Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

Makovec, Alajos↗

James Webb Space Telescope Navigation Optimization Challenges

This paper details the orbit determination, solar radiation pressure (SRP) modeling, and station-keeping maneuver planning for the NASA James Webb Space Telescope during the routine science phase of the mission. The complexities of SRP modeling driven by the vehicle’s large area, attitude profile, and attitude constraints for maneuver execution entail unique challenges for spaceflight navigation. The techniques utilized to combine predictive attitude and maneuver targeting modeling were refined using the experiences and data accumulated during and following the commissioning phase. The Navigation Team at NASA Goddard Space Flight Center’s Flight Dynamics Facility responded to these challenges and implemented methods for trajectory optimization and improving maneuver efficiency.

Flight Dynamics↗

Predictive model using artificial neural network to design phase change material-based ocean thermal energy harvesting systems for powering uncrewed underwater vehicles

Uncrewed Underwater Vehicles (UUVs) are a major beneficiary of the phase change material (PCM)-based ocean thermal energy harvesting technology for their mission needs. However, this technology relies on different parameters and energy conversion steps that could be critical to the general energy generation efficiency. Sea trials showed that the design performed lower than their laboratory design specifications. This underperformance results from different factors, mainly the UUV’s trajectory, travel time, underwater ocean currents, temperature fluctuations, and biofouling on the heat exchanger due to long term underwater operations. Therefore, there exists a need to continuously monitor the ambient energy harvesting system and predict system performance, for mission planning purposes. Two major parameters influencing the energy harvesting system include the final pressure inside the hydraulic energy storage vessel or accumulator, and the electrical load value. Here, this work focuses on the hydraulic to electric energy conversion system. Therefore, a combination of numerical model and experimental testing is used to develop a predictive model using artificial neural network using MATLAB. After validation with experimental testing, 1000 data samples obtained from the numerical model are used to train the ANN. Compared to the experimental results, the developed ANN model can predict in less than a second the designed benchtop system’s total efficiency with less than 15 percent maximum error range. This predictive model development represents a cost-effective way for optimization and a computational energy efficient mode aboard UUVs for mission planning for deployed UUVs using PCM-based ocean thermal energy harvesting technology.

30 DIRECT ENERGY CONVERSION↗

Survey Strategy Optimization for the Atacama Cosmology Telescope

In recent years there have been significant improvements in the sensitivity and the angular resolution of the instruments dedicated to the observation of the Cosmic Microwave Background (CMB). ACTPol is the first polarization receiver for the Atacama Cosmology Telescope (ACT) and is observing the CMB sky with arcmin resolution over approximately 2000 square degrees. Its upgrade, Advanced ACTPol (AdvACT), will observe the CMB in five frequency bands and over a larger area of the sky. We describe the optimization and implementation of the ACTPol and AdvACT surveys. The selection of the observed fields is driven mainly by the science goals, that is, small angular scale CMB measurements, B-mode measurements and cross-correlation studies. For the ACTPol survey we have observed patches of the southern galactic sky with low galactic foreground emissions which were also chosen to maximize the overlap with several galaxy surveys to allow unique cross-correlation studies. A wider field in the northern galactic cap ensured significant additional overlap with the BOSS spectroscopic survey. The exact shapes and footprints of the fields were optimized to achieve uniform coverage and to obtain cross-linked maps by observing the fields with different scan directions. We have maximized the efficiency of the survey by implementing a close to 24-hour observing strategy, switching between daytime and nighttime observing plans and minimizing the telescope idle time. We describe the challenges represented by the survey optimization for the significantly wider area observed by AdvACT, which will observe roughly half of the low-foreground sky. The survey strategies described here may prove useful for planning future ground-based CMB surveys, such as the Simons Observatory and CMB Stage IV surveys.

Atacama Cosmology Telescope (ACT)↗

Knowledge based tools for Hubble Space Telescope planning and scheduling: Constraints and strategies

The Hubble Space Telescope (HST) presents an especially challenging scheduling problem since a year's observing program encompasses tens of thousands of exposures facing numerous coupled constraints. Recent progress in the development of planning and scheduling tools is discussed which augment the existing HST ground system. General methods for representing activities, constraints, and constraint satisfaction, and time segmentation were implemented in a scheduling testbed. The testbed permits planners to evaluate optimal scheduling time intervals, calculate resource usage, and to generate long and medium range plans. Graphical displays of activities, constraints, and plans are an important feature of the system. High-level scheduling strategies using rule based and neural net approaches were implemented.

