Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEMONSTRATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

The Demonstration of Power over Ethernet (PoE) Technologies in Commercial and Institutional Buildings

Power over Ethernet (PoE) technologies are currently ubiquitous in offices in the form of phones, access points, and IP security cameras. They are systems that are familiar to and managed by on-site IT staff. As low voltage DC-power capabilities have increased with the advancement of IT network switches within offices, PoE devices are now being integrated across additional building systems, including lighting, computers, and HVAC controls. The connection of PoE devices to network switches offers the opportunity for energy monitoring and management to be performed through IT network management software. Data and results from technology validations of PoE equipment remain very limited. This lack of information hinders expansion of PoE as an energy management strategy as its benefits and challenges have been insufficiently quantified in real-world scenarios. This final report presents the findings of a DOE/State of Minnesota-funded project that demonstrated and assessed the energy and non-energy benefits of Power over Ethernet (PoE) technologies at six sites: two offices, three schools, and a hotel. The goals of the demonstrations were to: (1) assess the receptiveness of commercial and institutional markets to these new technologies, (2) demonstrate the feasibility of PoE technologies within standard design/construction practices and commercial codes, (3) assess the energy and cost savings opportunities of these technologies, (4) provide energy management opportunities where not typically available, and (5) formulate approaches to spur adoption of these technologies in the marketplace.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and Demonstration of Medium-Heavy Duty PHEV Work Trucks

The heavy-duty vehicle market (Class 6-8) has been a difficult segment for the introduction of plug-in vehicles due to the large energy storage requirement (with corresponding cost), challenging duty cycles, and the diversity of vehicle configurations. The Work Truck market represents a significant opportunity for Heavy-Duty PHEV adoption. (1) The usage cycle includes driving and stationary/worksite power requirements, ensuring full daily usage of the grid-charged battery (battery size: 15-30kWhr). Though daily driving can often be short (an average of 26 miles per day), worksite power includes substantial demand (hydraulics, exportable 110/220V power, 12V support, HVAC). (2) Worksite power demands for conventional vehicles require continuous loaded engine operation, resulting in significant emissions, fuel consumption and noise impacts. (3) These trucks serve an industry that is highly diverse in final vehicle duty cycle, configuration, and jobsite power demands resulting in the need for a modular, configurable hybrid solution. Through this program, Odyne has developed and demonstrated a medium/heavy duty plug-in hybrid solution capable of meeting the needs of the work truck market while delivering fuel and emissions reductions of 50% or greater when evaluated against the full-day work truck duty cycle. The Odyne system developed in this project was released for commercial sale as the G2V7 Odyne Plug-in Hybrid and ePTO systems. The testing and field demonstration proved that the Odyne hybrid system is capable of reducing work truck fuel use and emissions by over 50% while subsequent commercial sales demonstrate the flexibility of the modular design and the capability to support electric systems of 12 – 30 kW and hydraulic based systems of 60 kW (80 HP) or greater. Odyne is continuing to work with suppliers on reducing component costs and working with supporting agencies to initiate projects to increase the driving and full day fuel and emissions savings in order to continue to improve the customer value and return on investment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration of the Plant Fuel Reload Process Optimization for an Operating PWR

The United States (U.S.) nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor (LWR) nuclear power plants (NPPs) and can be achieved more economically by using a risk-informed ecosystem such as that being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program is promoting a wide range of research and development (R&D) activities with the goal to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering second license renewal. The RISA Pathway has two main goals: (1) the deployment of methodologies and technologies that enable better representation of safety margins and the factors that contribute to cost and safety; and (2) the development of advanced applications that enable cost-effective plant operation. This report summarizes the research outcomes in FY-2021, which the project progressed from the planning and methodology development phase to the early demonstration phase. The highlights of these activities are: (1) the development of a multi-objective optimization process using Genetic Algorithms (GAs); (2) the development and test of an approach for optimization process acceleration using artificial intelligence (AI) that significantly reduces the computational burden; (3) the demonstration of the fuel reload optimization framework for a generic pressurized water reactor (PWR); and (4) the demonstration of limiting design basis accident (DBA) scenarios for evaluation of the transition from deterministic to risk-informed approach for fuel reload optimization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance Demonstration of an Occupancy Sensor-enabled Integrated Solution for Commercial Buildings

