Electric Grid and Markets 101 [Slides]

This presentation covers aspects of operating the bulk power system with a focus on the regulatory levels of the US grid at a pretty introductory level. It was meant ot help inform a request from USDA for a "101" presentation that spoke to how electricity markets, contracting and regulation interact with the engineering and physics of operating the bulk power system. They are presently moving to being able to more directly fund PPAs or other non-co-op owned assets for member co-ops, is my understanding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Analysis of Thermal Plant Flexibility Using a National Generator Performance Database

Grid integration studies are key to understanding our ability to integrate variable generation resources into the power system and evaluating the associated costs and benefits. In these studies, it is important to understand the flexibility of the thermal power fleet, including how thermal plants operate at part load. Without a comprehensive understanding of thermal plant operation, we may over- or underestimate our ability to integrate variable generation resources and thus draw incomplete or inaccurate conclusions regarding their potential economic and environmental effects. The only public data source for understanding many elements of the operational characteristics of the thermal fleet is the U.S. Environmental Protection Agency Clean Air Markets database of historical power plant operation. However, though these data sets have been widely utilized, their use has proven to be difficult, and methods to clean and filter the data are not transparent. Here, we describe the database and a method to clean and filter it. We then use the cleaned database to demonstrate several characteristics of historical plant operation, including frequent part load operation. Finally, we provide a cleaned data set with heat rate curves and describe how to use it in general modeling activities and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating grid stress and reliability in future electricity grids across a range of demand, generation mix, and weather trends

The reliability of power grids in the future will depend on how system planners account for the integration of new technologies, extreme weather events, and uncertainties in demand growth from increased electrification and data centers. This study introduces an open-source, multisectoral, multiscale modeling framework that projects grid stress and reliability trends between 2020 and 2055 in the Western Interconnection of the United States. The framework integrates global to national energy-water-land dynamics with power plant siting and hourly grid operations modeling. We analyze future wholesale electricity price shocks and unserved energy events across eight scenarios spanning a range of population growth and economic change, generation mixes, and weather conditions. Our results show future grids with high percentage of non-renewable generation and strong economic growth are characterized by higher reliability and lower wholesale electricity prices than lower growth scenarios because of larger reliance on dispatchable generators and lower fossil fuel extraction costs. Scenarios with high percentage of renewable resources have lower median but more volatile wholesale electricity prices as well as more frequent and severe unserved energy events compared to scenarios relying more on dispatchable generators. These events occur because higher proportion of solar and wind energy causes net demand curves to deepen during midday (duck curves get progressively severe), exacerbating the challenge of meeting demand during summer evening peaks. This study suggests that robust and co-optimized transmission and energy storage planning could help maintain low wholesale electricity prices and high reliability levels in future electricity grids across uncertainties in generation mixes.

Electric grid reliability↗

Quantum computing in power systems

Electric power systems provide the backbone of modern industrial societies. Enabling scalable grid analytics is the keystone to successfully operating large transmission and distribution systems. However, today's power systems are suffering from ever-increasing computational burdens in sustaining the expanding communities and deep integration of renewable energy resources, as well as managing huge volumes of data accordingly. These unprecedented challenges call for transformative analytics to support the resilient operations of power systems. Recently, the explosive growth of quantum computing techniques has ignited new hopes of revolutionizing power system computations. Quantum computing harnesses quantum mechanisms to solve traditionally intractable computational problems, which may lead to ultra-scalable and efficient power grid analytics. This paper reviews the newly emerging application of quantum computing techniques in power systems. We present a comprehensive overview of existing quantum-engineered power analytics from different operation perspectives, including static analysis, transient analysis, stochastic analysis, optimization, stability, and control. We thoroughly discuss the related quantum algorithms, their benefits and limitations, hardware implementations, and recommended practices. We also review the quantum networking techniques to ensure secure communication of power systems in the quantum era. Finally, we discuss challenges and future research directions. This paper will hopefully stimulate increasing attention to the development of quantum-engineered smart grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating high levels of variable renewable energy into electric power systems

As more variable renewable energy (VRE) such as wind and solar are integrated into electric power systems, technical challenges arise from the need to maintain the balance between load and generation at all timescales. This paper examines the challenges with integrating ultra-high levels of VRE into electric power system, reviews a range of solutions to these challenges, and provides a description of several examples of ultra-high VRE systems that are in operation today.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Focus on monitoring and control of complex supply systems

The ongoing rapid transformation of our energy supply challenges the operation and stability of electric power grids and other supply networks. This focus issue comprises new ideas and concepts in the monitoring and control of complex networks to address these challenges.

