Search NASA⌕ Search

SEARCH · Search NASA

Results for “transition operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Overview of Functional Technical Requirements for Intentional Islands

This document provides an overview of intentional islands, otherwise known as microgrids. The topics covered include common types of microgrid configurations, high level summaries of standards that address some aspect of microgrid implementation and interconnection, and a discussion of specific standards that apply during specific the islanding operational stages of parallel operation, transition to islanding, islanding operation and transition back to parallel operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IBS for RHIC operation below transition energy and various RF systems

Following first successful runs in RHIC at low energies for physics (Beam Energy Scan I) there is a strong interest in further low-energy RHIC operation in the range of γ=4-10 but with higher luminosity (Beam Energy Scan II). An electron cooling was proposed to increase luminosity at these low energies. Both transverse and longitudinal Intra-beam Scattering (IBS) can be counteracted with electron cooling. In addition, the phase-space density of the hadron beams can be further increased by providing stronger cooling. Unfortunately, the defining intensity limitation for low energies in RHIC is expected to be the space charge. Experimental studies of the space-charge effects and beam lifetime in RHIC were reported. Additional limitations at low energies and their possible mitigations were discussed. It was suggested that better luminosity performance may be expected by using lower frequency RF system and longer bunches compared to the baseline 28 MHz RF, which is being used for RHIC operation with heavy ions. Recently, even lower frequency RF of 4.5 MHz was proposed for future low-energy RHIC operation. Although low-frequency RF systems in RHIC (either 9 or 4.5 MHz) seem to address possible limitations of beam lifetime observed at low energies, the resulting ion beam temperatures in beam rest frame get further from an equilibrium which lead to a much stronger longitudinal IBS. This would put stronger requirement on electron cooling system under consideration. However, operation below transition energy allows us to exploit an IBS feature that drives the transverse and longitudinal beam temperatures towards equilibrium by minimizing the longitudinal diffusion rate using larger longitudinal beam emittance and larger RF voltage. Such studies were performed before to explore IBS redistribution at low energies for the 28 and 56 MHz RHIC RF systems. This Note presents results of similar studies for newly proposed 4.5 and 9 MHz RF systems.

43 PARTICLE ACCELERATORS↗

Transitioning From Operations to Decommissioning - 16049

With the recent unplanned shutdown of a number of U.S. Nuclear Power Plants, a benchmarking effort was conducted in late 2104 to capture the lessons learned from these recently shutdown sites. The specific plants benchmarked for this effort included San Onofre Nuclear Generating Station (SONGS), Kewaunee, Zion, and Crystal River Nuclear Power Stations. The benchmark results found for the most part, site personnel had little or no decommissioning experience and in fact, were not aware of the challenges facing a plant in transitioning from operations to decommissioning. This lack of experience and knowledge resulted in a steep learning curve, a loss of productivity, and significant challenges by plant personnel prepared the site for decommissioning. The results of the benchmark identified a number of areas and challenges facing an operating plant during this period. All sites visited identified four key areas where significant cost savings and planning effectiveness could have been realized if they had been better prepared. The areas included transition planning, staffing, stakeholder involvement, and cost estimating. It was recognized if these areas are aggressively managed early in the process, it will have a significant positive impact on the effectiveness and cost of decommissioning and can better set the stage for a successful project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

China's plug-in hybrid electric vehicle transition: An operational carbon perspective

Assessing the emissions of plug-in hybrid electric vehicle (PHEV) operations is crucial for accelerating the carbon–neutral transition in the passenger car sector. This study is the first to adopt a bottom-up model to measure the real-world energy use and carbon dioxide emissions of China’s top twenty selling PHEV models across different regions from 2020 to 2022. The results indicate that (1) the actual electricity intensity of the best-selling PHEV models (20.2–38.2 kWh/100 km) was 30–40 % higher than the New European Driving Cycle values, and the actual gasoline intensity (4.7–23.5 L/100 km) was 3–6 times greater than the New European Driving Cycle values. (2) The overall energy use of the best-selling models varied among different regions, and the energy use from 2020 to 2022 in Southern China was double that Northern China and the Yangtze River Middle Reach. (3) The top-selling models emitted 4.7 megatons of carbon dioxide nationwide from 2020 to 2022, with 1.9 megatons released by electricity consumption and 2.8 megatons released by gasoline combustion. Furthermore, targeted policy implications for expediting the carbon–neutral transition within the passenger car sector are proposed. In essence, this study explores and compares benchmark data at both the national and regional levels, along with performance metrics associated with PHEV operations. The main objective is to aid nationwide decarbonization efforts, focusing on carbon reduction and promoting the rapid transition of road transportation toward a net-zero carbon future.