Traditionally, a single-loop fixed-gain controller is applied to supply fan (SF) and cooling coil (CC) valve controls while a fixed-damper position control is applied to outdoor air (OA) damper control at air handling units (AHUs) in commercial buildings. With the increasing application of occupancy sensors, the information generated by occupancy sensors is applied to not only reduce the electricity loads from lighting and controllable plug loads, but also reset OA intake and minimum supply airflow setpoints. Meanwhile, these intermittent operation actions greatly elevate the dynamics of AHU systems, which may introduce unstable SF and CC valve operations and inaccurate OA flow control at AHUs and consequently degrade maximum energy efficiency gains. With virtual fan and valve flow meter technologies, two advanced controls, including cascade control and gain scheduling control, can be implemented on both the SF and CC valve, and an advanced control using a virtual OA flow meter can be implemented on OA damper integrated with occupancy sensors. The goal of this project is to demonstrate the savings, cost, and performance of an integrated solution that integrates the three advanced HVAC controls with occupancy sensors to allow accurate and stable AHU operations in real buildings. The project objectives are to: 1) develop and validate an advance SF control algorithm; 2) develop and validate an advanced CC valve control algorithm; 3) validate an algorithm to implement a virtual OA flow meter; and 4) demonstrate the savings, cost, and performance of the integrated solution in real buildings. The technical approaches are to: 1) select a test system at the University of Oklahoma; 2) develop and implement the algorithms of advanced SF and CC valve controls and validate the performance; 3) develop and implement the advanced OA control using a virtual OA flow meter and validate the performance; 4) demonstrate the savings, cost, and performance of the proposed integrated solution with and without three advanced HVAC controls; and 5) disseminate the project results through publications and presentations. For the SF control, both the gain scheduling and cascade controls can improve the fan energy performance by reducing the fan power during the transient period and the fan control performance at lower speeds by reducing fan speed variation. Moreover, the gain scheduling control provides a simple and low-cost solution and is recommended. The fan power savings can reach 30% in a transient period. For the CC valve control, the gain scheduling control can considerably reduce the supply air temperature oscillation range and frequency under both higher and lower load conditions and the control valve response is much more stable. As a result, the gain scheduling control is recommended. The projected pump energy consumption can be reduced by 68.5%. With the developed virtual OA flow meter, the OA can be accurately controlled at its setpoint, which is determined based on the actual number of occupants in the building provided by occupancy sensors. The RMSE of the proposed OA control is 15.9 L/s. The energy data shows that the fan power and CC cooling energy were significantly reduced. On the other hand, the energy savings majorly results from the occupancy sensors and the energy savings by the advanced HVAC controls is minimal because that the controllers in the test AHU were tuned with very slow response. An annual technical savings potential is estimated as 0.5 quads in the commercial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SCALE Demonstration for Sodium-Cooled Fast Reactor Fuel Cycle Analysis

In support of the US Nuclear Regulatory Commission non-light-water reactor fuel cycle demonstration project, SCALE 6.3.1 capabilities for radionuclide characterization, criticality, and shielding were demonstrated for scenarios in the sodium-cooled fast reactor (SFR) nuclear fuel cycle. Three postulated accident scenarios were selected for analysis in this work. As a basis for all scenarios, irradiated fuel inventories were generated using SCALE/ORIGAMI. To cover multiple SFR design choices, two different types of SFR fuel, uranium/transuranic-loaded and U-based fuels, were considered. For the first scenario, SCALE/MAVRIC was used to calculate the radiation shielding and dose rates inside and outside of the containment building due to a drop of a spent fuel assembly from the fuel-handling system during unloading inside the containment building. For the second scenario, potential critical configurations in an electrofiner were investigated through criticality calculations with SCALE/CSAS. For the third scenario, the activity of the waste salt from an electrorefiner was evaluated using SCALE/ORIGEN. The dose rate produced by the analyzed SFR assemblies is similar to that produced by a typical pressurized water reactor (PWR) fuel assembly with a discharge burnup of 50 GWd/MTU, with the same cooling time of 10 days. The criticality analyses suggested that the different electrorefiner configurations have a large margin to criticality. The activity analysis of the electrofiner waste revealed that shielding and cooling may be required for the waste salt that contains transuranics and fission products produced by the electrorefiner because of the high activity of the waste salt. In general, the application of various capabilities in the SCALE code system for SFR fuel inventory generation, criticality, and shielding was successfully demonstrated for the selected scenarios in the SFR nuclear fuel cycle. Additional analyses can be performed to provide more accurate results when more details of the SFR nuclear fuel cycles are available, for example, the dimension of the electrorefiner and the salt compositions during reprocessing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial Heat Pump Water Heaters - CRADA 625 (Abstract)

