Search NASA⌕ Search

SEARCH · Search NASA

Results for “fleet efficiency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Space Shuttle RTOS Bayesian Network

With shrinking budgets and the requirements to increase reliability and operational life of the existing orbiter fleet, NASA has proposed various upgrades for the Space Shuttle that are consistent with national space policy. The cockpit avionics upgrade (CAU), a high priority item, has been selected as the next major upgrade. The primary functions of cockpit avionics include flight control, guidance and navigation, communication, and orbiter landing support. Secondary functions include the provision of operational services for non-avionics systems such as data handling for the payloads and caution and warning alerts to the crew. Recently, a process to selection the optimal commercial-off-the-shelf (COTS) real-time operating system (RTOS) for the CAU was conducted by United Space Alliance (USA) Corporation, which is a joint venture between Boeing and Lockheed Martin, the prime contractor for space shuttle operations. In order to independently assess the RTOS selection, NASA has used the Bayesian network-based scoring methodology described in this paper. Our two-stage methodology addresses the issue of RTOS acceptability by incorporating functional, performance and non-functional software measures related to reliability, interoperability, certifiability, efficiency, correctness, business, legal, product history, cost and life cycle. The first stage of the methodology involves obtaining scores for the various measures using a Bayesian network. The Bayesian network incorporates the causal relationships between the various and often competing measures of interest while also assisting the inherently complex decision analysis process with its ability to reason under uncertainty. The structure and selection of prior probabilities for the network is extracted from experts in the field of real-time operating systems. Scores for the various measures are computed using Bayesian probability. In the second stage, multi-criteria trade-off analyses are performed between the scores. Using a prioritization of measures from the decision-maker, trade-offs between the scores are used to rank order the available set of RTOS candidates.

Morris, A. Terry↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

DriveSense: A Noise-Resilient Framework for Driving Mode Identification

Accurate drive mode classification is essential for enhancing the reliability and predictive maintenance of heavy-duty electric trucks. This study proposes a novel fuzzy logic-based framework, DriveSense, for real-time drive mode classification, addressing key challenges such as sensor noise, transitional behaviors, and computational efficiency. The proposed approach integrates a two-stage filtering pipeline, combining adaptive outlier removal and a dynamic Kalman filter to enhance data quality. A fuzzy inference system with smoothened trapezoidal membership functions is then applied to classify driving modes into standstill, constant speed, acceleration, and deceleration while mitigating the effects of noise and edge cases. Performance evaluation using real-world and simulated drive cycles demonstrates significant improvements in classification accuracy (up to 97.8%), F1-score (up to 0.97), and robustness against noise, while reducing false positives. Comparative analysis against baseline models, demonstrates DriveSense’s superior accuracy and generalizability across diverse driving patterns. The framework’s lightweight and interpretable fuzzy inference engine operates with low computational latency, ensuring compatibility with real-time embedded systems typical of heavy-duty electric trucks. Moreover, DriveSense models transitional behaviors through overlapping fuzzy sets and adaptive borderline classification logic, enabling smooth identification of subtle shifts such as rolling stops or gradual deceleration. These results highlight DriveSense’s potential to enhance predictive maintenance strategies, reduce downtime, and support scalable, fleet-wide diagnostics.

Kumar, Praveen [Oak Ridge National Laboratory (ORN↗

Demonstration and Evaluation of the Human-Technology Integration Function Allocation Methodology

