Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Review of Quantitative Software Reliability Methods

The current U.S. Nuclear Regulatory Commission (NRC) licensing process for digital systems rests on deterministic engineering criteria. In its 1995 probabilistic risk assessment (PRA) policy statement, the Commission encouraged the use of PRA technology in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data. Although many activities have been completed in the area of risk-informed regulation, the risk-informed analysis process for digital systems has not yet been satisfactorily developed. Since digital instrumentation and control (I&C) systems are expected to play an increasingly important role in nuclear power plant (NPP) safety, the NRC established a digital system research plan that defines a coherent set of research programs to support its regulatory needs. One of the research programs included in the NRC's digital system research plan addresses risk assessment methods and data for digital systems. Digital I&C systems have some unique characteristics, such as using software, and may have different failure causes and/or modes than analog I&C systems; hence, their incorporation into NPP PRAs entails special challenges. The objective of the NRC's digital system risk research is to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems into NPP PRAs, and (2) using information on the risks of digital systems to support the NRC's risk-informed licensing and oversight activities. For several years, Brookhaven National Laboratory (BNL) has worked on NRC projects to investigate methods and tools for the probabilistic modeling of digital systems, as documented mainly in NUREG/CR-6962 and NUREG/CR-6997. However, the scope of this research principally focused on hardware failures, with limited reviews of software failure experience and software reliability methods. NRC also sponsored research at the Ohio State University investigating the modeling of digital systems using dynamic PRA methods. These efforts, documented in NUREG/CR-6901, NUREG/CR-6942, and NUREG/CR-6985, included a functional representation of the system's software but did not explicitly address failure modes caused by software defects or by inadequate design requirements. An important identified research need is to establish a commonly accepted basis for incorporating the behavior of software into digital I&C system reliability models for use in PRAs. To address this need, BNL is exploring the inclusion of software failures into the reliability models of digital I&C systems, such that their contribution to the risk of the associated NPP can be assessed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NRAP-Open-IAM: NRAP Open Source Integrated Assessment Model

