Search NASA⌕ Search

SEARCH · Search NASA

Results for “document analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

SAS4A/SASSYS-1 Commercial Grade Dedication Example Report for a Generic Sodium Pool-Type Fast Reactor Application

In the U.S., a key component of the commercialization of advanced reactors is completion of a license application, which must ultimately be approved by the Nuclear Regulatory Commission (NRC). The approval of the license application by the NRC is contingent on satisfactory demonstration of the design basis and the response of the advanced reactor design to transient and accident scenarios using accepted codes and methods. This report describes the qualification and dedication requirements that the advanced reactor safety analysis system software SAS4A/SASSYS-1 are expected to need to fulfill to be used for sodium-cooled pool-type fast reactor licensing. The qualification and dedication requirements are identified through performance critical characteristics and evaluation model acceptance criteria representative of the advanced reactor design considered for licensing. This document captures, additionally, the verification process developed to demonstrate that the software fulfills the qualification and dedication requirements for a generic sodium-cooled pool-type fast reactor as part of the commercial grade dedication process. Like most software that has primarily existed in the research and development space, the most significant challenge facing SAS4A/SASSYS-1 for use in a licensing framework is the availability of a documentation basis describing the code pedigree. SAS4A/SASSYS-1 has been used for licensing of the fast flux test facility (FFTF) and the JOYO sodium-cooled fast reactor in Japan, as well as the design of the CRBR Plant. However, the historical verification and validation (V&V) activities supporting SAS4A/SASSYS-1 development do not align with modern software quality assurance (SQA) and V&V requirements. Two approaches to use of SAS4A/SASSYS-1 in a commercial licensing framework have been identified: commercial-grade dedication (CGD) and software qualification. The methods and requirements prescribed in the ASME NQA-1-2008/2009 Standard and Regulatory Guide 1.203 on the evaluation model development and assessment process (EMDAP) have been used as guidance to define the CGD and qualification processes, respectively. A qualification and dedication requirements matrix has been developed which utilizes fundamental software verification. In this process, software verification is defined as a software quality process aimed at defining software requirement specifications, developing software design documentation, and performing and documenting acceptance testing of the code against requirements. A key element of software qualification and dedication includes determination of software acceptance with respect to critical characteristics relevant to the functional requirements of the software. To assist with identification of cross-cutting transient phenomena and functional requirements, domestic SFR vendor designs have been reviewed to identify a reference SFR design. For this report, the reference design is defined as a pool-type reactor with metal alloy fuel, a liquid-metal intermediate heat transport system, and passive decay heat rejection systems. Given this reference, a series of high-level cross-cutting phenomena was identified for a general class of single-fault undercooling or reactivity insertion transients that scopes the design basis space, with the goal of assisting with prioritization of documentation development efforts for key transient models in SAS: 1) Reactivity feedback response prior to scram; 2) System-wide thermal inertia; 3) Transition in natural circulation flow regime in heat removal systems; 4) Decay heat generation; 5) Steady-state fuel characterization; 5) Clad/fuel behavior at elevated temperatures; 6) Point kinetics and decay heat; 7) Pump coastdown behavior; 8) Core flow redistribution in loss of forced convection; 9) Pool stratification. As a demonstration of CGD of SAS4A/SASSYS-1 for a sodium pool reactor, a software qualification and dedication gap analysis as it relates to code documentation has been performed. This effort leverages the framework established as part of the SAS4A/SASSYS-1 SQA Program. This CGD demonstration provides a framework that vendors can build upon to demonstrate the applicability of the SAS4A/SASSYS-1 software for licensing a sodium-cooled pool-type fast reactor.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of the Unsteady Wakes of Heavy Trucks in Platoon Formation and Their Potential Influence on Energy Savings

The authors present transient wind velocity measurements from two successive, well-documented truck platooning track-test campaigns to assess the wake-shedding behavior experienced by trucks in various platoon formations. Utilizing advanced analytics of data from fast-response (100-200-Hz) multi-hole pressure probes, this analysis examines aerodynamic flow features and their relationship to energy savings during close-following platoon formations. Applying Spectral analysis to the wind velocity signals, we identify the frequency content and vortex-shedding behavior from a forward truck trailer, which dominates the flow field encountered by the downstream trucks. The changes in dominant wake-shedding frequencies correlate with changes to the lead and follower truck fuel savings at short separation distances. All followers experience a reduction in wake-shedding frequency at following distances less than 20 m—the same zone where lead trucks experience fuel savings/drag reductions and where followers experience a reduction in platooning benefits. The dominant vortex-shedding frequency decreased by upwards of 35% in this region. Additionally, the third truck in a platoon is shown to experience a lower wake-shedding frequency than the second vehicle in either a two- or three-truck platoon. The correlation of changes in the vortex-shedding frequency to trends in drag reduction, and the associated energy savings, suggest that these phenomena may be related and may provide an opportunity for improving the efficiency potential of truck platooning.