33 ADVANCED PROPULSION SYSTEMS↗

Community-wide Validation of Geospace Model Ground Magnetic Field Perturbation Predictions to Support Model Transition to Operations

In this paper we continue the community-wide rigorous modern space weather model validation efforts carried out within GEM, CEDAR and SHINE programs. In this particular effort, in coordination among the Community Coordinated Modeling Center (CCMC), NOAA Space Weather Prediction Center (SWPC), modelers, and science community, we focus on studying the models' capability to reproduce observed ground magnetic field fluctuations, which are closely related to geomagnetically induced current phenomenon. One of the primary motivations of the work is to support NOAA SWPC in their selection of the next numerical model that will be transitioned into operations. Six geomagnetic events and 12 geomagnetic observatories were selected for validation.While modeled and observed magnetic field time series are available for all 12 stations, the primary metrics analysis is based on six stations that were selected to represent the high-latitude and mid-latitude locations. Events-based analysis and the corresponding contingency tables were built for each event and each station. The elements in the contingency table were then used to calculate Probability of Detection (POD), Probability of False Detection (POFD) and Heidke Skill Score (HSS) for rigorous quantification of the models' performance. In this paper the summary results of the metrics analyses are reported in terms of POD, POFD and HSS. More detailed analyses can be carried out using the event by event contingency tables provided as an online appendix. An online interface built at CCMC and described in the supporting information is also available for more detailed time series analyses.

MAGNETIC↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

IBS and Potential Luminosity Improvement for RHIC Operation Below Transition Energy

There is a strong interest in low-energy RHIC operations in the single-beam total energy range of 2.5-25 GeV/nucleon. Collisions in this energy range, much of which is below nominal RHIC injection energy, will help to answer one of the key questions in the field of QCD about the existence and location of a critical point on the QCD phase diagram. There have been several short test runs during 2006-2008 RHIC operations to evaluate RHIC operational challenges at these low energies. Beam lifetimes observed during the test runs were limited by machine nonlinearities. This performance limit can be improved with sufficient machine tuning. The next luminosity limitation comes from transverse and longitudinal Intra-beam Scattering (IBS), and ultimately from the space-charge limit.

43 PARTICLE ACCELERATORS↗

Inverter Intensive Hybrid Power Plant Modeling with Small-Signal Stability Augmentation through Flexible Operation Mode Transition

Hybrid power plants (HPPs) prompt the penetration of inverter-based renewable energy sources (RES) in transmission systems; however, given their low-inertia nature, HPPs are dominated by power electronic inverters, so there are inevitable challenges in system stability when increasing numbers of HPPs are integrated into the modern power grids. To boost the penetration level of HPPs without jeopardizing system stability, it is desirable to equip them with operational characteristics (i.e., grid-forming capabilities) that are comparable to those of conventional power plants dominated by synchronous generators (SGs). In this paper, a holistic model of inverter intensive HPP is derived and a bi-level hierarchical control is developed to allow HPPs to flexibly switch among the designed operation modes (i.e., P-Q, P-V, and isochronous modes). Compared to SGs, which have limited controllability, the operation mode of each HPP could vary as requested. Such flexible mode transitions could be integrated into the secondary plant-level control and be leveraged as an additional control degree to further augment system stability. Further, the system small-signal stability margin is quantified with varying HPP operation modes. More importantly, modal analysis is thereby conducted to quantify the impacts of mode transition on the system oscillatory modes. The effectiveness of the proposed HPP bi-level hierarchical control is verified using extensive case studies based on the simplified real-world island power grid, and the results validate that the system small-signal stability margin can be enhanced with the additional degree of control flexibility enabled by HPP operation mode transition. The real-time hardware-in-the-loop (HIL) results are also provided to verify the proposed method.

grid-forming control↗

Impressed Sources and Fields in the Volume-Integral-Equation Formulation of Electromagnetic Scattering by a Finite Object: A Tutorial

Although free space cannot generate electromagnetic waves, the majority of existing accounts of frequency-domain electromagnetic scattering by particles and particle groups are based on the postulate of existence of an impressed incident field, usually in the form of a plane wave. In this tutorial we discuss how to account for the actual existence of impressed source currents rather than impressed incident fields. Specifically, we outline a self-consistent theoretical formalism describing electromagnetic scattering by an arbitrary finite object in the presence of arbitrarily distributed impressed currents, some of which can be far removed from the object and some can reside in its vicinity, including inside the object. To make the resulting formalism applicable to a wide range of scattering-object morphologies, we use the framework of the volume integral equation formulation of electromagnetic scattering, couple it with the notion of the transition operator, and exploit the fundamental symmetry property of this operator. Among novel results, this tutorial includes a streamlined proof of fundamental symmetry (reciprocity) relations, a simplified derivation of the Foldy equations, and an explicit analytical expression for the transition operator of a multi-component scattering object.