Note: This is the last version (a2.6.1) of NRAP-Open-IAM released during NRAP Phase II in 2022. The latest version of NRAP-Open-IAM is available here: https://edx.netl.doe.gov/dataset/phase-iii-nrap-open-iam NRAP-Open-IAM is an open-source software product that enables quantification of containment effectiveness and leakage risk at storage sites in the context of system uncertainties and variability. NRAP-Open-IAM represents the next-generation in a line of systems-based computational models developed for quantitative geological carbon storage (GCS) risk assessment. The model comprises a set of reduced-order and analytical models of various components of the GCS system, potential leakage pathways, receptors of concern including impact to groundwater resources and the atmosphere, a framework to support stochastic simulation, time stepping, uncertainty quantification, other analytical functionality for scenario and risk-performance evaluation, and a basic graphical user interface to support scenario development, data input simulation definition, and basic post-processing and results display. As the NRAP Open-IAM functionality continues to evolve, we continue to add to its capability to develop quantitative, probabilistic, and time-dependent profiles of the evolution of risk at a GCS site and evaluate the influence of uncertain parameters on uncertainty in predicted risk. It can be used to quantify the dynamics of reservoir saturation plume and pressure-affected area, for evaluation of the area of potential groundwater impact (i.e., Area of Review) and monitoring requirements to support cost and regulatory analysis, and for consideration of different post-injection site care and closure scenarios. This submission contains the current version of NRAP-Open-IAM available for evaluation and testing. To use the NRAP-Open-IAM, download the source code (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/4c24a3da-3b40-4ffe-9892-c807ae9f8760) then open the NRAP-Open-IAM user's guide (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669) to read more about the tool. Installation instructions for Windows, Mac, and Linux can be found in the "installers" folder of the extracted NRAP-Open-IAM folder and describe setup of environment (e.g., Python libraries) needed for proper work of the tool. Test of installation can be done by running "python openiam_setup_tests.py" in the "setup" folder. The installation test also runs a test suite to see if the NRAP-Open-IAM has been installed correctly. To run the test suite separately, run "python iam_test.py" in the "test" folder. User's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669 Developer's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/3bc6ee7d-609d-4eb6-80ba-fa6130ee0313 Reservoir simulation data used in some examples distributed with NRAP-Open-IAM: - Kimberlina: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/eb62cece-61b2-4037-9b6d-32407dde2ab8 - Kimberlina (compartmentalized): https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/366f9530-3b32-4b84-affe-ab2df1d9a8b5 - FutureGen 2.0: https://edx.netl.doe.gov/dataset/futuregen-2-0-1008-simulation-reservoir-lookup-table NRAP-Open-IAM GitLab repository: https://gitlab.com/NRAP/OpenIAM Related publications: - Bacon, D., Yonkofski, C., Brown, C., Demirkanli, D. and Whiting, J., 2019. Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM. International Journal of Greenhouse Gas Control 90: 102784. - Bacon, D. Demirkanli, D., and White, S., 2020. Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site. International Journal of Greenhouse Gas Control 102: 103153. - Harp, D., Oldenburg, C., and Pawar, R., 2019. A metric for evaluating conformance robustness during geologic CO2 sequestration operations. International Journal of Greenhouse Gas Control 85: 100-108. - Lackey, G., Vasylkivska, V., Huerta, N., King, S., and Dilmore, R., 2019. Managing well leakage risks at a geologic carbon storage site with many wells, International Journal of Greenhouse Gas Control, 88 :182-194. - Vasylkivska, V., Dilmore, R., Lackey, G., Zhang, Y., King, S., Bacon, D., Chen, B., Mansoor, K., and Harp, D., 2021. NRAP-Open-IAM: A flexible open-source integrated assessment model for geologic carbon storage risk assessment and management, Environmental Modelling & Software, 143: 105114. Presentations: - Chen, B., Harp, D., and Pawar, R., A data assimilation approach (ES-MDA) coupling with NRAP-Open-IAM for quantifying uncertainty reduction in geological CO2 sequestration. AGUFM 2019: T44A-02. - Chen, B., and Harp, D., Improving risk analysis precision for geologic CO2 sequestration by quantifying the uncertainty reduction before and after acquiring monitoring data. 14th Greenhouse Gas Control Technologies Conference, Melbourne, Australia, 2018, pp. 21-26. - Harp, D., National Risk Assessment Partnership Task 2: Containment Assurance. No. LA-UR-19-28654, Los Alamos National Laboratory (LANL), Los Alamos, NM (United States), 2019. - Vasylkivska, V., King, S., Bacon, D., Harp, D., Chen, B., Mansoor, K., Onishi, T., Yang, Y., Zhang, Y., and Keating, E., NRAP-Open-IAM: An open-source integrated assessment model, poster, Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting, Pittsburgh, PA, August 13-16, 2018. - Vasylkivska, V., Lackey, G., King, S., Wentworth, A., Huerta, N., Creason, C., DiGiulio, J., Yang, Y., and Dilmore, R., Long-term risk analysis of a geologic CO2 storage project during the post-injection period, SIAM Conference on Computational Science and Engineering, Spokane, WA, February 25-March 1, 2019. - Vasylkivska, V., Overview of the NRAP-Open-IAM tool for carbon storage (beta release), 2019 Annual NRAP Tool Users Meeting, Pittsburgh, PA, August 27, 2019. - Vasylkivska, V., Bacon, D., Chen, B., Dilmore, R., Harp, D., King, S., Lackey, G., Lindner, E., Liu, G., Mansoor, K. and Zhang, Y., NRAP-Open-IAM: A new, open-source code for integrated assessment of geologic carbon storage containment effectiveness and leakage risk, poster, American Geophysical Union Fall Meeting 2020 (virtual meeting), December 2020. - Vasylkivska, V., NRAP open-source integrated assessment model and relevant application, oral presentation, NRAP workshop "NRAP Tools for Geologic Carbon Storage Risk-Based Decision Making" held in conjunction with Groundwater Protection Council (GWPC) 2021 Annual Forum (virtual meeting), Salt Lake City, UT, September 2021. - Vasylkivska, V., NRAP-Open-IAM: open-source integrated assessment model, digital poster/demonstration, software demonstration session, 2022 Carbon Management Project Review Meeting, August 16, 2022

