Search NASA⌕ Search

SEARCH · Search NASA

Results for “risks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Risk-Based SMA and Modernizing Risk Classification at GSFC

In 2014, in response to a large volume of feedback from industry, the science community, and internal to Goddard Space Flight Center (GSFC), GSFC’s Safety and Mission Assurance (SMA) Directorate began a transition to a risk-based implementation of SMA, departing from its longstanding practice of being primarily driven by a mostly static set of Mission Assurance Requirements. The transition started out with a pilot project involving risk-based acceptance of bare-printed circuit boards that was enormously successful, continued through a complete organizational transformation in 2015, and culminated with the baselining of formal Risk-Based SMA policy in 2016. In this presentation we will describe the risk-based SMA concept, segue into how it shapes a modernization of risk classification that GSFC has rolled out, and provide results from the original pilot project for risk-based SMA, involving the printed circuit board assurance process.

Jesse Leitner↗

Risk Classification and Risk-based Safety and Mission Assurance

Recent activities to revamp and emphasize the need to streamline processes and activities for Class D missions across the agency have led to various interpretations of Class D, including the lumping of a variety of low-cost projects into Class D. Sometimes terms such as Class D minus are used. In this presentation, mission risk classifications will be traced to official requirements and definitions as a measure to ensure that projects and programs align with the guidance and requirements that are commensurate for their defined risk posture. As part of this, the full suite of risk classifications, formal and informal will be defined, followed by an introduction to the new GPR 8705.4 that is currently under review.GPR 8705.4 lays out guidance for the mission success activities performed at the Classes A-D for NPR 7120.5 projects as well as for projects not under NPR 7120.5. Furthermore, the trends in stepping from Class A into higher risk posture classifications will be discussed. The talk will conclude with a discussion about risk-based safety and mission assuranceat GSFC.

Risk Management↗

Risk Tolerance and Safety Culture: Minimizing the Risk of Catastrophe by Bringing the Lessons of Space Home

The Johnson Space Center has pursued integrating safety culture and risk management practices and techniques throughout a large organization with an extraordinarily diverse mission. Past mission and institutional failures have been used to inform NASA's safety culture and a implement a uniform risk management environment. Basics from the loss prevention industry have influenced NASA's approach to sustaining its unique, yet aging, infrastructure. Lessons learned at NASA can augment and enhance occupational safety, health and risk management capabilities within hazardous industries. By focusing on risk informed decision-making, building a pervasive safety culture, and accommodating human factors, NASA's safety capabilities have been specifically developed to minimize the risk of loss of life and loss of mission.

Mishap↗

Risk Tolerance and Safety Culture: Minimizing the Risk of Catastrophe by Bringing the Lessons of Space Home

The Johnson Space Center has pursued integrating risk management practices and techniques throughout a large organization with an extraordinarily diverse mission. Past mission and institutional failures have been used to inform NASA's safety culture and a implement a uniform risk management environment. Basics from the loss prevention industry have influenced NASA's approach to sustaining its unique, yet aging, infrastructure. Lessons learned at NASA can augment and enhance occupational safety, health and risk management capabilities within hazardous industries. By focusing on risk informed decision-making, building a pervasive safety culture, and accommodating human factors, NASA's safety capabilities have been specifically developed to minimize the risk of loss of life and loss of mission.

Loyd, David↗

A Risk Analysis Tool for Estimating the Risk of Electrical Failures Due to Human Induced Defects

