Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)

Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.

17 WIND ENERGY↗

Design and Characterization of the Engineering Model of the Spectrometer Onboard LuSEE-Night

The Lunar Surface Electromagnetics Explorer - Night, LuSEE-Night, is a low-frequency radio astronomy experiment that will explore the cosmic Dark Ages signal on the radio quiet farside of the Moon. The LuSEE-Night carries a radio frequency spectrometer consisting of a set of antennas, analog and digital processing electronics, and will be launched by NASA's Commercial Lunar Payload Services in 2025. The spectrometer is designed to observe the spectrum of the radio sky in the 0.5−50MHz band. The engineering model (EM) of the four-channel spectrometer has been developed. The EM has been characterized for linearity, gain, noise, and their temperature dependence, confirming that the EM meets all the requirements for LuSEE-Night. Three mitigation techniques have been implemented and verified to suppress self-induced electromagnetic interference (EMI). The flight model of the spectrometer is currently being developed and is scheduled to be shipped to the integration site in early 2024

47 OTHER INSTRUMENTATION↗

Scheduling and Control of Flexible Building Loads for Grid Services Based on a Virtual Battery Model

This paper presents a framework for modeling, scheduling, and controlling residential thermostatically controlled loads (TCLs) to provide multiple grid services, such as energy shifting, peak load reduction, and ancillary services. A modeling method is proposed to characterize the aggregate flexibility from heterogeneous TCLs using a battery-equivalent model. Based on the flexibility model, a multi-period optimal scheduling formulation is developed to best utilize the flexibility from building loads and maximize total benefits from stacked value streams. An algorithm is proposed to control individual TCLs to follow the desired power consumption in real-time. The proposed methods are illustrated and validated through simulations.

Wu, Di↗

Unlocking Autonomous Telescopes through Reinforcement Learning: An Offline Framework and Insights from a Case Study

Optimizing observational astronomy campaigns is becoming a complex and expensive task for next-generation telescopes, where manual planning of observations may tend to reach suboptimal results in terms of optimization.Reinforcement Learning (RL) has been well-demonstrated as a valuable approach for training autonomous systems, and it may provide the basis for self-driving telescopes capable of scanning the sky and optimizing the scheduling for astronomy campaigns.We have developed a framework for the optimization of telescope scheduling using RL techniques, based on a dataset containing data on a discrete set of sky locations that the telescope should visit, and a reward metric. We compared several RL algorithms applied to an offline simulation dataset based at the Stone Edge Observatory, considering a discrete set of sky locations to visit and using “t-effective” as a reward metric, a measure of the quality of the data.Deep Q-Networks (DQNs), belonging to the class of value-based methods, have shown remarkable success in the optimization of astronomical observations in our dataset. In the full environment, the average reward value in each state was found to be 92%±5% of the maximum possible reward, while on the test set it resulted in 87%±9% of the maximum possible reward.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Open Radiation Monitoring: Histogram Builder Module Design

The Open Radiation Monitoring Project seeks to develop and demonstrate a modular radiation detection architecture designed specifically for use in arms control treaty verification (ACTV) applications that will facilitate rapid development of trusted systems to meet the needs of potential future treaties. A modular architecture can be used to reduce more complex systems to a series of single purpose building blocks, thereby facilitating equipment inspection and in turn building trust in the equipment by all treaty parties. Furthermore, a modular architecture can be used to control data flow within the measurement system, reducing the risk of "hidden switches" and constraining the amount of sensitive information that could potentially be inadvertently leaked. This report details the first revision of a prototype circuit that will convert analog pulses directly into a histogrammed data set for further processing. The circuit was designed with both spectroscopy and multiplicity analysis in mind but can, in principle, be used to reduce any raw data stream into a histogram. The number of output channels is limited, and the histogram bin ranges are user configurable to allow for non-uniform and discontinuous bins, which makes it possible to restrict the information being passed down stream if desired. Pulse processing relies entirely on analog circuitry and non- programmable logic, which enables operation without the need for a central processor or other programmable control unit. The circuit remains untested under the Open Radiation Monitoring project due to the closure of the sponsoring program. However, further development and testing is scheduled to take place in support of a purpose-built trusted verification system development effort known as COGNIZANT, which demonstrates the potential benefit of developing a suite of modular trusted system components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

An exploration of online-simulation-driven portfolio scheduling in Workflow Management Systems

Workflow Management Systems used to automate the execution of scientific workflow applications on parallel and distributed computing platforms must make scheduling decisions at runtime. A large number of workflow scheduling algorithms have been proposed in the literature, but often these algorithms are evaluated based on simplifying assumptions that may not hold in practice. Furthermore, published algorithm evaluation and/or comparison results are necessarily only for a subset of all possible scenarios, and thus may not include scenarios relevant to particular use-cases. Consequently, it is difficult for Workflow Management Systems (WMSs) developers to decide which scheduling algorithm should be implemented. To obviate this difficulty, one possible approach is to implement a portfolio of scheduling algorithms and select the most effective algorithm at runtime. One method for performing this selection is to run an online simulation for each algorithm in the portfolio. The algorithm that leads to the best performance, in simulation, is selected for future use. The above simulation-driven portfolio scheduling (SDPS) approach has been proposed in a few parallel and distributed computing contexts. The main objective of this work is to evaluate the feasibility and potential merit of SDPS if implemented in WMSs. Here we perform this evaluation using simulated WMS executions, where the simulations are instantiated from real-world platform and workflow configurations. Our main finding is that SDPS is on par with or outperforms an approach in which a single algorithm is used, where this algorithm is the one that performs best on average across all our experimental scenarios. Furthermore, we find that SDPS remains an attractive proposition even in the presence of high levels of simulation error and for simulators with relatively low levels of sophistication. In many of our experimental scenarios we find that mitigating simulation error at runtime can further improve performance. Finally, we show that simulation overhead can be made sufficiently low for SDPS to be feasible in practice.