There is an imminent need for the existing nuclear power plants to reduce their operating and maintenance (O&M) costs to remain economically viable. Digital technology, including automation, provides a significant opportunity for the existing nuclear power plant fleet to transform the way in which work is accomplished, reducing O&M costs, and allowing the fleet to remain economically competitive. One notable opportunity to significantly reduce O&M costs pertains to modifications to the plant equipment and main control room (MCR). Existing instrumentation and control (I&C) technologies in the MCR are highly analog, costly to operate and maintain, and demand a high cognitive and physical workload from plant staff (i.e., operators). Digitalizing the MCR has a range of broad economic benefits, including improved plant performance and reduced manual work. Further, digital I&C systems can fundamentally change the way in which plant staff operate the plant; this is the concept of operation. Human-technology integration is important to ensure that impacts to the concept of operation are done in a way that account for capabilities of people and technology. Human-technology integration employs human factors engineering (HFE) methods and principles to maximize the benefits of digital technology, reducing human error, improving overall decision-making and usability. The U.S. Department of Energy Light Water Reactor Sustainability Program is applying human-technology integration research to ensure digital technologies are safe, reliable, and efficient. This paper documents the demonstration of the human-technology guidance developed by the Light Water Reactor Sustainability Program from a first-of-a-kind digital I&C upgrade, specifically addressing function analysis and allocation for a new digital I&C system that included changes in automation levels. The program’s specific approach is included in this work, following lessons learned. This document serves as a resource for industry to follow in applying human-technology integration and HFE to digital modifications, specific to function analysis and allocation. The lessons learned should be considered in the planning and execution of HFE activities that support such digital modifications.

99 GENERAL AND MISCELLANEOUS↗

Sustainable Campus with PEV and Microgrid

Market penetration of electric vehicles (EVs) is gaining momentum, as is the move towards increasingly distributed, clean and renewable electricity sources. EV charging shifts a significant portion of transportation energy use onto building electricity meters. Hence, integration strategies for energy-efficiency in buildings and transport sectors are of increasing importance. This paper focuses on a portion of that integration: the analysis of an optimal interaction of EVs with a building-serving transformer, and coupling it to a microgrid that includes PV, a fuel cell and a natural gas micro-turbine. The test-case is the Nanyang Technological University (NTU), Singapore campus. The system under study is the Laboratory of Clean Energy Research (LaCER) Lab that houses the award winning Microgrid Energy Management System (MG-EMS) project. The paper analyses three different case scenarios to estimate the number of EVs that can be supported by the building transformer serving LaCER. An approximation of the actual load data collected for the building into different time intervals is performed for a transformer loss of life (LOL) calculation. The additional EV loads that can be supported by the transformer with and without the microgrid are analyzed. The numbers of possible EVs that can be charged at any given time under the three scenarios are also determined. The possibility of using EV fleet at NTU campus to achieve demand response capability and intermittent PV output leveling through vehicle to grid (V2G) technology and building energy management systems is also explored.

Singh, Reshma↗

Real-time discovery of AT2020xnd: a fast, luminous ultraviolet transient with minimal radioactive ejecta

ABSTRACT The many unusual properties of the enigmatic AT2018cow suggested that at least some subset of the empirical class of fast blue optical transients (FBOTs) represents a genuinely new astrophysical phenomenon. Unfortunately, the intrinsic rarity and fleeting nature of these events have made it difficult to identify additional examples early enough to acquire the observations necessary to constrain theoretical models. We present here the Zwicky Transient Facility discovery of AT2020xnd (ZTF20acigmel, the ‘Camel’) at z = 0.243, the first unambiguous AT2018cow analogue to be found and confirmed in real time. AT2018cow and AT2020xnd share all key observational properties: a fast optical rise, sustained high photospheric temperature, absence of a second peak attributable to ejection of a radioactively heated stellar envelope, extremely luminous radio, millimetre, and X-ray emission, and a dwarf-galaxy host. This supports the argument that AT2018cow-like events represent a distinct phenomenon from slower-evolving radio-quiet supernovae, likely requiring a different progenitor or a different central engine. The sample properties of the four known members of this class to date disfavour tidal disruption models but are consistent with the alternative model of an accretion powered jet following the direct collapse of a massive star to a black hole. Contextual filtering of alert streams combined with rapid photometric verification using multiband imaging provides an efficient way to identify future members of this class, even at high redshift.

