Search NASA⌕ Search

SEARCH · Search NASA

Results for “plan template”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

BETO 2021 Peer Review - Process Monitoring and Predictions of Biorefinery Performance

Online process monitoring coupled with rapid predictive tools will be essential to refineries of the future to provide real-time feedback and process control on new, renewable feeds and their accompanying processes and products. This project will provide refinery operators with tools to predict product component concentrations in minutes from online, slip stream mass spectra, allowing for rapid detection of off-specification product. We will arrive at a template for predictive tool generation through the development of a specific tool as a starting point -- co-processing of pyrolysis oils and vacuum gas oil over fluid catalytic cracking (FCC) catalysts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Leveraging large language models to automate the identification of healthcare access barriers for veterans

Objective: To develop and evaluate an automated system for identifying healthcare barriers focusing on transportation issues in veterans’ clinical notes using large language models (LLMs) and to assess the impact of different prompting strategies on classification performance and explanation consistency. Methods: We developed a hybrid system combining pattern matching for templated notes with LLM analysis for free-text notes. Using 2000 manually annotated clinical notes, we compared four prompting strategies (dual-role short, dual-role long, analysis-first, analysis-only) across Mistral-7B and Llama-3.1 models. We evaluated classification performance using standard metrics and assessed explanation consistency through embedding similarity analysis. Results: The analysis-first strategy achieved superior performance, with Mistral-7B reaching an F1 score of 0.914, outperforming traditional machine learning approaches (GBM: 0.786, BERT: 0.811). LLMs demonstrated higher explanation consistency within models (mean cosine similarity 0.887–0.908) compared to cross-model similarities (0.767–0.872). Pattern matching successfully handled 6.7% of templated notes deterministically. Mistral-7B showed greater internal consistency but higher abstention rates compared to Llama-3.1. Conclusion: Requiring LLMs to analyze evidence before classification improves both accuracy and explanation consistency for identifying transportation barriers in clinical notes. This approach enables automated barrier detection at scale while providing clinically relevant explanations, supporting both population-level healthcare planning and individual patient care decisions.

Healthcare access barriers↗

Navigating Options for Transportation Electrification and Solar Charging: Steps and Lessons Learned in Montana Communities

This document is intended to assist communities who are considering investing in electric transportation. It can assist communities engage stakeholders, prioritize community goals, assess electric transportation options, and navigate complex decisions about deploying zero emission electric transportation in their community. It covers technological, economic and environmental aspects of the transition to electric vehicles (EV), and highlights the specific considerations related to the deployment of renewable energy technologies (e.g., distributed solar) in combination with EV supply equipment (EVSE, e.g., charging stations). There are many important decisions to make and questions for communities to ask themselves as they consider electric vehicle types, charging infrastructure, and electricity generation options. This guide will help communities assess: (1) Which stage in the decision-making process they are in with respect to EV deployment; (2) Questions they can explore to guide their decisions about EV deployment; (3) How to engage key stakeholders on EV deployment options; (4) Tradeoffs and benefits of various electric transportation options and; (5) Synergies of pairing electric vehicle charging and renewable energy generation technologies. The analysis and lessons learned presented in this roadmap are intended to serve as a template and guide for similarly situated communities across the country who want to prepare for and play a role in the electrified transportation future.

14 SOLAR ENERGY↗

RTN-011: Rubin Observatory Plans for an Early Science Program

This document outlines Rubin Observatory's plans for a dedicated \emph{Early Science Program} to enable high-impact science prior to the first annual data release of the Legacy Survey of Space and Time (LSST). Components of the Early Science Program include releasing science-grade commissioning data products via a series of ``Data Previews,'' ramping up of the transient alert stream during commissioning, implementing a program of incremental template generation to augment alert production in the early phases of the survey, and the first LSST Data Release, DR1, based on the first 6 months of data from the LSST. A detailed breakdown of which data products can be expected when is provided. The Rubin Operations team is working closely with the science community to optimize the Early Science Program for the time-domain and solar system science achievable in the first year of operations. This is a living document; both it and the Early Science Program will continue to evolve over the course of commissioning and pre-operations in response to the state of the as-built system and to community guidance.