Commercial heat pump water heater (CHPWH) systems significantly decarbonize the commercial and multifamily sectors by eliminating the reliance on gas-fired water heating. CHPWH systems are also well suited to include load shift controls that enable load-up and shed commands for supporting grid reliability and time-of-use pricing structure. However, they have not had wide adoption due to factors including price, complexity, and perceived risk. Although CHPWHs have been available in the US for decades, they have not made significant market gains in part because the systems have required significant and costly engineering design expertise and proved lackluster performance. Successful widespread market adoption requires a different approach; a shift from the current custom specialized expertise project design and installation to a repeatable approach that requires little specialized knowledge or expertise and can deliver persistent performance. Using this type of holistic systems approach requires effectively integrating four CHPWH system key components: primary air-to-water heat pumps; primary thermal storage tanks, a temperature maintenance system, and a control system which has capabilities to manage the primary heat pump cycles, any back-up, supplemental, or temperature maintenance heating, alarms, and grid connectivity allowing for demand response (DR), and/or load shifting. The project team has developed and will implement a suite of tools to support faster, less expensive, and more reliable field installations of CHPWH technology and with the resulting data used to further improve the tool set. These tools include: (1) A tool for optimizing system size and costs. (2) A tool that predicts annual energy use and overall system efficiency. (3) The Advanced Water Heater Specification (AWHS 8.0) defining the components of a full CHPWH system addressing performance requirements by climate zone. (4) The Qualified Products List: (QPL) of approved products that meet the specifications requirements. (5) Training materials including online on-demand modules, instructor-led training, and virtual interactive video tours of CHPWH installations in multifamily buildings. Demonstration site identification in low-income buildings in underserved communities is currently underway. Preliminarily, the team anticipates having three demonstrations in the Pacific Northwest and three in the Northeast for a total of six sites. After the demonstration sites are finalized, and M&V instrumentation installations are complete, the team will gather performance data and confirm whether the CHPWH systems perform as predicted and use the data to improve the existing tools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Achieving Unprecedented CO 2 Utilization InCO 2 Concrete™: System Design, Product Development and Process Demonstration