Aerospace electrical systems are required to withstand and adequately operate in extremely harsh environments that include, for example, high radiation exposure, temperature extremes, intense vibrational stress and drastic temperature cycling. The nature of aerospace electronics also demands high reliability since, with very few exceptions, there is no chance for hardware servicing or repairs. Common risk mitigation techniques for this type of situation are to perform a Reliability Analysis of the system throughout the development cycle, and to use electrical components that are regarded as “high reliability” because of additional controls and requirements applied in their design, manufacturing and testing. Unfortunately, studies have shown that even though these techniques are used, many systems fail to meet mission requirements well before the predicted lifetimes. This paper presents the analysis of failures of electrical parts, experienced during various stages of system development, at NASA Goddard Space Flight Center, Greenbelt MD, between the years 2001 and 2013. These components were subjected to qualification, screening and testing in which the goal was to ensure that the components would survive the stresses of the mission. The analysis categorizes failures by part type and failure mechanisms. One of the results of the analysis was the realization that a surprising proportion of failures experienced during system integration and testing were caused by human error (i.e. human induced defect). Further analysis included the determination of root failure mechanisms and any influencing factors contributing to these failures. The major causes of these defects were attributed to electrostatic damage (ESD), electrical overstress (EOS), mechanical overstress (MOS), and thermal overstress (TOS). Finally, the study proposes a risk analysis tool which incorporates these major causes for the failures, termed error-producing conditions (EPCs), and a proportionality factor representing the number of each type of failure that has occurred at the facility under study. These factors are quantified and used to communicate the risk of human induced defects for the assembly, integration and testing of space hardware based on the system’s electrical parts list. The new risk identification can trigger risk-mitigating actions more effectively, based on the presence of component categories or other hazardous conditions that have a history of failure due to human error.

Majewicz, Peter J.↗

NASA Risk Management: Speaking the Format of Risk

NASA's Risk Management Program is designed to communicate risk at all levels of the Agency. This presentation serves as an introduction to NASA Risk Management principles and risk-informed decision making. The contents of this presentation are intended to familiarize attendees of NASA's Quality Leadership Forum with how to incorporate risk communication into their practices.

Dacko, Taylor↗

Evaluation of the Spaceflight Cardiovascular Disease Risk using the Clinical Prediction Model Astro-Charm and the NASA Radiation Risk Model

Exposure to space radiation and other spaceflight hazards may pose an increased risk for cardiovascular diseases (CVD) during and after spaceflight [1], that should be quantified to plan future long-duration space missions such as the flight to Mars. The first CVD clinical prediction models (CPMs) for individuals were developed by the Framingham Heart Study investigators in the 1960’s. Since then, many CPMs have been developed and refined. The CPMs consider cardiovascular risk factors such as blood pressure, diabetes, cholesterol, and smoking. As there is a relationship between radiation-induced CVD risk and the background (non-exposed) CVD risk, it is possible to use CPMs to calculate a personalized risk for astronauts.

I. Plante↗

Got risk? risk-centric perspective for spacecraft technology decision-making

A risk-based decision-making methodology conceived and developed at JPL and NASA has been used to aid in decision making for spacecraft technology assessment, adoption, development and operation. It takes a risk-centric perspective, through which risks are used as a reasoning step to interpose between mission objectives and risk mitigation measures.

risk↗

Carbon/graphite fiber risk analysis and assessment study: Assessment of risk to the Lockheed Model L-1011 commercial transport aircraft

The risk associated with the accidental release of carbon/graphite fibers (CF) from fires on commercial transport aircraft incorporating composite materials was assessed. Data are developed to evaluate the potential for CF damage to electrical and electronic equipment, assess the cost risk, and evaluate the hazard to continued operation. The subjects covered include identification of susceptible equipments, determination of infiltration transfer functions, analysis of airport operations, calculation of probabilities of equipment failures, assessment of the cost risk, and evaluation of the hazard to continued operation. The results show the risks associated with CF contamination are negligible through 1993.

Daniledes, J.↗

The Use of the Satellite Breakup Risk Assessment Model (SBRAM) to Characterize Collision Risk to Manned Spacecraft