AoR↗

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

Quantifying the Sensitivity of Condition Incidence Parameters in the Evidence Library

One approach to quantifying spaceflight risk at NASA makes use event driven probabilistic techniques. The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is such a tool that estimates medical risk metrics via simulation and enables optimization of medical resources subject to mission constraints [1]. Previous analyses have informed medical set composition, exercise countermeasures, and water intake, where each analysis quantifies the risk associated with proposed variations in system design. As future mission profiles extend beyond Low-Earth Orbit (LEO) and lengthen in duration, understanding these risks and contributing factors is critical. MEDPRAT employs Monte Carlo sampling techniques to simulate missions and track the occurrence of medical events. These events follow fault-tree-like progressions through levels of severity and mitigation via medical treatment to many possible outcomes and these are reported throughout the mission. Making this possible, are the medical databases that contain evidence gathered by the Human Research Program (HRP). Quantifying the impact of uncertainty or variability in the input data is an important step in evaluating the credibility of modeling and simulation results. In this work, we investigate the sensitivity of medical risk metrics with respect to the condition incidence parameters within the Evidence Library (EL) [2] as the medical database input for MEDPRAT. The medical conditions, contained in the EL, are equipped with incidence rates that describe the likelihood that the condition will occur. These incidence rates reflect historical spaceflight data or when appropriate, terrestrial data. In this presentation, we will explore how uncertainty in these rates propagate to the medical risk described by MEDPRAT. These results identify the conditions and parameters with the largest contribution to medical risks.

Ian Lim↗

TANK FARM CLOSURE - A NEW TWIST ON REGULATORY STRATEGIES FOR CLOSURE OF WASTE TANK RESIDUALS FOLLOWING NUREG

Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most challenging activities faced by the DOE. This is due in part to the complicated regulatory structures that have developed. These regulatory structures are different at each of the DOE sites, making it difficult to apply lessons learned from one site to the next. During the past two years with the passage of the Section 3116 of the 'Ronald Reagan Defense Authorization Act of 2005' (NDAA) [2] some standardization has emerged for Savannah River Site and the Idaho National Laboratory tank residuals. Recently, with the issuance of 'NRC Staff Guidance for Activities Related to US. Department of Energy Waste Determinations' (NUREG-1854) [3] more explicit options may be considered for Hanford tank residuals than are presently available under DOE Orders. NUREG-1854, issued in August 2007, contains several key pieces of information that if utilized by the DOE in the tank closure process, could simplify waste classification and streamline the NRC review process by providing information to the NRC in their preferred format. Other provisions of this NUREG allow different methods to be applied in determining when waste retrieval is complete by incorporating actual project costs and health risks into the calculation of 'technically and economically practical'. Additionally, the NUREG requires a strong understanding of the uncertainties of the analyses, which given the desire of some NRC/DOE staff may increase the likelihood of using probabilistic approaches to uncertainty analysis. The purpose of this paper is to discuss implications of NUREG-1854 and to examine the feasibility and potential benefits of applying these provisions to waste determinations and supporting documents such as future performance assessments for tank residuals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A comparative analysis of accident risks in fossil, hydro, and nuclear energy chains

This study presents a comparative assessment of severe accident risks in the energy sector, based on the historical experience of fossil (coal, oil, natural gas, and LPG (Liquefied Petroleum Gas)) and hydro chains contained in the comprehensive Energy-related Severe Accident Database (ENSAD), as well as Probabilistic Safety Assessment (PSA) for the nuclear chain. Full energy chains were considered because accidents can take place at every stage of the chain. Comparative analyses for the years 1969-2000 included a total of 1870 severe ({>=} 5 fatalities) accidents, amounting to 81,258 fatalities. Although 79.1% of all accidents and 88.9% of associated fatalities occurred in less developed, non-OECD countries, industrialized OECD countries dominated insured losses (78.0%), reflecting their substantially higher insurance density and stricter safety regulations. Aggregated indicators and frequency-consequence (F-N) curves showed that energy-related accident risks in non-OECD countries are distinctly higher than in OECD countries. Hydropower in non-OECD countries and upstream stages within fossil energy chains are most accident-prone. Expected fatality rates are lowest for Western hydropower and nuclear power plants; however, the maximum credible consequences can be very large. Total economic damages due to severe accidents are substantial, but small when compared with natural disasters. Similarly, external costs associated with severe accidents are generally much smaller than monetized damages caused by air pollution.

