Search NASA⌕ Search

SEARCH · Search NASA

Results for “parachute”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

NASA CPAS Drogue Textile Riser Feasibility Study

Steel cable was chosen for the lower end of the drogue and main parachute risers on NASA's Orion Multi Purpose Crew Vehicle Parachute Assembly System (CPAS) to protect the risers from extreme temperatures and abrasion should they contact the crew module during deployment, as was done for Apollo. Due to the weight and deployment complexity inherent in steel, there was significant interest in the possibility of substituting textile for steel for the drogue and main parachute risers. However, textile risers could be damaged when subjected to high temperature and abrasion. Investigations were consequently performed by a subset of the authors to determine whether sacrificial, non-load-bearing textile riser covers could be developed to mitigate the thermal and abrasion concerns. Multiple material combinations were tested, resulting in a cover design capable of protecting the riser against severe riser/crew module contact interactions. A feasibility study was then conducted to evaluate the performance of the textile drogue riser cover in relevant abrasive environments. This paper describes the testing performed and documents the results of this feasibility study.

Hennings, Elsa J.↗

Extraction-Separation Performance and Dynamic Modeling of Orion Test Vehicles with Adams Simulation: 3rd Edition

NASA's Orion Capsule Parachute Assembly System (CPAS) Project is now in the qualification phase of testing, and the Adams simulation has continued to evolve to model the complex dynamics experienced during the test article extraction and separation phases of flight. The ability to initiate tests near the upper altitude limit of the Orion parachute deployment envelope requires extractions from the aircraft at 35,000 ft-MSL. Engineering development phase testing of the Parachute Test Vehicle (PTV) carried by the Carriage Platform Separation System (CPSS) at altitude resulted in test support equipment hardware failures due to increased energy caused by higher true airspeeds. As a result, hardware modifications became a necessity requiring ground static testing of the textile components to be conducted and a new ground dynamic test of the extraction system to be devised. Force-displacement curves from static tests were incorporated into the Adams simulations, allowing prediction of loads, velocities and margins encountered during both flight and ground dynamic tests. The Adams simulation was then further refined by fine tuning the damping terms to match the peak loads recorded in the ground dynamic tests. The failure observed in flight testing was successfully replicated in ground testing and true safety margins of the textile components were revealed. A multi-loop energy modulator was then incorporated into the system level Adams simulation model and the effect on improving test margins be properly evaluated leading to high confidence ground verification testing of the final design solution.

Varela, Jose G.↗

Isolating Added Mass Load Components of CPAS Main Clusters

The current simulation for the Capsule Parachute Assembly System (CPAS) lacks fidelity in representing added mass for the 116 ft Do ringsail Main parachute. The availability of 3-D models of inflating Main canopies allowed for better estimation the enclosed air volume as a function of time. This was combined with trajectory state information to estimate the components making up measured axial loads. A proof-of-concept for an alternate simulation algorithm was developed based on enclosed volume as the primary independent variable rather than drag area growth. Databases of volume growth and parachute drag area vs. volume were developed for several flight tests. Other state information was read directly from test data, rather than numerically propagated. The resulting simulated peak loads were close in timing and magnitude to the measured loads data. However, results are very sensitive to data curve fitting and may not be suitable for Monte Carlo simulations. It was assumed that apparent mass was either negligible or a small fraction of enclosed mass, with little difference in results.

Ray, Eric S.↗

Low Density Supersonic Decelerator Flight Dynamics Test-1 Flight Design and Targeting

