alignment between the costs incurred by the supplier and the virtual power plant’s energy costs.

Electricity rates↗

Valuing Maintenance Strategies for Fusion Plants as Part of a Future Electricity Grid

Scheduled maintenance is likely to be lengthy and therefore consequential for the economics of fusion power plants. The maintenance strategy that maximizes the economic value of a plant depends on internal factors such as the cost and durability of the replaceable components, the frequency and duration of the maintenance blocks, and the external factors of the electricity system in which the plant operates. Here, this paper examines the value of fusion power plants with various maintenance properties in a decarbonized United States Eastern Interconnection circa 2050. Seasonal variations in electricity supply and demand mean that certain times of year, particularly spring to early summer, are best for scheduled maintenance. Seasonality has two important consequences. First, the value of a plant can be 15% higher than what one would naively expect if value were directly proportional to its availability. Second, in some cases, replacing fractions of a component in shorter maintenance blocks spread over multiple years is better than replacing it all at once during a longer outage, even through the overall availability of the plant is lower in the former scenario.

power plant, maintenance, seasonality, electricity↗

Technoeconomic Analysis of Steel Production with Electric Thermal Energy Storage

The iron and steel industry is an important manufacturing sector and one of the largest energy consumers in the United States and globally. Hydrogen direct reduction of iron ore (H2DRI) is considered a promising process that could enhance domestic steel production. This process requires hydrogen inlet temperatures up to 950 degrees C to drive the endothermic reduction of the iron ore pellets. In this work we investigate the technoeconomic performance of an H2DRI plant using electric thermal energy storage (ETES) technologies for the hydrogen heating, compared to conventional natural gas fired heaters, hydrogen fired heaters, and electric hydrogen heaters. A technoeconomic analysis framework for the plant is developed and used in multiple case studies, covering different hydrogen prices, grid electricity profiles, and financing scenarios. The levelized cost of steel production is found out to be in the range of $775-950/mt, which is mostly inside the benchmarked steel price of $941/mt. ETES-based hydrogen heating is found to be in par with conventional natural gas fired heaters, and cheaper than hydrogen fired heaters and electric hydrogen heaters. The major cost drivers are the iron ore and hydrogen feedstock, followed by the hydrogen compression and heating capital. Several insights and suggested future directions are identified.

08 HYDROGEN↗

Nuclear Balance-of-Plant Analysis for Heat and Electricity Calculations in Several Advanced Nuclear Reactor Concepts

In addition to producing electricity, advanced nuclear reactors can also serve as a source of process heat for a wide range of industrial or residential applications. In cases where the heat application requires low-temperature heat, waste heat from the balance of plant (BOP) can be utilized with minimal impact on electricity generation. For applications requiring higher-temperature heat, heat can be extracted from the BOP, though this will reduce the amount of electricity generated. In either case, the optimal BOP design will be case-specific and depend on multiple factors, including the reactor type and the thermal requirements of the heat application.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Inputs to GCAM-USA: IM3 Phase 2 Experiments

Overview This dataset contains XML input files for the IM3 Phase 2 version of GCAM-USA. The files are organized into two categories: Scenario-specific inputs represent hydroclimate and socioeconomic effects on water availability, heating and cooling degree-hours, and agricultural productivity. They support eight IM3 canonical scenarios: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Model-improvement inputs extend GCAM-USA v5.3 with updated representations of coal and nuclear power plant retirements, electricity trade among U.S. interconnections, offshore carbon storage costs, and groundwater depletion constraints. Data structure Scenario-specific inputs rcp45_runoff/ and rcp85_runoff/XML files describing water availability by HUC2 basin under the RCP 4.5 and RCP 8.5 scenarios. rcp45_hdcd/ and rcp85_hdcd/XML files containing monthly-day and monthly-night heating and cooling degree-hours at the U.S. state level for different RCP-SSP combinations. rcp45_agyields/ and rcp85_agyields/XML files describing changes in agricultural productivity at the intersection of GCAM regions and HUC2 water basins for different RCP-SSP combinations. rcp45_emissions_pathway/The emissions-constraint XML file used to represent the RCP 4.5 pathway. Model-improvement inputs core_retire/Updates coal-fired power plant retirement schedules based on New England ISO. GCAMUSA_IM3_elec_trade_interconnect.xmlRestricts electricity trade to occur within the ERCOT, WECC, and IE interconnections. nuclear_USA.xmlUpdates the retirement schedules of the Diablo Canyon and Palisades nuclear power plants. high_cost_offshore_carbon.xmlUpdates the assumed cost of offshore carbon storage. water_supply_constrained_gleeson_5pct.xmlReplaces WaterGAP historical groundwater-depletion estimates with data from the Gleeson dataset and limits groundwater extraction to 5% of the available groundwater in each Superwell grid cell. How to use the data This dataset is designed for use with the IM3 version of GCAM-USA. Download or clone GCAM-USA from the IM3 GCAM GitHub repository at https://github.com/IMMM-SFA/gcam-core and check out the gcam-usa-im3 branch. Place the downloaded folder im3scenarios in the gcam-core/input directory while preserving the provided folder structure.