Miller, Glenn↗

A Performance Comparison of Pulsed Plasma Thruster Electrode Configurations

Pulsed plasma thrusters are currently planned on two small satellite missions and proposed for a third. In these missions, the pulsed plasma thruster's unique characteristics will be used variously to provide propulsive attitude control, orbit raising, translation, and precision positioning. Pulsed plasma thrusters are attractive for small satellite applications because they are essentially stand alone devices which eliminate the need for toxic and/or distributed propellant systems. Pulsed plasma thrusters also operate at low power and over a wide power range without loss of performance. As part of the technical development required for the noted missions, an experimental program to optimize performance with respect to electrode configuration was undertaken. One of the planned missions will use pulsed plasma thrusters for orbit raising requiring relatively high thrust and previously tested configurations did not provide this. Also, higher capacitor energies were tested than previously tried for this mission. Multiple configurations were tested and a final configuration was selected for flight hardware development. This paper describes the results of the electrode optimization in detail.

Arrington, Lynn A.↗

Optimal Control using Composite Bernstein Approximants

In this work, we present composite Bernstein polynomials as a direct collocation method for approximating optimal control problems. An analysis of the convergence properties of composite Bernstein polynomials is provided, and beneficial properties of composite Bernstein polynomials for the solution of optimal control problems are discussed. The efficacy of the proposed approximation method is demonstrated through a bang-bang example. Lastly, we apply this method to a motion planning problem, offering a practical solution that emphasizes the ability of this method to solve complex optimal control problems.

Gage MacLin↗

James Webb Space Telescope Navigation Optimization Challenges

This paper details the orbit determination, solar radiation pressure (SRP) modeling, and station-keeping maneuver planning for the NASA James Webb Space Telescope during the routine science phase of the mission. The complexities of SRP modeling driven by the vehicle’s large area, attitude profile, and attitude constraints for maneuver execution entail unique challenges for spaceflight navigation. The techniques utilized to combine predictive attitude and maneuver targeting modeling were refined using the experiences and data accumulated during and following the commissioning phase. The Navigation Team at NASA Goddard Space Flight Center’s Flight Dynamics Facility responded to these challenges and implemented methods for trajectory optimization and improving maneuver efficiency.

Flight Dynamics↗

Spacecraft Attitude Maneuver Planning Using Genetic Algorithms

A key enabling technology that leads to greater spacecraft autonomy is the capability to autonomously and optimally slew the spacecraft from and to different attitudes while operating under a number of celestial and dynamic constraints. The task of finding an attitude trajectory that meets all the constraints is a formidable one, in particular for orbiting or fly-by spacecraft where the constraints and initial and final conditions are of time-varying nature. This approach for attitude path planning makes full use of a priori constraint knowledge and is computationally tractable enough to be executed onboard a spacecraft. The approach is based on incorporating the constraints into a cost function and using a Genetic Algorithm to iteratively search for and optimize the solution. This results in a directed random search that explores a large part of the solution space while maintaining the knowledge of good solutions from iteration to iteration. A solution obtained this way may be used as is or as an initial solution to initialize additional deterministic optimization algorithms. A number of representative case examples for time-fixed and time-varying conditions yielded search times that are typically on the order of minutes, thus demonstrating the viability of this method. This approach is applicable to all deep space and planet Earth missions requiring greater spacecraft autonomy, and greatly facilitates navigation and science observation planning.

Kornfeld, Richard P.↗

Feedback Optimization of Incentives for Distribution Grid Services

Energy prices and net power injection limitations regulate the operations in distribution grids and typically ensure that operational constraints are met. Nevertheless, unexpected or prolonged abnormal events could undermine the grid's functioning. During contingencies, customers could contribute effectively to sustaining the network by providing services. Herein this paper proposes an incentive mechanism that promotes users' active participation by essentially altering the energy pricing rule. The incentives are modeled via a linear function whose parameters can be computed by the system operator (SO) by solving an optimization problem. Feedback-based optimization algorithms are then proposed to seek optimal incentives by leveraging measurements from the grid, even in the case when the SO does not have a full grid and customer information. Numerical simulations on a standard testbed validate the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated Multi-Robot Assembly of Compliance Optimized Structures

