Current State of Neutron Source Term Calculations

SOURCES-4C has some significant deficiencies that are mostly due to problems with the default data libraries that it uses. Some research groups have modified these libraries to fix most of the problems, but not all of them. Adding modern data libraries to SOURCES-4C is one of the most promising approaches to resolving these issues. Other promising options include using either NEDIS or a GEANT4 tool. Both of these codes approximately match the accuracy of the modified SOURCES-4C code. The NEDIS code is Russian. The GEANT4 tool might be computationally slow and it might also no longer be actively maintained. There are a handful of other (α,n) codes, but they are not accurate.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4

The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.

43 PARTICLE ACCELERATORS↗

SPALLATION NEUTRON SOURCE SUPERCONDUCTING LINAC KLYSTRON TO CAVITY MISMATCH EFFECTS AND COMPENSATION*

Abstract Observations of several of the 81 klystron output waveforms into their respective superconducting cavities do not correspond with their rectangular klystron inputs in open loop mode. This can't be completely explained by a drooping high voltage power supply especially when the waveform is parabolic. Some possible causes and effects of these anomalies are presented.

circulator↗

Prototype Spallation Neutron Source Rotating Target Assembly Final Test Report

A full-scale prototype of an extended vertical shaft, rotating target assembly based on a conceptual target design for a 1 to 3-MW spallation facility was built and tested. Key elements of the drive/coupling assembly implemented in the prototype include high integrity dynamic face seals, commercially available bearings, realistic manufacturing tolerances, effective monitoring and controls, and fail-safe shutdown features. A representative target disk suspended on a 3.5 meter prototypical shaft was coupled with the drive to complete the mechanical tests. Successful operation for 5400 hours confirmed the overall mechanical feasibility of the extended vertical shaft rotating target concept. The prototype system showed no indications of performance deterioration and the equipment did not require maintenance or relubrication.

McManamy, Thomas J↗