Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Design progress of cryogenic hydrogen system for China Spallation Neutron Source

China Spallation Neutron Source (CSNS) is a large proton accelerator research facility with 100 kW beam power. Construction started in October 2011 and is expected to last 6.5 years. The cryogenic hydrogen circulation is cooled by a helium refrigerator with cooling capacity of 2200 W at 20 K and provides supercritical hydrogen to neutron moderating system. Important progresses of CSNS cryogenic system were concluded as follows. Firstly, process design of cryogenic system has been completed including helium refrigerator, hydrogen loop, gas distribution, and safety interlock. Secondly, an accumulator prototype was designed to mitigate pressure fluctuation caused by dynamic heat load from neutron moderation. Performance test of the accumulator has been carried out at room and liquid nitrogen temperature. Results show the accumulator with welding bellows regulates hydrogen pressure well. Parameters of key equipment have been identified. The contract for the helium refrigerator has been signed. Mechanical design of the hydrogen cold box has been completed, and the hydrogen pump, ortho-para hydrogen convertor, helium-hydrogen heat exchanger, hydrogen heater, and cryogenic valves are in procurement. Finally, Hydrogen safety interlock has been finished as well, including the logic of gas distribution, vacuum, hydrogen leakage and ventilation. Generally, design and construction of CSNS cryogenic system is conducted as expected.

43 PARTICLE ACCELERATORS↗

A button - type beam position monitor design for TARLA facility

Turkish Accelerator and Radiation Laboratory in Ankara (TARLA) facility is proposed as an IR FEL and Bremsstrahlung facility as the first facility of Turkish Accelerator Center (TAC). TARLA is essentially proposed to generate oscillator mode FEL in 3-250 microns wavelengths range, will consist of normal conducting injector system with 250 keV beam energy, two superconducting RF accelerating modules in order to accelerate the beam 15-40 MeV. The TARLA facility is expected to provide two modes, Continuous wave (CW) and pulsed mode. Longitudinal electron bunch length will be changed between 1 and 10 ps. The bunch charge will be limited by 77pC. The design of the Button-type Beam Position Monitor for TARLA IR FEL is studied to operate in 1.3 GHz. Mechanical antenna design and simulations are completed considering electron beam parameters of TARLA. Ansoft HFSS and CST Particle Studio is used to compare with results of simulations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Vertically Integrated Circuits at Fermilab

The exploration of vertically integrated circuits, also commonly known as 3D-IC technology, for applications in radiation detection started at Fermilab in 2006. This paper examines the opportunities that vertical integration offers by looking at various 3D designs that have been completed by Fermilab. The emphasis is on opportunities that are presented by through silicon vias (TSV), wafer and circuit thinning, and finally fusion bonding techniques to replace conventional bump bonding. Early work by Fermilab has led to an international consortium for the development of 3D-IC circuits for High Energy Physics. For the first time, Fermilab has organized a 3D MPW run, to which more than 25 different designs have been submitted by the consortium.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Packaging, Transportation and Recycling of NPP Condenser Modules - 12262

Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged in inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Air-Power-Assist Engine Technology for Clean Combustion and Direct Energy Recovery in Heavy Duty Application

The first phase of the project consists of four months of applied research, starting from September 1, 2005 and was completed by December 31, 2005. During this time, the project team heavily relied on highly detailed numerical modeling techniques to evaluate the feasibility of the APA technology. Specifically, (i) A GT-Power{sup TM}engine simulation model was constructed to predict engine efficiency at various operating conditions. Efficiency was defined based on the second-law thermodynamic availability. (ii) The engine efficiency map generated by the engine simulation was then fed into a simplified vehicle model, which was constructed in the Matlab/Simulink environment, to predict fuel consumption of a refuse truck on a simple collection cycle. (iii) Design and analysis work supporting the concept of retrofitting an existing Sturman Industries Hydraulic Valve Actuation (HVA) system with the modifications that are required to run the HVA system with Air Power Assist functionality. A Matlab/Simulink model was used to calculate the dynamic response of the HVA system. Computer aided design (CAD) was done in Solidworks for mechanical design and hydraulic layout. At the end of Phase I, 11% fuel economy improvement was predicted. During Phase II, the engine simulation group completed the engine mapping work. The air handling group made substantial progress in identifying suppliers and conducting 3D modelling design. Sturman Industries completed design modification of the HVA system, which was reviewed and accepted by Volvo Powertrain. In Phase II, the possibility of 15% fuel economy improvement was shown with new EGR cooler design by reducing EGR cooler outlet temperature with APA engine technology from Air Handling Group. In addition, Vehicle Simulation with APA technology estimated 4 -21% fuel economy improvement over a wide range of driving cycles. During Phase III, the engine experimental setup was initiated at VPTNA, Hagerstown, MD. Air Handling system and HVA system were delivered to VPTNA and then assembly of APA engine was completed by June 2007. Functional testing of APA engine was performed and AC and AM modes testing were completed by October 2007. After completing testing, data analysis and post processing were performed. Especially, the models were instrumental in identifying some of the key issues with the experimental HVA system. Based upon the available engine test results during AC and AM modes, the projected fuel economy improvement over the NY composite cycle is 14.7%. This is close to but slightly lower than the originally estimated 18% from ADVISOR simulation. The APA project group demonstrated the concept of APA technology by using simulation and experimental testing. However, there are still exists of technical challenges to meet the original expectation of APA technology. The enabling technology of this concept, i.e. a fully flexible valve actuation system that can handle high back pressure from the exhaust manifold is identified as one of the major technical challenges for realizing the APA concept.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design and experimental demonstration of feedback adaptive RMP ELM controller toward complete long pulse ELM suppression on KSTAR