Autonomous assembly of large structures is one of the fundamental challenges on the way towards NASA’s objectives of deep space exploration. In this work, we propose an algorithmic framework to optimize the assembly process of a prescribed target structure by constraining the assembly effort as well as maintaining structural soundness throughout the process. This framework uses structural topology optimization with assembly effort metrics to generate checkpoints for robotic traversal algorithms. Assembly effort is quantified by the Wasserstein metric between consecutive structural configurations during the assembly process. The robotic assembly task is split into two subtasks, where we first optimize for a set of key frames, then perform reconfiguration between consecutive frames. Key frames are optimized by adopting topology optimization techniques to reduce assembly effort and maintain structural integrity during the assembly process, while reconfiguration between key frames is performed using a path planning algorithm with a minimum weight maximum matching approach on a bipartite graph. We employ a Crystalline robot model in which each structural element is capable of locomotion through the structure and locking into place with neighboring elements after reaching its destination. An example assembly of a two-dimensional cantilever beam under volume constraints and structural compliance considerations is presented to demonstrate the approach. Finally, we conclude by discussing possible future extensions to this work, including adoption of better metrics, extension to three-dimensional large-scale problems, and exacting finer control of structural integrity during the path-planning phase.

robotic assembly↗

Exploring Wildfire & Energy data toward State Prioritization Index (WESPI)

Energy infrastructure can both induce and suffer risks from wildfires ranging from direct damage to energy assets such as substations and power lines to Public Safety Power Shutoffs. Recent wildfire events underscore the need for data-driven approaches that help states and utilities proactively plan for wildfire risk. Existing national tools such as Federal Emergency Management Agency (FEMA)’s National Risk Index (NRI) are valuable for community hazard planning. However, they are less suited for energy infrastructure, as they emphasize population and building exposure rather than system vulnerabilities. In this paper, we explore relationships between energy and wildfire data and present a Wildfire-Energy State Prioritization Index (WESPI). Our methodology combines data from the US Forest Service’s Fire Simulation (FSIM) dataset with energy resilience metrics, historical fire incidents, and geospatial data on transmission lines and fire stations. Correlation analyses suggest that FSIM burn probability is more strongly associated with power outage metrics (ρ = 0.32) than NRI wildfire frequency, and counties with a greater density of fire stations experience more frequent, but less intense wildfires. We further leverage data for burn probability, transmission line density, and fire station density to develop a Wildfire-Energy State Prioritization Index (WESPI) to highlight counties where wildfire hazard, infrastructure exposure, and limited suppression capacity converge. The index provides a consistent, scalable framework for state energy offices and utilities to screen counties for vegetation management, optimization of outage management system deployment, and to inform wildfire mitigation plans.

Critical infrastructure↗

Off-Nominal Planning for the Cryogenic Vacuum Test of the JWST Optical Telescope Element/Integrated Science Instrument Module at JSC

The cryogenic thermal vacuum/thermal balance test of the James Webb Space Telescope (JWST) combined Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM), known as the OTIS, at the Johnson Space Center (JSC) Chamber A in 2017 was likely the most complex test ever performed by NASA for an unmanned mission. The test of the combined flight Optical Telescope and ISIM elements was prefaced by years of modifications to chamber facilities, and included three extensive precursor tests of non-flight and flight hardware to establish safe and optimal test operational procedures. One critical part of the test preparation was planning for off-nominal events that could arise, including appropriate responses. In some cases, assurance of personnel and payload safety required modification of original test hardware and procedures which had to be validated before the final test could begin. This planning proved especially prescient for the OTIS test, as Hurricane Harvey struck the Houston area during the test in August 2017, and consequences for the precious payload could have been severe. This paper describes the extent of the thermal off-nominal planning undertaken for the OTIS test, including including safing for hurricanes, and some real-life effects of Hurricane Harvey on the test conduct. Documentation of the consequences and mitigations for these events are discussed. The importance of off-nominal planning for future thermal vacuum/thermal balance tests is illustrated.