79 ASTRONOMY AND ASTROPHYSICS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Effect of varying threading dislocation densities on the optical properties of InGaN/GaN quantum wells with intentionally created V-shaped pits

The effect of varying threading dislocation densities on the internal quantum efficiencies (IQEs) of InGaN quantum wells (QWs), with and without intentionally created “V-pits,” is reported here. InGaN QW samples grown on GaN-on-sapphire templates with threading dislocation densities of <1 × 108 and <1 × 109 cm−2 are compared, with and without GaN/InGaN superlattice (SL) layers incorporated to intentionally open up the threading dislocation cores and form large-size “V-pits.” The formation of “V-pits” is confirmed by cross-sectional transmission electron microscopy to initiate from threading dislocations in the SL layers. The densities of the pits are confirmed by plan-view SEM to agree with the substrate threading dislocation densities. The experimental room temperature IQEs of the “V-pit” QW samples are enhanced to 15% ± 1% compared to 6% ± 2% for conventional QW samples. Both conventional and “V-pit” samples show insensitivity to the magnitude of the dislocation densities with respect to IQE performance, while the “V-pit” samples show shifts in the peak emission wavelengths compared to the conventional samples, attributed to strain modulation. This study provides additional understanding of the causes of the observed insensitivity of the IQEs to different threading dislocation densities.

Engineering↗

Adaptive Radiation Therapy (ART) Strategies and Technical Considerations: A State of the ART Review From NRG Oncology

The integration of adaptive radiation therapy (ART), or modifying the treatment plan during the treatment course, is becoming more widely available in clinical practice. ART offers strong potential for minimizing treatment-related toxicity while escalating or de-escalating target doses based on the dose to organs at risk. Yet, ART workflows add complexity into the radiation therapy planning and delivery process that may introduce additional uncertainties. This work sought to review presently available ART workflows and technological considerations such as image quality, deformable image registration, and dose accumulation. Quality assurance considerations for ART components and minimum recommendations are described. Personnel and workflow efficiency recommendations are provided, as is a summary of currently available clinical evidence supporting the implementation of ART. Finally, to guide future clinical trial protocols, an example ART physician directive and a physics template following standard NRG Oncology protocol is provided.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

CMB-S4: Iterative Internal Delensing and r Constraints

Abstract The tightest constraints on the tensor-to-scalar ratio r can only be obtained after removing a substantial fraction of the lensing B -mode sample variance. The planned Cosmic Microwave Background (CMB)-S4 experiment ( cmb-s4.org ) will remove the lensing B -mode signal internally by reconstructing the gravitational lenses from high-resolution observations. We document here a first lensing reconstruction pipeline able to achieve this optimally for arbitrary sky coverage. We make it part of a map-based framework to test CMB-S4 delensing performance and its constraining power on r , including inhomogeneous noise and two non-Gaussian Galactic polarized foreground models. The framework performs component separation of the high-resolution maps, followed by the construction of lensing B -mode templates, which are then included in a parametric small-aperture map cross-spectra-based likelihood for r . We find that the lensing reconstruction and framework achieve the expected performance, compatible with the target σ ( r ) ≃ 5 · 10 −4 in the absence of a tensor signal, after an effective removal of 92%–93% of the lensing B -mode variance, depending on the simulation set. The code for the lensing reconstruction can also be used for cross-correlation studies with large-scale structures, lensing spectrum reconstruction, cluster lensing, or other CMB lensing-related purposes. As part of our tests, we also demonstrate the joint optimal reconstruction of the lensing potential with the lensing curl potential mode at second order in the density fluctuations.

Astronomy & Astrophysics↗

Sensitivity of the Cherenkov Telescope Array to a dark matter signal from the Galactic centre

We provide an updated assessment of the power of the Cherenkov Telescope Array (CTA) to search for thermally produced dark matter at the TeV scale, via the associated gamma-ray signal from pair-annihilating dark matter particles in the region around the Galactic centre. We find that CTA will open a new window of discovery potential, significantly extending the range of robustly testable models given a standard cuspy profile of the dark matter density distribution. Importantly, even for a cored profile, the projected sensitivity of CTA will be sufficient to probe various well-motivated models of thermally produced dark matter at the TeV scale. This is due to CTA's unprecedented sensitivity, angular and energy resolutions, and the planned observational strategy. The survey of the inner Galaxy will cover a much larger region than corresponding previous observational campaigns with imaging atmospheric Cherenkov telescopes. CTA will map with unprecedented precision the large-scale diffuse emission in high-energy gamma rays, constituting a background for dark matter searches for which we adopt state-of-the-art models based on current data. Throughout our analysis, we use up-to-date event reconstruction Monte Carlo tools developed by the CTA consortium, and pay special attention to quantifying the level of instrumental systematic uncertainties, as well as background template systematic errors, required to probe thermally produced dark matter at these energies.

