Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Incorporating energy storage and user experience in isolated microgrid dispatch using a multi-objective model

In order to coordinate multiple different scheduling objectives from the perspectives of economy, environment, and users, a practical multi-objective dynamic optimal dispatch model incorporating energy storage and user experience is proposed for isolated microgrids. In this model, besides microturbine units, energy storage is employed to provide spinning reserve services for microgirds; and furthermore, from the perspective of demand side management, a consumer satisfaction indicator is developed to measure the quality of user experience. A two-step solution methodology incorporating multi-objective optimisation and decision analysis is put forward to address this model. First, a powerful heuristic optimisation algorithm, called the -dominance based evolutionary algorithm, is used to find a well-distributed set of Pareto-optimal solutions of the problem. Thereby, the best compromise solutions are identified from the entire solutions with the use of decision analysis by integrating fuzzy C-means clustering and grey relation projection. The simulation results on the modified Oak Ridge National Laboratory Distributed Energy Control and Communication lab microgrid test system demonstrate the effectiveness of the proposed approach.

Li, Yang↗

CRADA Number NFE-19-07846 with Grid Fruit, LLC (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-19-07846 between Oak Ridge National Laboratory (ORNL) and Grid Fruit, LLC (Grid Fruit) focused on simulating, monitoring, and adjusting controls of commercial refrigerator and freezer systems to provide load flexibility and demand response services from these machines. Viewing these medium and low-temp coolers as thermal masses, the volumes of chilled air in these coolers make them time-shiftable loads ripe for deployment at optimal times. Grid Fruit is a startup company developing methods to schedule the chilling cycles (e.g., in “build load” and “shed load” grid events) to provide energy efficiency, peak shifting, and other benefits both to the grid and the broader environment. These benefits can be magnified by coordinating chillers with HVAC, lights, computers, and other loads. Grid Fruit completed simulations and then selected and ordered controls hardware to prove the technology were successful, but the diversity of chiller models in the field without digital controls, as well as limited market demand at present, make further exploration necessary before commercialization.

42 ENGINEERING↗

Space station data flow

The results of the space station data flow study are reported. Conceived is a low cost interactive data dissemination system for space station experiment data that includes facility and personnel requirements and locations, phasing requirements and implementation costs. Each of the experiments identified by the operating schedule is analyzed and the support characteristics identified in order to determine data characteristics. Qualitative and quantitative comparison of candidate concepts resulted in a proposed data system configuration baseline concept that includes a data center which combines the responsibility of reprocessing, archiving, and user services according to the various agencies and their responsibility assignments. The primary source of data is the space station complex which provides through the Tracking Data Relay Satellite System (TDRS) and by space shuttle delivery data from experiments in free flying modules and orbiting shuttles as well as from the experiments in the modular space station itself.

Source record↗

Systems/operations technology

The deliberations of the Systems/Operations Technology Panel are summarized. The first real question that arose was to develop an understanding of what systems/operations technology is. A relativelynew discipline in the NASA technology organization, necessitates the definition of the objectives. Two objectives were established: (1) to make new things possible, and (2) to make existing capabilities cost less or work better. Making new things possible is not really applicable in the case of a space station. Both Salyut 7 and Skylab indicate that space stations are possible with existing (not necessarily new) technology. There was a concern on the part of some of the penelists that work better might mean higher performance, and that is not necessarily the case at all. Work better may mean simply to provide better service to the users of the space station at lower cost. The panel felt this to be a more realistic viewpoint. As evidenced from interaction with users (and all of the contractors found this basically to be true), the users want low cost, no schedule constraints, and no hassles.

