A Techno-Economic Assessment of Fusion Energy System Supply and Waste Generation and How Fission Energy May Close Operational Gaps
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Discussed in order after the introduction are solar components and systems (collectors, storage, service hot water systems, space heating with liquid and air systems, space cooling, heat pumps and controls); computer programs for system optimization; local solar and weather data; a description of buildings and plants in Southern California applying solar technology; current Federal and California solar legislation; standards, codes and performance testing information; a listing of manufacturers, distributors, and professional services available in Southern California region; and information access. Finally, solar design check lists for those engineers who wish to design their own systems. The program for the Solar Workshop for the Plant Engineer, March 30, 1978, Los Angeles, California is included.
The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.
The Energy 101: Wind presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of wind energy. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.
Silver-cadmium secondary battery energy storage system using vented cells for manned orbital spacecraft
Across Africa, countries have incorporated a variety of new energy sources into their energy mix to account for increasing demand. In Nigeria, electricity consumption per capita has grown nearly 50% in the past 20 years. To address rising demand for energy in Nigeria, the country has passed several recent policies and regulations aimed at increasing energy generation across the country, improving the country's transmission infrastructure, and ensuring that electricity reliably reaches end users, including commercial and industrial (C&I) customers. This guidebook is designed for C&I customers in Nigeria to use in the consideration of procuring such onsite, captive energy systems to supplement their energy needs. Each section of this guidebook touches on a step of the procurement process and details the relevant stakeholders, processes, and data needed to make decisions during that step.
The USABC Advanced Battery development plan had the following three focus areas: 1. Existing technology validation, implementation, and cost reduction 2. Identification of the next viable technology with emphasis on the potential to meet USABC cost and energy density goals. 3. Support high-risk, high-reward battery technology R&D The primary aim of this project was focused on the barriers that most impede wider public adoption of electrification in vehicles-cost, energy density, low-temp performance, calendar life, and improvements in abuse tolerance. The specific objectives are as follows: Cost Reduction: drive to significantly reduce battery cost to be in-line with the $\$$100/kWh or less (by the end of calendar year 2020) DOE cost goals. Additionally, goals of $\$$75/KWh were set for 2023 aligned with fast charge and some offset of energy density. Energy Density Increase: focus on improving the cell-level specific energy and energy densities to >350 watt hours per kilogram (Wh/kg) and >750Wh/L. Low Temperature Performance Increase: strive toward developments that improve the discharge power and eliminate or dramatically reduce the life limiting lithium plating associated with regenerative braking at low temperatures, during the program. Calendar Life Increase: drive to achieve a 15-year calendar life. Abuse Tolerance Improvement: strive to develop improvements in Li-ion abuse tolerance and/or development of electrochemical energy storage technologies with inherently better response to abuse circumstances. Emerging Areas: initiate new programs that address emerging technologies that arise during the contract period.
Explore the source record for details and available documents.
High energy density primary battery development - anode-electrolyte, cupric fluoride cathode, and chemical stability tests
Cathodic materials for high energy density storage battery
As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.
Supercapacitors are widely recognized as a favorable option for energy storage due to their higher power density compared to batteries, despite their lower energy density.
Not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Through an Expert Match technical assistance project, Ford County requested the National Laboratory of the Rockies evaluate solar PV, wind, and battery storage options at the Western State Bank Expo Center, assessing cost savings, on-site generation, and outage resilience. This slide deck presents the findings of this analysis.
Evaluation of various anode-electrolyte and cathode-electrolyte combinations for high energy density battery