01 COAL, LIGNITE, AND PEAT↗

A Simulation-Based Dynamic Approach for External Flooding Analysis in Nuclear Power Plants

All nuclear power plants must consider and evaluate external flooding risks such as local intense precipitation, dam failure, and coastal flooding due to storm surge or tsunami. While these events could challenge off-site power and other plant structure integrity, threaten plant safety systems and components, and limit plant access, they are more than often qualitatively regarded as risk insignificant and screened out from detailed evaluation and quantification. The recent lessons learned from the Fukushima seismic/tsunami initiated nuclear accident (2011), the Fort Calhoun (2011), Vermont Yankee (2013), Arkansas Nuclear One (2013), and St. Luice (2014) flooding events showed otherwise. However, developing an external flood model with traditional event tree/fault tree approach as in a static probabilistic risk assessment (PRA) model could be difficult to accurately represent plant system and component behavior and reliability of manual actions during an ever-progressing flood event. The plant response to external flood may be highly spatial- and time- dependent and subject to the hydrological and hydraulic characteristics of the flood event. Such unique challenges prompt the investigation of using the simulation-based dynamic analysis approaches for external flood risk assessment. Simulation methods can better illustrate the performance of structures, systems, and components during an external flooding event. A general framework to perform a simulation-based dynamic flooding analysis is presented in this paper with the sub-tasks of flood hazard analysis, flood fragility analysis, plant response modeling, safety margin analysis or PRA quantification. A new type of State PRA modeling technique is introduced to incorporate time-related interactions such as those from 3D simulations into a traditional PRA model.

99 GENERAL AND MISCELLANEOUS↗

Simulation-Based Recovery Action Analysis Using the EMRALD Dynamic Risk Assessment Tool

A recovery action is defined as the action that prevents deviant conditions from producing unwanted effects. It generally indicates a kind of countermeasure performed in response to a failure of human action. The recovery actions especially play an important role in complex systems like nuclear power plants (NPPs), which consist of highly sophisticated controllers to ensure that desired performance and safety must be achieved and maintained. This is because a combination of human error and its recovery failure may be able to cause a catastrophic effect on a system. Analyzing recovery actions has been a critical part of HRA, which is a technique to evaluate human errors and provide human error probabilities (HEPs) for application in probabilistic safety assessment (PSA). If recovery actions are not adequately analyzed and applied to PSA models, the PSA results may be under-estimated or be not able to reasonably account for the failure of human actions in the context of PSA. For this reason, some regulatory documents such as ASME/ANS RA-Sb-2013 by the American Society for Mechanical Engineers and the American Nuclear Society and NUREG-1792 by U.S. Nuclear Regulatory Commission have emphasized the importance of recovery analysis within the HRA. A couple of existing HRA methods, such as the Technique for Human Error-Rate Prediction (THERP), the Cause-Based Decision Tree (CBDT), and the Korean Standard HRA (K-HRA), have respectively suggested their own approaches to the HRA recovery analysis. However, there are a couple of limitations to treating recovery actions using only the current HRA methods available. The biggest limitation is that the existing recovery analysis does not explicitly consider a variety of recovery action types and recovery sequences as they occur in actual NPPs. To handle the limitations of existing recovery analysis, this study proposes a simulation-based recovery analysis method using the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software. The EMRALD software is a dynamic simulation tool for PSA. It supports realistic and dynamic modeling of human actions as they would be performed at NPPs. It is also favorable to simultaneously model the specific moment at which an action is performed, the time it takes to perform the action, and the failure probability of that action. In this paper, a detailed methodology for modeling recovery actions in the simulation platform is proposed with a couple of examples. Then, outputs from the simulation are discussed as reviewing if this novel approach can complement the challenges of existing recovery analyses.