NASA's Low Density Supersonic Decelerator (LDSD) program was established to identify, develop, and eventually qualify to Test [i.e. Technology] Readiness Level (TRL) - 6 aerodynamic decelerators for eventual use on Mars. Through comprehensive Mars application studies, two distinct Supersonic Inflatable Aerodynamic Decelerator (SIAD) designs were chosen that afforded the optimum balance of benefit, cost, and development risk. In addition, a Supersonic Disk Sail (SSDS) parachute design was chosen that satisfied the same criteria. The final phase of the multi-tiered qualification process involves Earth Supersonic Flight Dynamics Tests (SFDTs) within environmental conditions similar to those that would be experienced during a Mars Entry, Descent, and Landing (EDL) mission. The first of these flight tests (i.e. SFDT-1) was completed on June 28, 2014 with two more tests scheduled for the summer of 2015 and 2016, respectively. The basic flight design for all the SFDT flights is for the SFDT test vehicle to be ferried to a float altitude of 120 kilo-feet by a 34 thousand cubic feet (Mcf) heavy lift helium balloon. Once float altitude is reached, the test vehicle is released from the balloon, spun-up for stability, and accelerated to supersonic speeds using a Star48 solid rocket motor. After burnout of the Star48 motor the vehicle decelerates to pre-flight selected test conditions for the deployment of the SIAD system. After further deceleration with the SIAD deployed, the SSDS parachute is then deployed stressing the performance of the parachute in the wake of the SIAD augmented blunt body. The test vehicle/SIAD/parachute system then descends to splashdown in the Pacific Ocean for eventual recovery. This paper will discuss the development of both the test vehicle and the trajectory sequence including design trade-offs resulting from the interaction of both engineering efforts. In addition, the SFDT-1 nominal trajectory design and associated sensitivities will be discussed as well as an overview of the on-board flight software used to trigger and sequence the main flight events necessary to deploy the deceleration technologies. Finally, as-flown performance of the SFDT-1 system will be discussed.

Ivanov, Mark↗

Spacecraft Requirements Development and Tailoring

Spacecraft design is managed through the use of design requirements. Requirements are flowed from the highest level, the overall spacecraft, to systems, subsystems and ultimately individual components. Through the use of requirements, each part of the spacecraft will perform the functions that are required of it and will interface to the rest of the spacecraft. Functional requirements are used to make sure every component performs as expected and interface requirements ensure that each component works within the larger design environment where it operates. Writing good requirements is difficult and the verification of requirements can be expensive and time consuming. Because of this difficulty and expense, it is important that each requirement truly be “required” and critical to the overall performance of the vehicle. It is also important that requirements can be changed or eliminated as the system matures to minimize verification cost and schedule. The Capsule Parachute Assembly System (CPAS) Project is developing the parachute system for the NASA Multi-Purpose Crew Vehicle (MPCV) Orion Spacecraft. Throughout the development and qualification cycle for CPAS, requirements have been evaluated, added, eliminated, or more generically, “tailored”, to ensure that the system performs as required while minimizing the verification cost to the Program. One facet of this tailoring has been to delete requirements that do not add value to the overall spacecraft or are not needed. A second approach to minimize the cost of requirement verification has been to evaluate requirements based on the actual design as it has matured. As the design of the parachute system has become better understood, requirements that are not applicable have been eliminated. This paper will outline the evolution of CPAS requirements over time and will show how careful and considered changes to requirements can benefit the technical solution for the overall system design while allowing a Project to control costs.

Mcmichael, James H.↗

Challenges of Mars Sample Return Lander Entry, Descent, and Landing

The proposed Mars Sample Return (MSR) campaign would be perhaps the most ambitious robotic mission ever attempted in space exploration. The notional cam-paign consists of three Flagship-class missions operating in cooperation for over a decade in order to return samples of the Martian surface and atmosphere to Earth for analysis. The Mars 2020 rover, scheduled to launch in July 2020, will cache samples and place them on the surface for possible return. The second mission would be a Sample Return Lander (SRL) that consists of a small Sample Fetch Rover (SFR) to gather the samples, a Sample Transfer Arm (STA) to load the samples into a Mars Ascent Vehicle (MAV), and the MAV itself to launch the samples into orbit around Mars. The third mission would be an Earth Return Or-biter (ERO) designed to rendezvous and capture the Orbiting Sample (OS), return to Earth, and separate the Earth Entry Vehicle (EEV) for Entry, Descent, and Landing (EDL) at a location to be determined. This paper will focus on the SRL mission concept, specifically the EDL phase. Given the ambitious SRL sample re-trieval baseline surface mission, including a rocket launch of the samples into Mars orbit, it is estimated that the EDL system may be required to deliver as much as 2100 kg of dry mass to the surface. This represents an approximate 20-25% in-crease in mass capability over previous landed Mars missions. Additionally, there is a high probability that SRL would have to land very close to the samples on the surface to expedite retrieval operations; therefore, Pin Point Landing (PPL) accu-racy may be required. To address these challenges, promising EDL configuration augmentations were studied to include larger forebody/higher drag entry capsules, hypersonic/supersonic inflatable/non-inflatable aerodynamic decelerators, hypersonic trim tabs, ballute drag devices, larger parachutes, higher Mach and higher dynamic pressure parachute deployments, lower parachute deployment altitudes having shorter chute timelines necessitating more efficient terrain sensor strategies, and ad-ditional fuel for longer powered descent diverts to the target landing site. Over-arching the entire trade study was an attempt to stay as close to the experience base of past successful missions as possible to reduce implementation cost and risk. This paper will discuss the entire SRL EDL trade study in detail. The information presented about the potential MSR campaign is pre-decisional and is provided for planning and discussion purposes only.

