Search NASA⌕ Search

SEARCH · Search NASA

Results for “thermal vacuum tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Thermal Vacuum Test Correlation of A Zero Propellant Load Case Thermal Capacitance Propellant Gauging Analytics Model

This thesis describes the development and test data validation of the thermal model that is the foundation of a thermal capacitance spacecraft propellant load estimator. Specific details of creating the thermal model for the diaphragm propellant tank used on NASA's Magnetospheric Multiscale spacecraft using ANSYS and the correlation process implemented to validate the model are presented. The thermal model was correlated to within plus or minus 3 degrees Centigrade of the thermal vacuum test data, and was found to be relatively insensitive to uncertainties in applied heat flux and mass knowledge of the tank. More work is needed, however, to refine the thermal model to further improve temperature predictions in the upper hemisphere of the propellant tank. Temperatures predictions in this portion were found to be 2-2.5 degrees Centigrade lower than the test data. A road map to apply the model to predict propellant loads on the actual MMS spacecraft toward its end of life in 2017-2018 is also presented.

Thermal↗

Thermal Vacuum Test Correlation of a Zero Propellant Load Case Thermal Capacitance Propellant Gauging Analytical Model

This thesis describes the development and correlation of a thermal model that forms the foundation of a thermal capacitance spacecraft propellant load estimator. Specific details of creating the thermal model for the diaphragm propellant tank used on NASA's Magnetospheric Multiscale spacecraft using ANSYS and the correlation process implemented are presented. The thermal model was correlated to within plus or minus 3 degrees Celsius of the thermal vacuum test data, and was determined sufficient to make future propellant predictions on MMS. The model was also found to be relatively sensitive to uncertainties in applied heat flux and mass knowledge of the tank. More work is needed to improve temperature predictions in the upper hemisphere of the propellant tank where predictions were found to be 2 to 2.5 C lower than the test data. A road map for applying the model to predict propellant loads on the actual MMS spacecraft toward its end of life in 2017-2018 is also presented.

Gauging↗

Thermal Vacuum Testing of a Novel Loop Heat Pipe Design for the Swift BAT Instrument

An advanced thermal control system for the Burst Alert Telescope on the Swift satellite has been designed and an engineering test unit (ETU) has been built and tested in a thermal vacuum chamber. The ETU assembly consists of a propylene loop heat pipe, two constant conductance heat pipes, a variable conductance heat pipe (VCHP), which is used for rough temperature control of the system, and a radiator. The entire assembly was tested in a thermal vacuum chamber at NASA/GSFC in early 2002. Tests were performed with thermal mass to represent the instrument and with electrical resistance heaters providing the heat to be transferred. Start-up and heat transfer of over 300 W was demonstrated with both steady and variable condenser sink temperatures. Radiator sink temperatures ranged from a high of approximately 273 K, to a low of approximately 83 K, and the system was held at a constant operating temperature of 278 K throughout most of the testing. A novel LHP temperature control methodology using both temperature-controlled electrical resistance heaters and a small VCHP was demonstrated. This paper describes the system and the tests performed and includes a discussion of the test results.

Ottenstein, Laura↗

Validation of SERT 2 thermal analytical techniques by thermal vacuum testing of the prototype satellite

The thermal protection system for the flight configuration of the SERT 2 satellite was designed using an analytical thermal network to represent the satellite and its environment. A large part of this digital analytical network was adjusted and calibrated by comparing predicted temperatures with experimental measurements made with the prototype SERT 2 satellite in an extended thermal vacuum test. The procedures used in adjusting and calibrating the analytical network are outlined.

Smolak, G. R.↗

Thermal Vacuum Testing of a Proto-flight Miniature Loop Heat Pipe with Two Evaporators and Two Condensers

This paper describes thermal vacuum testing of a proto-flight miniature loop heat pipe (MLHP) with two evaporators and two condensers designed for future small systems applications requiring low mass, low power and compactness. Each evaporator contains a wick with an outer diameter of 6.35 mm, and each has its own integral compensation chamber (CC). Miniaturization of the loop components reduces the volume and mass of the thermal system. Multiple evaporators provide flexibility for placement of instruments that need to be maintained at the same temperature, and facilitate heat load sharing among instruments, reducing the auxiliary heater power requirement. A flow regulator is used to regulate heat dissipations between the two condensers, allowing flexible placement of radiators on the spacecraft. A thermoelectric converter (TEC) is attached to each CC for control of the operating temperature and enhancement of start-up success. Tests performed include start-up, power cycle, sink temperature cycle, high power and low power operation, heat load sharing, and operating temperature control. The proto-flight MLHP demonstrated excellent performance in the thermal vacuum test. The loop started successfully and operated stably under various evaporator heat loads and condenser sink temperatures. The TECs were able to maintain the loop operating temperature within b1K of the desired set point temperature at all power levels and all sink temperatures. The un-powered evaporator would automatically share heat from the other powered evaporator. The flow regulator was able to regulate the heat dissipation among the radiators and prevent vapor from flowing into the liquid line.