NASA uses environment models such as ORDEM96 to characterize the long-term orbital debris collision hazard for spacecraft in LEO. Occasionally, however, there are breakups of satellites or rocket bodies that create enhanced collision hazard for a period of time. This enhanced collision hazard can pose increased risks to space operations - especially those involving manned missions where the tolerance for risk is very low. NASA has developed SBRAM to simulate the enhanced debris environment in the days and weeks that follow such a breakup. This simulation provides the kind of risk probabilities that can be used by mission planners to consider if changes are warranted for the mission. Announcements of breakups come to NASA from US Space Command as soon as they are identified. The pre-breakup orbit and time of breakup are used to determine the initial conditions of the explosion. SBRAM uses the latest explosion models developed at NASA to simulate a debris cloud for the breakup. The model uses a Monte Carlo technique to create a random debris cloud from the probability distributions in the breakup model. Each piece of debris randomly created in the cloud is propagated in a deterministic manner to include the effects of drag and other orbital perturbations. The detailed geometry of each simulated close approach to the target spacecraft is noted and logged and the collision probability is computed using an estimated probability density in down-range and cross-range positions of both the target spacecraft and debris object. The collision probability is computed from the overlap of these probability densities for each close-approach geometry and summed over all computed conjunctions. Cloud propagation runs over the desired time interval are then repeated until the scale of the collision risk can be estimated to a desired precision. This paper presents an overview of the SBRAM model and a number of examples, both real and hypothetical, to demonstrate its use. In addition, a number of different examples are shown how the data can be used by decision makers on issues such as spacecraft orientation and timing of EVAs.

Matney, Mark J.↗

Independent Review of U.S. and Russian Probabilistic Risk Assessments for the International Space Station Mini Research Module #2 Micrometeoroid and Orbital Debris Risk

The Mini-Research Module-2 (MRM-2), a Russian module on the International Space Station, does not meet its requirements for micrometeoroid and orbital debris probability of no penetration (PNP). To document this condition, the primary Russian Federal Space Agency ISS contractor, S.P. Korolev Rocket and Space Corporation-Energia (RSC-E), submitted an ISS non-compliance report (NCR) which was presented at the 5R Stage Operations Readiness Review (SORR) in October 2009. In the NCR, RSC-E argued for waiving the PNP requirement based on several factors, one of which was the risk of catastrophic failure was acceptably low at 1 in 11,100. However, NASA independently performed an assessment of the catastrophic risk resulting in a value of 1 in 1380 and believed that the risk at that level was unacceptable. The NASA Engineering and Safety Center was requested to evaluate the two competing catastrophic risk values and determine which was more accurate. This document contains the outcome of the assessment.

Squire, Michael D.↗

2015 Sensorimotor Risk Standing Review Panel Evidence and Status Review For: the Risk of Impaired Control of Spacecraft/Associated Systems and Decreased Mobility Due to Vestibular/Sensorimotor Alterations Associated with Spaceflight

The 2015 Sensorimotor Risk Standing Review Panel (from here on referred to as the SRP) participated in a WebEx/teleconference with members of the Human Health Countermeasures (HHC) Element, representatives from the Human Research Program (HRP), NASA Headquarters, and NASA Research and Education Support Services (NRESS) on December 17, 2015 (list of participants is in Section VI of this report). The SRP reviewed the new Evidence Report for the Risk of Impaired Control of Spacecraft/Associated Systems and Decreased Mobility Due to Vestibular/Sensorimotor Alterations Associated with Spaceflight (from here on referred to as the 2015 Sensorimotor Evidence Report), and also received a status review of the Risk. The opening section of the 2015 Sensorimotor Evidence Report provides written descriptions of various incidents that have occurred during space missions. In most of these incidents, the main underlying contributing factors are not easy to identify unambiguously. For example, in section 1.9, a number of falls occurred while astronauts were walking on the moon. It is not clear to the SRP, however, why they fell. It is only possible to extrapolate from likely specific psychophysical or physiological abnormalities, but how these abnormalities were determined, and how they were directly responsible for the falls is unclear to the SRP. Section 2.1.2 on proprioception is very interesting, but the functional significance of the abnormalities detected is not clear. The SRP sees this as a problem throughout the report: a mapping between the component abnormalities identified and the holistic behaviors that are most relevant, for example, controlling the vehicle, and locomotion during egress, is generally lacking. The SRP thinks the cognitive section is too strongly focused on vestibular functioning. The SRP questions the notion that the main cognitive effects are mainly attributable to reversible vestibular changes induced by spaceflight. The SRP thinks that there can also be independent cognitive effects. The Functional Task Test (FTT) protocols and the Field Test are particularly valuable. The conclusion is that the unloading of major postural muscles experienced during spaceflight plays a central role in the alteration of functional task performance and balance control. This conclusion stands in contrast with the statements in other parts of the document that emphasize the role of vestibular changes on these functions. It would help to more fully integrate these two views on the predominant effects of spaceflight. Although the SRP thinks the countermeasures section is interesting, the proposed countermeasures are not well integrated with the abnormalities described in previous sections. The SRP thinks it would help enormously to have explicit links among each abnormality, its 2015 Sensorimotor Risk SRP Evidence Review Final Report 2 overall importance/impact on function, and the appropriate countermeasure that can be implemented to maintain adequate functioning.