Operation of a fusion power plant requires robust edge localized mode (ELM) suppression simultaneously with high plasma performance. In this study, we describe a novel feedback adaptive resonant magnetic perturbation (RMP) ELM controller designed to address this problem by achieving optimized ELM suppression through the advanced application of 3D RMPs. From real-time $D_α$ data, the controller is achievable robust ELM suppression while simultaneously minimizing the applied RMP in order to enhance plasma performance. In real time, the instantaneous ELM-frequency is analyzed with an adaptive feedback algorithm to determine amplitudes and phases of RMP coil currents that will maximize plasma performance while maintaining ELM suppression. When applied through the KSTAR plasma control system in several experiments using $textiti{n}$ = 1 RMPs, robust ELM suppression is achieved and sustained in feedback while reducing the RMP strength to ~65% of its initial value. Minimization of the RMP strength in this manner not only allows for operation of longer discharges due to a decrease in flux consumption but also allows for a strong recovery of up to ~60% of $β_N$ throughout the ELM-free period.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Process Design and Economics for Biochemical Conversion of Lignocellulosic Biomass to Ethanol: Dilute-Acid Pretreatment and Enzymatic Hydrolysis of Corn Stover

This report describes one potential biochemical ethanol conversion process, conceptually based upon core conversion and process integration research at NREL. The overarching process design converts corn stover to ethanol by dilute-acid pretreatment, enzymatic saccharification, and co-fermentation. Building on design reports published in 2002 and 1999, NREL, together with the subcontractor HarrisGroup Inc., performed a complete review of the process design and economic model for the biomass-to-ethanol process. This update reflects NREL's current vision of the biochemical ethanol process and includes the latest research in the conversion areas (pretreatment, conditioning, saccharification, and fermentation), optimizations in product recovery, and our latest understanding of the ethanolplant's back end (wastewater and utilities). The conceptual design presented here reports ethanol production economics as determined by 2012 conversion targets and 'nth-plant' project costs and financing. For the biorefinery described here, processing 2,205 dry ton/day at 76% theoretical ethanol yield (79 gal/dry ton), the ethanol selling price is $2.15/gal in 2007$.

09 BIOMASS FUELS↗

Prediction of Alpha-Particle-Immune Gate-All-Around Field-Effect Transistors (GAA-FET) Based SRAM Design

Alpha particles are known to be a major source of particles creating soft errors in semiconductor devices, such as content flipping in Static Random-Access Memory (SRAM). Recent advancements in transistor nodes have led to the introduction of Gate-All-Around Field Effect Transistors (GAA-FETs), which have better gate control, thus better electrostatics. Moreover, the introduction of bottom dielectric isolation (BDI) eliminates substrate leakage and thus is expected to enhance its radiation hardness. It is thus important to explore if one can design an SRAM that is completely radiation-hard to alpha particles. In this paper, using 3D Technology Computer-Aided-Design (TCAD) simulations, we show that it is possible to design an SRAM using GAA-FET technology so that it is immune to single alpha particle radiation error. In other words, with the design, there will be no single-event upset (SEU) due to alpha particles. We first use ab initio calculations in PHITS to show that there is a maximum linear energy transfer (LET), LET max , for the alpha particle in Si and Si x Ge 1-x . Based on that, by de signing a sub-7nm GAA-FET-based SRAM with BDI, we show that the SRAM does not flip even if the particle strike is in the worst-case scenario for LET > LET max .

