Search NASA⌕ Search

SEARCH · Search NASA

Results for “power generation dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Opportunities and Challenges for Nuclear-Renewable Hybrid Energy Systems

Tightly coupled nuclear-renewable hybrid energy systems (N-R HESs) are systems that link subsystems to generate dispatchable electricity and produce at least one industrial product from two or more energy resources. Because N-R HESs are designed to produce different products based on the value of those products in markets, their optimal designs and operations can be complex. This paper summarizes some key conclusions from a set of economic analyses of N-R HESs. Each N-R HES use case analyzed includes a nuclear reactor, a thermal power cycle to convert nuclear energy into electricity, either a wind or photovoltaic solar subsystem producing electricity, and an industrial process producing an energy or an industrial product. The analyses focused on identifying the optimal configuration and hours of operations for each N-R HES within ranges of hypothetical future electricity price profiles and industrial product prices. Four important insights are drawn from the results of those analyses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Methods for Representing Flexible, Energy-Constrained Technologies in Utility Planning Tools

Capacity expansion models are widely used by power system researchers, planners, and policy analysts to evaluate alternative power system investment scenarios. With the increasing deployment of wind and solar in the US, there has been much focus on improving the representations of variable generation (VG) technologies within capacity expansion models. Models that capture the variable net-load profiles and larger reserve requirements associated with high penetration VG systems represent an improvement to classic capacity expansion models, but fall short of capturing the complexities associated with storage technologies, such as battery energy storage (BES) and concentrating solar power with thermal energy storage (CSP with TES). While difficult to model in a capacity expansion setting, these technologies are potentially competitive sources of flexibility with the intriguing characteristics of being able to absorb VG that would otherwise be curtailed and directly contribute to renewable energy goals, respectively. In this paper we present methods for accurately representing these technologies in a large-scale capacity expansion model with high electrical and geospatial resolution. VG modeling techniques, including novel methods for capturing curtailment due to unit commitment and other hourly dispatch phenomena, are also reviewed. Modeling for a region in the southwestern United States demonstrates the economic relevance of being able to explicitly trade off the costs and capabilities of energy-constrained technologies, especially BES, against other resources in the near-term, in time to make plans for the coming decade

24 POWER TRANSMISSION AND DISTRIBUTION↗

Systems and methods for improved stability of power systems

The embodiments described herein provide for a system including a processor. The processor is configured to select at least one grid system contingency from a plurality of grid system contingencies. The processor is further configured to derive one or more eigen-sensitivity values based on the at least on grid system contingency. The processor is also configured to derive one or more control actions at least partially based on the eigen-sensitivity values. The processor is additionally configured to apply the one or more control actions for generation re-dispatch of a grid system.

Baone, Chaitanya Ashok↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LDES-Sizing-and-siting-model (Power grid test cases for long-duration energy storage (LDES) siting) [SWR-25-75]

This repository contains code and data for performing a siting analysis of long-duration energy storage (LDES) in the 5-bus and RTS systems using the Sienna suite developed by the National Renewable Energy Laboratory for production cost modeling (PCM). This analysis involves moving the LDES component to different buses in the system, running a simulation, and considering the production cost of the simulation. Different system configurations are also analyzed with these scripts (such as moving load or renewable dispatch generators to different buses) to observe the impacts the system configuration has on optimal siting. This repository contains three sub directories discussed below. Both the 5-bus and RTS systems have two different initial configurations for the renewable energy components in them, one that is predominantly PV-driven and one that is predominantly wind-driven. Sienna suite can be found here: https://github.com/NREL-Sienna

Cole, David [University of Wisconsin]↗

University of Arizona Compressed Air Energy Storage

Boiled down to its essentials, the grant’s purpose was to develop and demonstrate the viability of compressed air energy storage (CAES) for use in renewable energy development. While everyone agrees that energy storage is the key component to enable widespread adoption of renewable energy sources, the development of a viable scalable technology has been missing. The Department of Energy has focused on expanded battery research and improved forecasting, and the utilities have deployed renewable energy resources only to the extent of satisfying Renewable Portfolio Standards. The lack of dispatchability of solar and wind-based electricity generation has drastically increased the cost of operation with these components. It is now clear that energy storage coupled with accurate solar and wind forecasting make up the only combination that can succeed in dispatchable renewable energy resources. Conventional batteries scale linearly in size, so the price becomes a barrier for large systems. Flow batteries scale sub-linearly and promise to be useful if their performance can be shown to provide sufficient support for solar and wind-base electricity generation resources. Compressed air energy storage provides the most desirable answer in terms of scalability and performance in all areas except efficiency. With the support of the DOE, Tucson Electric Power and Science Foundation Arizona, the Arizona Research Institute for Solar Energy (AzRISE) at the University of Arizona has had the opportunity to investigate CAES as a potential energy storage resource.