Ivanov, Mark C.↗

Orion Artemis I Descent and Landing Performance

The Artemis I mission successfully demonstrated the Orion Multi-Purpose Crew Module ability to trigger parachute deployment, control angular rate and touch-down heading using reaction control jets while under parachutes, and automatically detect splashdown. Guidance and control logic is implemented to initiate para-chute events in a favorable dynamic state and select a touchdown heading direction that will minimize impact loads at splashdown. Detection of splashdown inhibits control to prevent firing reaction control jets under water and begin the transition into post-landing activities that cut parachutes and deploy the Crew Module Up-righting System (CMUS). This paper presents analysis of Orion descent and landing guidance and control performance for the Artemis I mission utilizing imagery taken from the vehicle, recorded flight data, and results from high fidelity simulations.

Artemis 1↗

Rigging Test Bed Development for Validation of Multi-Stage Decelerator Extractions

The Low Density Supersonic Decelerator project is developing new decelerator systems for Mars entry which would include testing with a Supersonic Flight Dynamics Test Vehicle. One of the decelerator systems being developed is a large supersonic ringsail parachute. Due to the configuration of the vehicle it is not possible to deploy the parachute with a mortar which would be the preferred method for a spacecraft in a supersonic flow. Alternatively, a multi-stage extraction process using a ballute as a pilot is being developed for the test vehicle. The Rigging Test Bed is a test venue being constructed to perform verification and validation of this extraction process. The test bed consists of a long pneumatic piston device capable of providing a constant force simulating the ballute drag force during the extraction events. The extraction tests will take place both inside a high-bay for frequent tests of individual extraction stages and outdoors using a mobile hydraulic crane for complete deployment tests from initial pack pull out to canopy extraction. These tests will measure line tensions and use photogrammetry to track motion of the elements involved. The resulting data will be used to verify packing and rigging as well, as validate models and identify potential failure modes in order to finalize the design of the extraction system.

Low Density Supersonic Decelerator (LDSD)↗

Uneven Inflation Load Share Trends in Clusters

The use of parachute clusters for payload recovery is still seeing widespread use ever since the early days of WWII. By involving the (near) simultaneous deployment of several smaller and identical canopies connected to the payload, cluster systems offer flexibility in tailoring to needed descent rates and load management, as well as providing robustness against individual canopy deployment or opening failure. Their downside, of course, resides in the possibility of differing inflation rates by each cluster member as caused by deployment variability, canopy-to-canopy interference, etc. Such variability leads to the lead-lag phenomenon, which causes uneven loading among the parachutes, often times leaving a single canopy to take up a significant portion of the system’s inflation loads. Herein we investigate how serious such an effect can be in terms of the number N of cluster members, underinflation drag of the lagging canopies, inflation swiftness of the leader in comparison to the laggards’, disreefing cutter activation staggering and pre-disreefing drag area. Two new metrics are used to highlight load share unevenness, namely, the peak and average leader canopy riser load in comparison to the leader’s drag during no-lead-lag; and leader peak load, as compared to total peak load. Results are calculated from data collected in NASA’s Orion/CPAS test program, as well as from simple algebraic expressions informing leader drag as sustained in different cluster systems (i.e., of different N) and varying leader inflation time relative to the laggards. Generally, using large-N cluster systems confers better load sharing among canopies. However, and in deployments where significant lead-lag occur, large-N systems may feature greater leader overload excursions, oftentimes in excess of 50% the no-lead-lag levels. These excursions are particularly made worse when cutter activation among the members are far from simultaneous and the laggards’ pre-disreefing drag area is small in comparison to the leader’s.