97 MATHEMATICS AND COMPUTING↗

Simulation-based assessment on stochastic load scheduling for building cooling systems

Here, to fill knowledge gaps related to stochastic load scheduling, we performed a comprehensive evaluation of the stochastic load scheduling for building cooling systems. Specifically, we studied the common uncertain variables in the load scheduling process for building cooling systems and categorized those variables based on their dynamic patterns. We then developed a generic stochastic load scheduling framework and applied it to building cooling systems that served a simulated community. This community consists of 100 heterogeneous houses and serves as a virtual testbed for evaluating the performance of stochastic load scheduling. In this evaluation, we considered representatives of uncertain variables with different dynamic patterns and included 100 realizations of the considered uncertainty in the evaluation to better catch the probability distribution of the control performance. The evaluation results suggest that deterministic load scheduling can reduce the operating energy cost by 18% but its performance can be affected by uncertainty. Stochastic load scheduling can further decrease the operating energy cost under uncertainty compared to deterministic load scheduling. We also found that the effectiveness of stochastic load scheduling in handling uncertainty is not directly associated with the number of uncertainty scenarios that are considered in its formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Principled Schedulability Analysis for Distributed Storage Systems Using Thread Architecture Models

In this article, we present an approach to systematically examine the schedulability of distributed storage systems, identify their scheduling problems, and enable effective scheduling in these systems. We use Thread Architecture Models (TAMs) to describe the behavior and interactions of different threads in a system, and show both how to construct TAMs for existing systems and utilize TAMs to identify critical scheduling problems. We specify three schedulability conditions that a schedulable TAM should satisfy: completeness, local enforceability, and independence; meeting these conditions enables a system to easily support different scheduling policies. We identify five common problems that prevent a system from satisfying the schedulability conditions, and show that these problems arise in existing systems such as HBase, Cassandra, MongoDB, and Riak, making it difficult or impossible to realize various scheduling disciplines. We demonstrate how to address these schedulability problems using both direct and indirect solutions, with different trade-offs. To show how to apply our approach to enable scheduling in realistic systems, we develop Tamed-HBase and Muzzled-HBase, sets of modifications to HBase that can realize the desired scheduling disciplines, including fairness and priority scheduling, even when presented with challenging workloads.

Computer Science↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Novel Approaches Toward Scalable Composable Workflows in Hyper-Heterogeneous Computing Environments

The annual Workshop on Workflows in Support of Large-Scale Science (WORKS) is a premier venue for the scientific workflow community to present the latest advances in research and development on the many facets of scientific workflows throughout their life-cycle. The Lightning Talks at WORKS focus on describing a novel tool, scientific workflow, or concept, which are work-in-progress and address emerging technologies and frameworks to foster discussion in the community. This paper summarizes the lightning talks at the 2023 edition of WORKS, covering five topics: leveraging large language models to build and execute workflows; developing a common workflow scheduler interface; scaling uncertainty workflow applications on exascale computing systems; evaluating a transcriptomics workflow for cloud vs. HPC systems; and best practices in migrating legacy workflows to workflow management systems.

Titov, Mikhail↗

Reinforcement Learning to Enhance Optimal Operation of Resilient Community Energy Systems

This paper presents a novel model-free multi-agent Reinforcement Learning (RL) control method to enhance the resilience of community energy systems in island mode, which coordinates multiple objectives without the necessity of identifying system models that require expert knowledge. Specifically, a community-level coordinator agent is designed to allocate renewable energy resources among different buildings, and multiple building-level agents are developed to optimize load schedules based on limited energy resources and requirements of building loads and occupants’ comfort. In a two-day evaluation, our RL approach demonstrated a similar performance against MPC without requiring system models and formulation of optimization problems as required in MPC.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Improving the nonlinear control performance of the supply fan at air handling units using a gain scheduling control strategy

Due to its nonlinear nature, the supply fan at air handling units with the controller tuned at the design condition tends to be aggressive and oscillate under partial load conditions. Here, the objective of this paper is to develop and validate a gain scheduling control strategy to improve its nonlinear control performance. First, a control-oriented model, which does not require numerous physical parameters and extensive test data, is developed to study the nonlinearity of the fan system. Based on the theoretical model and experimental verifications, the issue of an aggressive response with a conventional fixed-gain controller is caused by the fact that the system gain is proportional to the ratio of the duct static pressure to the fan speed. To address the issue, a scheduling function of the measurable duct static pressure and fan speed is proposed to be included in the conventional fixed-gain controller to compensate for the fan system gain variation. The gain scheduling control strategy is found to approximately maintain the identical control performance under all operation conditions. Most importantly, the gain scheduling control strategy can be readily implemented without intensive computation and additional measurements, showing a promising potential in industrial applications.

42 ENGINEERING↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