Search NASA⌕ Search

SEARCH · Search NASA

Results for “Demonstration Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet (Fact Sheet)

This fact sheet reports on the City of Burbank, California's fuel cell bus demonstration project and the U.S. Department of Energy's (DOE) involvement. Included are specifications for the fuel cell bus and information about its operation. BurbankBus, the city's mass transit entity, received a grant from the California Air Resources Board to fund its zero-emission bus demonstration and is collaborating with DOE's Fuel Cell Technologies Program to evaluate the bus performance. DOE's National Renewable Energy Laboratory will collect and analyze performance and operations data for at least one year. Researchers will use the data to better understand the technology and determine future development work. In addition, demonstration information will help fleets make informed purchase decisions.

08 HYDROGEN↗

Tank Side Cesium Removal System Project and Technology Maturation Program - 19519

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce Low Activity Waste (LAW) from Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where the hazardous constituents in the LAW will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes cesium from supernatant tank waste using non-elutable cesium ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, a tailored Technology Maturation/Testing Plan (TMP) has been developed to identify principal Technology Elements (TEs) for the proposed process, designate Critical Technology Elements (CTEs), identify gaps in the existing knowledge base and identify the necessary activities to mature the technologies for successful deployment of TSCR. The project scope and technology maturation approach are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inverse modeling of ground surface uplift and pressure with iTOUGH-PEST and TOUGH-FLAC: The case of CO2 injection at In Salah, Algeria

Ground deformation, commonly seen in storage projects, carries useful information about processes occurring in the injection formation. The Krechba gas field at In Salah (Algeria) is one of the best-known sites for studying ground surface deformation during geological carbon storage. At this first industrial-scale on-shore CO 2 demonstration project, satellite-based ground-deformation monitoring data of high quality are available and used to study the large-scale hydrological and geomechanical response of the system to injection. In this work, we carry out coupled fluid flow and geomechanical simulations to understand the uplift at three different CO 2 injection wells (KB-501, KB-502, KB-503). Previous numerical studies focused on the KB-502 injection well, where a double-lobe uplift pattern has been observed in the ground-deformation data. The observed uplift patterns at KB-501 and KB-503 have single-lobe patterns, but they can also indicate a deep fracture zone mechanical response to the injection.The current study improves the previous modeling approach by introducing an injection reservoir and a fracture zone, both responding to a Mohr-Coulomb failure criterion. In addition, we model a stress-dependent permeability and bulk modulus, according to a dual continuum model. Mechanical and hydraulic properties are determined through inverse modeling by matching the simulated spatial and temporal evolution of uplift to InSAR observations as well as by matching simulated and measured pressures. The numerical simulations are in agreement with both spatial and temporal observations. The estimated values for the parameterized mechanical and hydraulic properties are in good agreement with previous numerical results. In addition, the formal joint inversion of hydrogeological and geomechanical data provides measures of the estimation uncertainty.

58 GEOSCIENCES↗

1:52 Scale Testing of the First US Commercial Scale Floating Wind Turbine, VolturnUS: Testing Overview and the Evolution of Scale Model Testing Methods

Over the past 6 years, the University of Maine (UMaine) has been an active contributor in research and scale-model testing of floating offshore wind turbines (FOWTs). This paper serves to share the evolution of UMaine’s scale-model testing pedigree by exploring the various test campaigns at a high level, culminating with the design validation of the VolturnUS floating platform. These model test campaigns have each provided key insights into the behavior of FOWT platforms as well as improving the ability to perform model tests of FOWTs. In 2011, the UMaine-led DeepCwind Consortium carried out 1/50-scale model tests of a generic tension leg platform (TLP), a semi-submersible (semi), and a spar-buoy (spar) floating platform at the Maritime Research Institute Netherlands (MARIN) test facility. The designs were Froude-scaled and supported a scaled version of the 5-MW National Renewable Energy Laboratory (NREL) offshore research turbine. Data from these tests has been used extensively for numerical simulation validation efforts using NREL’s computer-aided engineering software FAST and laid the foundation for UMaine’s design efforts on VolturnUS. In 2013, UMaine conducted another test campaign at MARIN using the original semi-submersible from 2011 with an improved turbine as well as a 1:50-scale model of the VolturnUS concrete semi-submersible design. The improved DeepCwind semi-submersible data is currently being utilized in the validation of a large number of other analysis codes as part of the International Energy Agency’s OC5 project. In 2015, UMaine opened its own Wind/Wave test facility, the Alfond Wind/Wave Ocean Engineering Laboratory (W2). Utilizing this new facility, UMaine tested the 1:50-scale model DeepCwind semi-submersible, repeating the tests from MARIN, to validate the experimental equipment and procedures as well as demonstrate the capability of the W2. In 2016 UMaine carried out testing of a 1:52-scale model of the 100% design of the VolturnUS with a 6-MW topside as a final design validation to support the US Department of Energy-supported, full-scale Aqua Ventus demonstration project scheduled to be connected to the grid in 2019. A newly designed 6-MW scale model turbine was used in this test and the performance-matched turbine design methodology is described. Selected results from the test campaign and preliminary numerical comparisons are discussed as well as key lessons learned from the model test campaigns are presented.