Energy↗

Front-End Engineering Design Study for Retrofit Post-Combustion Carbon Capture on a Natural Gas Combined Cycle Power Plant

The objective of the project is to conduct a Front-End Engineering Design (FEED) study to determine the technical and economic feasibility of installing a retrofit, post-combustion, carbon capture facility on a commercially operating, natural gas-fired, combined cycle (NGCC) power plant. The Electric Power Research Institute (EPRI), California Resources Corporation (CRC), and Fluor Corporation used Fluor's Econamine FG Plus SM (EFG+) conducted the FEED study for capturing CO 2 produced by CRC's 550 MWe Elk Hills Power Plant (EHPP), located in the Elk Hills Oil Field near Tupman, Kern County, California. The EHPP was commissioned in 2003 and is powered by two General Electric 7FA gas turbines, with two heat recovery steam generators (HRSGs) providing steam to a General Electric D11 steam turbine. The target capture amount is 4,000 tonnes CO 2 /day for use in either enhanced oil recovery or dedicated geological saline storage located on CRC property at or nearby EHPP. This CO 2 is captured from a combination of the CO 2 emitted from the flue gas from EHPP and the flue gas generated from a natural gas-fired auxiliary boiler that supplies steam to the EFG+ process.

03 NATURAL GAS↗

Value of Geothermal Energy Storage for Supply-Side and Demand-Side Applications

This report presents the results of a study examining the value potential for geothermal energy storage (GES), a long-duration energy storage resource that stores thermal and/or geomechanical energy in the subsurface. GES could benefit the overall U.S. power system by temporally shifting electricity generation (supply-side) or meeting building heating and cooling load (demand-side). This report analyzes supply-side and demand-side opportunities independently because of differences in applications and models. Currently there is significant uncertainty about the development costs for GES, with only a limited number of demonstration plants for electric energy storage and building heating and cooling storage developments. In this report, we estimate the value of supply-side and demand-side GES to the bulk power system in the contiguous United States. Because of the significant uncertainty about GES development costs, this analysis does not consider GES deployment costs but instead focuses on the value of GES to the U.S. electricity system. The estimated values of GES provide reference points for economically competitive commercial cost targets. Supply-side GES is modeled as part of an enhanced geothermal system (EGS) generation plant in NREL's Regional Energy Deployment System (ReEDS) capacity expansion model (Ho et al. 2021). In contrast to conventional geothermal plants, which generate constant power, EGS plants have unique features that may allow for in-reservoir energy storage for flexible generation. Demand-side GES for heating and cooling, including seasonal hot and cold storage and short-duration heat pump storage, is incorporated into a price-taker model using Cambium electricity marginal cost projections. To establish an upper bound for the value of GES, analysis focused on favorable scenarios for storage with high generation from zero marginal cost, variable renewable energy resources. High penetrations of variable renewable energy generation can increase hourly electricity price variability, which increases the value of temporal energy arbitrage for storage technologies like GES.

15 GEOTHERMAL ENERGY↗

Quality Guidelines for Energy Systems Studies: Cost Estimation Methodology for NETL Assessments of Power Plant Performance

This paper summarizes the methodology employed by the National Energy Technology Laboratory (NETL) in calculating power plant costs in its techno-economic studies, such as the Cost and Performance Baseline for Fossil Energy Systems series of reports. It also outlines the approach used to calculate the cost of electricity by which NETL evaluates electric power plants. These metrics and a clear understanding of the methodology used are essential in allowing different power plant technologies to be compared on a similar basis. These guidelines are tailored for power producing plants, although they can be applied to a variety of different revenue generating plants (e.g., coal to liquids, syngas generation, hydrogen).

