Search NASA⌕ Search

SEARCH · Search NASA

Results for “scenario planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The National Transmission Planning Study: Chapter 5: Stress Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Generating Sequential PV Deployment Scenarios for High Renewable Distribution Grid Planning

This paper introduces a novel approach for generating solar photovoltaic (PV) plant deployment scenarios for grid integration planning. The approach guarantees consistency among scenarios of the same deployment by ensuring that higher penetration scenarios contain PV units deployed in lower penetration scenarios. It also constrains the size and spatial distribution of the PV plants and considers three placement types. A case study on a real-world distribution system proves that the precepts of scenario consistency, deployment diversity, and placement are met. The study further investigates the impact of the resulting scenarios via a stochastic hosting capacity analysis. Results indicate that the ratio between PV and load sizes, referred to as the nodal PV penetration factor (NPPF), is a key driver of the grid integration impact. By reducing the NPPF from 5 to 2, the maximum hosting capacity increased by at least 112%. The study also reveals that scenarios under random placement can lead to higher hosting capacity values.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Generating Sequential PV Deployment Scenarios for High Renewable Distribution Grid Planning: Preprint

This paper introduces a novel approach for generating solar photovoltaic (PV) plant deployment scenarios for grid integration planning. The approach guarantees consistency among scenarios of the same deployment by ensuring that higher penetration scenarios contain PV units deployed in lower penetration scenarios. It also constrains the size and spatial distribution of the PV plants and considers three placement types. A case study on a real-world distribution system proves that the precepts of scenario consistency, deployment diversity, and placement are met. The study further investigates the impact of the resulting scenarios via a stochastic hosting capacity analysis. Results indicate that the ratio between PV and load sizes, referred to as the nodal PV penetration factor (NPPF), is a key driver of the grid integration impact. By reducing the NPPF from 5 to 2, the maximum hosting capacity increased by at least 112%. The study also reveals that scenarios under random placement can lead to higher hosting capacity values.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

The National Transmission Planning Study: Chapter 3: Transmission Portfolios and Operations for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 4: AC Power Flow Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Data-driven profile prediction for DIII-D

A new, fully data-driven algorithm has been developed that uses neural networks to predict plasma pro les on a scale of τ E into the future given actuators and the present plasma state. The model was trained and tested on DIII-D data from the 2013-2018 experimental campaigns. The model is accurate on average, with q predictions the worst and pressure predictions the best. The model can run in milliseconds and is very simple to use. This makes it a potentially useful tool for operators and physicists when planning plasma scenarios. It also is a candidate for doing phase-space exploration without going through the DIIID database or complicated and computationally expensive simulation codes. Here, a reduced model using only realtime diagnostics has also been developed and formed the basis for a model-predictive control algorithm implemented and successfully tested on DIII-D.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Error field predictability and consequences for ITER

Abstract ITER coil tolerances are re-evaluated using the modern understanding of coupling to least-stable plasma modes and an updated center-line-traced model of ITER’s coil windings. This reassessment finds the tolerances to be conservative through a statistical, linear study of n = 1 error fields (EFs) due to tilted, shifted misplacements and nominal windings of central solenoid and poloidal field coils within tolerance. We also show that a model-based correction scheme remains effective even when metrology quality is sub-optimal, and compare this to projected empirical correction schemes. We begin with an analysis of the necessity of error field correction (EFC) for daily operation in ITER using scalign laws for the EF penetration threshold. We then consider the predictability of EF dominant mode overlap across early planned ITER scenarios and, as measuring EFs in high power scenarios can pose risks to the device, the potential for extrapolation to the ITER Baseline Scenario (IBS). We find that carefully designing a scenario matching currents proportionally to those of the IBS is far more important than plasma shape or profiles in accurately measuring an optimal correction current set.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Biosphere Futures: a database of social-ecological scenarios

T. Biosphere Futures (https://biospherefutures.net/) is a new online database to collect and discover scenario studies from across the world, with a specific focus on scenarios that explicitly incorporate interdependencies between humans and their supporting ecosystems. It provides access to a globally diverse collection of case studies that includes most ecosystems and regions, enabling exploration of the multifaceted ways in which the future might unfold. Together, the case studies illuminate the diversity and plurality of people’s expectations and aspirations for the future. The objective of Biosphere Futures is to promote the use of scenarios for sustainable development of the biosphere and to foster a community of practice around social-ecological scenarios. We do so by facilitating the assessment, synthesis, and comparative analysis of scenario case studies, pointing to relevant resources, and by helping practitioners and researchers to disseminate and showcase their own work. This article begins by outlining the rationale behind the creation of the database, followed by an introduction to its functionality and the criteria employed for selecting case studies. Subsequently, we present a synthesis of the first 100 case studies included in the scenarios database, highlighting emerging patterns and identifying potential avenues for further research. Finally, given that broader utilization and contributions to the database will enhance the achievement of Biosphere Futures’ objectives, we invite the creators of social-ecological scenarios to contribute additional case studies. By expanding the database’s breadth and depth, we can collectively foster a more nuanced understanding of the possible trajectories of our biosphere and enable better decision making for sustainable development.