47 OTHER INSTRUMENTATION↗

Using Visual Systems Mapping to Improve Transparency and Comparability of Life Cycle Assessment Baseline Scenarios

Visual systems mapping is a systems engineering approach used to represent complex processes and interactions. This study evaluates its application for documenting assumptions in life cycle assessment (LCA) baseline scenarios. In LCA, the baseline or reference case represents the business as usual system against which changes in impacts (e.g., emissions) are assessed. These baseline assumptions are particularly influential in biomass LCAs, yet they often vary across studies due to regional context, system boundaries, and simplifying assumptions that are not consistently or transparently documented. As a result, key feedbacks, omitted processes, and boundary choices may remain unclear, limiting comparability across studies and weakening their usefulness for decision-making. This study examines whether visual systems mapping can improve the transparency and comparability of biomass LCA baseline scenarios. A case study of five published biomass-related LCAs were reviewed, and their baseline scenarios were translated into visual system maps to identify included processes, omitted components, and underlying assumptions. The analysis demonstrates that visual systems mapping can make baseline assumptions more explicit, highlight excluded dynamics, and improve documentation of system boundaries. Based on these findings, the study recommends the use of visual systems mapping alongside open data repositories and reproducible workflows to support greater transparency, reproducibility, and comparability in LCAs. These improvements can strengthen the role of LCAs in informing decisions related to sustainable biomass systems.

Davis, Maggie [ORNL] (ORCID:0000000181319328)↗

KBKit: A Python Toolkit for Kirkwood–Buff Theory from Molecular Dynamics

Thermodynamic properties of liquid mixtures govern processes that range from drug delivery to energy storage, yet extracting these properties from molecular simulations remains challenging. Kirkwood–Buff (KB) theory offers a rigorous route by linking microscopic pair distribution functions to macroscopic free energies, but practical use of the theory has been hindered by two obstacles: (i) the long simulations needed to obtain well-converged Kirkwood-Buff integrals (KBIs) and (ii) the specialized corrections required to translate finite-size data to the thermodynamic limit. $\texttt{KBKit}$ is an open-source Python package that removes these barriers. It automatically computes KBIs and derived thermodynamic quantities from GROMACS input files, applies state-of-the-art finite-size corrections, and provides built-in diagnostic tools to quantify statistical uncertainty. Written with modern software-engineering practices—continuous integration, extensive unit testing, and thorough documentation—$\texttt{KBKit}$ is both reliable and easy to extend. By condensing complex KBI analysis into a few intuitive commands, $\texttt{KBKit}$ enables researchers to incorporate KB theory into routine simulation workflows and accelerate the discovery of solution-phase thermodynamics.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Biomass yields, reproductive fertility, compositional analysis, and genetic diversity of newly developed triploid giant miscanthus hybrids

Abstract Miscanthus × giganteus (giant miscanthus), first found as a naturally occurring hybrid, has shown promise as a bioenergy/biomass crop throughout much of the temperate world. This allotriploid (2 n = 3 x = 57) hybrid resulted from a cross between tetraploid Miscanthus sacchariflorus (2 n = 4 x = 76) and diploid Miscanthus sinensis (2 n = 2 x = 38) and is particularly desirable due to its low fertility that minimizes reseeding and potential invasiveness. However, there is limited genetic diversity in commonly grown cultivars of triploid M. × giganteus and breeding and development efforts to improve and domesticate this crop have been minimal. Here, we report on newly developed M. × giganteus hybrids compared with the industry standard M. × giganteus '1993‐1780'. Dry biomass yields of new hybrids ranged from 19.5 to 32.4 Mg/ha/year for the fourth growing season, compared with 21.0 Mg/ha/year for M. × giganteus '1993‐1780'. Plant reproductive fertility remained low for all accessions with overall fertility [(seed set × seed germination)/100] ranging from 0.3% to 4.5% for new hybrids compared to 0.4% for M. × giganteus '1993‐1780'. Culm density and height varied among accessions and were positively correlated with increased biomass. Based on compositional analyses, theoretical ethanol yields ranged from 9, 740 to 16,278 L/ha/year for new hybrids compared to 10,406 L/ha/year for M. × giganteus '1993‐1780'. Relative feed value indices were low overall and ranged between 66.0 and 72.8 for new hybrids compared to M. × giganteus '1993‐1780' with 71.3. The genetic diversity of new hybrids, compared with existing cultivars, was characterized using whole genome sequences. Based on pair‐wise distances, cluster analysis clearly showed increased diversity of new hybrids compared with earlier selections. These results document new triploid hybrids of M. × giganteus with enhanced biomass and theoretical ethanol yields in combination with broader genetic diversity and lowreproductive fertility.