25 ENERGY STORAGE↗

Comparison of AEO 2008 Natural Gas Price Forecast to NYMEX Futures Prices

On December 12, 2007, the reference-case projections from Annual Energy Outlook 2008 (AEO 2008) were posted on the Energy Information Administration's (EIA) web site. We at LBNL have, in the past, compared the EIA's reference-case long-term natural gas price forecasts from the AEO series to contemporaneous natural gas prices that can be locked in through the forward market, with the goal of better understanding fuel price risk and the role that renewables can play in mitigating such risk. As such, we were curious to see how the latest AEO reference-case gas price forecast compares to the NYMEX natural gas futures strip. This brief memo presents our findings. Note that this memo pertains only to natural gas fuel price risk (i.e., the risk that natural gas prices might differ over the life of a gas-fired generation asset from what was expected when the decision to build the gas-fired unit was made). We do not take into consideration any of the other distinct attributes of gas-fired and renewable generation, such as dispatchability (or lack thereof) or environmental externalities. A comprehensive comparison of different resource types--which is well beyond the scope of this memo--would need to account for differences in all such attributes, including fuel price risk. Furthermore, our analysis focuses solely on natural-gas-fired generation (as opposed to coal-fired generation, for example), for several reasons: (1) price volatility has been more of a concern for natural gas than for other fuels used to generate power; (2) for environmental and other reasons, natural gas has, in recent years, been the fuel of choice among power plant developers (though its appeal has diminished somewhat as prices have increased); and (3) natural gas-fired generators often set the market clearing price in competitive wholesale power markets throughout the United States. That said, a more-complete analysis of how renewables mitigate fuel price risk would also need to consider coal and other fuel prices. Finally, we caution readers about drawing inferences or conclusions based solely on this memo in isolation: to place the information contained herein within its proper context, we strongly encourage readers interested in this issue to read through our previous, more-detailed studies, available at http://eetd.lbl.gov/ea/EMS/reports/53587.pdf or http://eetd.lbl.gov/ea/ems/reports/54751.pdf.

03 NATURAL GAS↗

Apples and oranges: don't compare levelized cost of renewables: Joskow

MIT Prof. Paul Joskow points out that the levelized metric is inappropriate for comparing intermittent generating technologies like wind and solar with dispatchable generating technologies like nuclear, gas combined cycle, and coal. The levelized comparison fails to take into account differences in the production profiles of intermittent and dispatchable generating technologies and the associated large variations in the market value of the electricity they supply. When the electricity is produced by an intermittent generating technology, the level of output and the value of the electricity at the times when the output is produced are key variables that should be taken into account.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Energy Service Interface for Distributed Energy Resources

Renewable energy resources, particularly wind and solar photovoltaic, are becoming significant contributors to electric power generation. These re-sources will contribute towards achieving sustainable electric power systems. However, renewable resources will dramatically increase the demand for flexible power system operations. This paper proposes an energy service interface that will allow aggregated distributed energy resources, such as residential loads and inverter-based systems, to participate in NERC-defined smart energy reliability services. Such cyber-physical systems will increase system flexibility by ensuring match between energy supply and energy demand.Aggregation and coordinated dispatch of millions of distributed energy resources will require development of large-scale computing networks. Several smart grid interface-enabling technologies, including IEEE 2030.5, Common Smart Inverter Profile, SunSpec Modbus, and CTA 2045, are discussed. Residential loads are categorized by their static and dynamic energy characteristics to identify services in which they can participate. The business model for the energy services interface as well as probabilistic modeling for resource estimation are highlighted as future considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Complementary relationship between small-hydropower and increasing penetration of solar photovoltaics: Evidence from CAISO

To achieve the 100% green electricity goal, we need to understand the relationship between resources in the market and identify the flexible clean resources (i.e., hydropower) to integrate power from wind and photovoltaic (PV). This paper reveals a complementary relationship between small hydropower plants and solar PVs in the California Independent System Operator (CAISO) based on the system-wide hourly generation data from 2013 to 2017. When the solar PV increases its portion in the generation mix by 1%, small hydro will increase its portion by 0.01–0.06%. Such response is obvious in the net demand peak hours, both morning and evening. The low operation cost, flexibility, and dispatchability of small hydro in CAISO explain this complementarity. Due to its benefit in emission and low Levelized Cost of Electricity (LCOE), it is suggested to consider more small hydro projects to accommodate additional PV capacity for the 100% green electricity goal. Our estimation indicates that the current feasible potential of small hydro is sufficient, if the relation stays the same over years. If developers can mitigate the environmental impact, more technical potential will become feasible. Thus, small hydro could integrate more solar PV and reduce the demand for natural gas plants and batteries.