17 WIND ENERGY↗

Heat Transfer and Latent Heat Storage in Inorganic Molten Salts for Concentrating Solar Power Plants

A key technological issue facing the success of future Concentrating Solar Thermal Power (CSP) plants is creating an economical Thermal Energy Storage (TES) system. Current TES systems use either sensible heat in fluids such as oil, or molten salts, or use thermal stratification in a dual-media consisting of a solid and a heat-transfer fluid. However, utilizing the heat of fusion in inorganic molten salt mixtures in addition to sensible heat, as in a Phase change material (PCM)-based TES, can significantly increase the energy density of storage requiring less salt and smaller containers. A major issue that is preventing the commercial use of PCM-based TES is that it is difficult to discharge the latent heat stored in the PCM melt. This is because when heat is extracted, the melt solidifies onto the heat exchanger surface decreasing the heat transfer. Even a few millimeters of thickness of solid material on heat transfer surface results in a large drop in heat transfer due to the low thermal conductivity of solid PCM. Thus, to maintain the desired heat rate, the heat exchange area must be large which increases cost. This project demonstrated that the heat transfer coefficient can be increase ten-fold by using forced convection by pumping a hyper-eutectic salt mixture over specially coated heat exchanger tubes. However, only 15% of the latent heat is used against a goal of 40% resulting in a projected cost savings of only 17% against a goal of 30%. Based on the failure mode effect analysis and experience with pumping salt at near freezing point significant care must be used during operation which can increase the operating costs. Therefore, we conclude the savings are marginal to justify using this concept for PCM-TES over a two-tank TES. The report documents the specialty coatings, the composition and morphology of hypereutectic salt mixtures and the results from the experiment conducted with the active heat exchanger along with the lessons learnt during experimentation.

14 SOLAR ENERGY↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tank Side Cesium Removal System Project and Technology Maturation Program - 20101

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce a Low Activity Waste (LAW) feed from existing mixed Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where it will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes undissolved solids and cesium from tank waste supernatant using non-elutable ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, technology testing has been performed to answer design questions and reduce risk. The project scope and technology testing approach are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the technology required to develop photovoltaic power system for large scale national energy applications

A technical assessment of a program to develop photovoltaic power system technology for large-scale national energy applications was made by analyzing and judging the alternative candidate photovoltaic systems and development tasks. A program plan was constructed based on achieving the 10 year objective of a program to establish the practicability of large-scale terrestrial power installations using photovoltaic conversion arrays costing less than $0.50/peak W. Guidelines for the tasks of a 5 year program were derived from a set of 5 year objectives deduced from the 10 year objective. This report indicates the need for an early emphasis on the development of the single-crystal Si photovoltaic system for commercial utilization; a production goal of 5 x 10 to the 8th power peak W/year of $0.50 cells was projected for the year 1985. The developments of other photovoltaic conversion systems were assigned to longer range development roles. The status of the technology developments and the applicability of solar arrays in particular power installations, ranging from houses to central power plants, was scheduled to be verified in a series of demonstration projects. The budget recommended for the first 5 year phase of the program is $268.5M.

Lutwack, R.↗

NANA Strategic Energy Plan & Energy Options Analysis

NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authority’s state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: • Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine. • Biomass Feasibility analysis in the upper Kobuk; • Run of the river hydroelectric development for the Upper Kobuk; • Solar photovoltaic (PV) power demonstration projects for Noatak, Ambler, Selawik, Kiana, and Noorvik; • Heat Recovery for several communities; In September 2008, the NRC team participated at the Alaska Rural Energy Conference in Girdwood, Alaska In November 2008, the NRC team gave a presentation on the NANA regional energy plans at a DOE Tribal Energy Program conference in Denver, Colorado. In January 2009, the final SEP report was submitted to NRC.