Ku, Jentung↗

Transient Heater Analysis for Orion Thermal Vacuum Testing

The Space Environments Complex (SEC) at NASA's Plum Brook Station is currently being prepared to perform thermal vacuum testing of the Orion spacecraft. This thermal vacuum, or T-VAC test will be run for a period of 60 days, which will be the longest such test ever conducted at SEC. The Orion Crew Module (CM) and Service Module (SM) will undergo T-VAC testing in SEC's Space Simulation Vacuum Chamber to ensure the functionality of these systems in a high vacuum environment at extremely cold temperatures. The T-VAC test setup in SEC was modeled and simulated in Thermal Desktop. The initial results from thermal analysis showed areas on the chamber floor to reach very low temperatures, which were below the minimum operating range of certain hardware located on or near the chamber floor. These hardware including elastomeric seals on the GN2 piping, bearing pads and O-rings are essential to both test and the operation of the SEC facility, and must be kept well above -20°F throughout the duration of the T-VAC test. Thus, further analysis was conducted to include the placement of patch heaters on the chamber floor in an effort to increase the temperature near colder areas on the floor. The results and findings from this analysis showed that using these heaters will result in a favorable temperature distribution on the chamber floor. This paper will discuss the methods used in the analysis, and the results obtained to determine the optimal configuration of these heaters on the chamber floor.

Wilhite, Jarred↗

Transient Heater Analysis for Orion Thermal Vacuum Testing

The Space Environments Complex (SEC) at NASA’s Plum Brook Station is currently being prepared to perform thermal vacuum testing of the Orion spacecraft. This thermal vacuum, or T-VAC test will be run for a period of 60 days, which will be the longest such test ever conducted at SEC. The Orion Crew Module (CM) and Service Module (SM) will undergo T-VAC testing in SEC’s Space Simulation Vacuum Chamber to ensure the functionality of these systems in a high vacuum environment at extremely cold temperatures. The T-VAC test setup in SEC was modeled and simulated in Thermal Desktop. The initial results from thermal analysis showed areas on the chamber floor to reach very low temperatures, which were below the minimum operating range of certain hardware located on or near the chamber floor. These hardware including elastomeric seals on the GN2 piping, bearing pads and O-rings are essential to both test and the operation of the SEC facility, and must be kept well above -20°F throughout the duration of the T-VAC test. Thus, further analysis was conducted to include the placement of patch heaters on the chamber floor in an effort to increase the temperature near colder areas on the floor. The results and findings from this analysis showed that using these heaters will result in a favorable temperature distribution on the chamber floor. This paper will discuss the methods used in the analysis, and the results obtained to determine the optimal configuration of these heaters on the chamber floor.

Wilhite, Jarred↗

Lessons Learned from the Wide Field Camera 3 TV1 and TV2 Thermal Vacuum Test Campaigns

The Wide Field Camera 3 (WFC3) instrument has undergone two complete thermal vacuum tests (TV1 and TV2), during which valuable lessons were learned regarding test configuration, test execution, model capabilities, and modeling practices. The very complex thermal design of WFC3 produced a number of challenging aspects to ground testing with numerous ThermoElectric Coolers and heat pipes, not all of which were functional. Lessons learned during TV1 resulted in significant upgrades to the model capabilities and a change in the test environment approach for TV2. These upgrades proved invaluable during TV2 when pretest modeling assumptions proved to be false. Each of the lessons learned relate to one of two following broad statements: 1. Ensure the design can be tested and that the effect of non-flight like conditions is well understood, particularly with respect to non passive devices (TECs, Heat Pipes, etc) 2. Ensure that the model is sufficiently detailed and is capable of predicting off-nominal behavior and the power dissipation of any thermal devices, especially TECs This paper outlines a number of the lessons learned over these two test campaigns with respect to the thermal design, model, and test configuration and presents recommendations for future tests.

Peabody, Hume↗

xEMU Thermal Vacuum Testing Overview

The Exploration Extravehicular Mobility Unit (xEMU) project was the culimation of over a decade of spacesuit development that was performed in-house at the NASA Johnson Space Center. This project reached a level where almost fully completed development fidelity spacesuits had been designed, assembled and tested in an integrated configuration. The xEMU Development-Verification-Test (DVT) hardware was assembled into two different xEMU test articles and underwent a series of thermal-vacuum tests at the Johnson Space Center’s Chamber B. These tests not only gathered data on thermal performance, but also exercised the life support system, communication system, suit information systems, and suit avionics. This complex test has and will continue to produce many meaningful reports ranging from component level test results (for example on spacesuit boots), test design of heater cages to simulate thermal environments for a spacesuit test article, and higher level thermal performance of subsystems (such as the Portable Life Support System) or the entire assembly. This paper provides an overview of the test configuration and also top level results from this highly successful integrated test of the xEMU.

