Search NASA⌕ Search

SEARCH · Search NASA

Results for “transmission operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Characterizing HVDC Transmission Flexibility under Extreme Operating Conditions

System operators rely on system flexibility, traditionally mainly from generation, to handle unexpected reliability and resilience events, ranging from excessive resource forecast errors to extreme events like heatwaves, earthquakes, and cyberattacks. Flexible transmission, such as controllable high voltage direct current (HVDC) transmission systems present an opportunity to increase overall system flexibility to accommodate operational challenges. This paper provides a methodology to study contributions to system flexibility by controllable, power electronics based transmission. The Western Electricity Coordinating Council (WECC) system is used as an example to study contributions from existing and future HVDC lines. Under extreme system conditions, it is identified that HVDC transmission flexibility can contribute with 24.8 to 28% of avoided unserved energy, and in some areas, the benefits amount to 50 to 70%.

HVDC transmission, PCM, Balancing authorities↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

State-of-the-art of data collection, analytics, and future needs of transmission utilities worldwide to account for the continuous growth of sensing data

Nowadays, transmission system operators require higher degree of observability in real-time to gain situational awareness and improve the decision-making process to guarantee a safe and reliable operation. Digitalization of energy systems allows utilities to monitor the system dynamic performance in real-time at fast time scales. The use of such technologies has unlocked new opportunities to introduce new data driven algorithms for improving the stability assessment and control of the system. Motivated by these challenges, a group of experts have worked together to highlight and establish a baseline set of these common concerns, which can be used as motivation to propose innovative analytics and data-driven solutions. In this document, the results of a survey on 10 transmission system operators around the world are presented and it aims to understand the current practices of the participating companies, in terms of data acquisition, handling, storage, modelling and analytics. The overall objective of this document is to capture the actual needs from the interviewed utilities, thereby laying the groundwork for setting valid assumptions for the development of advanced algorithms in this field.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Online Output-Based Inertia Estimation of Modern Power Systems

The overall inertia of modern power systems is drastically impacted by the penetration level of converter-based resources (CBRs). The intermittent output of CBRs and their dependence on the weather conditions affirm the need for a realtime inertia estimation approach. This can help the transmission system operators(TSOs) to be continuously aware of the changes in the system inertia and to take suitable control actions. This paper is a step forward to a totally data-driven framework for power system inertia estimation using the available measurements from the phasor measurement units (PMUs). This inertia estimation is done based on the spectral analysis of the so-called Koopman linear operator. Koopman operator considers the relationship between the system's inertia and its dynamical response to slight disturbances in the load. Simulation results show that Koopman operator can approximate the system behavior in a reconstructed linear space hence inertia constant is estimated accurately.

data-driven↗

Project: Corbomite - Product: ConsoleWorks REACT

TDi Technologies presents ConsoleWorks REACT, an advanced platform designed to tackle the complexities of cyber and operational risk assessment. This comprehensive solution goes beyond asset-focused approaches by considering the impact of both assets and people have on the security and operation of critical infrastructure, specifically targeting preventing gird mis-operation by evaluating real-time human interaction or commands with critical assets. The hypothesis suggests that by integrating the assessment of user commands into the overall risk assessment process, organizations can make more informed decisions, prioritize resources effectively, and respond promptly to potential threats. This hypothesis forms the basis for the development of a proactive and holistic risk management approach that is more comprehensive and context aware than traditional models which only look at assets, patch levels, configuration and threat intel by collecting that information off the network vs directly from the asset, human, and human interaction all in real-time. ConsoleWorks' unique man-in-the-middle architecture is a key feature that sets it apart in the cybersecurity landscape. This architecture enables the real-time observation, enforcement, and commands or interaction risk transparency of user interaction with critical infrastructure to be risk mitigated and audited as they are aggregated with device and human risk factors for a more comprehensive risk threat score across a device or group of devices. This architecture allows ConsoleWorks to act as a secure intermediary between users and critical assets, monitoring all interactions and ensuring that only authorized commands are sent to the asset to be executed. This not only enhances security but also provides a comprehensive audit trail of all user activities, contributing to compliance efforts and facilitating incident investigation and risk management. By integrating this unique architecture with our comprehensive risk assessment methodology, ConsoleWorks REACT provides a powerful solution for managing cyber and operational risks, enabling organizations to maintain a robust security posture and effectively mitigate potential threats. To that end, the primary objective of this project was to research and develop a robust solution that enables the energy industry to mitigate the risks associated with human actions that can compromise the security or operations of assets critical to energy delivery, generation, transmission and operation. ConsoleWorks REACT plays a pivotal role in achieving this goal by leveraging its unique capabilities to monitor and track all user activity. Through its Zero Trust approach, which emphasizes continuous verification, the platform ensures secure access to assets and serves as the centralized human response and notification platform for addressing cyber and operational issues.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Aggregated EV Flexibility With TSO-DSO Coordination

