Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

On the use of NMR distance measurements for assessing surface site homogeneity

The past few decades have seen tremendous growth in the area of single-site heterogeneous catalysis, which aims to combine the best aspects of homogeneous and heterogeneous catalysis, namely molecular-level site control and ease of separation/recycling. Despite this, we still do not have a means of assessing site homogeneity and whether the produced catalyst is indeed a “single-site”. Recent developments have enabled the use of NMR-based distance measurements to determine the conformations and configurations of surface sites, leading to the question whether such measurements can be used to distinguish materials containing either single or multiple surface sites with otherwise indistinguishable NMR properties. Here, we describe a Monte Carlo-based multi-structure search algorithm and its application to the determination of multi-site structures from supported metal complexes. The sensitivity of REDOR data to the existence of multiple sites is assessed using synthetic data and prior literature examples are revisited to determine whether the single-site approximation was indeed appropriate. We lastly apply this new methodology to differentiate the configurations of zirconocene complexes grafted onto alumina supports that were thermally treated at different temperatures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

EDL Simulation Results for the Mars 2020 Landing Site Safety Assessment

The Mars 2020 rover is NASA’s next flagship mission, set to explore Mars in search of scientific evidence of past microbial life. Importantly, the rover will also, for the first time, have the ability to collect and cache rock and soil samples for retrieval and return to laboratories here on Earth. A key step in the development of the Mars 2020 mission is the selection of a suitable landing site with the largest likelihood of meeting scientific goals. This decision is a complex and critical one that requires close interaction between the scientific and engineering communities. The chosen landing site must be both scientifically interesting — providing the project with the greatest possible chance of gathering credible and defendable scientific evidence — and also safe enough to attempt a landing in the first place. Thus, arguably one of the most important undertakings of the Entry, Descent, and Landing (EDL) team, is to effectively enumerate, quantify, and communicate the landing risks to all of the stakeholders. The culmination of this effort is the Landing Site Safety Assessment, which is a review commissioned by the project, presided over by the EDL Standing Review Board, and attended by management and science stakeholders, in which the EDL team communicates their assessment of the associated landing risks and the statistical probability of a successful landing at each of the final candidate landing sites. This paper summarizes the results of high-fidelity computer simulations of the Mars 2020 EDL sequence used in this assessment. From an EDL performance perspective, all four candidates offer similar level of robustness, which is in-family with Mars Science Laboratory (MSL). However, two new features of the Mars 2020 EDL sequence – range trigger and Terrain-Relative Navigation (TRN) – dramatically enhance the capability of the EDL system to safely land at landing sites with much more rugged terrain than ever before considered. This has allowed the landing site selection for Mars 2020 to proceed in a manner that has been unprecedentedly weighted more heavily toward scientific interest and less heavily on engineering constraints. With TRN, the overall probability of success is predicted to be approximately 99% for all of the candidates.

David Way↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

The exposure history of the Apollo 16 sites. An assessment based on methane and carbide measurements

Soils from eight stations at the Apollo 16 landing site have been analyzed for methane and carbide. These results, in conjunction with published data from photogeology, bulk chemistry, rare gases, primordial and radionuclides, and agglutinate abundances have been interpreted in terms of differing contributions from three components, North and South Ray crater ejecta and Cayley Plains material.

Pillinger, C. T.↗

The exposure history of the Apollo 16 site: An assessment based on methane and hydrolysable carbon

Nineteen soils from eight stations at the Apollo 16 landing site have been analyzed for methane and hydrolysable carbon. These results, in conjunction with published data from photogeology, bulk chemistry, rare gases, primordial and cosmogenic radionuclides, and agglutinate abundances have been interpreted in terms of differing contributions from three components-North and South Ray Crater ejecta and Cayley Plains material.

Pillinger, C. T.↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

Preliminary Radioisotope Screening for Off-site Consequence Assessment of Advanced Non-LWR Systems

Currently a set of 71 radionuclides are accounted for in off-site consequence analysis for LWRs. Radionuclides of dose consequence are expected to change for non-LWRs, with radionuclides of interest being type-specific. This document identifies an expanded set of radionuclides that may need to be accounted for in multiple non-LWR systems: high temperature gas reactors (HTGRs); fluoride-salt-cooled high-temperature reactors (FHRs); thermal-spectrum fluoride-based molten salt reactors (MSRs); fast-spectrum chloride-based MSRs; and, liquid metal fast reactors with metallic fuel (LMRs) Specific considerations are provided for each reactor type in Chapter 2 through Chapter 5, and a summary of all recommendations is provided in Chapter 6. All identified radionuclides are already incorporated within the MACCS software, yet the development of tritium-specific and carbon-specific chemistry models are recommended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PSH Assessment and Site Identification [Slides]

NLR's Pumped Storage Hydropower (PSH) geospatial and cost model algorithms are applied to the Chemehuevi Reservation to assess the potential for PSH within the reservation. The algorithm identifies both "open-loop" PSH opportunities formed by constructing a new reservoir within the reservation paired with bordering Lake Havasu and "closed-loop" systems formed by two new reservoirs within the reservation. Options range from 28 to 538 MW of electrical generation power at maximum generation and 10 hours of storage. CAPEX is estimates as 4422 2022 $\$$/kW of generating power, which is meaningfully higher than the lowest cost systems identified in NLR's national scale assessments. Further economic analysis is needed to fully evaluate whether this would be an attractive option to meet the Chemehuevi Reservation's goals.

25 ENERGY STORAGE↗

Combining artificial intelligence and physics-based modeling to directly assess atomic site stabilities: from sub-nanometer clusters to extended surfaces

The performance of functional materials is dictated by chemical and structural properties of individual atomic sites. In catalysts, for instance, the thermodynamic stability of constituting atomic sites is a key descriptor from which more complex properties, such as molecular adsorption energies and reaction rates, can be derived. In this study, we present a widely applicable machine learning (ML) approach to instantaneously compute the stability of individual atomic sites in structurally and electronically complex nano-materials. Conventionally, we determine such site stabilities using computationally intensive first-principles calculations. With our approach, we predict the stability of atomic sites in sub-nanometer metal clusters of 3–55 atoms with mean absolute errors in the range of 0.11–0.14 eV. To extract physical insights from the ML model, we introduce a genetic algorithm (GA) for feature selection. This algorithm distills the key structural and chemical properties governing the stability of atomic sites in size-selected nanoparticles, allowing for physical interpretability of the models and revealing structure–property relationships. The results of the GA are generally model and materials specific. In the limit of large nanoparticles, the GA identifies features consistent with physics-based models for metal–metal interactions. By combining the ML model with the physics-based model, we predict atomic site stabilities in real time for structures ranging from sub-nanometer metal clusters (3–55 atom) to larger nanoparticles (147 to 309 atoms) to extended surfaces using a physically interpretable framework. Finally, we present a proof of principle showcasing how our approach can determine stable and active nanocatalysts across a generic materials space of structure and composition.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