79 ASTRONOMY AND ASTROPHYSICS↗

Antares: A low cost modular launch vehicle for the future

The single-stage-to-orbit launch vehicle Antares is a revolutionary concept based on identical modular units, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg (22,000 lb) into low Earth orbit (LEO). When coupled with a standard Centaur upper stage, it is capable of placing 4000 kg (8800 lb) into geosynchronous Earth orbit (GE0). The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles can be attached depending on the payload and mission requirements. With a seven-vehicle configuration, the Antares' modular concept provides a heavy lift capability of approximately 70,000 kg (154,000 lb) to LEO. This expandability allows for a wide range of payload options, such as large Earth satellites, Space Station Freedom material, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Source record↗

Launch Alaska Transportation and Energy Accelerator (LATEA)

The Launch Alaska Transportation and Energy Accelerator (LATEA), funded through the U.S. Department of Energy Office of Technology Commercialization’s Energy Program for Innovation Clusters (EPIC),advanced deployment of innovative and efficient transportation and energy technology in Alaska from October 2021 through June 2025. The project was designed to leverage Launch Alaska’s accelerator model to identify, recruit, and support transportation technology companies with novel solutions to market needs while building the stakeholder networks, demonstration opportunities, and institutional capacity necessary to accelerate commercialization in one of the most challenging operating environments in the United States.

08 HYDROGEN↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration of Electrolyzer Operation at a Nuclear Plant to Allow for Dynamic Participation in an Organized Electricity Market and In-House Hydrogen Supply

This document details the execution of Cooperative Agreement DE-EE0008849, “demonstration of electrolyzer operation at a nuclear plant to allow for dynamic participation in an organized electricity market and in-house hydrogen supply” during the performance period of 10/1/2019 – 9/30/2024. The project was funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). Constellation Energy Generation, LLC (formerly Exelon Generation Company, LLC) is the prime recipient of the award. Other members of the project team are INL, NREL, ANL and Nel Hydrogen. The main project objective was to demonstrate an end-to-end integrated grid-scale carbon-free H 2 production, storage and utilization pilot plant at a nuclear generating facility. The project also aimed to evaluate market opportunities and regulatory requirements related to the participation of integrated hydrogen production and nuclear plant facilities in organized power markets, by demonstrating dynamic control and operation of the electrolyzer and assessing the economics of dynamic participation combined with the revenue streams from hydrogen production. On March 7th , 2023 Constellation started hydrogen production at it’s Nine Mile Point Nuclear Plant in Oswego, New York. The PEM electrolyzer operating at Nine Mile Point uses 1.25 megawatt of nuclear electricity to produce 560 kilograms of clean hydrogen per day, more than enough to meet the plant’s operational hydrogen use. It will also help set the stage for possible large-scale deployments at other clean energy centers in Constellation’s fleet that would couple clean hydrogen production with storage and other on-site uses. Employing the lessons learned from the 1.25 MW demonstration-scale, nuclear-powered clean hydrogen production facility at Nine Mile Point, Constellation was a major participant in the MachH2 hydrogen hub recently selected for up to $\$$1 billion by the Department of Energy (DOE) as part of the bipartisan Infrastructure Investment and Jobs Act. Constellation will use a portion of the hub funding to build the world’s largest nuclear-powered clean hydrogen production facility at its LaSalle Clean Energy Center in Illinois. The project was featured in a number of news articles and press releases and received 2 awards. At the 2023 DOE HFTO’s Annual Merit Review meeting, the P.I. Dr. Uuganbayar Otgonbaatar and project manager Robert Beaumont were recognized for “outstanding achievements in the development and demonstration of a first-of-a-kind clean hydrogen production facility, powered by carbon-free nuclear energy, at the Nine Mile Point Nuclear Station in Oswego, New York.” The project was also awarded 2023 Nuclear Energy Institute’s Top Innovative Practice award.