79 ASTRONOMY AND ASTROPHYSICS↗

Natural Gas Community of the Future (Final Report)

Nicor Gas, a subsidiary of Southern Company Gas and its parent company Southern Company, is developing the concept of the Carbon-neutral, Affordable, Resilient, and Equitable Community ("CARE Community") to address the challenges of accessibility and affordability of grid-interactive efficient buildings in historically disadvantaged communities. The CARE Community is a new construction net-zero energy and carbon neutral residential neighborhood consisting of 50 homes with electricity and natural gas services in South Suburban Chicago, built as low-income affordable housing. The National Renewable Energy Laboratory (NREL) is assisting Southern Company to explore how energy efficiency, renewable technologies, and the reliability and resilience of natural gas can be combined and optimized in an islandable energy system as part of a broader effort to understand the role natural gas plays in future communities integrated with renewable energy and improved energy efficiency. The CARE Community will demonstrate how energy efficiency, distributed energy resources (DERs), and advanced controls can be combined with existing natural gas infrastructure to serve historically disadvantaged communities in a cold climate with low energy cost for affordable housing programs and enhanced resilience to withstand extreme weather. Homes will be a part of an islandable energy system, integrating multiple DER technologies such as solar panels, natural gas fuel cells, reciprocating natural gas engines, and battery storage. The CARE Community will provide a replicable template that affordable housing developers and energy companies can adopt throughout the United States. In this report, we present the design and modeling of the community and potential approaches for integrating DERs. We analyze and discuss annual simulations under normal operating conditions and week-long simulations under electric power grid outage conditions.

03 NATURAL GAS↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

BETTER Together

The Standard Energy Efficiency Data (SEED) and Building Efficiency Targeting Tool for Energy Retrofits (BETTER) platforms are both developed by the Department of Energy and work better together. SEED is a database to manage building characteristics and performance data from a variety of sources. BETTER provides simple energy efficiency measure analyses based on high level data about the building or portfolio of buildings. A demonstration of each platform and their integration will be provided. The inputs for BETTER are building type, floor area, location, utility data, and whether PV shall be included in the analysis. The BETTER analysis can be manually set up through the web application or data can be uploaded with a BuildingSync XML file either directly or through the API. SEED can be the source of this data and the data can be sent to BETTER through the SEED application after the BETTER API token has been entered. The benefit of utilizing SEED is that it has connections to many other sources of data such as ENERGY STAR Portfolio Manager, Audit Template, and Salesforce. Therefore, it is likely that a user of SEED will already have the required inputs for BETTER in SEED already and can create BETTER analyses across their whole portfolio in a couple mouse clicks. This is a major time savings and enables decision makers an easy path to identify buildings that should undergo more detailed audits or retrofit pathways.

ASHRAE↗

CMB-S4: Foreground-cleaning Pipeline Comparison for Measuring Primordial Gravitational Waves

We compare multiple foreground-cleaning pipelines for estimating the tensor-to-scalar ratio, r, using simulated maps of the planned CMB-S4 experiment within the context of the South Pole Deep Patch. To evaluate robustness, we analyze bias and uncertainty on r across various foreground suites using map-based simulations. The foreground-cleaning methods include: a parametric maximum likelihood approach applied to auto- and cross-power spectra between frequency maps; a map-based parametric maximum-likelihood method; and a harmonic-space internal linear combination using frequency maps. We summarize the conceptual basis of each method to highlight their similarities and differences. To better probe the impact of foreground residuals, we implement an iterative internal delensing step, leveraging a map-based pipeline to generate a lensing B-mode template from the large aperture telescope frequency maps. Our results show that the performance of the three approaches is comparable for simple and intermediate-complexity foregrounds, with σ(r) ranging from 3–5 ×10 −4 . However, biases at the 1σ–2σ level appear when analyzing more complex forms of foreground emission. By extending the baseline pipelines to marginalize over foreground residuals, we demonstrate that contamination can be reduced to within statistical uncertainties, albeit with a pipeline-dependent impact on σ(r), which translates to a detection significance between 2σ and 4σ for an input value of r = 0.003. These findings suggest varying levels of maturity among the tested pipelines, with the auto- and cross-spectra-based approach demonstrating the best stability and overall performance. Moreover, given the extremely low noise levels, mutual validation of independent foreground-cleaning pipelines is essential to ensure the robustness of any potential detection.

