Search NASA⌕ Search

SEARCH · Search NASA

Results for “Drying”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

A New Model of Dry Firn Densification Constrained By Continuous Strain Measurements Near South Pole

Converting measurements of ice-sheet surface elevation change to mass change requires measurements of accumulation and knowledge of the evolution of the density profile in the firn. Most firn-densification models are tuned using measured depth-density profiles, a method which is based on an assumption that the density profile in the firn is invariant through time. Here we present continuous measurements of firn-compaction rates in 12 boreholes near the South Pole over a two-year period. To our knowledge, these are the first continuous measurements of firn compaction on the Antarctic Plateau. We use the data to derive a new firn-densification algorithm framed as a constitutive relationship. We also compare our measurements to compaction rates predicted by several existing firn densification models. Results indicate that an activation energy of 60 kJ mol (−1), a value within the range used by current models, best predicts the seasonal cycle in compaction rates on the Antarctic Plateau. Our results suggest models can predict firn-compaction rates with at best 7% uncertainty and cumulative firn compaction on a two year timescale with at best 8% uncertainty.

C. Max Stevens↗

Determining Drying Conditions to Mitigate Hanford Transfer Line Corrosion

Radioactive waste is stored in underground, carbon-steel double-shell tanks at the Department of Energy Hanford site.1,2,3 The underground transfer lines are used to transfer the waste between the tanks and other assets at the Hanford tank farm facilities. The transfer lines constructed before 1990 are pipe-in-pipe design with most of the lines having carbon steel carrier pipe and carbon steel encasements. The lines constructed after 1990 have a stainless-steel carrier with a carbon steel encasement. The carrier lines, which are in contact with the waste, provide a critical confinement function, while the encasements provide secondary containment to reduce the risk of a release and contamination to the environment. In 2022, a visual inspection of the annulus between the encasement and the carrier for one of the pre-1990 transfer lines revealed standing liquid in contact with the carrier pipe. Additionally, a significant build-up of corrosion products on the exterior of the carrier pipe and the interior of the encasement pipe was observed. To assess the extent of condition, borescope inspections were performed in the encasement space of additional transfer lines in the facility to provide a baseline. The inspection revealed that of the lines inspected, 29 had either moisture present or evidence that moisture had been present in the past (e.g., waterline corrosion where the pipe had been exposed to standing water). Additional inspections indicated several instances of pitting corrosion on the interior of the encasement and exterior the carrier transfer lines. An image of the carrier pipe with several pits is presented in Figure 1(a) and the profiled image of the transfer line section along with the pit depths are presented Figure 1(b). As seen in the figure, the deepest pit was 73 mils on the pipe section. These lines were designated as “do-not-use” until further compensatory actions are implemented to return the lines to service.

Shukla, Pavan K. [Savannah River National Laborato↗

Determining Drying Conditions to Mitigate Hanford Double Shell Storage Tank Underside Corrosion — Phase 1

The Hanford Site in Washington State has legacy radiological waste that is being retrieved from single shell tanks (SSTs) and transferred to newer, double shell tanks (DSTs) for eventual closure of the SSTs. The waste is maintained in the DSTs until eventual immobilization can be performed at the Waste Treatment and Immobilization Plant (WTP), currently under construction. Until full immobilization is complete, extended service of the DSTs must be ensured by mitigating corrosion of the steel tank walls and buried steel pipelines. A Pit Air Supply System has been developed to mitigate corrosion of the leak detection pits connected to the concrete foundations of the DSTs. The objectives for the present study are: (i) to corrode steel specimens in an electrolytic simulant to form artificial pits with specific pit depths, and (ii) to determine the temperature and humidity levels that will mitigate further pit growth. Experimental work and results will be presented to evaluate conditions associated with the PASS system and predict corrosion rates when the PASS is operating.

Atmospheric Corrosion↗