Anthropogenic sources of carbon dioxide are generated from a number of sources, but the key among these are ordinary Portland cement (OPC) production and combustion of fossil fuels. Cement production is the largest global CO 2 source from the mineral decomposition of carbonates. This is due to the clinkering process whereby limestone (mainly consisting of CaCO 3 ) is decomposed into CaO and CO 2 , and combined with silica rich clays at high temperatures to form clinkers (i.e. the four key minerals that comprise cement). The high temperature range of 1400 – 1550°C required for this process accounts for up to 60% of the generated CO 2 from cement production. Combination of the limestone decomposition and thermal requirements of the clinkering process causes cement production to contribute 8-9% of annual global CO 2 emissions. Combustion of fossil fuels (coal, oil and gas) was shown to contribute a much larger portion of global CO 2 emissions. As of 2018, combustion of fossil fuels accounted for 65% of global CO 2 , where 41% was derived from stationary sources for electricity and heat generation and the other 24% was related to transport. To reduce these contributions, key steps forward in CO 2 utilization technologies are required. Therefore, a CO 2 mineralization technology (CO 2 mineralization concrete) to reduce the OPC content in concrete, while utilizing flue gas emissions from fossil fuel combustion has been developed to address both areas simultaneously. This Reversa™ technology utilizes low-carbon cementation agents produced by in situ CO 2 mineralization (“mineral carbonation reactions”) to offer a promising alternative to OPC. CO 2 mineralization relies upon the reaction of dissolved CO 2 with inorganic alkaline reactants to precipitate mineral carbonates (e.g., CaCO 3 ), which bind proximate particles and achieve cementation. Herein, a concrete green body, which is composed of a mixture of binder, water, and mineral aggregates, is exposed to CO 2 borne in industrial flue gas streams. This manner of CO 2 mineralization allows the production of construction components that feature equivalent engineering attributes as their OPC-based counterparts while featuring a much smaller embodied carbon intensity (eCI). The purpose of this project is to demonstrate the feasibility of the Reversa process evolving from a TRL-3 technology at the bench-scale up to TRL-6 technology at the pilot-scale. The reliability of the Reversa technology was tested to prove the effective production of three standard industrial concrete products selected during the course of the project. The results detailed herein will demonstrate the evolution of this technology to the industrial scale. The culmination of this work resulted in 9 production runs completed at the National Carbon Capture Center (NCCC), Wilsonville, AL, using natural gas (NG) flue gas as the CO 2 source. Over the course of the production runs at NCCC, the CO 2 utilization as a function of time, 24-h CO 2 uptake, electricity usage, and 28-d net area compressive strength recorded for each run. Collection of this data will be used to determine the success of the demonstration goals: (1) achieving in excess of 0.2gCO 2 /g reactant , (2) achieving greater than 50% reduction in global warming potential compared to standard produced units, and (3) ensuring compliance of carbonated concrete with industry standard specifications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Demonstration of low-density, high-performance operation of sustained spheromaks and favorable scalability toward compact, low-cost fusion power plants (Final Scientific/Technical Report)

This project worked to advance the technical viability of a novel method for efficiently sustaining stable, high-performance spheromak plasma configurations to serve as the basis of compact, low-cost fusion power plants. In particular, our group worked to improve the method of Steady Inductive Helicity Injection (SIHI) with Imposed-Dynamo Current Drive (IDCD) for spheromak plasma sustainment. Prior to this project demonstrations of this plasma sustainment technology have achieved plasma performance consistent with entry milestone 3 of the BETHE FOA. Research and development (R&D) activities for this project were focused on increasing plasma performance toward a level consistent with exit milestone 4. To do this the PI and his group worked to increase the performance of sustained spheromaks produced in an existing experimental prototype (HIT-SIU) while improving confidence in projections to and design of future, higher performance devices through three primary R&D activities: 1) Improved control over the density of plasma in the device throughout a discharge to provide a pathway for demonstration of spheromaks Ohmically heating to the Mercier beta limit via: a. Fueling the device directly with plasma through the installation of pre-ionized source on the injectors b. Optimization of electrical current waveforms in the driver circuits to enable low-density plasma formation with a lower fueling rate 2) Computational demonstration of a validated, realistic injector circuit coupled to a dynamic plasma model capable of use as a design tool for SIHI drivers and associated circuits for new experimental design points on the pathway to commercial reactors. The improvements in plasma performance achieved during research activity 1), and the computational projections performed in research activity 2) increased the technological readiness level (TRL) of this fusion energy concept toward a level sufficient to attract early-stage private investment and/or other forms of follow-on investment to pursue required R&D activities required for the eventual fusion power plants based on this novel technical approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Demonstration of Coupled Tiamat Single Assembly Calculations

This report corresponds to milestone L3:PHI.PCI.P15.03, which was originally intended to investigate the time discretization approaches with the newly developed fully coupled Tiamat capability, targeting single assembly problems. At the time, it was thought that various time discretization approaches would need to be assessed. However, it was decided that this was not necessary as what is currently implemented in the code is adequate to provide consistent and full coupling between MPACT, CTF, ORIGEN, and Bison. As such, the milestone has effectively been repurposed as a stepping stone to the quarter core demonstration milestone slated for completion in August by describing and demonstrating the new fully coupled Tiamat capability on a single assembly case based on VERA Progression Problem 6, but with the addition of depletion throughout a representative cycle. Additionally, several other contributions that have been critical to this demonstration are also described. These include (1) the 1.5D capability developed by the Bison team, (2) improvements to the burnup representation in Bison through Tiamat, and (3) the additions to MOOSE to allow Bison to resolve the same timestep are also discussed. Initial simulations have been performed for the Watts Bar Unit 1 Cycle 1 with fully coupled Tiamat. While there are a few things to be improved for the final simulations, the initial results look very promising. The current status and results from this will be presented here, as well as the path forward to resolve the issues observed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