99 GENERAL AND MISCELLANEOUS↗

Space Shuttle Main Engine Implications for the Abort-to-Orbit Off-the-Pad Study

In 2001, the Space Shuttle Main Engine (SSME) project office was contacted by the Space Shuttle Ascent Guidance, Navigation, and Control group to provide the engine perspective for an Abort-to-Orbit (ATO) study. The purpose of the AT0 Off-the-Pad study was to determine the feasibility of eliminating the Return to Launch Site and Transatlantic abort modes by using a five-segment solid rocket booster and throttling the remaining SSMEs to a higher power level. This would enable all abort modes to be Abort-to-Orbit. The SSME project office at Marshall Space Flight Center collaborated with MSFC's Space Transportation Directorate and Rocketdyne Propulsion and Power to provide the AT0 Off-the-Pad study with the analysis required. Power levels at 109%, 1 11% and 1 13% of rated power level were studied as well as mixture ratio decreases down to 5.85. SSME was to evaluate and define the technical and programmatic impacts to certify the SSME to these abort power levels. The SSME systems analysis group performed a steady state analysis using the SSME power balance model to determine if there were any technical issues associated with higher power level, low mixture ratio operation. Based on each power level/mixture ratio combination, an engine certification plan was created and a preliminary probabilistic risk assessment was performed. The results showed favorable results for higher power 1evel/lower mixture ratio SSME operation. In nearly all performance and redline parameters, the traded engine operation was encompassed by nominal engine performance of a prior engine configuration.

Schoffstoll, Dayna L.↗

Validating a Dynamic PWR Safety and Security Model?

Nuclear power plants (NPPs) are assessed for safety and security using separate models that cannot capture how an attacker's decisions and a plant's response unfold together in real time, leaving regulators and operators without a complete picture of true plant vulnerability. Traditional probabilistic risk assessment (PRA) methods treat adversarial events as fixed initiators with predetermined outcomes, and are structurally incapable of representing the time-dependent interplay between physical security events, safety system response, and operator mitigative actions. At Idaho National Laboratory (INL), I contributed to the development and validation of Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF). Where static PRA relies on event-tree logic that cannot evolve mid-scenario, MASS-DEF couples a time-dependent dynamic PRA tool EMRALD (Event Modeling Risk Assessment using Linked Diagrams) with attack simulation software, allowing attacker behavior, plant system states, and operator actions to interact across time. My work focused on validating a general Pressurized Water Reactor (PWR) model. I traced model logic against PWR plant to identified errors in logic and confirm accuracy. I then built and tested attack scenarios against a general PWR model to verify that the model produced expected outcomes across all logical pathways. I also contributed a section to a related technical paper applying the same EMRALD platform to radiation dose modeling. Results show that MASS-DEF can quantitatively demonstrate that many plants exceed their regulatory security thresholds. This demonstrated margin provides a technically defensible basis for reducing the number of guards without compromising regulatory compliance. Physical security costs represent roughly 10% of annual operating budgets, making such reductions directly meaningful to INL's mission of sustaining existing commercial NPPs. This internship strengthened my understanding of nuclear systems, probabilistic modeling, and technical writing, and has solidified my pursuit of a career at a national laboratory.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

Probabilistic Groundwater Modeling of the RDX Plume at Los Alamos National Laboratory to Support Risk Assessment - 20359