Steinberg, Susan↗

Space flight risk data collection and analysis project: Risk and reliability database

The focus of the NASA 'Space Flight Risk Data Collection and Analysis' project was to acquire and evaluate space flight data with the express purpose of establishing a database containing measurements of specific risk assessment - reliability - availability - maintainability - supportability (RRAMS) parameters. The developed comprehensive RRAMS database will support the performance of future NASA and aerospace industry risk and reliability studies. One of the primary goals has been to acquire unprocessed information relating to the reliability and availability of launch vehicles and the subsystems and components thereof from the 45th Space Wing (formerly Eastern Space and Missile Command -ESMC) at Patrick Air Force Base. After evaluating and analyzing this information, it was encoded in terms of parameters pertinent to ascertaining reliability and availability statistics, and then assembled into an appropriate database structure.

Source record↗

Biodosimetry as a New Paradigm for Determination of Radiation Risks and Risk-Mitigation in Astronauts Exposed to Space Radiation

Predicting risk of cancer in astronauts exposed to space radiation is challenging partly because uncertainties of absorption of dose and the processing of dose-related damage at the cellular level degrade the confidence of predicting the expression of cancer. Cellular biodosimeters that simultaneously report: 1) the quantity of absorbed dose after exposure to ionizing radiation, 2) the quality of radiation delivering that dose, and 3) the macromolecular profiles related to malignant transformation in cells absorbing that dose would therefore be useful. An approach to such a multiparametric biodosimeter will be reported, This is the demonstration of two dose-responsive field-effects of enhanced protein-expression. In one case, expression of keratin 18 (K18) in cultures of human mammary epithelial cells (HMEC) irradiated with cesium-137 gamma-rays is enhanced following exposure of log phase cells to relatively low doses of 30 to 90 cGy. K18 has been reported by a marker for tumor staging and for apoptosis. In the second case, expression of connexin 43 (Cx43) is increased in irradiated stationary phase cultures of HMEC, indicating enhanced formation of gap junctions. Gap junctions have been reported to be involved in bystander effects following irradiation. It is a biodosimeter for assessing radiogenic damage. It is suggested further that such biomolecular dosimetry may introduce a new paradigm for assessing cancer risk and risk-mitigation in individuals, a requirement for managing radiation health in astronauts during extended missions in space. This new paradigm is built upon the statistical power provided by the use of functional genomics and proteomics represented in combined gene- and protein-expression assays.

Richmond, Robert↗

Achieving a Risk-Informed Decision-Making Environment at NASA: The Emphasis of NASA's Risk Management Policy

This slide presentation reviews the evolution of risk management (RM) at NASA. The aim of the RM approach at NASA is to promote an approach that is heuristic, proactive, and coherent across all of NASA. Risk Informed Decision Making (RIDM) is a decision making process that uses a diverse set of performance measures along with other considerations within a deliberative process to inform decision making. RIDM is invoked for key decisions such as architecture and design decisions, make-buy decisions, and budget reallocation. The RIDM process and how it relates to the continuous Risk Management (CRM) process is reviewed.

Dezfuli, Homayoon↗

2013 Immune Risk Standing Review Panel Evidence Review for: The Risk of Crew Adverse Health Event Due to Altered Immune Response

The 2013 Immune Risk Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on February 3-4, 2014. The SRP reviewed the new Evidence Report for the Risk of Crew Adverse Health Event Due to Altered Immune Response (from here on referred to as the 2013 Immune Evidence Report), as well as the Research Plan for this Risk that is in the current version of the Human Research Program’s (HRP) Integrated Research Plan (IRP).

Steinberg, Susan↗

ESMD Risk Management Workshop: Systems Engineering and Integration Risks

This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

Systems Engineering↗