Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Anomalous Thrust Production from an RF Test Device Measured on a Low-Thrust Torsion Pendulum

This paper describes the eight-day August 2013 test campaign designed to investigate and demonstrate viability of using classical magnetoplasmadynamics to obtain a propulsive momentum transfer via the quantum vacuum virtual plasma. This paper will not address the physics of the quantum vacuum plasma thruster, but instead will describe the test integration, test operations, and the results obtained from the test campaign. Approximately 30-50 micro-Newtons of thrust were recorded from an electric propulsion test article consisting primarily of a radio frequency (RF) resonant cavity excited at approximately 935 megahertz. Testing was performed on a low-thrust torsion pendulum that is capable of detecting force at a single-digit micronewton level, within a stainless steel vacuum chamber with the door closed but at ambient atmospheric pressure. Several different test configurations were used, including two different test articles as well as a reversal of the test article orientation. In addition, the test article was replaced by an RF load to verify that the force was not being generated by effects not associated with the test article. The two test articles were designed by Cannae LLC of Doylestown, Pennsylvania. The torsion pendulum was designed, built, and operated by Eagleworks Laboratories at the NASA Johnson Space Center of Houston, Texas. Approximately six days of test integration were required, followed by two days of test operations, during which, technical issues were discovered and resolved. Integration of the two test articles and their supporting equipment was performed in an iterative fashion between the test bench and the vacuum chamber. In other words, the test article was tested on the bench, then moved to the chamber, then moved back as needed to resolve issues. Manual frequency control was required throughout the test. Thrust was observed on both test articles, even though one of the test articles was designed with the expectation that it would not produce thrust. Specifically, one test article contained internal physical modifications that were designed to produce thrust, while the other did not (with the latter being referred to as the "null" test article). Test data gathered includes torsion pendulum displacement measurements which are used to calculate generated force, still imagery in the visible spectrum to document the physical configuration, still imagery in the infrared spectrum to characterize the thermal environment, and video imagery. Post-test data includes static and animated graphics produced during RF resonant cavity characterization using the COMSOL Multiphysics® software application. Excerpts from all of the above are included and discussed in this paper. Lessons learned from test integration and operations include identification of the need to replace manual control of the resonant cavity target frequency with an automated frequency control capability. Future test plans include the development of an automatic frequency control circuit. Test results indicate that the RF resonant cavity thruster design, which is unique as an electric propulsion device, is producing a force that is not attributable to any classical electromagnetic phenomenon and therefore is potentially demonstrating an interaction with the quantum vacuum virtual plasma. Future test plans include independent verification and validation at other test facilities.

Brady, David↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Soil Desiccation Pilot Test Results

Over decades of operation, the U.S. Department of Energy (DOE) and its predecessors have released nearly 2 trillion L (450 billion gal) of liquid into the vadose zone at the Hanford Site. Much of this liquid waste discharge into the vadose zone occurred in the Central Plateau, a 200 km2 (75 mi2 ) area that includes approximately 800 waste sites. Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths below the limit of direct exposure pathways, but may need to be remediated to protect groundwater (DOE 2008a; Dresel et al. 2011). The Tri-Party Agencies (DOE, U.S. Environmental Protection Agency, and Washington State Department of Ecology) established Milestone M-015-50, which directed DOE to submit a treatability test plan for remediation of Tc-99 and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment and have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. Testing technologies for remediating Tc-99 and uranium will also provide information relevant for remediating other contaminants in the vadose zone. The desiccation test described herein was conducted as an element of the test plan published in March 2008 to meet Milestone M-015-50 (DOE 2008a). This field test report was prepared and submitted in response to Milestone M-015-110D, which set a date for desiccation field test activities to be reported to the Tri-Party Agencies. The desiccation field test was conducted at the Hanford Site 200-BC-1 Operable Unit. This waste site contains 26 cribs and trenches that received about 110 million L (29 million gal) of liquid waste primarily in the mid-1950s. The waste contained about 410 curies of Tc-99 (Corbin et al. 2005). There is no evidence the contamination has reached groundwater, located about 100 m (330 ft) below ground surface (bgs) in this area. Initial characterization efforts indicated the Tc-99 inventory is located mostly at a depth in the vadose zone of between about 30 and 70 m (98 and 230 ft) bgs. However, transport model predictions have indicated the potential for this contamination to adversely impact groundwater in the future (Ward et al. 2004). The test was conducted in two steps to provide information about desiccation that is intended for use in subsequent feasibility studies for waste sites with inorganic and radionuclide contaminants in the deep vadose zone. The first step was field-scale test site characterization conducted as described in a characterization work plan (DOE 2008b). Results of the characterization effort have been previously reported in DOE (2010a) and Um et al. (2009). A field test plan (DOE 2010b) was prepared and used to guide the desiccation field testing effort. Laboratory and numerical modeling efforts (Truex et al. 2011; Ward et al. 2008; Oostrom et al. 2009, 2011, 2012, In Press) preceded and accompanied the field test and are incorporated herein as their results pertain to assessment of desiccation for future feasibility studies.