Woodcock, G. R.↗

Simulation Modeling and Performance Evaluation of Space Networks

In space exploration missions, the coordinated use of spacecraft as communication relays increases the efficiency of the endeavors. To conduct trade-off studies of the performance and resource usage of different communication protocols and network designs, JPL designed a comprehensive extendable tool, the Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE). The design and development of MACHETE began in 2000 and is constantly evolving. Currently, MACHETE contains Consultative Committee for Space Data Systems (CCSDS) protocol standards such as Proximity-1, Advanced Orbiting Systems (AOS), Packet Telemetry/Telecommand, Space Communications Protocol Specification (SCPS), and the CCSDS File Delivery Protocol (CFDP). MACHETE uses the Aerospace Corporation s Satellite Orbital Analysis Program (SOAP) to generate the orbital geometry information and contact opportunities. Matlab scripts provide the link characteristics. At the core of MACHETE is a discrete event simulator, QualNet. Delay Tolerant Networking (DTN) is an end-to-end architecture providing communication in and/or through highly stressed networking environments. Stressed networking environments include those with intermittent connectivity, large and/or variable delays, and high bit error rates. To provide its services, the DTN protocols reside at the application layer of the constituent internets, forming a store-and-forward overlay network. The key capabilities of the bundling protocols include custody-based reliability, ability to cope with intermittent connectivity, ability to take advantage of scheduled and opportunistic connectivity, and late binding of names to addresses. In this presentation, we report on the addition of MACHETE models needed to support DTN, namely: the Bundle Protocol (BP) model. To illustrate the use of MACHETE with the additional DTN model, we provide an example simulation to benchmark its performance. We demonstrate the use of the DTN protocol and discuss statistics gathered concerning the total time needed to simulate numerous bundle transmissions

network protocols↗

Optimizing Air Transportation Service to Metroplex Airports: Analysis of Historical Data - Part 1

The air transportation system is a significant driver of the U.S. economy, providing safe, affordable, and rapid transportation. During the past three decades airspace and airport capacity has not grown in step with demand for air transportation (+4% annual growth), resulting in unreliable service and systemic delays. Estimates of the impact of delays and unreliable air transportation service on the economy range from $32B to $41B per year. This report describes the results of an analysis of airline strategic decision-making with regards to: (1) geographic access, (2) economic access, and (3) airline finances. This analysis evaluated markets-served, scheduled flights, aircraft size, airfares, and profit from 2005-2009. During this period, airlines experienced changes in costs of operation (due to fluctuations in hedged fuel prices), changes in travel demand (due to changes in the economy), and changes in infrastructure capacity (due to the capacity limits at EWR, JFK, and LGA). This analysis captures the impact of the implementation of capacity limits at airports, as well as the effect of increased costs of operation (i.e. hedged fuel prices). The increases in costs of operation serve as a proxy for increased costs per flight that might occur if auctions or congestion pricing are imposed.

Donohue, George↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

The Galaxy platform for accessible, reproducible, and collaborative data analyses: 2024 update

Galaxy (https://galaxyproject.org) is deployed globally, predominantly through free-to-use services, supporting user-driven research that broadens in scope each year. Users are attracted to public Galaxy services by platform stability, tool and reference dataset diversity, training, support and integration, which enables complex, reproducible, shareable data analysis. Applying the principles of user experience design (UXD), has driven improvements in accessibility, tool discoverability through Galaxy Labs/subdomains, and a redesigned Galaxy ToolShed. Galaxy tool capabilities are progressing in two strategic directions: integrating general purpose graphical processing units (GPGPU) access for cutting-edge methods, and licensed tool support. Engagement with global research consortia is being increased by developing more workflows in Galaxy and by resourcing the public Galaxy services to run them. The Galaxy Training Network (GTN) portfolio has grown in both size, and accessibility, through learning paths and direct integration with Galaxy tools that feature in training courses. Code development continues in line with the Galaxy Project roadmap, with improvements to job scheduling and the user interface. Environmental impact assessment is also helping engage users and developers, reminding them of their role in sustainability, by displaying estimated CO 2 emissions generated by each Galaxy job.

97 MATHEMATICS AND COMPUTING↗

STS-103 Crew Interviews: Scott Kelly

Live footage of a preflight interview with Pilot Scott J. Kelly is seen. The interview addresses many different questions including why Kelly became an astronaut, the events that led to his interest, any role models that he had, and his inspiration. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, replacement of the gyroscopes, transistors, and computers. Also discussed are the Chandra X Ray Astrophysics Facility, and a brief touch on Kelly's responsibility during any of the given four space walks scheduled for this mission.