42 ENGINEERING↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗

Evaluation of Oil-Industry Stimulation Practices for Engineered Geothermal Systems

Geothermal energy extraction is typically achieved by use of long open-hole intervals in an attempt to connect the well with the greatest possible rock mass. This presents a problem for the development of Enhanced (Engineered) Geothermal Systems (EGS), owing to the challenge of obtaining uniform stimulation throughout the open-hole interval. Fluids are often injected in only a fraction of that interval, reducing heat transfer efficiency and increasing energy cost. Pinnacle Technologies, Inc. and GeothermEx, Inc. evaluated a variety of techniques and methods that are commonly used for hydraulic fracturing of oil and gas wells to increase and evaluate stimulation effectiveness in EGS wells. Headed by Leen Weijers, formerly Manager of Technical Development at Pinnacle Technologies, Inc., the project ran from August 1, 2004 to July 31, 2006 in two one-year periods to address the following tasks and milestones: 1) Analyze stimulation results from the closest oil-field equivalents for EGS applications in the United States (e.g., the Barnett Shale in North Texas) (section 3 on page 8). Pinnacle Technologies, Inc. has collected fracture growth data from thousands of stimulations (section 3.1 on page 12). This data was further evaluated in the context of: a) Identifying techniques best suited to developing a stimulated EGS fracture network (section 3.2 on page 29), and b) quantifying the growth of the network under various conditions to develop a calibrated model for fracture network growth (section 3.3 on page 30). The developed model can be used to design optimized EGS fracture networks that maximize contact with the heat source and minimize short-circuiting (section 3.4 on page 38). 2) Evaluate methods used in oil field applications to improve fluid diversion and penetration and determine their applicability to EGS (section 4 on page 50). These methods include, but are not limited to: a) Stimulation strategies (propped fracturing versus water fracturing versus injecting fluid below fracturing gradients) (section 4.1 on page 50); b) zonal isolation methods (by use of perforated casing or packers) (section 4.2 on page 57); c) fracture re-orientation and fracture network growth techniques (e.g., by use of alternating high- and low-rate injections) (section 4.4 on page 74); and d) fluid diversion methods (by use of the SurgiFrac technique, the StimGun perforation technique, or stress shadowing). This project task is to be completed in the first project year, enabling the most promising techniques to be field tested and evaluated in the second project year. 3) Study the applicability of the methods listed above by utilizing several techniques (section 5 on page 75) including, but not limited to: a) Hydraulic Impedance Testing (HIT) to determine the location of open hydraulic fractures along a open-hole interval; b) pressure transient testing to determine reservoir permeability, pore pressure, and closure stress; and c) treatment well tilt mapping or microseismic mapping to evaluate fracture coverage. These techniques were reviewed for their potential application for EGS in the first project year (section 5.1 on page 75). This study also includes further analysis of any field testing that will be conducted in the Desert Peak area in Nevada for ORMAT Nevada, Inc. (section 5.2 on page 86), with the aim to close the loop to provide reliable calibrated fracture model results. Developed through its hydraulic fracture consulting business, techniques of Pinnacle Technologies, Inc. for stimulating and analyzing fracture growth have helped the oil and gas industry to improve hydraulic fracturing from both a technical and economic perspective. In addition to more than 30 years of experience in the development of geothermal energy for commercial power generation throughout the world, GeothermEx, Inc. brings to the project: 1) Detailed information about specific developed and potential EGS reservoirs, 2) experience with geothermal well design, completion, and testing practices, and 3) a direct connection to the Desert Peak EGS project.

15 GEOTHERMAL ENERGY↗

Multipurpose Transportation, Aging, and Disposal Canisters for Used Nuclear Fuel - Getting From Here to There and Beyond