astronomy data analysis↗

Recommended Target Fields for Commissioning the Vera C. Rubin Observatory

The commissioning team for the Vera C. Rubin observatory is planning a set of engineering and science verification observations with the Legacy Survey of Space and Time (LSST) commissioning camera and then the Rubin Observatory LSST Camera. The time frame for these observations is not yet fixed, and the commissioning team will have flexibility in selecting fields to observe. In this document, the Dark Energy Science Collaboration (DESC) Commissioning Working Group presents a prioritized list of target fields appropriate for testing various aspects of DESC-relevant science performance, grouped by season for visibility from Rubin Observatory at Cerro Pachon. Our recommended fields include Deep-Drilling fields (DDFs) to full LSST depth for photo-$z$ and shape calibration purposes, HST imaging fields to full depth for deblending studies, and an $\sim$200 square degree area to 1-year depth in several filters for higher-level validation of wide-area science cases for DESC. We also anticipate that commissioning observations will be needed for template building for transient science over a broad RA range. We include detailed descriptions of our recommended fields along with associated references. We are optimistic that this document will continue to be useful during LSST operations, as it provides a comprehensive list of overlapping data-sets and the references describing them.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Methodology and Tool for the Physical Security Analysis of Micro and Advanced Reactors

This work proposes a dynamic evaluation methodology to relax the conservatism in physical security evaluation, by leveraging an ongoing work in the Light Water Reactor Sustainability pathway. This methodology is implemented in a dynamic risk assessment tool named Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The work extends EMRALD’s capability to support a sandbox feature where analysts can easily create attack scenarios and modify advanced/small modular reactor (A/SMR) security and safety features using templates. This approach saves time and cost since the analysis does not require creating detailed computer-aided design models, as is commonly required in commercial force-on-force software tools. EMRALD is completely free to use at https://emraldapp.inl.gov. We have developed basic templates including physical barriers, intrusion sensors, physical areas, and safety actions, that can be downloaded from EMRALD’s GitHub site: https://github.com/idaholab/EMRALD. These templates use generic data commonly used for training purposes, which do not reflect any actual operating nuclear reactor. Users may adjust the data in the templates with their own dataset and/or create new templates in EMRALD. The proposed methodology combines security and safety by assessing sabotage effects up to the radiological consequence to the public instead of merely the core damage state. This practice follows the industry standard for advanced non-light-water reactors currently proposed for endorsement by the Nuclear Regulatory Commission. The combination of security and safety is expressed in an achievability-consequence chart. EMRALD can be used to generate data for this chart. A hypothetical case study using a representative sodium-cooled fast reactor (SFR) facility is presented in this report to demonstrate this methodology. This case study does not contain any actual nuclear plant information. This work will benefit A/SMR vendors and utilities to implement security by design during the reactor design iteration phase, such that they do not have to perform upgrades and retrofits to the reactor after it is installed to improve its physical protection system. The tool may also be used to analyze domestic or foreign reactor designs to support the International Nuclear Security Techniques for Advanced Reactors (INSTAR) bilateral missions. Future works are planned to implement the methodology on a reference SFR reactor and a reference high-temperature gas-cooled reactor to obtain insights and lessons-learned for the A/SMR community.

97 MATHEMATICS AND COMPUTING↗

Integrated Methane Monitoring Platform Extension, Volume I: Final Technical Report

The IMMPE project, DE-FE0032284, was to enhance methane monitoring technologies and their applications across various natural gas asset classes. The scope included deploying advanced methane detection and monitoring technologies to identify and mitigate fugitive methane emissions, measuring emission rates, and assessing impacts. The findings included the successful mitigation of identified emissions and quantification of emission rates. A key outcome was the development of a comprehensive template and summary of recommendations for methane emissions monitoring, which is replicable for both upstream and downstream applications. Furthermore, the project emphasized the importance of education by providing training opportunities for technicians and regulators, thereby fostering awareness and promoting the adoption of cost-effective methane emissions monitoring and management techniques.