G-Band Radar Demonstration for Microphysics Field Campaign Report

The G-Band Radar Demonstration for Microphysics (GRDM) campaign took place at the Eastern Pacific Cloud Aerosol Precipitation Experiment (EPCAPE) from March 15 to April 30, 2024. This was a deployment of two of NASA’s Jet Propulsion Laboratory (JPL) radars and one radar from Brookhaven National Laboratory to demonstrate the utility of high-frequency millimeter-wave radars for remote sensing of stratocumulus microphysical properties. The radars were deployed on the Ellen Browning Scripps Memorial Pier alongside the AMF instruments (Figure 1). The radars include a Ka-band (35 GHz), W-band (94 GHz), and four G-band (158, 165, 174, and 240 GHz) channels. The 240 GHz and W-band channels provide complete Doppler spectra, which are useful for advanced analysis. The 158-175 GHz channels are sensitive to the water vapor profile and are useful for attenuation correction. These radars complement the high-sensitivity ARM KAZR. The goal of the deployment was to observe drizzling stratocumulus and demonstrate the capabilities of the multifrequency radar data set to constrain profiles of liquid water content and drizzle drop characteristic size. The data are still being analyzed. The methodology to derive the cloud and precipitation parameters will exploit differential attenuation and differential reflectivity between low-frequency (Ka-band) and high-frequency (G-band) channels. The method will also exploit the capability of the G-band observations to constrain the attenuation due to water vapor. These observations will quantify the capabilities and limitations of the emerging technology of G-band radars for constraint stratocumulus cloud microphysics, which are key to constraining aerosol-cloud-precipitation interactions and low-cloud climate feedback.

47 OTHER INSTRUMENTATION↗

ATF Cladding Mechanical Properties Report: Capability Demonstration

This report documents mechanical testing capability demonstration activities performed in fiscal year (FY)2025 at Oak Ridge National Laboratory(ORNL)on chromium-coated (Cr-coated) and uncoated advanced zirconium alloy claddings irradiated in the High Flux Isotope Reactor (HFIR) to approximately 4 displacements per atom (dpa), corresponding to ~13GWd/t burnup. Specimens were prepared in axial tension (ATT) and ring tension (RTT) geometries, and passive silicon carbide(SiC)thermometry (TM) was employed to determine irradiation temperatures, which averaged 38–43 °C below the 330 °C design target. Mechanical testing at ambient temperature demonstrated the expected irradiation-induced hardening, with yield strength(YS)and ultimate tensile strength(UTS)values increasing substantially relative to unirradiated counterparts. However, this strengthening was accompanied by a reduction in ductility, as indicated by lower uniform and total elongations(UE and TE). Both coated and uncoated claddings exhibited similar mechanical response, though Cr-coated specimens showed surface cracking perpendicular to the loading direction, attributable to the hardness mismatch between the coating and substrate. Fracture in all cases remained ductile, and no coating spallation was observed following HFIR irradiation. Complementary efforts were directed toward the fabrication of test specimens from commercially irradiated cladding (rod 47I, ~31.1 GWd/t average burnup). Axial sectioning and computer numerical control(CNC)machining successfully produced ATT geometries suitable for benchmarking against HFIR-irradiated specimens. This capability enables direct comparison of cladding behavior between test reactor and commercial reactor environments, thereby supporting the validation of HFIR as a surrogate irradiation platform for accident tolerant fuel (ATF) development. Once HFIR irradiations are completed in FY26,the relevant comparison tests will be completed. Collectively, the FY 2025 PIE campaign has provided mechanical performance data for irradiated advanced claddings The demonstrated capabilities support the framework for mechanical testing and further evaluations in subsequent years. These efforts will represent an important contribution toward the licensing and deployment of Cr-coated zirconium alloy cladding as a near-term ATF solution.