A plume of the contaminant hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) with concentrations greater than the New Mexico tap water drinking standard (9.66 ppb) is present in the regional aquifer near the southwestern boundary of Los Alamos National Laboratory (LANL). A risk assessment is performed for exposure to regional aquifer groundwater, with long-term predictions of RDX concentrations provided by a calibrated, probabilistic, numerical fate and transport model. The structure of the model is hierarchical, with the RDX Regional Aquifer (RA) groundwater model acting as the primary tool for analysis of downgradient RDX concentrations. The RA model is deeply informed by the conceptual site model (CSM) and is calibrated using site RDX concentration data and hydraulic head measurements, along with other analyses. The model is calibrated using data through December 2019. Where data are scarce other lines of evidence are used to inform inputs, including the multiphase RDX Vadose Zone (VZ) model and Pipe and Disk analytical screening tool. Model inputs are described with informative prior distributions using a robust approach to development that incorporates all available lines of evidence for every parameter used as an input to the RA model. Calibration is performed using a classical nonlinear optimization routine, which is then used to initialize a Bayesian calibration. The Bayesian calibration constrains the uncertainty in the classical calibration, ultimately providing posterior distributions for all model parameters. The challenges of the calibration include high-dimensional parameter space, including spatially heterogeneous hydraulic conductivities, comparatively sparse data, and low RDX concentrations. Posterior parameter distributions developed in the calibration process are then used for stochastic predictive model runs into the future. The result of the forward runs is spatially and temporally explicit estimates of head and concentration with uncertainty at all points in space and time. The probabilistic modeling approach presented here includes innovative computational and statistical methods that leverage high-performance computing (HPC) resources. It makes use of prior modeling work performed at the chromium plume site in the central LANL area, with extensive updates. The risk assessment will ultimately be used to support decision-making at the site, using multiple appropriately weighted sources of information, as well as uncertainty, sensitivity, and value-of-information analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Model for Estimation of GDP Losses in the MACCS Offsite Consequence Analysis Code

The MACCS (MELCOR Accident Consequence Code System) code is the U.S. Nuclear Regulatory Commission (NRC) tool used to perform probabilistic health and economic consequence assessments for atmospheric releases of radionuclides. It is also used by international organizations, both reactor owners and regulators. It is intended and most commonly used for hypothetical accidents that could potentially occur in the future rather than to evaluate past accidents or to provide emergency response during an ongoing accident. It is designed to support probabilistic risk and consequence analyses and is used by the NRC, U.S. nuclear licensees, the Department of Energy, and international vendors, licensees, and regulators. This report describes the modeling framework, implementation, verification, and benchmarking of a GDP-based model for economic losses that has recently been developed as an alternative to the original cost-based economic loss model in MACCS. The GDP-based model has its roots in a code developed by Sandia National Laboratories for the Department of Homeland Security to estimate short-term losses from natural and manmade accidents, called the Regional Economic Accounting analysis tool (REAcct). This model was adapted and modified for MACCS and is now called the Regional Disruption Economic Impact Model (RDEIM). It is based on input-output theory, which is widely used in economic modeling. It accounts for direct losses to a disrupted region affected by an accident, indirect losses to the national economy due to disruption of the supply chain, and induced losses from reduced spending by displaced workers. RDEIM differs from REAcct in its treatment and estimation of indirect loss multipliers, elimination of double counting associated with inter-industry trade in the affected area, and that it is designed to be used to estimate impacts for extended periods that can occur from a major nuclear reactor accident, such as the one that occurred at the Fukushima Daiichi site in Japan. Most input-output models do not account for economic adaptation and recovery, and in this regard RDEIM differs from its parent, REAcct, because it allows for a user-definable national recovery period. Implementation of a recovery period was one of several recommendations made by an independent peer review panel to ensure that RDEIM is state-of-practice. For this and several other reasons, RDEIM differs from REAcct. Both the original and the RDEIM economic loss models account for costs from evacuation and relocation, decontamination, depreciation, and condemnation. Where the original model accounts for an expected rate of return, based on the value of property, that is lost during interdiction, the RDEIM model instead accounts for losses of GDP based on the industrial sectors located within a county. The original model includes costs for disposal of crops and milk that the RDEIM model currently does not, but these costs tend to contribute insignificantly to the overall losses. This document discusses three verification exercises to demonstrate that the RDEIM model is implemented correctly in MACCS. It also describes a benchmark study at five nuclear power plants chosen to represent the spectrum of U.S. commercial sites. The benchmarks provide perspective on the expected differences between the RDEIM and the original cost-based economic loss models. The RDEIM model is shown to consistently predict larger losses than the original model, probably in part because it accounts for national losses by including indirect and induced losses; whereas, the original model only accounts for regional losses. Nonetheless, the RDEIM model predicts losses that are remarkably consistent with the original cost-based model, differing by 16% at most for the five sites combined with three source terms considered in this benchmark.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Proposed Activities to Address Regulatory Gaps and Challenges for Licensing Advanced Reactors Using Seismic Isolation