13 HYDRO ENERGY↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

5.1.6 Demo #6: NanoStitch (NAWAStitch) Multifunctional Composites Trade Validation

The overall objective of the NanoStitch Multifunctional Composites Trade Validation Demonstration project was to determine the value proposition of adding NanoStitch to rapid-cure composite systems for structures used in the expanding sector of advanced air mobility (AAM) and specifically electric vertical take-off and landing (eVTOL) aircraft. The expected value proposition was stronger composite parts, with new multifunctional attributes, that are lower cost to fabricate and maintain. NanoStitch is a new composite innovation where a contiguous vertically aligned carbon nanotube (VACNT) forest is located between each ply of a laminate composite resulting in improved mechanical properties as well as other multifunctional properties such as enhanced thermal and electrical conductivity. NanoStitch was originally distributed by N12, later acquired by NAWA Technologies, now called NAWAStitch, and henceforth referred to in this document as NAWAStitch. Two significant evaluations were framed to help meet the overall objective. First, was Task 1 to evaluate the effects that adding NAWAStitch to a rapid cure material system would have on the mechanical and processing properties of the material. Second, was Task 2 to evaluate the workability of adding NAWAStitch to practical flight demonstration articles. From previous research, it was already known that the application of NAWAStitch to a composite structure can enhance the mechanical properties of that structure. However, this project will help the engineering community understand those benefits and the basic structural strength values to apply when incorporating NAWAStitch material into composite structure that utilizes a rapid-cure resin system, which is novel. Testing showed that by adding NAWAStitch to the prepreg, most material properties were improved because the VACNTs strengthened the resin to fiber interface, and the interface itself, between plies. For example compression strength improved by more than 20%, and erosion resistance by more than 50%. The UDRI team identified two flight demonstration articles through discussions with Aurora Flight Sciences (Aurora) and reviewing literature on air mobility and the eVTOL market. The demonstration articles were a thin skin honeycomb panel and a section from an eVTOL propeller blade. The manufacturing and testing trials of the demonstration articles were as follows: • NAWAStitch added no manufacturing complexity or detriment to the article physical qualities, while at the same time added multifunctional properties such as enhanced rain erosion and electrothermal de-icing besides enhanced mechanical properties • VACNTs did not increase or hurt the mechanical properties of the interface between honeycomb core materials and the thin skin face sheet • Demonstrated successful de-icing function in an eVTOL propeller meeting real-world specifications in uniformity and endurance • Multifunctional eVTOL propeller cost analysis showed a cost savings of at least 67 % for a single propeller blade with multifunctional de-icing capability and improved mechanical properties which equates to a potential savings of $10,116 per eVTOL aircraft with six three-bladed propellers Overall, the results of this project can provide additional tools for the composite industry to optimize energy efficiency through faster and stronger composite parts that are lower cost to fabricate and maintain. Additionally, the results of this effort can help US industry like NAWA America set the stage for rapid growth and establishment of a manufacturing facility in Ohio. The project has given NAWA America the basic understanding of how the addition of VACNTs to a composite structure can affect the mechanical properties and hence point them to potential commercial applications. The project has also provided Teijin Carbon US with another potential material application for their rapid cure materials that are manufactured at the Renegade facility in Miamisburg, OH.

36 MATERIALS SCIENCE↗

Wetland Water Cooling Partnership: The Use of Constructed Wetlands to Enhance Thermoelectric Power Plant Cooling and Mitigate the Demand of Surface Water Use

Through the Phase I study segment of contract #DE-NT0006644 with the U.S. Department of Energy’s National Energy Technology Laboratory, Applied Ecological Services, Inc. and Sterling Energy Services, LLC (the AES/SES Team) explored the use of constructed wetlands to help address stresses on surface water and groundwater resources from thermoelectric power plant cooling and makeup water requirements. The project objectives were crafted to explore and develop implementable water conservation and cooling strategies using constructed wetlands (not existing, naturally occurring wetlands), with the goal of determining if this strategy has the potential to reduce surface water and groundwater withdrawals of thermoelectric power plants throughout the country. Our team’s exploratory work has documented what appears to be a significant and practical potential for augmenting power plant cooling water resources for makeup supply at many, but not all, thermoelectric power plant sites. The intent is to help alleviate stress on existing surface water and groundwater resources through harvesting, storing, polishing and beneficially re-using critical water resources. Through literature review, development of conceptual created wetland plans, and STELLA-based modeling, the AES/SES team has developed heat and water balances for conventional thermoelectric power plants to evaluate wetland size requirements, water use, and comparative cooling technology costs. The ecological literature on organism tolerances to heated waters was used to understand the range of ecological outcomes achievable in created wetlands. This study suggests that wetlands and water harvesting can provide a practical and cost-effective strategy to augment cooling waters for thermoelectric power plants in many geographic settings of the United States, particularly east of the 100th meridian, and in coastal and riverine locations. The study concluded that constructed wetlands can have significant positive ancillary socio-economic, ecosystem, and water treatment/polishing benefits when used to complement water resources at thermoelectric power plants. Through the Phase II pilot study segment of the contract, the project team partnered with Progress Energy Florida (now Duke Energy Florida) to quantify the wetland water cooling benefits at their Hines Energy Complex in Bartow, Florida. The project was designed to test the wetland’s ability to cool and cleanse power plant cooling pond water while providing wildlife habitat and water harvesting benefits. Data collected during the monitoring period was used to calibrate a STELLA model developed for the site. It was also used to inform management recommendations for the demonstration site, and to provide guidance on the use of cooling wetlands for other power plants around the country. As a part of the pilot study, Duke Energy is scaling up the demonstration project to a larger, commercial scale wetland instrumented with monitoring equipment. Construction is expected to be finalized in early 2014.