54 ENVIRONMENTAL SCIENCES↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Strategy Implementation Plan”

[This is part of a hypothetical scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] In prior years, as a part of efforts to strengthen and better sustain nuclear security within the State, Centralia requested through the Integrated Nuclear Security Support Plan (INSSP) framework that the International Atomic Energy Agency (IAEA) conduct an expert mission on establishing and operating a national nuclear security support centre (NSSC). After the IAEA conducted the NSSC expert mission, members of the Centralia Committee on Nuclear Security (CNS) agreed to initiate the feasibility determination phase of establishing an NSSC, in line with the systematic process recommended by the IAEA. Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, prepared a Feasibility Report in collaboration with members of the CNS and based on input gathered among relevant national stakeholders. The report was presented to the National Security Advisor (NSA), who reviewed and approved the proposal for Centralia to proceed with establishing an NSSC. After Centralia moved into the planning phase for the Centralia Nuclear Security Support Centre (CNSSC), per REF, the primary stakeholders of the centre jointly developed this strategy implementation plan, which provides an outline of the organizational structure, needs analysis, programme objectives, financial and project management, risk management, and other key aspects of the centre. This document will be reviewed and updated as necessary on a semi-annual basis during the project implementation period of establishing CNSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Spatiotemporal Super-Resolution with Generative Machine Learning for Creating Renewable Energy Resource Data Under Climate Change Scenarios

As we plan for a future with higher penetrations of renewables and increasing electrification, it becomes more important to understand how the electricity grid will operate under a variety of weather events. We must also consider that the weather our future grid will experience will be different and possibly more extreme than the historical weather that we have extensive data for. We can use data from global climate models (GCMs) to help understand how our climate may change over the next several decades, but there is often a significant gap between the low-resolution GCM data and the high-resolution weather data required to study power systems under specific weather events. Therefore, our objective in this work is to develop tools that can bridge this gap by using low-resolution GCM data to create realistic high-resolution weather datasets that can be used to study renewable energy generation and electricity demand. To accomplish this objective, we have developed a set of generative machine learning models that can rapidly downscale GCM daily average output data at an approximate grid resolution of 100km to hourly data at an approximate 4 km grid resolution. The models can be used to create high resolution data from nearly any GCM included in the Coupled Model Intercomparison Project (CMIP) Phase 5 or 6. Our methods include all datasets regularly used to study the integration of wind and solar power plants as well as changes in electricity demand due to heating and cooling loads. These models and datasets enable power systems modelers to study climate change-influenced weather events and their impact on the grid. We have downscaled and validated wind, solar, temperature, and humidity data with very promising results. The generative machine learning methods are computationally efficient and produce data that has similar statistical characteristics to current state-of-the-art historical datasets. We have trained initial generative models and produced an initial dataset collectively referred to as Sup3rCC: Super-Resolved Renewable Energy Resource Data with Climate Change Impacts. The data covers a (mostly) historical period from 2015-2025 and a future period from 2050-2059. We have also taken hypothetical high-electrification load data and scaled the heating and cooling loads with respect to the 2050-2059 high-resolution Sup3rCC meteorology. The results show how future levels of renewable energy generation and electrified load may be impacted by climate change, setting the stage for capacity expansion models to consider a dynamic climate through model years.

climate change↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Scenario optimization for the tokamak ramp-down phase in RAPTOR: Part B. safe termination of DEMO plasmas

An optimized plasma current ramp-down strategy is critical for safe and fast termination of plasma discharges in a tokamak demonstration fusion reactor (DEMO), both in planned and emergency scenarios, avoiding plasma disruptions and excessive heat loads to the first wall. Plasma stability limits and machine-specific technical requirements constrain the stable envelope through which the plasma must be navigated. Large amounts of auxiliary heating are required throughout the ramp-down phase, to avoid a radiative collapse in the presence of intrinsic tungsten and seeded xenon impurities, as quantitatively estimated in this work. As the plasma current is reduced, the current density becomes increasingly peaked, reflected by a growing value of the internal inductance $\ell$ $i3$ , resulting in reduced controllability of the vertical position of the plasma. The feasibility of different plasma current ramp-down rates is tested by applying an automated optimization framework embedding the RAPTOR core transport solver. Optimal time traces for plasma current $I$ $p$ $(t)$ and plasma elongation $κ(t)$ are proposed, to satisfy an $I$ $p$ -dependent upper limit on the plasma internal inductance, as obtained from vertical stability studies using the CREATE-NL code, as well as a constraint on the time evolution of $q$ 95 , to avoid an ideal MHD mode. A negative current density near the plasma edge is observed in our simulations, even for the most conservative $I$ $p$ ramp-down rate, indicating significant transient dynamics due to a large resistive time.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Stakeholder-driven carbon neutral pathways for Thailand and Bangkok: integrated assessment modeling to inform multilevel climate governance

Thailand has established a target of carbon neutrality by 2050. Reaching this goal will require coordination and collaboration between stakeholders spanning sectors and scales, including energy system decision makers, land managers, and city planners. Robust decarbonization scenarios incorporating current plans and targets, additional measures needed, and trade-offs between strategies can help stakeholders make informed decisions in the face of uncertainty. Through iterative engagement with decision makers at the city and national levels, we develop and analyze carbon neutral scenarios for Thailand that incorporate Bangkok’s role using a global integrated assessment model. We find that Thailand can reach carbon neutrality through power sector decarbonization, energy efficiency improvements, widespread electrification, and advanced technologies including carbon capture and storage and hydrogen. Negative emissions technologies will also be needed to offset Thailand and Bangkok’s hardest-to-abate CO 2 emissions. Bangkok, as a major population and economic center, contributes significantly to Thailand’s energy demand and emissions and can therefore play an important role in climate change mitigation. Accordingly, our results underscore the importance of subnational climate action in meeting Thailand’s carbon neutral goal. Our analysis also indicates that without sustained land-based carbon sequestration, much more mitigation effort will be needed in Thailand’s energy sector, including at the subnational scale, to reach carbon neutrality. These insights can help stakeholders identify priorities, consider tradeoffs, and make decisions that will impact Bangkok and Thailand’s long-term climate change mitigation potential. This analysis demonstrates how stakeholder engagement in integrated assessment modeling can facilitate and inform multilevel climate governance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