Electric vehicles (EVs) are becoming a promising source of grid ancillary services due to the temporal and spatial charging flexibility, quick response and storage capability. Such advantages are increasing with government policy promotion and technology improvement. However, the exploration of EV flexibility requires the coordination of both transmission system operators (TSOs) and distribution system operators (DSOs), to ensure the safe and reliable operation of power network. In this paper, we propose a coordinated evaluation method that determines the optimal utilization of EV temporal flexibility without compromising EV owners’ usage. At the distribution level, DSOs first evaluate EV aggregators’ operational boundaries to exploit distribution level services. At the transmission level, TSOs then determine EV charging schedules and ancillary service capacity simultaneously, taking into account the requirement from DSOs. Here, we validate the model in a case study using the IEEE 123 node test feeder and EV charging sessions obtained from a transportation simulation tool that uses real-world data.

33 ADVANCED PROPULSION SYSTEMS↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Optimized Dispatch of Distributed Energy Resources for Resiliency and Power Quality Improvements at the Grid-Edge

Distributed Energy Resources (DERs) installed on low-voltage distribution systems, both utility-owned and nonutility owned may be employed to make improvements to system resiliency and power quality, in addition to simply serving load demand. By selectively dispatching active and reactive power from these existing DERs, improvements in voltage profiles and service availability during adverse events may be achieved. Further benefits can be gained by optimally choosing which DERs to dispatch power from, and the distribution of power from those DERs. For a given operating condition, using Linear Programming methods, optimal power dispatch values for individual DERs can be determined, while considering variables such as voltage gains, losses in the lines and the DERs, and DER reserve capacities. One such optimization technique is developed in this paper, and results from a real-time simulation study on a modified IEEE 13-bus distribution system with three DERs, are being presented. The operation of the optimized DER selection and dispatch algorithm is shown during normal operation of the transmission system when the DERs operate in grid-connected mode. Similar analyses can drive decision making during transmission system failure when the DERs operate in grid-forming or islanded mode.

Chowdhury, Prithwiraj Roy↗

Laboratory Evaluation of Federated, Hierarchical Controls for Distribution Power System Management: Preprint

The connection of more loads and distributed energy resources (DERs) to the distribution power system brings both challenges and opportunities to system operators. There are opportunities to aggregate flexible loads and DERs to provide transmission grid services, but the coordinated actions of DERs being managed by independent, third-party DER aggregators to support transmission system operations can present challenges. We developed a federated DER management architecture and control framework that aims to manage heterogeneous DERs to deliver reliable transmission grid services while respecting distribution system constraints. The controls include stochastic day-ahead optimization, model predictive control, and a simple real-time management scheme. We present simulation results obtained from a realistic laboratory test bed of federated controls managing DERs within a substation service area to make the substation net power follow the optimal net power determined by the day-ahead optimization based on cost and limiting reverse power flow.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review of Technical Requirements for Inverter-Based Resources in Chile

This document compares the technical requirements in the grid code of Chile (NTSyCS) against the EirGrid (Ireland transmission system operator) and National Grid Electricity System Operator (NESO) grid codes and the Institute of Electrical and Electronics Engineers (IEEE) 2800-2022 standard for conventional inverter technology at the transmission and subtransmission levels in the process of being adopted by system operators in the U.S. The document is intended to be a guide and reference for future updates of the NTSyCS, considering the local system requirements and present improvements in inverter-based resource (IBR) technology. In light of the findings of the aforementioned comparative review, this document proposes and describes the requirements for conventional IBRs that could be incorporated and updated into the Chilean grid code. The document is structured around the main grid challenges posed by the transition to an IBR-dominated grid and conventional IBRs capabilities to help address them. This document does not provide guidance on how this specification should be implemented (e.g., through a mandate or market solution).