20 FOSSIL-FUELED POWER PLANTS↗

Retrofit of a Multifamily Mass Masonry Building in New England

Merrimack Valley Habitat for Humanity (MVHfH) has partnered with Building Science Corporation to provide high performance affordable housing for 10 families in the retrofit of an existing brick building (a former convent) into condominiums. The research performed for this project provides information regarding advanced retrofit packages for multi-family masonry buildings in Cold climates. In particular, this project demonstrates safe, durable, and cost-effective solutions that will potentially benefit millions of multi-family brick buildings throughout the East Coast and Midwest (Cold climates). The retrofit packages provide insight on the opportunities for and constraints on retrofitting multifamily buildings with ambitious energy performance goals but a limited budget. The condominium conversion project will contribute to several areas of research on enclosures, space conditioning, and water heating. Enclosure items include insulation of mass masonry building on the interior, airtightness of these types of retrofits, multi-unit building compartmentalization, window selection, and roof insulation strategies. Mechanical system items include combined hydronic and space heating systems with hydronic distribution in small (low load) units, and ventilation system retrofits for multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

HPC4Energy Final Report : GE Energy

Power System planning tools are being used today to simulate systems that are far larger and more complex than just a few years ago. Advances in renewable technologies and more pervasive control technology are driving planning engineers to analyze an increasing number of scenarios and system models with much more detailed network representations. Although the speed of individual CPU’s has increased roughly according to Moore’s Law, the requirements for advanced models, increased system sizes, and larger sensitivities have outstripped CPU performance. This computational dilemma has reached a critical point and the industry needs to develop the technology to accurately model the power system of the future. The hpc4energy incubator program provided a unique opportunity to leverage the HPC resources available to LLNL and the power systems domain expertise of GE Energy to enhance the GE Concorda PSLF software. Well over 500 users worldwide, including all of the major California electric utilities, rely on Concorda PSLF software for their power flow and dynamics. This pilot project demonstrated that the GE Concorda PSLF software can perform contingency analysis in a massively parallel environment to significantly reduce the time to results. An analysis with 4,127 contingencies that would take 24 days on a single core was reduced to 24 minutes when run on 4,217 cores. A secondary goal of this project was to develop and test modeling techniques that will expand the computational capability of PSLF to efficiently deal with systems sizes greater than 150,000 buses. Toward this goal the matrix reordering implementation time was sped up 9.5 times by optimizing the code and introducing threading.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

H- Ion Sources for High Intensity Proton Drivers

Existing RF Surface Plasma Sources (SPS) for accelerators have specific efficiencies for H + and H - ion generation around 3 to 5 mA/cm 2 per kW, where about 50 kW of RF power is typically needed for 50 mA beam current production. The Saddle Antenna (SA) SPS described here was developed to improve H- ion production efficiency, reliability and availability for pulsed operation as used in the ORNL Spallation Neutron Source . At low RF power, the efficiency of positive ion generation in the plasma has been improved to 200 mA/cm 2 per kW of RF power at 13.56 MHz. Initial cesiation of the SPS was performed by heating cesium chromate cartridges by discharge as was done in the very first versions of the SPS. A small oven to decompose cesium compounds and alloys was developed and tested. After cesiation, the current of negative ions to the collector was increased from 1 mA to 10 mA with RF power 1.5 kW in the plasma (6 mm diameter emission aperture) and up to 30 mA with 4 kW RF power in the plasma and 250 Gauss longitudinal magnetic field. The ratio of electron current to negative ion current was improved from 30 to 2. Stable generation of H- beam without intensity degradation was demonstrated in the aluminum nitride (AlN) discharge chamber for 32 days at high discharge power in an RF SPS with an external antenna. Some modifications were made to improve the cooling and cesiation stability. The extracted collector current can be increased significantly by optimizing the longitudinal magnetic field in the discharge chamber. While this project demonstrated the advantages of the pulsed version of the SA RF SPS as an upgrade to the ORNL Spallation Neutron Source, it led to a possibility for upgrades to CW machines like the many cyclotrons used for commercial applications. Four appendices contain important details of the work carried out under this grant.