Symmetry relations↗

Project Startup: Evaluating the Performance of Electric Buses

The National Renewable Energy Laboratory (NREL) is evaluating the in-service performance of fast-charge battery electric buses compared to compressed natural gas (CNG) buses operated by Foothill Transit in West Covina, California. Launched in 2015 in collaboration with the California Air Resources Board, this study aims to improve understanding of the overall use and effectiveness of fast-charge electric buses and associated charging infrastructure in transit operation.

33 ADVANCED PROPULSION SYSTEMS↗

Diesel Generator Controller Evaluation via Controller-Hardware-in-the-Loop for Various Microgrid Operation Modes

This paper presents the Controller-Hardware-in-the-Loop (CHIL) evaluation of a diesel generator controller for various microgrid operation modes. The model of the diesel generator (governor, exciter, and primary control) is simulated in real time, and the secondary control is implemented in a real hardware controller, Woodward easYgen, which is tested via CHIL with different microgrid configurations under microgrid transition operations. The experimental results demonstrate that the control settings and configuration of the Woodward controller work correctly for different microgrids under microgrid transition operations, which provides confidence for site commissioning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Perseverance Rover’s Robotic Arm and Turret Mounted Instruments’ Surface Commissioning

The Robotic Arm (RA) on the Perseverance rover is an integral component of the Sampling and Caching System necessary for completing the science goals of the Mars 2020 mission. While the Perseverance rover was based on the Curiosity rover which landed in 2012, the Robotic Arm was redesigned to carry a much larger turret with a new suite of payloads. Shortly after Perseverance landed in Jezero Crater, a series of checkouts was completed with the RA during the first 100 sols of the mission in order to ensure proper functionality of the RA and the instruments mounted on the turret. This period of time in the mission was called Surface Operations Transition (SOX). The objective of SOX was to systematically execute checkout activities for all the basic functionality so that the RA and instruments, as well as other rover components, could be released for scientific exploration.RA activities during SOX can be divided into a few different categories: Mechanism Checkouts, Rover Visual Inspections, Performance Characterization, and Instrument Functional Checkouts. Many of these checkouts built off of each other such that each subsequent activity would verify incrementally complex functionality. Many of the defined activities were executed several times throughout the development of the rover and served as a check that the RA’s performance is consistent with testing on Earth. Other activities were developed uniquely for SOX to respond to challenges discovered during development. They were designed to be verifiable without the help of ground support equipment or previous executions on the flight hardware to compare against.This paper discusses the formulation and conception of the various RA SOX checkout activities, verification and testing required to certify them for flight, execution of the activities on Mars, issues encountered, and finally results and findings as the mission transitioned to nominal science operations. We will be presenting the results and analysis using downlinked imaging and data from the flight vehicle to show how we verified the performance of the Robotic Arm and the turret mounted instruments in order to transition to science operations with a clean bill of health.

Edgett, Kenneth↗

Transition to Operations Plans for GPM Datasets

Founded in 2002 at the National Space Science Technology Center at Marshall Space Flight Center in Huntsville, AL. Focused on transitioning unique NASA and NOAA observations and research capabilities to the operational weather community to improve short-term weather forecasts on a regional and local scale. NASA directed funding; NOAA funding from Proving Grounds (PG). Demonstrate capabilities experimental products to weather applications and societal benefit to prepare forecasters for the use of data from next generation of operational satellites. Objective of this poster is to highlight SPoRT's research to operations (R2O) paradigm and provide examples of work done by the team with legacy instruments relevant to GPM in order to promote collaborations with groups developing GPM products.