The idea of a universal canister system, in which used fuel can be placed at reactor sites, transported and - without ever needing to be re-opened -, disposed of in a geologic repository, is certainly not new. Originally proposed by DOE in the early 1990's as the Multi-Purpose Canister (MPC) system, this common sense idea has always had considerable appeal as a means to reduce used fuel handling and simplify repository surface facility operations. However, difficulties in launching the development of such a system, in the face of large uncertainties in repository design and limited program funding, caused the original MPC project to be abandoned in 1997. Then, after eight years of inactivity in this area, DOE, while experiencing difficulty completing the repository surface facility design and having missed a December 2004 deadline for submittal of a repository license application to the Nuclear Regulatory Commission (NRC), re-proposed the concept. Under this renewed initiative, the MPC systems were renamed as Transportation, Aging, and Disposal or TAD canister systems. DOE's repository design had advanced significantly at this point and industry, having gained considerable experience through the design, licensing, manufacture, and loading of over 800 used fuel dry storage systems, was well positioned to provide DOE with the meaningful technical input that would be necessary to bring the TAD concept to reality. With a firm foundation on which to build, industry actively engaged DOE in an extensive series of interactions to facilitate TAD development. This paper describes the evolution of the TAD concept through the industry/DOE dialogue that occurred over an 18 month period beginning in January 2006. It discusses the technical issues that were addressed and resolved through this collaboration. Successful completion of this dialogue led to the issuance, by DOE, of a final TAD design specification in July, 2007. This specification is being used by DOE as a fundamental input to the Yucca Mountain license application that DOE expects to submit to the NRC no later than June 2008. DOE is now in the process completing a procurement of TAD demonstrations. As part of these demonstrations, DOE expects industry vendors to seek and obtain storage and transportation licenses for the TADs by 2010 and for utilities to deploy them at reactor sites by 2012. (authors)

42 ENGINEERING↗

Annual Site Environmental Report: 2010 (ASER)

This report provides information about environmental programs during the calendar year of 2010 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that overlap the calendar year - i.e., stormwater monitoring covering the winter season of 2010/2011 (October 2010 through May 2011) are also included. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2010, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. During 2010, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued. The following are among SLAC's environmental accomplishments for 2010. To facilitate management and identification of future potential greenhouse gases (GHG) reduction opportunities, SLAC voluntarily completed GHG inventories for calendar year (CY) 2008 and CY 2009 and submitted the results to The Climate Registry. A Lead Management Plan was completed to reduce the potential of lead impacting the environment, and two large legacy tube-trailer modules, each containing 38 tubes of compressed ethane, were reused or recycled by an outside contractor, resulting in hazardous waste avoidance and cost savings of approximately $100,000 in transportation and disposal costs. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in GHG emissions. Phase I of the SLAC Advanced Metering project for electrical and natural gas systems was completed. Phase I included the design of the metering system and purchase of the enterprise software. The planning, design, and installation of an advanced water metering system for select buildings, landscape, and process systems were completed. In addition, the last major onsite chiller containing a Class I ozone-depleting substance was taken out of service, and SLAC continued to replace conventional vehicles with electric vehicles. In 2010, there were no radiological impacts to the public or the environment from SLAC operations. The potential doses to the public were negligible and far below the regulatory and SLAC administrative limits. No radiological incidents occurred that increased radiation levels to the public or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC shipped 2,891 cubic feet of low-level radioactive waste, half of which was legacy waste, to appropriate treatment and disposal facilities for low-level radioactive waste. SLAC also continued its efforts to reduce the inventory of materials no longer needed for its mission by permanently removing 125 sealed radioactive sources from the inventory. Ninety-seven of the sealed sources were returned to the manufacturer, and 28 were sent to Energy Solutions for processing before being sent to the Nevada Test Site for burial. In addition, 87 concrete blocks which had been stored in an area known as the Bone Yard were surveyed for potential surface contamination and volumetric activation prior to off-site release. Based on the comprehensive measurements, all 87 blocks were qualified for release and were disposed of as ordinary materials at a landfill. In 2010, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparation and Testing of Corrosion and Spallation-Resistant Coatings

This Energy & Environmental Research Center (EERC) project is designed to determine if plating APMT®, a specific highly oxidation-resistant oxide dispersion-strengthened FeCrAl alloy made by Kanthal, onto nickel-based superalloy turbine parts is a viable method for substantially improving the lifetimes and maximum use temperatures of the parts. The method for joining the APMT plate to the superalloys is called evaporative metal bonding and involves placing a thin foil of zinc between the plate and the superalloy, clamping them together, and heating in an atmosphere-controlled furnace. Upon heating, the zinc melts and dissolves the oxide skins of the alloys at the bond line, allowing the two alloys to diffuse into each other. The zinc then diffuses through the alloys and evaporates from their surfaces. During this annual reporting period, the finite element model was completed and used to design clamping jigs to hold the APMT plate to the larger blocks of superalloys during the bonding process. The clamping system was machined from titanium–zirconium–molybdenum and used to bond the APMT plate to the superalloy blocks. The bond between the APMT plate was weak for one of each of the superalloy blocks. We believe that this occurred because enough oxidation had occurred on the surface of the parts as a result of a 1-month time period between sandblasting to prepare the parts and the actual bonding process. The other blocks were, therefore, bonded within 1 day of preparing the parts for bonding, and their joints appear strong. Scanning electron microscopy analyses of representative joints showed that no zinc remained in the alloys after bonding. Also, phases rich in hafnium and tantalum had precipitated near the bond line in the APMT. Iron from the APMT had diffused into the superalloys during bonding, more extensively in the CM247LC than in the Rene 80. Nickel from the superalloys had diffused into the APMT, again more extensively in the joint with the CM247LC than with the Rene 80. One-inch-diameter buttons were machined from each of the bonded blocks and sent to Siemens for standard oxidation, spallation, and corrosion testing, which should be complete in the spring of 2016.