Off-Nominal Planning↗

The scoping, design, and plasma physics optimization of the Eos neutron source stellarator

On the path to a fusion pilot plant, Thea Energy plans to build Eos, a sub-breakeven, deuterium-deuterium, beam-target fusion, stellarator neutron source facility for producing tritium and other valuable radioisotopes. In this paper, a set of 1D plasma physics models are coupled and used to design the operating point of the facility and predict performance. At this foundational stage of the design, analytic and approximate models are sufficient to capture the leading-order effects, and fast enough to run in the inner loop of an optimizer. Higher-fidelity analyses will follow. Models of 1D profile-dependent neutral beam stopping, ion beam slowing down, beam-target fusion, electron-ion classical heat transfer, energy confinement (ISS04), beam pressure, beam heating of ions and electrons, beam-beam fusion fraction, and neutral beam injection and gyrotron heating electrical efficiencies are included. A numerical optimizer is used to determine the minimum required facility electric power to generate tritium at a given rate. A potentially advantageous regime is described in which modern precisely-quasisymmetric stellarators, new high-temperature superconductors, ITER-derived neutral beam injection, and new high-frequency gyrotrons enable a suitible target plasma with hot electrons, cold ions, peaked density and temperature profiles, and high beam-injected ion density. It appears possible at this time for a facility with a medium-scale and medium-strength stellarator whose required facility electric power is less than 40 MW to produce $2.5\times 10^{17}$ neutrons s -1 for the production of radioisotopes. With the addition of a tritium breeding blanket, such a facility could produce 0.2 grams d -1 or 70 grams yr -1 of tritium.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

International Coordination and Cooperation on LunaNet Spectrum

LunaNet is planned to be the network of networks operated by a set of cooperating organizations to provide interoperable Communications, networking, Position, Navigation, and Timing (CPNT) services to users on and around the Moon based on a framework of mutually agreed-upon standards, protocols, frequency bands and interface requirements. LunaNet follows a service-oriented architecture that is agnostic about the types of organizations that provide services, e.g., government, industry, or academia. LunaNet is open, scalable, resilient, secure, and extensible. To achieve these goals, LunaNet Service Providers (LNSP) must coordinate with each other to define and develop the architecture, to plan initial and evolved capabilities, and to operate their networks. One of the central LunaNet tenets is the use of shared spectrum. For example, the Lunar Augmented Navigation Service (LANS) acts like a Global Navigation Satellite System (GNSS) such as the US Global Positioning System (GPS) or European Galileo but the LNSPs’ contributions to LunaNet must use the same frequency band (2483.5 MHz-2500.0 MHz) and transmit the same waveform synchronized by highly accurate clocks so that Users ‘see’ one virtual network and use the same multilateration algorithm to determine their positions. This necessitates a high degree of spectrum coordination. NASA’s Lunar and Human Spaceflight Spectrum Management Team has been actively supporting development of the LunaNet Interoperability Specification (LNIS), soliciting inputs from spectrum policy and planning experts across NASA, ESA and JAXA. Cislunar spectrum use considerations have been studied and adjudicated within the Space Frequency Coordination Group (SFCG) and inform the ongoing discussion of a lunar communication and navigation architecture within the existing radio regulatory framework of the International Telecommunication Union, leading to the 2027 World Radiocommunication Conference (WRC-27). The frequency plan contained in the publicly released draft of the LunaNet Interoperability Specification reflects the initial phase of exploration (roughly to 2030) defining an optimal set of radio frequencies in appropriately allocated services consistent with WRC-23 decisions for use by known or planned CPNT applications, while striving to maximize coexistence and compatibility amongst cislunar systems and other systems within the near-Earth regime (< 2 million km from Earth). Important considerations include: protection of extremely sensitive receive-only radio astronomy systems on the lunar far side, known as the Shielded Zone of the Moon (SZM); compatibility between Direct with Earth (DWE) communications links and links needed to support relay satellites in lunar orbit with their customer systems on orbit or on the lunar surface; compatibility between multiple lunar surface communications systems and capabilities over varied and challenging terrain and distances; as well as ensuring compatibility and interoperability between navigation systems which either leverage Earth-based or in-situ lunar systems. In addition, the lunar CPNT architecture is envisioned to be the basis – with adjustments – of the future Mars CPNT architecture as we expand into the solar system using Interplanetary Networking (IPN). The second phase of lunar spectrum definition will address planned international capabilities for the next decade that will require action at WRC-27 and beyond. This paper will discuss each of these considerations in more depth and how the current LunaNet frequency plan addresses them.