Touchell, Darren H.↗

Evaluation of Microreactor Inhalation Dose Consequences

The new generation of microreactors are intended to provide useful, very reliable and safe safe energy for a variety of applications such as supplying to remote locations. Microreactors range from less than 1 MW th to more than 20 MW th . A range of technologies is being considered, including variations in neutron energy spectrum (fast or thermal), variations in primary and secondary coolant choices (e.g. metal cooled, gas cooled, and unique power cycle reactors. The reactors tend to use new fuel forms and types with unique benefits such as metal or TRISO fuel for higher fuel density and safety, respectively. The notional image of a microreactor is a reactor that fits in a seavan or intermodal shipping container. This would allow conventional shipping options, including aircraft, and match other mobile power sources. A development of a capability to test these reactors is needed, whether in a facility or in an open area. INL is in the process of determining acceptable test areas for these various reactors and an understanding of potential bounding consequences is important in informing siting and required infrastructure capability decisions. This ECAR considers the bounding release fractions of these types of reactors at 20 MW th and documents the dose consequences to the public and collocated worker. This is a scoping analysis for the generalized type of reactor, and the analysis will be refined based on the specific reactor design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MARSAME Release Report for TA-03 Building 16

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that materials associated with technical area 3, Buildings 16 and 18 (collectively known as TA-3-16) (Figure 1) do not meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE 2020) and are to be treated as Low Level Waste (LLW). These conclusions are based on the known history of the building combined with radiation survey data collected in 2020 and 2021, and findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL 2020a). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2000) and LANL procedures (LANL 2020b). Final approvals for waste disposition will come from LANL’s Waste Management Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARSAME Radiological Release Report TA-50, TRU Liquid Waste Construction Soil

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that the soil associated with Technical Area 50 (TA-50), Transuranic (TRU) Liquid Waste construction project (TLW) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE 2020, NNSA 2021). This conclusion is based on the known history of the area combined with soil sample data collected in 2021; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC ES-FSD-004, Environmental Radiation Protection (LANL 2020a). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2000) and LANL procedures (LANL 2020b). Final approvals for waste disposition will come from LANL’s Waste Management Program. The scope of this final release report includes the TLW construction site soil located south of TA-50, Building 001.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Diamond Drive Widening and Roundabout Construction Projects

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with the Diamond Drive Widening/Roundabout Projects (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16; Addendum Part I for Delineating BH-056

On July 11, 2022, Sandia National Laboratories in California (SNL/CA) submitted a Response to Regional Water Quality Control Board Comments on Soil Sampling Results for Closure of a Portion of SWMU #16 in response to the February 16,2022 San Francisco Bay Regional Water Quality Control Board’s (SFRWQCB) letter requesting supporting information for the recommended closure of 7,700 linear feet of abandoned sewer lines. On August 18, 2022, SFRWQCB further requested a Sampling and Analysis Plan (SAP) for additional “step-out” sampling to delineate the potential presence of benzidine near borehole BH-056, which is located near the former sewer line. SNL/CA is in the process of contracting Weiss Associates (Weiss) to perform and oversee the boring, sampling, analysis, and report development to determine the potential presence and extent of benzidine. This document outlines the work that is anticipated, including the development of the SAP, to complete the investigation and submit a final report to the SFRWQCB. The work proposed by Weiss provides an estimated schedule for completing the investigation and developing the addendum Part II SAP for the project. In addition, Weiss provided a preliminary estimate of the sample locations (see Attachment A) which serve as addendum Part I of the SAP requested by the SFRWQCB. The contractor will submit the addendum Part II SAP, to satisfy the SFRWQCB requirement, before proceeding with any work.

54 ENVIRONMENTAL SCIENCES↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

MARSAME Radiological Release Report for Replacement Water Lines from TA-48 to TA-55

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Diamond Drive Widening and Roundabout Construction Projects, Revision 1

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that the soil, concrete and asphalt associated with the Diamond Drive Widening/Roundabout Projects (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Weapons Facility Operations #5 Decontamination and Demolition Project

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has identified materials associated with Weapons Facility Operations (WFO) #5 that meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020) and materials in one building that did not meet the criteria for unrestricted release and are to be treated as low level waste (LLW). These conclusions are based on the known history of the area combined with radiation survey data data collected in 2022 and 2023. The findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Weapons Facility Operations #4 Decontamination and Demolition Project: TA-14-0005, TA-15-0009, TA-15-0202, TA-15-0233, TA-36-0019

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has identified materials associated with Weapons Facility Operations (WFO) #4 that meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020) and materials in one building that do not meet the criteria for unrestricted release and are to be treated as low level waste (LLW). These conclusions are based on the known history of the buildings combined with radiation survey data data collected in 2022 and 2023. The findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program. The scope of this final release report includes Technical Area (TA) 14 Building 5 (TA-14-0005), TA-15 Buildings 9, 202, and 233 (TA-15-0009/0202/0233), and TA-36 Building 19 (TA-36-0019). MARSAME provides guidance on statistical sampling for residual radionuclides in bulk materials; smaller, miscellaneous items can be released via the release procedures outlined in LANL Policy 121 Radiation Protection (LANL, 2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARSAME Release Report for Replacement Water Lines From TA-48 to TA-55, Revision 2

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA 55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

ComStock Measure Scenario Documentation: Reduced Thermostat Setbacks for Heat Pumps

This report provides documentation of a measure for the End Use Savings Shapes project, which consists of analysis of different energy efficiency and renewable energy measures on the commercial building stock, using NREL's ComStock tool. The measure consists of a reduction in thermostat setbacks for air-source heat pump RTUs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