parachutes↗

AGU Publications Updates Authorship Policy to Foster Greater Equity and Transparency in Global Research Collaborations

AGU Publications encourages research collaborations between regions, countries, and communities. When well-resourced researchers complete research or field work in low-resourced settings while excluding local communities or researchers from the process, this can be referred to as parachute science or helicopter research. To help address concerns of parachute science and to promote greater equity and transparency in global research collaborations, AGU Publications has updated its authorship policy across its scholarly journals. The implementation of this policy follows a successful 18-month pilot at JGR: Biogeosciences. For research completed in low-resourced regions, authors are encouraged to include a disclosure statement pertaining to the ethical and scientific considerations of their research collaborations.

99 GENERAL AND MISCELLANEOUS↗

Spin Investigation Of A 1/20-Scale Model Of An Unswept-Wing, Twin-Engine, Observation Airplane

An investigation was conducted in the Langley 20-foot free-spinning tunnel on a 1/20-scale model of an unswept-wing, twin-engine, observation airplane. The effects of control settings and movements on the erect spin and recovery characteristics for the normal loading and the most rearward center-of-gravity loading (external wing tanks full) were determined. Also, tests were made to determine the effect on the spin and recovery characteristics of a large radar store, of empty and full external wing tanks, and of an asymmetrical condition when one empty or one full external wing tank is carried. Spin-recovery parachute tests were also performed. The results of the tests indicate that erect spins obtained on the airplane for the normal loading should be satisfactorily terminated by rudder reversal to full against the spin, ailerons moved to with the spin, followed one-half turn later by forward movement of the stick to neutral. With the radar store, with wing tanks empty, or with an asymmetrical condition when one empty tank is on either wing, satisfactory recoveries can be obtained by using the same technique as for the normal loading. Recoveries for the model with a rearward center-of-gravity loading (external wing tanks full) or with a full tank on the wing inboard of the spin axis will be slow to unsatisfactory with rudder reversal to full against the spin followed by brisk forward stick movement. With a full tank on the wing outboard of the spin axis, the recoveries will be satisfactory. Spins in the landing configuration should be terminated by first retracting the flaps, slats, and landing gear, after which recovery should be attempted immediately by using the recovery technique recommended for the normal loading condition. Inverted spins can be satisfactorily terminated by rudder reversal to full against the spin followed by neutralization of the longitudinal and lateral controls. A 12.7-foot-diameter tail parachute with a towline length of 21.7 feet and a drag coefficient of 0.65 should be satisfactory for recoveries from erect and inverted demonstration spins when used simultaneously with movement of rudder to neutral.

SPIN↗

Supersonic and subsonic measurements of mesospheric ionization.

An Arcas rocket-parachute system was used at night to compare supersonic and subsonic ionization measurements below 75 km. A hemispherical nose-tip probe was used on ascent and a parachute-borne blunt probe on descent to measure polar conductivities, which were due entirely to positive and negative ions. The velocity of the supersonic probe was Mach 2.5 at 50 km and 1.75 at 70 km; the blunt probe was subsonic below 71 km. Between 65 and 75 km the ratio of negative to positive conductivities (and thus of mobilities) determined by the blunt probe was about 1.2, and it approached 1 below this altitude range. The ratio obtained by the nose-tip probe varied from 1.5 at 75 km to .6 at 65 km, thus indicating a rapid variation of the effects of the shock wave on the sampled ions. The absolute values of positive conductivity measured subsonically and supersonically were essentially identical from 60 to 75 km, indicating that the sampled ions were unchanged by the shock. However, below 60 km the shock apparently 'broke up' the positive ions, as indicated by higher measured conductivities.