LunaNet↗

Optimal processing of satellite-derived magnetic anomaly data

It is shown how the concept of the power spectrum can be extended to two-dimensional spatial power spectra and how it can be used in determining optimal data processing methods for satellite-derived magnetic anomaly data and planning missions to obtain such data. The analysis techniques are applied to the data set and data-processing procedure described by Mayhew et al. (1980), a study that treats magnetic anomaly data for Australia and the surrounding ocean obtained by the polar orbit POGO series satellites. It is shown that the data-processing method used by Mayhew et al. is approximately equivalent to an invariant two-dimensional linear filter and that it is reasonably close to optimal with respect to accuracy, although some possible improvements are suggested. However, as is usual when filtering data, some real 'signal' is unavoidably removed along with the 'noise' resulting in errors that can be quite large. A method for reducing these errors by using additional data from a medium inclination orbit satellite (for example, 60 deg inclination) is proposed.

Mcleod, M. G.↗

Deploying a Route Optimization EFB Application for Commercial Airline Operational Trials

The Traffic Aware Planner (TAP), developed for NASA Langley Research Center to support the Traffic Aware Strategic Aircrew Requests (TASAR) project, is a flight-efficiency software application developed for an Electronic Flight Bag (EFB). Tested in two flight trials and planned for operational testing by two commercial airlines, TAP is a real-time trajectory optimization application that leverages connectivity with onboard avionics and broadband Internet sources to compute and recommend route modifications to flight crews to improve fuel and time performance. The application utilizes a wide range of data, including Automatic Dependent Surveillance Broadcast (ADS-B) traffic, Flight Management System (FMS) guidance and intent, on-board sensors, published winds and weather, and Special Use Airspace (SUA) schedules. This paper discusses the challenges of developing and deploying TAP to various EFB platforms, our solutions to some of these challenges, and lessons learned, to assist commercial software developers and hardware manufacturers in their efforts to implement and extend TAP functionality in their environments. EFB applications (such as TAP) typically access avionics data via an ARINC 834 Simple Text Avionics Protocol (STAP) server hosted by an Aircraft Interface Device (AID) or other installed hardware. While the protocol is standardized, the data sources, content, and transmission rates can vary from aircraft to aircraft. Additionally, the method of communicating with the AID may vary depending on EFB hardware and/or the availability of onboard networking services, such as Ethernet, WIFI, Bluetooth, or other mechanisms. EFBs with portable and installed components can be implemented using a variety of operating systems, and cockpits are increasingly incorporating tablet-based technologies, further expanding the number of platforms the application may need to support. Supporting multiple EFB platforms, AIDs, avionics datasets, and user interfaces presents a challenge for software developers and the management of their code baselines. Maintaining multiple baselines to support all deployment targets can be extremely cumbersome and expensive. Certification also needs to be considered when developing the application. Regardless of whether the software is itself destined to be certified, data requirements in support of the application and user interface elements may introduce certification requirements for EFB manufacturers and the airlines. The example of TAP, the challenges faced, solutions implemented, and lessons learned will give EFB application and hardware developers insight into future potential requirements in deploying TAP or similar flight-deck EFB applications.

Roscoe, David A.↗

Automated Signal Timing Plan Reconstruction Using High-Resolution Event-Based Controller Data for Digital Twins

Transportation digital twins are essential tools for evaluating emerging technologies such as connected and automated vehicles, adaptive traffic signal control, and mobility optimization strategies. Realistic digital twins require accurate emulation of real-world signal controllers and detailed signal timing plans. However, signal timing plans are often unavailable or difficult to access, forcing researchers and modelers to rely on assumed fixed timings or halt their analysis. To overcome this challenge, we present a method that directly estimates signal timing plan parameters using high-resolution, event-based data from traffic signal controllers. The proposed method extracts key parameters, including cycle length, offset, phase sequence, coordinated phases, phase-specific minimum and maximum green durations, vehicle extensions, and splits under coordination. A rule-based deterministic signal timing reconstruction algorithm based on traffic signal operation rules, such as those outlined in the Signal Timing Manual, is developed and validated. We evaluate this method, which uses high-resolution controller event logs and verified signal timing plans, on 94 signalized intersections in Nashville, Tennessee, demonstrating their ability to generate accurate, simulation-ready signal timing plans for tools such as SUMO and Vissim.

Saroj, Abhilasha [ORNL] (ORCID:0000000191178063)↗