08 HYDROGEN↗

Evaluating the Techno-Economic Feasibility of Forward Osmosis Process Utilizing Low Grade Heat: Applications in Power Plant Water, Wastewater, and Reclaimed Water Treatment

Recovering and using uncoverted heat produced during electric power generation holds potential to significantly improve the efficiency of the electric power industry. One potential use of this low-temperature waste heat is on-site water treatment using waste heat driven processes to comply with the 2015 Effluent Limitation Guidelines for the Steam Electric Generating Sector. Ammonia-carbon dioxide forward osmosis (NH 4 HCO 3 FO) is a two-step waste heat driven process that involves a membrane separation process in which an osmotic pressure gradient created by an NH 4 HCO 3 draw solution is used to pull water across the membrane and a distillation column to regenerate the NH 4 HCO 3 draw solution. In this work we estimate the quantity, quality, and spatio-temporal availability of waste heat produced at U.S. coal, nuclear, and natural gas plants. We combine these estimates of waste heat availability with a techno-economic optimization model of NH 4 HCO 3 FO in order to assess the potential of NH 4 HCO 3 FO to treat flue gas desulfurization (FGD) wastewater, gasification wastewater, and boiler feedwater. We find that in 2012, 18.9 billion GJ of waste heat was discharged from the U.S. coal, natural gas, and nuclear fleet, although only 900 million GJ of waste heat was discharged at temperatures suitable for NH 4 HCO 3 FO. A maximum of 1.9 billion m3/yr of water could be produced using this waste heat to drive a NH 4 HCO 3 FO. The costs of waste heat driven NH 4 HCO 3 FO for FGD and gasification wastewater treatment to zero liquid discharge (ZLD) and boiler feedwater treatment are 2.20-2.40/m 3 and 0.35-0.65/m 3 , respectively. With mechanical vapor compression and crystallization for ZLD wastewater treatment and reverse osmosis for boiler feedwater treatment as the cost benchmark technologies, waste heat driven NH 4 HCO 3 FO is cost competitive for ZLD wastewater treatment, but not boiler feedwater treatment.

20 FOSSIL-FUELED POWER PLANTS↗

Climate Impacts on U.S. Electric Sector Evolution and Water Use Under Varying Market Futures: Are Some Energy Technologies and Regions More Affected by Climate Than Others?

Climate impacts on air temperatures and water availability have the potential to alter future electricity sector investment decisions as well as the reliability and performance of the U.S. power system. Different electricity sector configurations are more or less vulnerable to climate-induced changes. For example, once-through cooled thermal facilities are very efficient under cooler and wetter conditions but can be more vulnerable under warmer and drier conditions. Non-thermal renewable technologies are essentially 'drought-proof' but have other reliability challenges. Prior efforts have explored the impacts of climate change on electric sector for a limited set of climate and electricity scenarios. Here, we provide a comprehensive suite of scenarios that evaluate how different electricity sector market futures in the U.S. could be affected by a range of climate and water resource conditions. We use four representative concentration pathway (RCP) scenarios under five global circulation models (GCM) as climate drivers to a Water Balance Model (WBM), for twenty unique future climate-water conditions modeled through 2050. The electric sector impacts of these climate-water futures are then evaluated by the Regional Energy Deployment Systems (ReEDS) electricity capacity expansion model. To explore a breadth of possible electricity market futures, four electricity sector scenarios are considered to represent different carbon emission and water usage conditions: (1) business-as-usual, (2) CO2 cap, (3) CO2 cap with high renewable energy costs and extended nuclear lifetimes, and (4) continued coal reliance that maintains the existing coal fleet through 2050. Thus, we examine 84 possible futures in total when including a static climate representation of each market scenario. Results indicate that U.S. electric sector responds to climate change by constructing a combination of gas-fired and low-carbon generating sources, and the balance between technologies are determined by fuel prices, technology costs and policy. The cost for power sector to respond to climate change are generally proportional to the costs of electricity system components, while the relative sensitivity and vulnerability to climate pressures will vary across different generating technologies and different regions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA Tech Briefs, January 2009