PLSS↗

xEMU Thermal Vacuum Testing Overview

The Exploration Extravehicular Mobility Unit (xEMU) project was the culimation of over a decade of spacesuit development that was performed in-house at the NASA Johnson Space Center. This project reached a level where almost fully completed development fidelity spacesuits had been designed, assembled and tested in an integrated configuration. The xEMU Development-Verification-Test (DVT) hardware was assembled into two different xEMU test articles and underwent a series of thermal-vacuum tests at the Johnson Space Center’s Chamber B. These tests not only gathered data on thermal performance, but also exercised the life support system, communication system, suit information systems, and suit avionics. This complex test has and will continue to produce many meaningful reports ranging from component level test results (for example on spacesuit boots), test design of heater cages to simulate thermal environments for a spacesuit test article, and higher level thermal performance of subsystems (such as the Portable Life Support System) or the entire assembly. This paper provides an overview of the test configuration and also top level results from this highly successful integrated test of the xEMU.

PLSS↗

Thermal Assessment of Landsat-7 ETM+ Radiative Cooler in Instrument and Spacecraft Thermal Vacuum Tests and in Flight

During the radiative cooler cool-down phase of the Landsat-7 Enhanced Thematic Mapper Plus (ETM+) instrument thermal vacuum test #3, the coldest temperature that the Cold Focal Plane Array (CFPA) achieved was 89.5 K. The cold stage/CFPA temperature decreased from 315 K to 89.5 K in 80 hours. In the spacecraft and instrument integrated thermal vacuum test, the cold stage/CFPA temperature decreased from 315 K to 86.9 K in 80 hours, and was still decreasing at a rate of 0.08 K/hr when the cool-down was terminated. The cool-down was faster, and a colder CFPA temperature was obtained. In flight, the cooler cool- down was even faster, and colder. The cold stage/CFPA temperature decreased from 315 K to 89.7 K in 33 hours, and was still decreasing at a rate of 1 K/hr when cool- down was terminated at 89.7 K. The factors that affected the ETM+ cooler cool-down are the radiation heat sink temperature for the cold stage and intermediate stage, parasitic radiation heat load to the cooler, parasitic conduction heat load to the cooler, and cooler outgas time preceding cooler cool-down.

Choi, Michael K.↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

molecular, contamination, thermal vacuum, cryogeni↗

Analytical Methodology Used To Assess/Refine Observatory Thermal Vacuum Test Conditions For the Landsat 8 Data Continuity Mission

Thermal and Fluids Analysis Workshop Silver Spring, MD NCTS 21070-15 The Landsat 8 Data Continuity Mission, which is part of the United States Geologic Survey (USGS), launched February 11, 2013. A Landsat environmental test requirement mandated that test conditions bound worst-case flight thermal environments. This paper describes a rigorous analytical methodology applied to assess refine proposed thermal vacuum test conditions and the issues encountered attempting to satisfy this requirement.

0000↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

optics↗

The importance of thermal-vacuum testing in achieving high reliability of spacecraft mechanisms

The work performed on thermal vacuum testing of complex mechanisms is described. The objective of these tests is to assess the mechanism reliability by monitoring performance in an environment that closely resembles the environment that will occur during flight. To be both valid and cost effective, these tests are performed in a detailed, formally controlled manner. A review of the major test observations is given, during which time some failure modes are detected. Full confidence now exists in many mechanism and component designs, and much valuable data obtained.

Parker, K.↗

Techniques associated with thermal-vacuum testing of the OAO-C heat pipes

The mechanical problems associated with testing the two high-heat load pipes are discussed. One of these pipes was tested three times before being accepted. The first test resulted in the discovery of non-condensable hydrogen gas, which prevented the pipe from functioning properly. The second test was a repeat of the first, to see if all the gas had been removed. The third test was to see if any changes had occurred to the pipe as a result of saddle modifications. Saddle modifications were necessary because the epoxy binding agent between the saddles and the pipe had decomposed during the testing. The test problems discussed deal with the specially designed heat-removal devices, the mobile tilt table, the table position indicator, and the heat input mechanisms, all of which were necessary to conduct a high-heat load, thermal-vacuum test. The final results showed that the techniques used were adequate for thermal-vacuum testing of heat pipes.

Marshburn, J. P.↗

Solar Thermal Vacuum Test of Deployable Astromesh Reflector

On September 10, 2008, a 36-hour Solar Thermal Vacuum Test of a 5m deployable mesh reflector was completed in JPL's 25' Space Simulator by the Advanced Deployable Structures Group at JPL. The testing was performed under NASA's Innovative Partnership Program (IPP) as a risk reduction effort for two JPL Decadal Survey Missions: DESDynI and SMAP. The 5.0 m aperture Astromesh reflector was provided by Northrop Grumman Aerospace Systems (NGAS) Astro Aerospace, our IPP industry partner. The testing utilized a state-of-the-art photogrammetry system to measure deformation of the reflector under LN2 cold soak, 0.25 Earth sun, 0.5 sun and 1.0 sun. An intricate network of thermocouples (approximately 200 in total) was used to determine the localized temperature across the mesh as well as on the perimeter truss of the reflector. Half of the reflector was in a fixed shadow to maximize thermal gradients. A mobility system was built for remotely actuating the cryo-vacuum capable photogrammetry camera around the circumference of the Solar Simulator. Photogrammetric resolution of 0.025 mm RMS (0.001") was achieved over the entire 5 meter aperture for each test case. The data will be used for thermo-elastic model correlation and validation, which will benefit the planned Earth Science Missions.

Photogrammetry↗