36 MATERIALS SCIENCE↗

Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial Heat Pump Water Heaters (CRADA 625) (Final Report)

This report is a final deliverable for project 81966: Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial Heat Pump Water Heaters (CRADA 625) Commercial heat pump water heater (CHPWH) systems can significantly improve the energy efficiency of service water heating (SWH), aka domestic hot water (DHW), in commercial and multifamily buildings but have not yet achieved widespread adoption due to pricing, complexity, and perceived risk factors. The goal of this project – Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial HPWHs (Scaling Up) – was to demonstrate and validate a holistic systems approach for CHPWHs that de-risks the technology, creating a reliable, cost-effective, and repeatable approach to CHPWH deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PLUTONIUM-URANIUM EXTRACTION (PUREX) FACILITY ALARACT DEMONSTRATION FOR FILTER HOUSING

This document presents an As Low As Reasonably Achievable Control Technology (ALARACT) demonstration for evaluating corrosion on the I-beam supporting filter housing No.9 for the 291-A-l emission unit of the Plutonium-Uranium Extraction (PUREX) Facility, located in the 200 East Area of the Hanford Site. The PUREX facility is currently in surveillance and maintenance mode. During a State of Washington, Department of Health (WDOH) 291-A-l emission unit inspection, a small amount of corrosion was observed at the base of a high-efficiency particulate air (HEPA) filter housing. A series of internal and external inspections identified the source of the corrosion material as oxidation of a small section of one of the carbon steel I-beams that provides support to the stainless steel filter housing. The inspections confirmed the corrosion is isolated to one I-beam support location and does not represent any compromise of the structural support or filter housing integrity. Further testing and inspections of the support beam corrosion and its cause were conducted but did not determine the cause. No definitive evidence was found to support any degradation of the housing. Although no degradation of the housing was found, a conservative approach will be implemented. The following actions will be taken: (1) The current operating filter housing No.9 will be removed from service. (2) The only remaining available filter housings (No.1, No.2, and No.3) will be placed in service. These filter housings have new HEPA filters fitted with stainless steel frames and faceguards which were installed in the spring of 2007. (3) Filter housings No.5 and No.10 will be put on standby as backups. To document the assessment of the unit, a draft ALARACT filter housing demonstration for the PUREX filter housing was prepared, and informally provided to WDOH on August 7, 2008. A follow up WDOH response to the draft ALARACT filter housing demonstration for the PUREX filter housing questioned whether deteriorated galvanized filter faceguards discovered during an internal filter housing inspection met American Society of Mechanical Engineers (ASME) AG-l or Military Specification (MIL) 51068 standards. The filter system was designed and installed prior to the issuance of AG-l, February 1986; however, MIL 51068 did require galvanized faceguards. The faceguards are not necessary for filtration or structural purposes; it is concluded that the system is in compliance with the intent of the applicable standard. Appendix B provides supporting information to address this issue.

36 MATERIALS SCIENCE↗

Microchannel Reactor System Design & Demonstration For On-Site H2O2 Production by Controlled H2/O2 Reaction