Tech Briefs are short announcements of innovations originating from research and development activities of the National Aeronautics and Space Administration. They emphasize information considered likely to be transferable across industrial, regional, or disciplinary lines and are issued to encourage commercial application. Topics covered include: The Radio Frequency Health Node Wireless Sensor System; Effects of Temperature on Polymer/Carbon Chemical Sensors; Small CO2 Sensors Operate at Lower Temperature; Tele-Supervised Adaptive Ocean Sensor Fleet; Synthesis of Submillimeter Radiation for Spectroscopy; 100-GHz Phase Switch/Mixer Containing a Slot-Line Transition; Generating Ka-Band Signals Using an X-Band Vector Modulator; SiC Optically Modulated Field-Effect Transistor; Submillimeter-Wave Amplifier Module with Integrated Waveguide Transitions; Metrology System for a Large, Somewhat Flexible Telescope; Economical Implementation of a Filter Engine in an FPGA; Improved Joining of Metal Components to Composite Structures; Machined Titanium Heat-Pipe Wick Structure; Gadolinia-Doped Ceria Cathodes for Electrolysis of CO2; Utilizing Ocean Thermal Energy in a Submarine Robot; Fuel-Cell Power Systems Incorporating Mg-Based H2 Generators; Alternative OTEC Scheme for a Submarine Robot; Sensitive, Rapid Detection of Bacterial Spores; Adenosine Monophosphate-Based Detection of Bacterial Spores; Silicon Microleaks for Inlets of Mass Spectrometers; CGH Figure Testing of Aspherical Mirrors in Cold Vacuums; Series-Coupled Pairs of Silica Microresonators; Precise Stabilization of the Optical Frequency of WGMRs; Formation Flying of Components of a Large Space Telescope; Laser Metrology Heterodyne Phase-Locked Loop; Spatial Modulation Improves Performance in CTIS; High-Performance Algorithm for Solving the Diagnosis Problem; Truncation Depth Rule-of-Thumb for Convolutional Codes; Efficient Method for Optimizing Placement of Sensors.

Source record↗

Numerical homogenization of concrete microstructures without explicit meshes

Life management of electric hydro or nuclear power plants requires to estimate long-term concrete properties on facilities, for obvious safety and serviceability reasons. Decades-old structures are foreseen to be operational for several more decades. As a large number of different concrete formulations are found in EDF facilities, empirical models based on many experiments cannot be an option for a large fleet of power plant buildings. To build predictive models, homogenization techniques offer an appealing alternative. To properly upscale creep, especially at long term, a rather precise description of the microstructure is required. However, the complexity of the morphology of concrete poses several challenges. In particular, concrete is formulated to maximize the packing density of the granular skeleton, leading to aggregates spanning several length scales with small inter particle spacings. Thus, explicit meshing of realistic concrete microstructures is either out of reach of current meshing algorithms or would produce a number of degrees of freedom far higher than the current generic FEM codes capabilities. This paper proposes a method to deal with complex matrix-inclusions microstructures such as the ones encountered at the mortar or concrete scales, without explicitly meshing them. The microstructure is superimposed to an independent mesh, which is a regular Cartesian grid. This inevitably yields so called 'gray elements', spanning across multiple phases. As the reliability of the estimate of the effective properties highly depends on the behavior affected to these gray elements, special attention is paid to them. As far as the question of the solvers is concerned, generic FEM codes are found to lack efficiency: they cannot reach high enough levels of discretization with classical free meshes, and they do not take advantage of the regular structure of the mesh. Thus, a specific finite differences/finite volumes solver has been developed. At first, generic off-the-shelf linear system solvers were used. To further improve the efficiency in terms of memory requirements, specific variants of the preconditioned conjugate gradient were implemented. This allowed to homogenize the conductivity of a concrete-like microstructure using more than 10{sup 9} degrees of freedom on a rather common hardware for 2010 (a PC embedding 48 GB of RAM). Taking benefit of the properties of the regular Cartesian grid we have also investigated a multi-level method to improve the CPU efficiency of the code.