02 PETROLEUM↗

Irrigation Modernization Task 4: Accelerating Energy Solutions (FY2022 Final Report)

This report offers insights on energy solutions for irrigation modernization that serve the needs of farmers as well as residents and industry in the local community. Solutions are found in the irrigation districts where local generation from renewable energy sources – solar, hydro, and wind – can be combined with energy storage and customer loads. These combined resources configured in microgrids can lower costs during peak loads and provide resiliency by maintaining electricity supply during outages. The goal of this project, as stated in the FY2022 AOP, is to promote realization of energy solutions that are tailored to physical location, community, infrastructure, and energy value streams. Further, it is to develop examples of how to increase value of, and overcome barriers to, energy solutions in the context of irrigation modernization. In pursuit of that goal, the project looked at options for: 1) Reducing the cost of energy consumed in irrigation systems, 2) Increasing the revenue from surplus power generation, and 3) Deploying new power generation configured as part of a local microgrid. Potential solutions to reducing energy costs and increasing surplus power revenue revolve around addressing regulatory and legal constraints tied to how power is purchased by and sold to the irrigator or irrigation district. Some headway was made in identifying barriers and ways to push utilities to be more accommodating to distributed energy sources; however, for the most part, real progress hinges on changes at the regulatory and legislative level. Deployment of local, renewable generation systems can be implemented provided the economics of the project and the location are favorable. In concert with Famers Conservation Alliance and Energy Trust of Oregon, a number of approaches were studied in the past year, including off-grid solar powered pumps, grid-tied community solar projects, and in-conduit canal hydropower systems. Ultimately three viable projects were identified: 1) North Unit Irrigation District/City of Redmond, Oregon Critical Facility Microgrid – offers combined in-conduit hydro and solar power generation. 2) Wallowa County/Joseph, Oregon Irrigation System Upgrades – centered on upgrades to a non-powered dam that will add a turbine as well as in-conduit power in canal feeders downstream. 3) Medford, Oregon Wastewater Treatment Plant Biogas Cogeneration System – centered on building out biogas storage and grid upgrades to power the plant, sell excess power, and provide emergency backup power (supplanting a diesel generator). Each of these projects has characteristics that broaden the understanding of the value of microgrids employing renewable energy to achieve resiliency and net-zero carbon goals. The first two projects are centered on new hydropower systems. Although the Medford project is only tangentially tied to an irrigation district, it was selected for study analysis as it was the only one mature enough (with sufficient data) to complete an analysis within this project year. Thus, we chose to move forward developing a case study, in concert with the Community Water-Power Resilience project, to demonstrate a method for evaluating such projects. Essentially, this case study serves as a template for studies to be carried out next year that more directly involve irrigation system hydropower, e.g., the project at the Wallowa County/Joseph, Oregon Irrigation System. Lastly, it is recognized that the locations and case studies in this report are all located in Oregon. We recognize this as a limitation. While the intent is not to ignore other states or regions, this result is driven by the fact that we have cultivated a collaboration with non-profit entities in Oregon that focus on these topics – Farmers Conservation Alliance and Energy Trust of Oregon. These partners were central to identifying projects that may be good fits for this program. A goal in the coming year is to establish collaboration with entities in other states/regions that, similarly, can connect us to potential projects in their geographic area. The potential benefits from the WPTO’s support for demonstration projects as energy solutions in irrigation districts include: (1) Alternative power supplies for communities and farms using renewable, carbon-free energy resources, (2) Cost savings for electricity for communities and farms, (3) Resiliency of power supplies for critical loads when electricity from the grid is not available, (4) Resiliency of power supplies for critical infrastructure in the event of catastrophic events, and (5) Demonstration of irrigation modernization projects that provide resilience and a reduced carbon footprint to irrigation districts and nearby communities. These deployments can serve as vanguards/archetypes spurring similar projects in other districts and states.

13 HYDRO ENERGY↗