24 POWER TRANSMISSION AND DISTRIBUTION↗

The value of hydropower flexibility for electricity system decarbonization

Hydropower is an abundant, dispatchable, clean energy resource that will play an important role in supporting the clean energy transition. In particular, dispatchable hydropower can provide the operational flexibility that will be required in future systems with high variable renewable energy penetrations. However, the theoretical operational flexibility of hydropower can be restricted in practice by various non-power constraints. In this paper, we quantify how increasing the operational flexibility of dispatchable hydropower resources with reservoirs impacts least-cost generation portfolios and supports power system decarbonization. Specifically, we conduct a capacity expansion analysis of a two-zone system: a hydro-dominated region and a neighboring region with aggressive decarbonization targets that are represented by the United States Pacific Northwest and California respectively. We then introduce a quantifiable index for characterizing the operational flexibility of reservoir hydropower and assess how changes in this metric impact the system-optimal generation portfolio. We find that increasing hydropower flexibility leads to more investment in wind generation, less investment in natural gas generation, lower system costs, and lower system emissions. We further demonstrate a substitution effect between the grid services provided by flexible hydropower operation, increased transmission capacity on a congested line, and energy storage resources. Finally, we show that increasing the operational flexibility of hydropower increases the effective load carrying capability of both hydropower and wind resources. This research supports a more nuanced understanding of how hydropower can support electricity system decarbonization and may motivate reassessing the cost-benefit tradeoffs of non-power constraints that restrict operational flexibility.

Capacity expansion modeling↗

Dynamic Line Rating Models and Their Potential for a Cost‐Effective Transition to Carbon‐Neutral Power Systems

Most transmission system operators (TSOs) currently use seasonally steady-state models considering limiting weather conditions that serve as reference to compute the transmission capacity of overhead power lines. The use of dynamic line rating (DLR) models can avoid the construction of new lines, market splitting, false congestions, and the degradation of lines in a cost-effective way. DLR can also be used in the long run in grid extension and new power capacity planning. In the short run, it should be used to help operate power systems with congested lines. The operation of the power systems is planned to have the market trading into account; thus, it computes transactions hours ahead of real-time operation, using power flow forecasts affected by large errors. In the near future, within a “smart grid” environment, in real-time operation conditions, TSOs should be able to rapidly compute the capacity rating of overhead lines using DLR models and the most reliable weather information, forecasts, and line measurements, avoiding the current steady-state approach that, in many circumstances, assumes ampacities above the thermal limits of the lines. Here, this work presents a review of the line rating methodologies in several European countries and the United States. Furthermore, it presents the results of pilot projects and studies considering the application of DLR in overhead power lines, obtaining significant reductions in the congestion of internal networks and cross-border transmission lines.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Puerto Rico Grid and Recovery Post Hurricane Maria

This presentation discusses the impact of and recovery from Hurricanes Irma and Maria in Puerto Rico. The hurricanes hit two weeks apart in 2017, resulting in damage to all elements (generation, distribution, and transmission) of Puerto Rico's already fragile energy system.

demand response↗

Voltage Optimization

Voltage optimization refers to a volt-var optimization technique which was originally designed to minimize energy consumption and improve end-use efficiency on the distribution system. This reduces source voltage at a substation, which lowers generation demand, reduces system losses, and improves system stability. This has been the conventional implementation of voltage optimization: focusing on regulation of voltages throughout the distribution system via coordinated adjustments of load tap changers, line-voltage regulators, switched shunt compensation, and the targeted placement of new shunt compensation. These methods have received increased focus following a growth in distributed-energy resources (DERs) interconnecting at the distribution level, given their developing capability to participate in voltage regulation. This is paired with the intermittency challenges they pose, load imbalances, and voltage fluctuations. Voltage optimization has long been an area of extensive research within the distribution system, with various strategies and philosophies demonstrating a range of effects. The conventional focus on the distribution system owes to the typical operation of transmission systems, which assumes firm local resources and flows strictly from generation resources to loads. The strategies employed in distribution have also been optimized for this typically radial configuration and operation of the distribution system.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Squeezing a Prism into a Surface: Emulating Bulk Optics with Achromatic Metasurfaces

Metasurfaces promise to replace bulky prisms and lenses with 2D surfaces, revolutionizing wavefront control with technologically significant advantages in size, weight, and planar fabrication. However, conventional implementations suffer from large chromatic aberrations and cannot sustain performance over practical bandwidths of real-world signals because of the limited phase modulation margin available in a surface. How can an infinitely thin surface generate the arbitrarily large, broadband phase delay that bulk phase accumulation can provide? Here, equivalence between bulk optics and certain multiresonant metasurfaces is demonstrated, where phase delay arises from trains of multiple resonances in the effective sheet conductivities of the surface itself instead of accumulation of propagation phase. The fundamentally required electromagnetic surface conductivities of a purely achromatic metasurface are derived and general design rules for arbitrarily broadband beam steering and lensing are obtained. Both operation in transmission and reflection can be achieved in a unified way by proper alignment of the resonances, enabling 360° directionality. The arbitrary spectral bandwidth, dual reflection/transmission operation, and complete dispensability of propagation phase constitute a major advance in the state of the art of achromatic metasurfaces for wavefront manipulation.

36 MATERIALS SCIENCE↗