43 PARTICLE ACCELERATORS↗

Retrofit of a MultiFamily Mass Masonry Building in New England

Merrimack Valley Habitat for Humanity (MVHfH) has partnered with Building Science Corporation to provide high performance affordable housing for 10 families in the retrofit of an existing brick building (a former convent) into condominiums. The research performed for this project provides information regarding advanced retrofit packages for multi-family masonry buildings in Cold climates. In particular, this project demonstrates safe, durable, and cost-effective solutions that will potentially benefit millions of multi-family brick buildings throughout the East Coast and Midwest (Cold climates). The retrofit packages provide insight on the opportunities for and constraints on retrofitting multifamily buildings with ambitious energy performance goals but a limited budget. The condominium conversion project will contribute to several areas of research on enclosures, space conditioning, and water heating. Enclosure items include insulation of mass masonry building on the interior, airtightness of these types of retrofits, multi-unit building compartmentalization, window selection, and roof insulation strategies. Mechanical system items include combined hydronic and space heating systems with hydronic distribution in small (low load) units, and ventilation system retrofits for multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Stratus and Stratocumulus Cloud Microphysics and Drizzle Relationships With CCN Modality

High resolution extended-range cloud condensation nuclei (CCN) spectral comparisons with cloud microphysics and drizzle of the Physics of Stratocumulus Tops (POST) field experiment confirmed results in the Marine Stratus/Stratocumulus Experiment (MASE). Both of these stratus cloud projects demonstrated that bimodal CCN spectra typically caused by cloud processing were associated with clouds that exhibited higher concentrations of smaller droplets with narrower distributions and less drizzle than clouds associated with unimodal CCN spectra. Resulting brighter clouds and increased cloudiness could enhance both indirect aerosol effects (IAE). These stratus findings are opposite of analogous measurements in two cumulus cloud projects, which showed bimodal CCN associated with fewer larger droplets more broadly distributed and with more drizzle than clouds associated with unimodal CCN. Resulting reduced cumulus brightness and cloudiness could reduce both IAE. Physics of Stratocumulus Tops (POST) flights in air masses with higher CCN concentrations, N CCN , showed more extremes of the stratus characteristics. However, POST flights with lower N CCN showed opposite droplet characteristics similar to the cumulus clouds, yet still showed less drizzle in clouds associated with bimodal CCN, but not as much less as the flights with higher N CCN . Since all MASE clouds were in polluted air masses, while the two cumulus projects were in clean air masses we deduce from these four projects that both the dynamic stratus/cumulus differences (vertical wind) and N CCN are responsible for the microphysics and drizzle differences among these projects. This is because the clean POST characteristics are a hybrid between MASE/POST high N CCN and the two cumulus projects.

bimodality↗

EM-Enhanced HyPOR Loop for Fast Fusion Cycles

Vacuum pumps are the heart of a fusion energy facility – fusion power cannot be generated without them. Nevertheless, the vacuum technology needed to operate a viable fuel cycle for a compact fusion power plant does not exist. Commercial vacuum technology offers the best solution to this challenge, but a pump oil recycling and detritiation system is necessary. Conventional oil detritiation processes have only been developed to deal with legacy waste and are too slow and destructive to the oil. Further, post hoc detritiation strategies are intrinsically inefficient. Our approach is to rethink the challenge holistically by designing the pumping fluid and tritium extraction system in an integrated manner to achieve an innovative solution. By selecting an oil for the specific task of pumping tritium and then designing our catalytic system to selectively target the tritium-bearing functional groups, an effective detritiation system (hydrocarbon pump oil recycling, HyPOR, loop) for fusion power plants can be obtained. The project demonstrated a HyPOR loop process that can selectively remove heavier hydrogen isotopes from pump oil, reaching the target of 99.5 % removal, with an uptake of less than 0.01% of tritium throughput, while also purifying the oil of radiation-induced damage. The recycled oil retained its pumping characteristics over 7 recycles and gamma irradiation over 30 MGy. By meeting these targets, the project enable a reduction in pump operational costs from $\$$14.5M/year to $\$$103k/year (>140× reduction), reducing pump electric power consumption from 2.8 MW to 0.25 MW (>10× reduction), and reducing in-process tritium inventory from 2.03 kg to 0.48 kg (>4× reduction).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