Source record↗

Multiple Payload Ejector for Education, Science and Technology Experiments

The education research community no longer has a means of being manifested on Space Shuttle flights, and small orbital payload carriers must be flown as secondary payloads on ELV flights, as their launch schedule, secondary payload volume and mass permits. This has resulted in a backlog of small payloads, schedule and cost problems, and an inability for the small payloads community to achieve routine, low-cost access to orbit. This paper will discuss Goddard's Wallops Flight Facility funded effort to leverage its core competencies in small payloads, sounding rockets, balloons and range services to develop a low cost, multiple payload ejector (MPE) carrier for orbital experiments. The goal of the MPE is to provide a low-cost carrier intended primarily for educational flight research experiments. MPE can also be used by academia and industry for science, technology development and Exploration experiments. The MPE carrier will take advantage of the DARPAI NASA partnership to perform flight testing of DARPA s Falcon small, demonstration launch vehicle. The Falcon is similar to MPE fiom the standpoint of focusing on a low-cost, responsive system. Therefore, MPE and Falcon complement each other for the desired long-term goal of providing the small payloads community with a low-cost ride to orbit. The readiness dates of Falcon and MPE are complementary, also. MPE is being developed and readied for flight within 18 months by a small design team. Currently, MPE is preparing for Critical Design Review in fall 2005, payloads are being manifested on the first mission, and the carrier will be ready for flight on the first Falcon demonstration flight in summer, 2006. The MPE and attached experiments can weigh up to 900 lb. to be compatible with Falcon demonstration vehicle lift capabilities fiom Wallops, and will be delivered to the Falcon demonstration orbit - 100 nautical mile circular altitude.

Lechworth, Gary↗

Is the Last Inflight Rest Break Really the Best?

As pilots experienced in augmented long-haul flights know, current FAA regulations limit options for scheduling in-flight rest periods, such that on many long-haul operations the landing pilot needs to use the final bunk period, closest to top of descent (TOD). However, the logistics of a particular flight (e.g., timing of the flight, timing of passenger service) and the pilot’s own physiology may mean that the last rest break isn’t always the best. To study this, we conducted a large survey of pilots flying these operations. Pilots completed the survey after eligible flights and provided us with information on which rest break they used, how much sleep they received, factors that disrupted sleep and ratings on the quality of their sleep, and they also provided fatigue and alertness ratings at top-of-descent. Pilots from another US-based carrier were also surveyed, in collaboration with our research partners at Washington State University, to increase the sample size and gather insights between operations.

in-flight rest↗

LLNL ES&H Analytical Services and Instrumentation Analytical Laboratory (ALAB) (CY2022 Management Review Report)

"An annual review shall be conducted of the analytical activities to ensure continuing suitability, adequacy, and effectiveness." (ALAB-01 Rev 6 ALQAP section 6.11.2) "The laboratory management shall review its management system at planned intervals, in order to ensure its continuing suitability, adequacy and effectiveness..."(ISO/IEC 17025:2017 Section 8.9.1) "In accordance with a predetermined schedule and procedure, the laboratory's top management shall periodically conduct a review of the laboratory's management system and testing and/or calibration activities to ensure their continuing suitability and effectiveness, and to introduce necessary changes or improvements. "(TNI Standard EL-V1M2-2016-Rev2.1:Quality Systems General Requirements)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

STS-103 Crew Interviews: Claude Nicollier

Live footage of a preflight interview with Mission Specialist Claude Nicollier is seen. The interview addresses many different questions including why Nicollier became an astronaut, the events that led to his interest, any role models that he had, and his inspiration. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, replacement of the gyroscopes, transistors, and computers. Also discussed are the Chandra X-Ray Astrophysics Facility, and a brief touch on Nicollier's responsibility during any of the given four space walks scheduled for this mission.

Source record↗

Management Tools

Manugistics, Inc. (formerly AVYX, Inc.) has introduced a new programming language for IBM and IBM compatible computers called TREES-pls. It is a resource management tool originating from the space shuttle, that can be used in such applications as scheduling, resource allocation project control, information management, and artificial intelligence. Manugistics, Inc. was looking for a flexible tool that can be applied to many problems with minimal adaptation. Among the non-government markets are aerospace, other manufacturing, transportation, health care, food and beverage and professional services.