Over the last decade, particularly since implementation of the certified design regulatory approaches outlined in 10 CFR 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” interest has been increasing in the use of seismic isolation (SI) technology to support seismic safety in nuclear facilities. In 2009, the United States (U.S.) Nuclear Regulatory Commission (NRC) initiated research activities to develop new guidance targeted at isolated facilities because SI is being considered for nuclear power plants in the U.S. One product of that research, which was developed around a risk-informed regulatory approach, is a draft NRC NUREG series (NUREG/CR) report that investigates and discusses considerations for use of SI in otherwise traditionally founded large light water reactors (LWRs). A coordinated effort led to new provisions for SI of LWRs in the American Society of Civil Engineers standard ASCE/SEI 4-16, “Seismic Analysis of Safety Related Nuclear Structures.” The risk-informed design philosophy that underpinned development of the technical basis for these documents led to a set of proposed performance objectives and acceptance criteria intended to serve as the foundation for future NRC guidance on the use of SI and related technology. Although the guidance provided in the draft SI NUREG/CR report and ASCE/SEI 4 16 provides a sound basis for further development of nuclear power plant designs incorporating SI, these initial documents were focused on surface-founded or near-surface-founded LWRs and were, necessarily, limited in scope. For example, there is limited information in both the draft NUREG/CR report and ASCE/SEI 4-16 related to nonlinear analysis of soil-structure systems for deeply-embedded reactors, the isolation of components, and the use of vertical isolation systems. Also not included in the draft SI NUREG/CR report are special considerations for licensing of isolated facilities using the certified design approach in 10 CFR 52 and a detailed discussion of seismic probabilistic risk assessments for isolated facilities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Phase 2: Updated Geothermal Play Fairway Analysis of the Tularosa Basin, New Mexico

Play fairway analysis (PFA) methodologies, both deterministic and stochastic, are being applied for medium to low enthalpy geothermal resources in the Tularosa Basin, in south-central New Mexico. These PFA methods use datasets representative of heat, groundwater and fault-fracture related permeability to locate areas with the lowest risk of geothermal energy development. Our Phase 1 PFAs predicted several plays throughout the study area, with a range of certainty and risk, based upon legacy data. In Phase 2, new data were collected for high priority plays and integrated into the PFAs to enhance certainty and further reduce risk. Field geology, gravity surveys and alluvial fan geomorphology supplemented the understanding of geologic structure and potential permeability, while additional well sampling, geothermometry and temperature logging provided valuable information about heat in the subsurface. In order to statistically compare and contrast the layers of evidence in the Tularosa Basin with the broader Great Basin, a probabilistic Weights of Evidence analysis was conducted in parallel with the inclusive and deterministic petroleum industry logic PFA. Both methods yielded 3 similar plays, while Weights of Evidence identified 2 additional plays. A sixth play was inferred around the NASA-Aerospace Data Facility Southwest site, north-east of Las Cruces, based on a promising shallow temperature survey, geothermometers, and structural interpretations of geophysical data. Here, the White Sands Missile Range main cantonment (headquarters) play is now given high priority, along with McGregor Range, Fort Bliss, due to the discovery of relatively high geothermometer values.