desiccation↗

Electric Vehicle Communications Standards Testing and Validation - Phase II: SAE J2931/1

Vehicle to grid communication standards enable interoperability among vehicles, charging stations and utility providers and provide the capability to implement charge management. Several standards initiatives by the Society of Automobile Engineers (SAE), International Standards Organization and International Electrotechnical Commission (ISO/IEC), and ZigBee/HomePlug Alliance are developing requirements for communication messages and protocols. Recent work by the Electric Power Research Institute (EPRI) in collaboration with SAE and automobile manufacturers has identified vehicle to grid communication performance requirements and developed a test plan as part of SAE J2931/1 committee work. This laboratory test plan was approved by the SAE J2931/1 committee and included test configurations, test methods, and performance requirements to verify reliability, robustness, repeatability, maximum communication distance, and authentication features of power line carrier (PLC) communication modules at the internet protocol layer level. The goal of the testing effort was to select a communication technology that would enable automobile manufacturers to begin the development and implementation process. The EPRI/Argonne National Laboratory (ANL)/Pacific Northwest National Laboratory (PNNL) testing teams divided the testing so that results for each test could be presented by two teams, performing the tests independently. The PNNL team performed narrowband PLC testing including the Texas Instruments (TI) Concerto, Ariane Controls AC-CPM1, and the MAXIM Tahoe 2 evaluation boards. The scope of testing was limited to measuring the vendor systems communication performance between Electric Vehicle Support Equipment (EVSE) and plug-in electric vehicles (PEV). The testing scope did not address PEV’s CAN bus to PLC or PLC to EVSE (Wi-Fi, cellular, PLC Mains, etc.) communication integration. In particular, no evaluation was performed to delineate the effort needed to translate the IPv6/SEP2.0 messages to PEV’s CAN bus. The J2931/1 laboratory test results were presented to the SAE membership on March 20-22, 2012. The SAE committee decided to select HomePlug GreenPHY (HPGP) as the communication technology to use between the PEV and EVSE. No technology completely met all performance requirements. Both the MAXIM Tahoe 2 and TI Concerto met the 100Kbps throughput requirement, are estimated to meet the latency measurement performance, and met the control pilot impairment requirements. But HPGP demonstrated the potential to provide a data throughput rate of 10x of the requirement and either met or showed the potential to meet the other requirements with further development.

33 ADVANCED PROPULSION SYSTEMS↗

The analytical control program for the NASA Space Station Freedom Environmental Control and Life Support System (ECLSS) Water Recovery Test

NASA-Marshall has striven to maximize quality assurance and quality control measures in the course of Water Recovery Test (WRT) development for the Space Station Freedom ECLSS. The WRT was subjected to an independent analytical control program that is governed by the Analytical Control Test Plan and the Microbiological Methods for Water Recovery Testing Plan. Attention is given to analysis results for volatiles, sodium, and conductivity.

Tatara, James D.↗

Empirical Validation of Building Energy Modeling using Flexible Research Platform

Recently, efforts have been made to provide reliable empirical data for ANSI/ASHRAE Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs, to enable improved accuracy of building energy model (BEM) engines and improved characterization of their accuracy. The motivation for this effort is that the use of reliable empirical validation data sets in the evaluation of building energy modeling tools will lead to more consistent and validated simulation engines across all software vendors. This would expedite the use of building energy modeling in designing new buildings and retrofitting existing buildings, which delivers more energy efficient buildings.As part of a three-year multi-lab empirical validation project sponsored by U.S. DOE, this research project generated cooling season test plans by reviewing ASHRAE Standard 140, and the tests were performed based on the test plan. Finally, the experimental data sets were compared with the EnergyPlus model to demonstrate the validation procedure.