We successfully demonstrated an innovative hydrogen peroxide (H2O2) production concept which involved the development of flame- and explosion-resistant microchannel reactor system for energy efficient, cost-saving, on-site H2O2 production. We designed, fabricated, evaluated, and optimized a laboratory-scale microchannel reactor system for controlled direct combination of H2 and O2 in all proportions including explosive regime, at a low pressure and a low temperature to produce about 1.5 wt% H2O2 as proposed. In the second phase of the program, as a prelude to full-scale commercialization, we demonstrated our H2O2 production approach by ‘numbering up’ the channels in a multi-channel microreactor-based pilot plant to produce 1 kg/h of H2O2 at 1.5 wt% as demanded by end-users of the developed technology. To our knowledge, we are the first group to accomplish this significant milestone. We identified the reaction pathways that comprise the process, and implemented rigorous mechanistic kinetic studies to obtain the kinetics of the three main dominant reactions. We are not aware of any such comprehensive kinetic studies for the direct combination process, either in a microreactor or any other reactor system. We showed that the mass transfer parameter in our microreactor system is several orders of magnitude higher than what obtains in the macroreactor, attesting to the superior performance of microreactor. A one-dimensional reactor model incorporating the kinetics information enabled us to clarify certain important aspects of the chemistry of the direct combination process as detailed in section 5 of this report. Also, through mathematical modeling and simulation using sophisticated and robust commercial software packages, we were able to elucidate the hydrodynamics of the complex multiphase flows that take place in the microchannel. In conjunction with the kinetics information, we were able to validate the experimental data. If fully implemented across the whole industry as a result of our technology demonstration, our production concept is expected to save >5 trillion Btu/year of steam usage and >3 trillion Btu/year in electric power consumption. Our analysis also indicates >50 % reduction in waste disposal cost and ~10% reduction in feedstock energy. These savings translate to ~30% reduction in overall production and transportation costs for the $1B annual H2O2 market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration Assessment of Light Emitting Diode (LED) Commercial Garage Lights In the Providence Portland Medical Center, Portland, Oregon

This U.S. Department of Energy GATEWAY Demonstration project studied the applicability of light-emitting diode (LED) luminaires for commercial parking garage applications. High-pressure sodium (HPS) area luminaires were replaced with new LED area luminaires. The project was supported under the U.S. Department of Energy (DOE) Solid State Lighting Program. Other participants in the demonstration project included Providence Portland Medical Center in Portland, Oregon, the Energy Trust of Oregon, and Lighting Sciences Group (LSG) Inc. Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. PNNL manages GATEWAY demonstrations for DOE and represents their perspective in the conduct of the work. Quantitative and qualitative measurements of light and electrical power were taken at the site for both HPS and LED light sources. Economic costs were estimated and garage users’ responses to the new light sources were gauged with a survey. Six LED luminaires were installed in the below-ground parking level A, replacing six existing 150W HPS lamps spread out over two rows of parking spaces. Illuminance measurements were taken at floor level approximately every 4 ft on a 60-ft x 40-ft grid to measure light output of these LED luminaires which were termed the “Version 1” luminaires. PNNL conducted power measurements of the circuit in the garage to which the 6 luminaires were connected and determined that they drew an average of 82 W per lamp. An improved LED luminaire, Version 2, was installed in Level B of the parking garage. Illuminance measurements were not made of this second luminaire on site due to higher traffic conditions, but photometric measurements of this lamp and Version 1 were made in an independent testing laboratory and power usage for Version 2 was also measured. Version 1 was found to produce 3600 lumens and Version 2 was found to produce 4700 lumens of light and to consume 78 Watts. Maximum and minimum light levels were measured for the HPS and LED Version 1 luminaires and projected for the Version 2 luminaires. Maximum light levels were 23.51 foot candles, 20.54 fc, and 26.7 fc respectively and minimum light levels were 1.49 fc, 1.45 fc, and 1.88 fc. These results indicate very similar or even slightly higher light levels produced by the LED lamps, despite the higher lumen output of the HPS lamp. The LED lamps provide higher luminaire efficacy because all of the light is directed down and out. None of it is “lost” in the fixture. Also the HPS luminaire had poorly designed optics and a plastic covering that tended to get dirty and cracked, further decreasing the realized light output.[is this an accurate way to say this?] Consumer perceptions of the Version 2 LED were collected via a written survey form given to maintenance and security personnel. More than half felt the LED luminaires provided more light than the HPS lamps and a majority expressed a preference for the new lamps when viewing the relamped area through a security camera. Respondents commented that the LED luminaires were less glary, created less shadows, had a positive impact on visibility, and improved the overall appearance of the area. PNNL conducted an economic analysis and found that the Version 1 lamp produced annual energy savings of 955 kWh and energy cost savings of $76.39 per lamp at electricity rates of 6.5 cents per kWh and $105.03 at 11 cents per kWh. PNNL found that the Version 2 lamp produced annual energy savings of 991 kWh and energy cost savings of $79.26 per lamp at electricity rates of 6.5 cents per kWh and $108.98 at 11 cents per kWh. PNNL also calculated simple payback and found that Version 1 showed paybacks of 5.4 yrs at 6.5c/kWh and 4.1 yrs at 11c/kWh while Version 2 showed paybacks of 5.2 yrs at 6.5c/kWh and 3.9 yrs at 11c/kWh.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