Hurley, John↗

Design and Fabrication of Cherenkov Counters for the Detection of SNM

The need for large-size detectors for long-range active interrogation (AI) detection of SNM has generated interest in water-based detector technologies. Water Cherenkov Detectors (WCD) were selected for this research because of their transportability, scalability, and an inherent energy threshold. The detector design and analysis was completed using the Geant4 toolkit. It was demonstrated both computationally and experimentally that it is possible to use WCD to detect and characterize gamma rays. Absolute efficiency of the detector (with no energy cuts applied) was determined to be around 30% for a {sup 60}Co source.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Hydrogen Production from the Next Generation Nuclear Plant

The Next Generation Nuclear Plant (NGNP) is a high temperature gas-cooled reactor that will be capable of producing hydrogen, electricity and/or high temperature process heat for industrial use. The project has initiated the conceptual design phase and when completed will demonstrate the viability of hydrogen generation using nuclear produced process heat. This paper explains how industry and the U.S. Government are cooperating to advance nuclear hydrogen technology. It also describes the issues being explored and the results of recent R&D including materials development and testing, thermal-fluids research, and systems analysis. The paper also describes the hydrogen production technologies being considered (including various thermochemical processes and high-temperature electrolysis).

08 HYDROGEN↗

OptCircuit: An optimization based method for computational design of genetic circuits

Background: Recent years has witnessed an increasing number of studies on constructing simple synthetic genetic circuits that exhibit desired properties such as oscillatory behavior, inducer specific activation/repression, etc. It has been widely acknowledged that that task of building circuits to meet multiple inducer-specific requirements is a challenging one. This is because of the incomplete description of component interactions compounded by the fact that the number of ways in which one can chose and interconnect components, increases exponentially with the number of components. Results: In this paper we introduce OptCircuit, an optimization based framework that automatically identifies the circuit components from a list and connectivity that brings about the desired functionality. Multiple literature sources are used to compile a comprehensive compilation of kinetic descriptions of promoter-protein pairs. The dynamics that govern the interactions between the elements of the genetic circuit are currently modeled using deterministic ordinary differential equations but the framework is general enough to accommodate stochastic simulations. The desired circuit response is abstracted as the maximization/minimization of an appropriately constructed objective function. Computational results for a toggle switch example demonstrate the ability of the framework to generate the complete list of circuit designs of varying complexity that exhibit the desired response. Designs identified for a genetic decoder highlight the ability of OptCircuit to suggest circuit configurations that go beyond the ones compatible with digital logicbased design principles. Finally, the results obtained from the concentration band detector example demonstrate the ability of OptCircuit to design circuits whose responses are contingent on the level of external inducer as well as pinpoint parameters for modification to rectify an existing (nonfunctional) biological circuit and restore functionality. Conclusion: Our results demonstrate that OptCircuit framework can serve as a design platform to aid in the construction and finetuning of integrated biological circuits.

59 BASIC BIOLOGICAL SCIENCES↗

An Inverse-Designed Nanophotonic Interface for Excitons in Atomically Thin Materials

Efficient nanophotonic devices are essential for applications in quantum networking, optical information processing, sensing, and nonlinear optics. Extensive research efforts have focused on integrating two-dimensional (2D) materials into photonic structures, but this integration is often limited by size and material quality. Here, we use hexagonal boron nitride (hBN), a benchmark choice for encapsulating atomically thin materials, as a waveguiding layer while simultaneously improving the optical quality of the embedded films. When combined with a photonic inverse design, it becomes a complete nanophotonic platform to interface with optically active 2D materials. Grating couplers and low-loss waveguides provide optical interfacing and routing, tunable cavities provide a large exciton-photon coupling to transition metal dichalcogenide (TMD) monolayers through Purcell enhancement, and metasurfaces enable the efficient detection of TMD dark excitons. This work paves the way for advanced 2D-material nanophotonic structures for classical and quantum nonlinear optics.

2D materials↗