Im, Piljae↗

Application of 'Six Sigma{sup TM}' and 'Design of Experiment' for Cementation - Recipe Development for Evaporator Concentrate for NPP Ling AO, Phase II (China) - 12555

Cementation of radioactive waste is a common technology. The waste is mixed with cement and water and forms a stable, solid block. The physical properties like compression strength or low leach ability depends strongly on the cement recipe. Due to the fact that this waste cement mixture has to fulfill special requirements, a recipe development is necessary. The Six Sigma{sup TM}' DMAIC methodology, together with the Design of experiment (DoE) approach, was employed to optimize the process of a recipe development for cementation at the Ling Ao nuclear power plant (NPP) in China. The DMAIC offers a structured, systematical and traceable process to derive test parameters. The DoE test plans and statistical analysis is efficient regarding the amount of test runs and the benefit gain by getting a transfer function. A transfer function enables simulation which is useful to optimize the later process and being responsive to changes. The DoE method was successfully applied for developing a cementation recipe for both evaporator concentrate and resin waste in the plant. The key input parameters were determined, evaluated and the control of these parameters were included into the design. The applied Six Sigma{sup TM} tools can help to organize the thinking during the engineering process. Data are organized and clearly presented. Various variables can be limited to the most important ones. The Six Sigma{sup TM} tools help to make the thinking and decision process trace able. The tools can help to make data driven decisions (e.g. C and E Matrix). But the tools are not the only golden way. Results from scoring tools like the C and E Matrix need close review before using them. The DoE is an effective tool for generating test plans. DoE can be used with a small number of tests runs, but gives a valuable result from an engineering perspective in terms of a transfer function. The DoE prediction results, however, are only valid in the tested area. So a careful selection of input parameter and their limits for setting up a DoE is very important. An extrapolation of results is not recommended because the results are not reliable out of the tested area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

Standards controlling air emissions for the soil desiccation pilot test

This air emissions document supports implementation of the Treatability Test Plan for Soil Desiccation as outlined in the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau (DOE/RL-2007-56). Treatability testing supports evaluation of remedial technologies for technetium-99 (Tc-99) contamination in the vadose zone at sites such as the BC Cribs and Trenches. Soil desiccation has been selected as the first technology for testing because it has been recommended as a promising technology in previous Hanford Site technology evaluations and because testing of soil desiccation will provide useful information to enhance evaluation of other technologies, in particular gas-phase remediation technologies.

54 ENVIRONMENTAL SCIENCES↗

X-Ray Diffraction Texture Analysis of Uranium Alloy Fuel PLN-5527 R0

This test plan describes XRD sample characterization for uranium alloys. This test plan includes preferred sample preparation information, characterization method, instrument parameters, calibration method, analysis software, data-acceptance requirements, documentation/reporting requirements. Texture measurements will be taken based on relative peak shapes (e.g., peak height, area, integrated intensity, etc.), relative to the individual XRD pattern.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optical Closed-Loop Propulsion Control System Development

The overall objective of this program was to design and fabricate the components required for optical closed-loop control of a F404-400 turbofan engine, by building on the experience of the NASA Fiber Optic Control System Integration (FOCSI) program. Evaluating the performance of fiber optic technology at the component and system levels will result in helping to validate its use on aircraft engines. This report includes descriptions of three test plans. The EOI Acceptance Test is designed to demonstrate satisfactory functionality of the EOI, primarily fail-safe throughput of the F404 sensor signals in the normal mode, and validation, switching, and output of the five analog sensor signals as generated from validated optical sensor inputs, in the optical mode. The EOI System Test is designed to demonstrate acceptable F404 ECU functionality as interfaced with the EOI, making use of a production ECU test stand. The Optical Control Engine Test Request describes planned hardware installation, optical signal calibrations, data system coordination, test procedures, and data signal comparisons for an engine test demonstration of the optical closed-loop control.

Poppel, Gary L.↗

Plans and Status of Wind-Tunnel Testing Employing an Aeroservoelastic Semispan Model

This paper presents the research objectives, summarizes the pre-wind-tunnel-test experimental results to date, summarizes the analytical predictions to date, and outlines the wind-tunnel-test plans for an aeroservoelastic semispan wind-tunnel model. The model is referred to as the Supersonic Semispan Transport (S4T) Active Controls Testbed (ACT) and is based on a supersonic cruise configuration. The model has three hydraulically-actuated surfaces (all-movable horizontal tail, all-movable ride control vane, and aileron) for active controls. The model is instrumented with accelerometers, unsteady pressure transducers, and strain gages and will be mounted on a 5-component sidewall balance. The model will be tested twice in the Langley Transonic Dynamics Tunnel (TDT). The first entry will be an "open-loop" model-characterization test; the second entry will be a "closed-loop" test during which active flutter suppression, gust load alleviation and ride quality control experiments will be conducted.