20 FOSSIL-FUELED POWER PLANTS↗

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation

To address the data needs of energy system designers and to serve as a baseline for research and development, NETL has carried out a study to characterize the flexibility attributes - both performance and cost - of nine common commercial natural gas-fueled electricity generating units. The intermittent output of low-carbon, renewable power generation sources such as wind and solar create challenges to grid stability and reliability. Fossil-fueled power generation technologies are currently used to provide reliable, on-demand power during periods of reduced renewable output. Dispatchable generators must be able to accommodate increasing renewable generation as the nation pursues the Administration’s target of a decarbonized energy sector by 2035. As energy system experts seek to identify least-cost approaches to decarbonization, accurate cost and performance data characterizing dispatchable fossil generators that operate flexibly, at capacity factors that have been declining over time, and are needed to inform models for capacity expansion. Furthermore, these technologies continue to be a significant source of carbon dioxide emissions, providing the impetus for research and development, including the advancement and potential incorporation of carbon capture technologies. This study characterizes the cost and performance of select state-of-the-art natural gas-fueled power generation technologies: reciprocating internal combustion engines (RICE), simple cycle combustion turbines, and natural gas combined cycles (NGCC). An emphasis is placed on flexibility characteristics, such as part-load heat rate, ramp rates, start up times, and start up costs.

03 NATURAL GAS↗

Electricity and natural gas tariffs at United States wastewater treatment plants

Abstract Wastewater treatment plants (WWTPs) are large electricity and natural gas consumers with untapped potential to recover carbon-neutral biogas and provide energy services for the grid. Techno-economic analysis of emerging energy recovery and management technologies is critical to understanding their commercial viability, but quantifying their energy cost savings potential is stymied by a lack of well curated, nationally representative electricity and natural gas tariff data. We present a dataset of electricity tariffs for the 100 largest WWTPs in the Clean Watershed Needs Survey (CWNS) and natural gas tariffs for the 54 of 100 WWTPs with on-site cogeneration. We manually collected tariffs from each utility’s website and implemented data checks to ensure their validity. The dataset includes facility metadata, electricity tariffs, and natural gas tariffs (where cogeneration is present). Tariffs are current as of November 2021. We provide code for technical validation along with a sample simulation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lithium, a path to make fusion energy affordable

In this tutorial article, we review the technological, physics, and economic basis for a magnetic fusion device utilizing a flowing liquid lithium divertor (molten metal velocity in the range of cm/s) and operating in a low-recycling plasma regime. When extrapolated to magnetic fusion reactor scale, the observed effects of a liquid lithium boundary on recycling reduction, confinement increase, and anomalous heat transport mitigation may offer a fundamentally distinct and promising alternative route to fusion energy production. In addition, this lithium-driven low recycling regime could accelerate fusion’s commercial viability since such a device would be smaller, dramatically decreasing plant and electricity costs if all technological complexities are solved. First, the theoretical basis of the energy confinement and fusion performance as well as the related possibilities of low recycling regimes driven by flowing lithium plasma-facing components are reviewed. Then the paper emphasizes the technological obstacles that need to be overcome for developing the necessary systems for such a flowing liquid lithium solution at reactor scale and details how many of these have been overcome at laboratory and/or proof-of-concept scale. Finally, the current and planned scientific and engineering endeavors being performed at the University of Illinois at Urbana-Champaign regarding this alternative reactor option are discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Modeling of Additively Manufactured Ceramic Heat Exchangers with Semi-Elliptical Cross-Section Flow Channels

An approximate and easily applied analytical model was developed for heat transfer calculations of heat exchangers consisting of multiple rows and columns of heat transfer fluid flow channels with semi-elliptical cross sections. Heat exchangers of this type are being developed by using ceramic material and additive manufacturing for high temperature and pressure-concentrating solar electric power plants. Calculations using the model require only the geometrical dimensions and flow conditions of the heat exchanger. Comparisons of modeling predictions, with both simulation results and experimental data, were conducted to verify the viability of the model. The results showed good agreement where almost all the modeling predictions were within 20% of the simulation results or the experimental data. Finally, the proposed modeling approach is more generally applicable to heat transfer analysis of heat exchangers with similar flow channel configurations to those considered in this study.

Ceramic↗