36 MATERIALS SCIENCE↗

Project Antares: A low cost modular launch vehicle for the future

The single stage to orbit launch vehicle Antares is based upon the revolutionary concept of modularity, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth's orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg into low Earth orbit (LEO). When coupled with a Centaur upper stage it is capable of placing 3500 kg into geostationary orbit. The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Antares' projected launch costs are $1340 per kg to LEO which offers a tremendous savings over launch vehicles available today. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles, up to seven, can be attached depending on the payload and mission requirements. With a seven vehicle configuration Antares's modular concept provides a heavy lift capability of approximately 70,000 kg to LEO. This expandability allows for a wider range of payload options such as large Earth satellites, Space Station Freedom support, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Aarnio, Steve↗

High-burnup boiling water reactor steady-state operating conditions and fuel performance analysis

The primary operational costs for existing nuclear reactors are plant operation costs, maintenance costs, and fuel costs, all of which are influenced by the materials used and the design of the reactor core. Optimizing core design parameters—including burnup limits and enrichment levels—can lengthen cycles, reduce outages, reduce reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. Furthermore, developing higher-fidelity tools to simulate these parameters enables better identification of the available margin, improves overall plant safety, and improves the understanding a given plant’s responses to accident scenarios. Here, in the US, much of the research and development focus has traditionally been on pressurized water reactors (PWRs), but boiling water reactors (BWRs) comprise approximately one-third of the US reactor fleet. Modeling and simulation advances for BWRs and PWRs—particularly those achieved through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program—are crucial to the long-term viability of the light–water reactor industry. A key research area of the high burnup and increased enriched fuel initiative is focused on addressing issues related to postulated loss-of-coolant accident (LOCA) scenarios. NEAMS has dedicated significant effort to enhancing tools to better support BWRs. A current focus is showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity steady-state analysis is a first step toward demonstrating a best-estimate, pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior for a representative BWR. The objective of this effort is to provide a modeling capability that will help elucidate and provide a best-estimate evaluation for cladding rupture susceptibility in BWRs. This modeling capability could then be used to prevent and/or mitigate cladding ruptures in postulated accident scenarios without penalizing operational parameters. Additionally, the results of this work will help identify strategies for finding additional margins or potentially limiting cladding ruptures through core design optimizations to enable more efficient core designs.

Capps, Nathan [Oak Ridge National Laboratory (ORNL↗

Development of Human and Technology Integration Guidance for Work Optimization and Effective Use of Information

Existing nuclear power contributes to roughly 20% of the total electricity generation, and consistently provides the highest capacity factor of any other electricity generating resource in the United States. Despite these advantages, the existing nuclear power plant fleet in the United States has been enduring significant challenges in providing electricity in a cost-competitive manner, which has ultimately threatened the long-term economic viability of these plants. A major contributor to these increased operating and maintenance costs has been the continued reliance of a large workforce who perform their work under an operating model that has largely remained unchanged since the commissioning of these nuclear power plants. Unfortunately, while this operating model has provided safe and reliable electricity, other industries have already began transforming their workforce through the use of advanced digital technology and automation that has reduced their operating and maintenance cost significantly. In order for the United States nuclear industry to remain economically viable, a similar transformation must be considered in which digital technologies and automation capabilities are brought in to support key plant functions across all work functions across plant operation, maintenance, and support. To effectively integrate digital technology and automation in the existing nuclear power plant operating model, a multidisciplinary approach is needed that addresses technological and sociotechnical (i.e., human and technology integration) considerations. This report describes an extension to the human and technology integration methodology, herein referred to as Human Integration and Technology Task Force for Work Management Optimization (HITT), to support the safe, reliable, and efficient use of proposed innovations with the intended users in their intended environment to perform their intended tasks. By effectively incorporating human and technology integration into a plant modernization effort by using HITT, we believe that a utility can significantly improve work performance and overall workforce quality of life. For instance, if HITT is performed to optimize work management, scheduling performance and scope stability can be improved by up to 10%. HITT enables these benefits through developing a rich understanding of the work being performed, the utility’s vision, and the opportunities that provide greatest value to optimize performance through a 10-step process illustrated below as a quick guide. The quick guide contains links in the righthand side of each step that allows for navigation to the detailed section (Section 4) of HITT in this technical report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