Perry, Boyd, III↗

Virtual Diagnostics Interface (ViDI) for Planning Laser-Based Wind Tunnel Experiments

Virtual Diagnostics Interface (ViDI), originally introduced by Richard Schwartz in 2004 and described again by Alderfer, et. al., in 2007, is an interactive 3D software tool developed at NASA Langley Research Center to serve three main purposes: assist in pre-test planning, enhance post-test image analysis and visualization, and serve as a central location for data storage and distribution.1,2 ViDI is composed of custom-developed software and Autodesk® 3ds Max® as it incorporates Computer Aided Design (CAD) models with the results obtained from optical diagnostics.3 This software tool has proven useful in the field of optical diagnostics where pre-test planning of beam paths, optical elements, and test articles must be carried out to avoid interference, ensure spatial resolution is sufficient, and the camera Field of View (FoV) is adequate for the field of interest. Typically, practical considerations such as the distance a camera is from the region of interest, the angles at which the camera is oriented and issues such as the size of the camera and its sensor and size and focal length lens as well as the path of the laser need to be taken into account to predict a successful measurement. An example application of ViDI is shown in Fig.1 where an experiment to investigate flow separation over the wing of the High Lift Common Research Model (HL-CRM) is currently being planned in the National Transonic Facility (NTF) at NASA Langley Research Center.

virtual diagnostics interface↗

Supersonic Retropropulsion Test 1853 in NASA LaRC Unitary Plan Wind Tunnel Test Section 2

A supersonic retropropulsion experiment was conducted in the Langley Research Center Unitary Plan Wind Tunnel Test Section 2 at Mach numbers of 2.4, 3.5, and 4.6. Intended as a code validation effort, this study used pretest computations to size and refine the model such that tunnel blockage and internal flow separations were minimized. A 5-in diameter 70 degree sphere-cone forebody, which can accommodate up to four 4:1 area ratio nozzles, followed by a 9.55 inches long cylindrical aft body was selected for this test after computational maturation. The primary measurements for this experiment were high spatial-density surface pressures. In addition, high speed schlieren video and internal pressures and temperatures were acquired. The test included parametric variations in the number of nozzles utilized, thrust coefficients (roughly 0 to 4), and angles of attack (-8 to 20 degrees). The run matrix was developed to also allow quantification of various sources of experimental uncertainty, such as random errors due to run-to-run variations and systematic errors due to flowfield or model misalignments. To accommodate the uncertainty assessment, many runs and replicates were conducted with the model at various locations within the tunnel and with model roll angles of 0, 60, 120, and 180 degrees. This test report provides operational details of the experiment, contains a review of trends, and provides all schlieren and pressure results within appendices.

Berry, Scott A.↗

THERMAL MODELING OF HANFORD LEAD CANISTER’S HEATER BENCH TESTS

A computational fluid dynamics (CFD) model was built to simulate planned testing of heater assemblies for the Hanford Lead Canister (HLC) project. The HLC is a canister storage system that will contain heaters to simulate the decay heat of nuclear material and provide the canister storage system with environmental conditions equivalent to the operating conditions on a dry storage pad. The HLC will be equipped with long-term data collection and monitoring systems to provide an early warning of corrosion, pitting, cracking, or other signs of canister degradation that might threaten the integrity of the containment boundary over the potentially long term of dry storage. An important part of the HLC development is to confirm the function and ability of the electric heater assemblies that were specially designed to provide heating similar to the decay heat of nuclear material contained within the canister storage system. Heater bench testing is planned for early 2022 in a test configuration that does not include the canister. The goal of the bench testing is to verify that the heaters can replicate the decay heat of a canister with nuclear material and to validate the thermal models, which are critical to understanding the HLC’s thermal environment, including the local air flow within the canister storage system. Testing of the heater assemblies inside the canister system are planned in the future to validate canister level thermal models, and rigorous pre-deployment testing of the complete HLC cask and canister system is intended to be completed before the HLC is deployed in the 2025-2026 timeframe. This study presents the pre-test temperature predictions of the bench testing. A description of the heater assemblies and planned bench testing is presented. The model was developed with the commercial CFD code STAR-CCM+. An uncertainty analysis was run with the CFD model to determine the uncertainty in the temperature predictions and provide a range over which the predicted temperatures are expected to vary. The uncertainty analysis was performed by coupling STAR-CCM+ with the software Dakota, which provides advanced parametric analyses, including quantification of margins and uncertainty with computational models. This work is expected to provide insight into SNF canister behavior.

Suffield, Sarah R.↗

Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

Trajectory analysis↗

Preparing General Mission Analysis Tool for Operational Maneuver Planning of the Advanced Composition Explorer Mission

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

mission design↗