15 GEOTHERMAL ENERGY↗

LandScan mosaic enables high-resolution gridded population estimates with explicit uncertainty

Gridded population datasets represent high-resolution distributions of human occupancy, enabling informed decision-making across a broad range of fields. These data products are valuable for assessing environmental risk, urban development, disaster preparedness and resource allocation—areas where accurate population estimates directly enhance policy effectiveness and optimize resource distribution. Despite the importance of gridded population datasets, traditional population modeling approaches often overlook inherent uncertainties in the estimation process. This limitation can create a false sense of certainty in population estimates, potentially leading to flawed decisions by those who rely on the data. To address this methodological gap, we introduce a probabilistic machine learning modeling framework, LandScan Mosaic, that explicitly incorporates uncertainty into the population modeling process. Our approach systematically quantifies uncertainty in three key modeling parameters of the LandScan HD gridded population dataset: building use types, floor counts, and occupancy rates. By employing Monte Carlo simulations, we propagate these uncertainties through the modeling process, yielding probability distributions of population counts in place of deterministic point estimates. We demonstrate the practical application of this framework in Iloilo City, Philippines, using structured decision-making techniques and our probabilistic estimates to identify and prioritize areas most affected by projected flooding, supporting targeted interventions that address both economic and social risks. In doing so, we propose a population-specific approach for incorporating confidence into structured decision making processes. Through a comparative analysis with conventional deterministic approaches and point estimate approaches, including LandScan HD and WorldPop, we evaluate how the incorporation of machine learning and uncertainty influences decision rankings. This research advances population distribution modeling by offering a robust, quantitative approach that explicitly accounts for uncertainty in the underlying data, along with guidance for how users can apply uncertainty in their decision-making.

Environmental sciences↗

Integration of Advanced Probabilistic Analysis Techniques with Multi-Physics Models

An integrated simulation platform that couples probabilistic analysis-based tools with model-based simulation tools can provide valuable insights for reactive and proactive responses to plant operating conditions. The objective of this work is to demonstrate the benefits of a partial implementation of the Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Detailed Framework Specification through the coupling of advanced PRA capabilities and accurate multi-physics plant models. Coupling a probabilistic model with a multi-physics model will aid in design, operations, and safety by providing a more accurate understanding of plant behavior. This represents the first attempt at actually integrating these two types of analyses for a control system used for operations, on a faster than real-time basis. This report documents the development of the basic communication capability to exchange data with the probabilistic model using Reliability Workbench (RWB) and the multi-physics model using Dymola. The communication pathways from injecting a fault (i.e., failing a component) to the probabilistic and multi-physics models were successfully completed. This first version was tested with prototypic models represented in both RWB and Modelica. First, a simple event tree/fault tree (ET/FT) model was created to develop the software code to implement the communication capabilities between the dynamic-link library (dll) and RWB. A program, written in C#, successfully communicates faults to the probabilistic model through the dll. A systems model of the Advanced Liquid-Metal Reactor–Power Reactor Inherently Safe Module (ALMR-PRISM) design developed under another DOE project was upgraded using Dymola to include proper interfaces to allow data exchange with the control application (ConApp). A program, written in C+, successfully communicates faults to the multi-physics model. The results of the example simulation were successfully plotted.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analyzing Dynamic Probabilistic Risk Assessment Data through Topology-Based Clustering

We investigate the use of a topology-based clustering technique on the data generated by dynamic event tree methodologies. The clustering technique we utilizes focuses on a domain-partitioning algorithm based on topological structures known as the Morse-Smale complex, which partitions the data points into clusters based on their uniform gradient flow behavior. We perform both end state analysis and transient analysis to classify the set of nuclear scenarios. We demonstrate our methodology on a dataset generated for a sodium-cooled fast reactor during an aircraft crash scenario. The simulation tracks the temperature of the reactor as well as the time for a recovery team to fix the passive cooling system. Combined with clustering results obtained previously through mean shift methodology, we present the user with complementary views of the data that help illuminate key features that may be otherwise hidden using a single methodology. By clustering the data, the number of relevant test cases to be selected for further analysis can be drastically reduced by selecting a representative from each cluster. Identifying the similarities of simulations within a cluster can also aid in the drawing of important conclusions with respect to safety analysis.

97 MATHEMATICS AND COMPUTING↗