Zavodsky, Bradley↗

Transition probabilities in the U(6) limit of the symplectic interacting vector boson model

The tensor properties of the algebra generators and the basis are determined in respect to the reduction chain Sp(12,R) superset of U(6) superset of U(3) x U(2) superset of O(3) x U(1), which defines one of the dynamical symmetries of the interacting vector boson model. The action of the Sp(12,R) generators as transition operators between the basis states is presented. Analytical expressions for their matrix elements in the symmetry-adapted basis are obtained. As an example the matrix elements of the E2 transition operator between collective states of the ground band are determined and compared with the experimental data for the corresponding intraband transition probabilities of nuclei in the actinide and rare-earth region. On the basis of this application the important role of the symplectic extension of the model is analyzed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Calculations of the $np→dγ$ reaction in chiral effective field theory

Here, we present a calculation of the radiative capture cross section of the $np→dγ$ reaction in the low-energy range, where the M⁢1 reaction channel dominates. Employing the LENPIC nucleon-nucleon interaction up to the fifth order (N4LO) that is regularized by the semilocal coordinate space regulators, we obtain the initial and final state wave functions, and evaluate the phase shifts of the scattering state and deuteron properties. We derive the transition operator from the chiral effective field theory up to the next-to-next-to leading order (N2LO), where we also regularize the transition operator using regulators consistent with those of the interactions. We compute the capture cross sections, and the results show a converging pattern with the chiral-order expansion of the nucleon-nucleon interaction, where the regulator dependence of the results is weak when higher-order nucleon-nucleon interactions are employed. We quantify the uncertainties of the cross-section results due to the chiral-order truncation. The chirally complete and consistent cross-section results are calculated up to N2LO and they compare well with the experiments and other theoretical predictions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Automated Electric Vehicle Fleet Operations for On-Demand Service: Challenges and Opportunities

Automated/autonomous vehicle fleet operations within automated mobility districts have been studied over the past five years by the National Renewable Energy Laboratory, a US Department of Energy federally funded research and development center. This paper extends the analysis in this third phase of research underway to include considerations for electric vehicle operations and charging within a fleet of right-sized automated vehicles providing on-demand public mobility services. The current focus of research is on the operational complexities and associated challenges for automated/autonomous vehicles employing electric drivetrains and the resultant need for an efficient battery charging process while vehicles are operating in an "on-demand" mode of service. The blossoming of microtransit with shared-ride and point-to-point dispatching of each vehicle instills complex operations, with multiple mobility-on-demand transit operating sites being deployed, studied, and analyzed across North America. As a starting point, the authors' experience over the past 20 years with the analysis of automated transit network systems operating on and within dedicated and protected transitways provides initial insights into the system-level operational implications for maintaining a sufficient battery charge for a fleet of automated vehicles. Lessons learned through the prior analyses of automated transit network systems operating in on-demand service are identified, along with the capital cost implications for the requisite operating fleet size and charging station infrastructure for various approaches. These costs are summarized in juxtaposition with the benefits of realizing the higher goals of reducing environmental impacts and energy use within automated mobility districts as automated/autonomous vehicle technology matures. Finally, the discussion addresses key aspects of battery-electric propulsion for managed fleets in fully automated operation that will be studied as the third phase of research continues.

ADVANCED PROPULSION SYSTEMS↗

A Large-Scale Hardware Experiment Demonstration of Operating High Inverter-Based Resource Power Systems With Grid-Forming Inverters

This paper presents experimental hardware results from a microgrid system as the penetration level of grid-forming (GFM) inverters increases. The experiment aims to showcase the advantages of GFM inverters in enhancing system stability and to investigate the operational challenges in systems relying entirely on inverter-based resources (IBRs). Five test scenarios are devised to progressively increase GFM inverter penetration levels: 0% (S1), 19% (S2), 37% (S3), 68% (S4), and 100% (S5). To ensure consistency, identical loading conditions and dynamic events are applied across all scenarios. The conducted tests include load step changes, output variation of grid-following (GFL) inverters during islanded mode, transition operations (such as synchronization to the grid and islanding), and rateof- change-of-frequency (ROCOF) and voltage jump tests during grid-connected mode. Key findings from the tests are summarized as follows: (1) Scenario S1 proved most challenging for load steps, and GFL variations because of insufficient GFM capacity, leaving the diesel generator unable to handle transient ridethrough; (2) Scenario S5 was the most difficult for transition operations, because the lack of a diesel generator to maintain stiff bus voltage resulted in unexpected reactive power flows during synchronization, causing the point of common coupling (PCC) breaker to trip; (3) Scenarios S4 and S5 were particularly challenging for ROCOF tests because of minimal system inertia, leading to large transients that triggered breaker trips; and (4) Scenario S4 exhibited the strongest voltage recovery capability because of the presence of the diesel generator and a higher number of GFM inverters, both of which possess the highest capacity for reactive power injection.

24 POWER TRANSMISSION AND DISTRIBUTION↗