Source record↗

Trajectory Design Analysis over the Lunar Nodal Cycle for the Multi-Purpose Crew Vehicle (MPCV) Exploration Mission 2 (EM-2)

The first crewed mission, Exploration Mission 2 (EM-2), for the MPCV Orion spacecraft is scheduled for August 2021, and its current mission is to orbit the Moon in a highly elliptical lunar orbit for 3 days. A 21-year scan was performed to identify feasible missions that satisfy the propulsive capabilities of the Interim Cryogenic Propulsion Stage (ICPS) and MPCV Service Module (SM). The mission is divided into 4 phases: (1) a lunar free return trajectory, (2) a hybrid maneuver, during the translunar coast, to lower the approach perilune altitude to 100 km, (3) lunar orbit insertion into a 100 x 10,000 km orbit, and (4) lunar orbit loiter and Earth return to a splashdown off the coast of Southern California. Trajectory data was collected for all feasible missions and converted to information that influence different subsystems including propulsion, power, thermal, communications, and mission operations. The complete 21-year scan data shows seasonal effects that are due to the Earth-Moon geometry and the initial Earth parking orbit. The data and information is also useful to identify mission opportunities around the current planned launch date for EM-2.

Gutkowski, Jeffrey P.↗

O’Hare Airport Short-Term Ground Transportation Modal Demand Forecast Using Gaussian Processes

Here, the principal objective of this study is to analyze the spatial and temporal variation of ground transportation airport demand and provide demand forecast to inform planning capability and explore alternatives for investments to accommodate airport growth. Because of its good adaptability and strong generalization ability for dealing with high-dimensional input, small-sample, and nonlinear spatial data, Gaussian process (GP) regression is used to provide forecast estimates using data from transportation network company (TNC) trips and urban rail passengers at Chicago's O'Hare International Airport. TNC airport trips differ significantly, with three times more distance, more than twice the travel time, and half of the share requests compared with nonairport trips. This highlights the need for separate demand models. Hourly analysis of the rail service indicates that this is likely heavily used by airport workers, whereas TNC services focus on travelers because of variations in the peak demand hours. Heteroscedastic GP regression is implemented because of differences in trip variance between night and day hours. Estimates are given for weekdays and weekend trips, and the 95% confidence intervals are calculated. The introduction of flight schedule information into the models shows marginal improvements in their performance. However, fitting a GP regression becomes computationally expensive with increased sample size and the introduction of spatial components. Transportation planners and policymakers can use the results and methods implemented in this study to optimize transportation assets and provide long-range simulations of the current and future conditions in the area.

42 ENGINEERING↗

Exe-Guard Project

The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical manual scanning process. Control systems are vulnerable to performance losses if off-the-shelf blacklist antivirus solutions aren’t implemented with care. This investment in configuration in addition to constant decommissioning to perform manual signature file updates is unprecedented and impractical. Additionally, control systems are often disconnected or islanded from the network making the delivery of signature updates difficult. Exe-Guard project developed a white list antivirus solution that mitigated the above drawbacks and allows control systems to cost-effectively apply malware protection while maintaining high reliability. The application of security patches can also be minimized since white listing maintains constant defense against unauthorized code execution. Security patches can instead be applied in less frequent intervals where system decommissioning can be scheduled and planned for. Since control systems are less dynamic than IT environments, the feasibility of maintaining a secure baselined state is more practical. Because upgrades are performed in infrequent, calculated intervals, it allows a new security baseline to be established before the system is returned to service. Exe-Guard built on the efforts of SNL under the Code Seal project. SNL demonstrated prototype Trust Anchors on the project which are independent monitoring and control devices that can be integrated into untrustworthy components. The exe-Guard team started with the lessons learned under this project then designed commercial solution for white list malware protection. Malware is a real threat, even on islanded or un-networked installations, since operators can unintentionally install infected files, plug in infected mass storage devices, or infect a piece of equipment on the islanded local area network that can then spread to other connected equipment. Protection at the device level is one of the last layers of defense in a security-in-depth defense model before an asset becomes compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Respirator Cartridge Performance Testing on a Hanford AN Tank Farm Exhauster Slipstream

Washington River Protection Solutions (WRPS) conducted tests on two types of chemical cartridges for use in air purifying respirators to determine the period of time that the cartridges would provide adequate performance to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPCs) from vapors exiting the exhauster at the Hanford AN tank farm. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing cartridge change schedule. Testing is commonly applied in situations where mixtures of COPCs exist and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from September 30−October 2, 2016, on a slipstream from the AN Exhauster under static conditions fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina) were assessed on separate days. Sample media (sorbent tubes) were used to collect samples of the vapor stream entering and exiting the respirator cartridge and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