97 MATHEMATICS AND COMPUTING↗

Intra-hour Solar Irradiance Forecast in Multiple Locations using Deep Transfer Learning

In recent years, solar power system installation imposes several challenges on the operations of local and regional power grids due to the inherent variability of ground-level solar irradiance. This work proposes a novel real-time solar forecast methodology for intra-hour solar irradiance based on deep transfer learning from ground-based sky imager for time horizons ranging from 5-15 min. There are three unique aspects of the proposed methodology: (1) a Deep Learning based algorithm development which is modeled as a classification approach rather than a traditional regression approach; (2) the use of the Transfer Learning technique to show generalization capability, robustness, and portability of baseline model in the newly deployed location where availability of enough data for training is typically scarce, and (3) redefinition of point-based irradiation forecast error estimation technique with a window-based one that is more intuitive and user-friendly. The system is developed using multiple years of irradiance and sky image recording in New Jersey and one-year data from Colorado, USA. The method is validated against ground telemetry from these two locations of diverse geographic and climatic conditions. Results show that the forecasting method proposed in this work is robust and highly accurate (8% MAPE error) for multiple locations deployment.

Deep Learning, Convolution Neural Networks, transf↗

An Alternative Timing and Synchronization Approach for Situational Awareness and Predictive Analytics

Accurate and synchronized timing information is required by power system operators for controlling the grid infrastructure (relays, Phasor Measurement Units (PMUs), etc.) and determining asset positions. Satellite-based global positioning system (GPS) is the primary source of timing information. However, GPS disruptions today (both intentional and unintentional) can significantly compromise the reliability and security of our electric grids. A robust alternate source for accurate timing is critical to serve both as a deterrent against malicious attacks and as a redundant system in enhancing the resilience against extreme events that could disrupt the GPS network. To achieve this, we rely on the highly accurate, terrestrial atomic clock-based network for alternative timing and synchronization. In this paper, we discuss an experimental setup for an alternative timing approach. The data obtained from this experimental setup is continuously monitored and analyzed using various time deviation metrics. We also use these metrics to compute deviations of our clock with respect to the National Institute of Standards and Technologys (NIST) GPS data. The results obtained from these metric computations are elaborately discussed. Finally, we discuss the integration of the procedures involved, like real-time data ingestion, metric computation, and result visualization, in a novel microservices-based architecture for situational awareness.

Chinthavali, Supriya↗

Alleviating Contingency Violations through Visual Analytics and Suggested Actions

Contingency analysis (CA) is essential in maintaining a stable and secure power grid. It is required by operating standards that contingency violations need to be alleviated within 30 minutes. In today’s practice, operators normally make decisions based on the information they have with limited support. This paper presents a new feature of user suggested actions integrated in the graphical contingency analysis (GCA) tool, developed by the authors to help the operator’s decision making process. This paper provides a few examples on showing how the decision support element of the GCA tool is further enhanced by this new feature to alleviate contingency violations for better grid reliability.

Contingency Analysis, Operator Actions, Situationa↗

Grid Integration of Small-Scale Photovoltaic Systems in Secondary Distribution Network—A Review

The relative share of renewable energy, specifically the solar photovoltaic (PV), is increasing exponentially in the world electric energy sector. This is a cumulative result of reduction in the cost of solar panels, improvement in the panel efficiency, and advancement in the associated power electronics. Among different types of PV plants, installation of small-scale rooftop PV is growing rapidly due to direct end-user benefits and lucrative governmental incentives. There are various standards developed in regards to grid integration of PVs and other distributed generations (DGs). Different power converter topologies are developed to interface the PV panel with the utility grid. To keep up with the stringent regulations imposed by the standards, various control strategies and grid synchronization methods have been developed. This review article amalgamates and summarizes all of the aforementioned aspects of a grid-integrated PV system including various standards, power stage architectures, grid synchronization methods, operation under extreme events, and control methodologies, pertaining to small-scale PV plants. This article will help freshman researchers to gain some familiarity with the topic and introduce them to some of the key issues encountered in this field.

14 SOLAR ENERGY↗

Assessment of Industrial Load for Demand Response across U.S. Regions of the Western Interconnect

Demand response has the ability to both increase power grid reliability and potentially reduce operating system costs. Understanding the role of demand response in grid modeling has been difficult due to complex nature of the load characteristics compared to the modeled generation and the variation in load types. This is particularly true of industrial loads, where hundreds of different industries exist with varying availability for demand response. We present a framework considering industrial loads for the development of availability profiles for demand response that can provide more regional understanding and can be inserted into analysis software for further study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decommissioning of NPP in Europe? Strategies, Risks and Opportunities - 16124

This paper offers a strategic perspective on the rapidly developing European nuclear decommissioning scene, with a particular focus on the German market. We will identify a number of strategic themes that might be interesting to international companies practicing in decommissioning. The market size and valuation has received attention in several studies published in the last three years due to political concerns surrounding the funding of decommissioning. This paper will focus mainly on the decommissioning and decontamination (D and D) of Nuclear Power Plants (NPPs), commercially operated reactors generating electricity for power grids. There is also a substantial developing market also in D and D of fuel cycle facilities, research reactors and military production sites. However, they represent a rather different technical and financial challenge so will not be explored here. Further, we also restrict our geographic scope to European Union members and Germany in particular, to ensure our observations offer specific value. Our principal contention is that the German national industry holds too little capacity to fully undertake its own decommissioning program; leading to a conclusion that the European program as a whole will require significant support from international companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sub-Second Parallel State Estimation