Hale, L. C.↗

Study of solid rocket motor for space shuttle booster, volume 2, book 5, appendices E thru H

Preliminary parametric studies were performed to establish size, weight and packaging arrangements for aerodynamic decelerator devices that could be used for recovery of the expended solid propellant rocket motors used in the launch phase of the Space Shuttle System. Computations were made using standard engineering analysis techniques. Terminal stage parachutes were sized to provide equilibrium descent velocities for water entry that are presently thought to be acceptable without developing loads that could exceed the boosters structural integrity. The performance characteristics of the aerodynamic parachute decelerator devices considered are based on analysis and prior test results for similar configurations and are assumed to be maintained at the scale requirements of the present problem.

Source record↗

Development flight tests of the Viking decelerator system.

Significant aspects of a low altitude flight test phase of the overall Viking decelerator system development are given. This test series included nine aircraft drop tests that were conducted at the Joint Parachute Test Facility, El Centro, California, between September 1971 and May 1972. The test technique and analytical planning method utilized to best simulate loading conditions in a low density environment are presented and some test results are shown to assess their adequacy. Performance effects relating to suspension line lengths of 1.7 D sub o with different canopy loadings are noted. System hardware developments are described, in particular the utilization of a fabric deployment mortar cover which remained attached to the parachute canopy. Finally, the contribution of this test series to the overall program is assessed.

Murrow, H. N.↗

Qualification flight tests of the Viking decelerator system.

The Balloon Launched Decelerator Test (BLDT) series conducted at White Sands Missile Range (WSMR) during July and August of 1972 flight qualified the NASA Viking '75 decelerator system at conditions bracketing those expected for Mars. This paper discusses the decelerator system design requiremnts, compares the test results with prior work, and discusses significant considerations leading to successful qualification in earth's atmosphere. The Viking decelerator system consists of a single-stage mortar-deployed 53-foot nominal diameter disk-gap-band parachute. Full-scale parachutes were deployed behind a full-scale simulated Viking vehicle at Mach numbers from 0.47 to 2.18 and dynamic pressures from 6.9 to 14.6 psf. Analyses show that the system is qualified with sufficient margin to perform successfully for the Viking mission.

Moog, R. D.↗

The Viking mortar - Design, development, and flight qualification.

Approximately 25,400 ft above the local surface of Mars, a radar height sensor fires the Viking mortar, which ejects a 53-ft D sub o disk-gap-band (DGB) parachute. The parachute decelerates and stabilizes the Viking lander sufficiently for the terminal engine system to take over and effect a soft landing. The general design and environmental requirements for the mortar system are presented; various illustrations of the mortar components and how the mortar system functions also are presented. Primary emphasis is placed on manufacturing, developing, and qualification testing of the mortar system.

Brecht, J. P.↗

An advanced technique for the prediction of decelerator system dynamics.

An advanced two-body six-degree-of-freedom computer model employing an indeterminate structures approach has been developed for the parachute deployment process. The program determines both vehicular and decelerator responses to aerodynamic and physical property inputs. A better insight into the dynamic processes that occur during parachute deployment has been developed. The model is of value in sensitivity studies to isolate important parameters that affect the vehicular response.

Talay, T. A.↗

Ocean recovery of Shuttle Solid Rocket Boosters.

Cost effective recovery of the expended Space-Shuttle Solid Rocket Boosters (SRB) from the ocean will result in significant overall cost savings to the Space Shuttle Program. The ocean recovery mission begins with the dispatching of the recovery team to the predicted splashdown area. The SRBs, drogue parachutes and main parachutes must be tracked, located, retrieved, and transported to land where they will be refurbished and recycled for reuse. Trade studies to be conducted will consider the recovery mission requirements and weigh the advantages, disadvantages and costs of various candidate recovery systems. Major parameters effecting the selection of the final system will ensure that the system will meet overall objectives. Large- and small-scale SRB model testing has been conducted to establish characteristics of SRBs during water entry, floating free and under tow.

Junker, L. J.↗