13 HYDRO ENERGY↗

Electric Vehicles Charging Time Constrained Deliverable Provision of Secondary Frequency Regulation

Aggregation of electric vehicles (EVs) is a promising technique for providing secondary frequency regulation (SFR) in highly renewable energy-penetrated power systems. Equipped with energy storage devices, EV aggregation can provide reliable SFR. However, the main challenge is to guarantee reliable intra-interval SFR capacities and inter-interval delivery following the automatic generation control (AGC) signal. Furthermore, aggregated EV SFR provision will be further complicated by the EV charging time anxiety because SFR provision might extend EV's charging time. This paper proposes a deliverable EV SFR provision with a charging-time-constrained control strategy. First, a charging-time-constrained EV aggregation is proposed to address the uncertainty of EV capacity based on the state-space model considering the charging-time restriction of EV owners. Second, a real-time economic dispatch and time domain simulation (RTED-TDS) cosimulation framework is proposed to verify financial results and the dynamic performance of the EV SFR provision. Last, the proposed charging time-constrained EV aggregation is validated on the IEEE 39-bus system. In conclusion, the results demonstrate that with charging time-constrained EV aggregation, the dynamic performance of the system can be improved with a marginal increase in total cost. More importantly, the charging time constraint can be respected in the proposed SFR provision of the EV aggregation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY↗

Optimization of Energy Storage System Economics and Controls by Incorporating Battery Degradation Costs in REopt

The use of stationary electrochemical energy storage systems utilizing lithium-ion batteries has increased rapidly as the production scale and price for lithium-ion batteries has decreased. These energy storage systems are crucial for maintaining grid resiliency, especially for grids operating with high penetration of renewable energy generation assets or for with a variety of distributed energy generation and storage systems. One challenging factor for the development of battery energy storage systems is estimating the proper sizing, in terms of both power and energy, that minimizes total costs over the lifetime of the systems; this calculation is difficult in simple cases, where a battery is costed independently, but is extremely challenging when building loads and electrical generation by photovoltaic resources are also considered. REopt is a techoeconomic optimization tool developed by NREL to address these challenges. Previously, battery degradation has been priced by simply assuming a 10-year replacement schedule for battery systems. However, this does not account for varying degradation trends observed across real-world batteries, or allow for batteries to be operated in a degradation-aware manner that optimizes battery dispatch based on operating costs. This work incorporates a battery life model into REopt. This battery life model is simple, so that it may be solvable within the constrains of a mixed-integer linear optimization problem, but is fit to accelerated aging data recorded in the lab. To achieve the best possible accuracy for lifetime estimates given these constraints, parameters for the battery life model in REopt are estimated by fitting 20-year simulations of battery life after identifying state-space battery degradation model from accelerated aging data. Comparisons of battery life predicted in REopt and from the state-space battery degradation model to ensure validity of lifetime estimates made by REopt. Battery life and cost is optimized by controlling three decision to minimize system life cost: battery sizing, daily state-of-charge, and daily energy-throughput. The cost of battery degradation as a function of these control variables is then estimated assuming two possible maintenance strategies: replacement, where the entire battery system is replaced if cell reach an end-of-life capacity threshold; and augmentation, which establishes a fund to pay for continual purchase of new batteries to maintain the initial energy capacity of the system. These two strategies offer conservative (for replacement) and optimistic (for augmentation) bounds for total system cost. The degradation cost incurred by these strategies is then used to control battery dispatch decisions, operating the battery in a degradation-aware manner that maximizes battery lifetime while also providing energy when favorable. Because the mixed-integer linear program has perfect foresight of future energy needs, batteries with degradation costs are always operated using 'just-in-time' charging, which is unrealistic, as no energy is left in the storage system to perform other energy services or to serve as emergency back-up power. To combat this, an inequality constraint on the average annual state-of-charge is imposed, and the sensitivity of system cost to average stored energy, e.g., the cost of system resiliency, can be quantified. Analysis of results has several conclusions, for instance, oversizing of battery storage systems is not a cost burden when battery storage is an optimal solution, as any additional battery capacity can simply be utilized to avoid costs of purchasing energy from a utility.

battery↗

Photovoltaic and Behind-the-Meter Battery Storage: Advanced Smart Inverter Controls and Field Demonstration

Electric utilities have little visibility of the electrical distribution system, and consequently, limited diagnostic capabilities. The distribution grid was designed for a unidirectional power flow, where energy is supplied by few large centralized power plants; however, this is set to change to meet California’s aggressive decarbonization goals. The large-scale deployment of distributed renewable generation, such as photovoltaics (PV), can have many negative effects on an unprepared grid. As illustrated in the California “duck curve,” PV generation modifies load profiles during the day, which causes steep ramping in the evening. This effect indicates the need to revise the electrical grid’s design and operation. This project sought to (a) create a centralized resource in California to test and validate distribution technology controls with industry standard PV, storage, and high-fidelity sensors, (b) support strategic and operational decisions for new grid architectures by providing simulation models, (c) promote new ways to control clusters of PV smart inverters, in accordance with California Rule 21, and (d) innovate, develop, and field test a predictive controller to maximize economic profit for the customer while supporting the grid. The controller was built using the state-of-the-art model predictive control methodology to optimally control behind-the-meter PV and battery storage. In consideration of the duck curve, the controller optimally controls the battery dispatch by charging during excess generation periods and discharging during the critical afternoon demand hours. The controller was evaluated in annual simulations and revealed the potential cost-effectiveness of behind-the-meter battery storage. The simulations showed that the annual electricity bill could be reduced by as much as 35 percent, with a payback period of the investment in battery storage in about 6 years – significantly shorter than the manufacturer’s 10-year warranty. All developed simulation models, the grid event library, and the MPC controller are open-source and available online.

Model Predictive control↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