TANK 12 SLUDGE CHARACTERIZATION AND ALUMINUM DISSOLUTION DEMONSTRATION

A 3-L sludge slurry sample from Tank 12 was characterized and then processed through an aluminum dissolution demonstration. The dominant constituent of the sludge was found to be aluminum in the form of boehmite. The iron content was minor, about one-tenth that of the aluminum. The salt content of the supernatant was relatively high, with a sodium concentration of {approx}7 M. Due to these characteristics, the yield stress and plastic viscosity of the unprocessed slurry were relatively high (19 Pa and 27 cP), and the settling rate of the sludge was relatively low ({approx}20% settling over a two and a half week period). Prior to performing aluminum dissolution, plutonium and gadolinium were added to the slurry to simulate receipt of plutonium waste from H-Canyon. Aluminum dissolution was performed over a 26 day period at a temperature of 65 C. Approximately 60% of the insoluble aluminum dissolved during the demonstration, with the rate of dissolution slowing significantly by the end of the demonstration period. In contrast, approximately 20% of the plutonium and less than 1% of the gadolinium partitioned to the liquid phase. However, about a third of the liquid phase plutonium became solubilized prior to the dissolution period, when the H-Canyon plutonium/gadolinium simulant was added to the Tank 12 slurry. Quantification of iron dissolution was less clear, but appeared to be on the order of 1% based on the majority of data (a minor portion of the data suggested iron dissolution could be as high as 10%). The yield stress of the post-dissolution slurry (2.5 Pa) was an order of magnitude lower than the initial slurry, due most likely to the reduced insoluble solids content caused by aluminum dissolution. In contrast, the plastic viscosity remained unchanged (27 cP). The settling rate of the post-dissolution slurry was higher than the initial slurry, but still relatively low compared to settling of typical high iron content/low salt content sludges. Approximately 40% of the post-dissolution sludge settled over a three week period. The corresponding volume of supernatant that was decanted from the waste was approximately 35% of the total waste volume. The decanted supernatant contained approximately one-third of the dissolved aluminum and exhibited a mild greenish-grey hue.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS WITH TANK 40 AND H CANYON NEPTUNIUM

The Defense Waste Processing Facility (DWPF) is currently processing Sludge Batch 5 (SB5) from Tank 40. SB5 contains the contents of Tank 51 from November 2008, qualified by the Savannah River National Laboratory (SRNL) and the heel in Tank 40 remaining from Sludge Batch 4. Current Liquid Waste Operations (LWO) plans are to (1) decant supernatant from Tank 40 to remove excess liquid caused by a leaking slurry pump and (2) receive a Np stream from H Canyon It should be noted that the Np stream contains significant nitrate requiring addition of nitrite to Tank 40 to maintain a high nitrite to nitrate ratio for corrosion control. SRNL has been requested to qualify the proposed changes; determine the impact on DWPF processability in terms of hydrogen generation, rheology, etc.; evaluate antifoam addition strategy; and evaluate mercury stripping. Therefore, SRNL received a 3 L sample of Tank 40 following the transfer of Tank 51 to Tank 40 (Tank Farm Sample HTF-40-08-157 to be used in testing and to perform the required Waste Acceptance Product Specifications radionuclide analyses). Based on Tank Farm projections, SRNL decanted a portion* of the sample, added sodium nitrite, and added a Np solution from H Canyon representative of the Np to be dispositioned to Tank 40 (neutralized to 0.6 M excess hydroxide). The resulting material was used in a DWPF Chemical Process Cell (CPC) demonstration -- a Sludge Receipt and Adjustment Tank (SRAT) cycle and a Slurry Mix Evaporator (SME) cycle. Preliminary data from the demonstration has been reported previously. This report includes discussion of these results and additional results, including comparisons to Tank Farm projections and the SB5 demonstration.

54 ENVIRONMENTAL SCIENCES↗