This report describes the performance of Pacific Northwest National Laboratory (PNNL) sub-second parallel state estimation (PSE) tool using the utility data from the Bonneville Power Administrative (BPA) and discusses the benefits of the fast computational speed for power system applications. The test data were provided by BPA. They are two-days’ worth of hourly snapshots that include power system data and measurement sets in a commercial tool format. These data are extracted out from the commercial tool box and fed into the PSE tool. With the help of advanced solvers, the PSE tool is able to solve each BPA hourly state estimation problem within one second, which is more than 10 times faster than today’s commercial tool. This improved computational performance can help increase the reliability value of state estimation in many aspects: (1) the shorter the time required for execution of state estimation, the more time remains for operators to take appropriate actions, and/or to apply automatic or manual corrective control actions. This increases the chances of arresting or mitigating the impact of cascading failures; (2) the SE can be executed multiple times within time allowance. Therefore, the robustness of SE can be enhanced by repeating the execution of the SE with adaptive adjustments, including removing bad data and/or adjusting different initial conditions to compute a better estimate within the same time as a traditional state estimator’s single estimate. There are other benefits with the sub-second SE, such as that the PSE results can potentially be used in local and/or wide-area automatic corrective control actions that are currently dependent on raw measurements to minimize the impact of bad measurements, and provides opportunities to enhance the power grid reliability and efficiency. PSE also can enable other advanced tools that rely on SE outputs and could be used to further improve operators’ actions and automated controls to mitigate effects of severe events on the grid. The power grid continues to grow and the number of measurements is increasing at an accelerated rate due to the variety of smart grid devices being introduced. A parallel state estimation implementation will have better performance than traditional, sequential state estimation by utilizing the power of high performance computing (HPC). This increased performance positions parallel state estimators as valuable tools for operating the increasingly more complex power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Transactive Energy Trading of Electric Vehicle Charging Stations With On-Site PV Generation in Constrained Power Distribution Networks

This paper presents a two-level transactive energy market framework, that enables energy trading among electric vehicle charging stations (EVCSs). At the lower level, the discharging capability of EVs and on-site PV generation are leveraged by individual EVCS for participating in the transactive trading with their peers. Once the lower-level trading is completed, EVCSs trade energy at the upper level through the power grid network managed by the distribution system operator (DSO). The upper-level market is cleared while satisfying the power distribution network constraints. A cooperative game-based model is proposed to model the energy trading among EVCSs. To this end, the asymmetric Nash bargaining method is applied to allocate the grand coalition's payoff to each EVCS at the upper-level market, while a weighted proportional allocation method is used to allocate individual EVCS's payoff to its respective EVs at the lower-level market. In this work, the upper-level market formulation is further decomposed into two subproblems representing an energy scheduling and trading subproblem which maximizes EVCS payoffs, and a bargaining subproblem which allocates EVCS payoffs. The effectiveness of the proposed framework for incentivizing transactive trades among EVs and EVCSs is validated in case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Efficient Network Partitioning: Application for Decentralized State Estimation in Power Distribution Grids

Increase in the proliferation of distributed energy resources require real-time situational awareness for efficient grid operations. State estimation plays an important role for the real-time control and management of the power grid. As the sensing infrastructure grows, aggregating and handling high volumes of data at a centralized location is extremely difficult. To address this challenge, this paper first proposes a novel and efficient hier-archical spectral clustering-based network partitioning algorithm followed by a decentralized compressive sensing (DCS)-based state estimation. The applicability of the proposed network partitioning algorithm is tested on an IEEE 123-bus network, an IEEE 8,500-node system, and a 6,000+ node distribution network. The results shows that the proposed approach efficiently divides the network into multiple sub-networks with the minimum number of edge connections among the neighbors. Then, we perform DCS-based state estimation on the 6,000+ node distribution network after dividing the network into 18 optimal partitions. Simulation results show that the DCS-based state estimation recovers the system states with high accuracy and low complexity.

alternating direction method of multipliers↗

Droughts in Wind and Solar Power: Assessing Climate Model Simulations for a Net‐Zero Energy Future

Abstract Understanding and predicting “droughts” in wind and solar power availability can help the electric grid operator planning and operation toward deep renewable penetration. We assess climate models' ability to simulate these droughts at different horizontal resolutions, ∼100 and ∼25 km, over Western North America and Texas. We find that these power droughts are associated with the high/low pressure systems. The simulated wind and solar power variabilities and their corresponding droughts during historical periods are more sensitive to the model bias than to the model resolution. Future climate simulations reveal varied future change of these droughts across different regions. Although model resolution does not affect the simulation of historical droughts, it does impact the simulated future changes. This suggests that regional response to future warming can vary considerably in high‐ and low‐resolution models. These insights have important implications for adapting power system planning and operations to the changing climate.

Liu, Xue [Department of Oceanography Texas A&amp,M↗