Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Supporting cost-effective watershed management strategies for Chesapeake Bay using a modeling and optimization framework

Extensive efforts to adaptively manage nutrient pollution rely on Chesapeake Bay Program’s (Phase 6) Watershed Model, called Chesapeake Assessment Scenario Tool (CAST), which helps decision-makers plan and track implementation of Best Management Practices (BMPs). We describe mathematical characteristics of CAST and develop a constrained nonlinear BMP-subset model, software, and visualization framework. This represents the first publicly available optimization framework for exploring least-cost strategies of pollutant load control for the United States’ largest estuary. The optimization identifies implementation options for a BMP subset modeled with load reduction effectiveness factors, and the web interface facilitates interactive exploration of >30,000 solutions organized by objective, nutrient control level, and for ~200 counties. We assess framework performance and demonstrate modeled cost improvements when comparing optimization-suggested proposals with proposals inspired by jurisdiction plans. Stakeholder feedback highlights the framework’s current utility for investigating cost-effective tradeoffs and its usefulness as a foundation for future analysis of restoration strategies.

54 ENVIRONMENTAL SCIENCES↗

Validation Testing for Molten Chloride Reactor Experiment Equipment Removal and Disposal Techniques

The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Use of Nuclear Divers in Decommissioning of Spent Fuel Pools/Ponds in the United Kingdom - 17431

Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Temperature Split-Flow Recompression Brayton Cycle Initial Test Results

Supercritical CO 2 (S-CO 2 ) power plants offer the potential for better economics because of their small size, use of standard materials, and improved electrical power conversion efficiency at modest temperature (400–750°C). Sandia National Laboratories (SNL or Sandia) and the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) are operating a supercritical CO 2 Brayton cycle power system—the Generation IV (Gen IV) split-flow S-CO 2 compressor test loop—currently located in Arvada Colorado, at Barber Nichols, Inc., under contract to Sandia. A photograph of the upgraded loop is shown in Figure E-1. This system is one of the first S-CO 2 power-producing Brayton cycles operating in the world. This report provides a summary of the newly installed hardware and briefly describes some of the test results that were performed in the upgraded split-flow Brayton loop during June and July of 2011. The Gen IV S-CO 2 split-flow Brayton loop was reconfigured to operate as a simple heated recuperated Brayton loop for the testing in this report period. The test loop had just concluded a phase of construction that substantially increased the capability of the loop by adding heaters, a high-temperature (HT) recuperator, more waste heat removal capability, high-power load banks, larger diameter piping with more bends to reduce thermal stress, and more capable scavenging pumps to reduce windage and friction within the turbomachinery and provide greater cooling capabilities. With these additions, the loop greatly increased its capacity for electrical power generation (30–80 kWe per generator, depending on the loop configuration) and its ability to reach high temperatures (up to 810 K [1000°F]). In recent weeks of testing, the test facility began to realize this potential by achieving new records in turbine inlet temperature (615 K [650°F]), shaft speed (52,000 rpm), pressure ratio (1.65), flow rate (2.7 kg/s), and electrical power generated (20 kWe). These operating conditions still remain short of design conditions for each turbine—an inlet temperature of 810 K (1000°F), a pressure ratio of 1.8, a shaft speed of 75,000 rpm, a flow rate of 3.5 kg/s, and a maximum generator power of 125 kWe—but they are beginning to be approached. Not all planned upgrades were implemented due to the limited funding profile of FY2010. Only 520 kW of heater power were installed—not the total 780 kW. Furthermore, because one of the heater controllers was not functioning, only 390 kW of heater power were available. Similarly, the 3-in. piping was installed only in the high-pressure leg of the loop, not in the low-pressure leg, as was originally planned. We also had to rely on the new load bank capability for rapid shutdown situations, and were not able to install a dedicated shutdown resistor. Nevertheless, in spite of these limitations, we operated the loop at record operating conditions and were largely limited only by the facility and support equipment—not the turbomachinery.

Wright, Steven Alan↗

IrrigationViz: A Geospatial Visualization Application to Facilitate Irrigation Modernization

Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements

99 - GENERAL AND MISCELLANEOUS↗

SU-E-T-240: Design and Implement of An Electronic Records Function for Treatment Plan Checked Meeting

Purpose: To replace the paper records, we designed an electronic records function for plan checked meeting in our in-house developed radiotherapy information management system(RTIMS). Methods: Since 2007, the RTIMS has been developed on a database and web service of Apache+PHP+MySQL, and almost all computers and smartphones could access the RTIMS through IE browser, to input, search, count, and print the data. In 2012, we also established an radiation therapy case conference multi-media system(RTCCMMS) based on Windows Remote Desktop feature. Since 2013, we have carried out the treatment plan checked meeting of the physics division in every afternoon for about half an hour. In 2014, we designed an electronic records function, which includes a meeting information record and a checked plan record. And the meeting record includes the following items: meeting date, name, place, length, status, attendee, content, etc. The plan record includes the followings: meeting date, meeting name, patient ID, gender, age, patient name, course, plan, purpose, position, technique, CTsim type, plan type, primary doctor, other doctor, primary physicist, other physicist, difficulty, quality, score, opinion, status, note, etc. Results: In the past year, the electronic meeting records function has been successfully developed and implemented in the division, and it could be accessed from an smartphone. Almost all items have the corresponding pull-down menu selection, and each option would try to intelligently inherit default value from the former record or other form. According to the items, we could do big data mining to the input data. It also has both Chinese and English two versions. Conclusion: It was demonstrated to be user-friendly and was proven to significantly improve the clinical efficiency and quality of treatment plan. Since the RTIMS is an in-house developed system, more functions can be added or modified to further enhance its potentials in research and clinical practice. Project supported by the National Natural Science Foundation of China (Grant No.81101694)

60 APPLIED LIFE SCIENCES↗

Better Buildings NW Ohio

When the Toledo Lucas County Port Authority (TLCPA) filed for the Department of Energy EECBG grant in late 2009, it was part of a strategic and Board backed objective to expand the organization’s economic development and financing programs into alternative energy and energy efficiency. This plan was filed with the knowledge and support of the areas key economic development agencies. The City of Toledo was also a key partner with the Mayor designating a committee to develop a Strategic Energy Policy for the City. This would later give rise to a Community Sustainability Strategic Plan for Toledo, Lucas County and the surrounding region with energy efficiency as a key pillar. When the TLCPA signed the grant documents with the DOE in June of 2010, the geographic area was severely distressed economically, in the early stages of a recovery from over a 30% drop in business activity and high unemployment. The TLCPA and its partners began identifying potential project areas well before the filing of the application, continuing to work diligently before the formal award and signing of the grant documents. Strong implementation and actions plans and business and financing models were developed and revised throughout the 3 year grant period with the long term goal of creating a sustainable program. The TLCPA and the City of Toledo demonstrated early leadership by forming the energy improvement district and evaluating buildings under their control including transportation infrastructure and logistics, government services buildings and buildings which housed several for profit and not for profit tenants while completing significant energy efficiency projects that created public awareness and confidence and solid examples of various technologies and energy savings. As was stated in the DOE Award Summary, the undertaking was focused as a commercial program delving into Alternative Energy Utility Districts; what are referred to in Ohio Statute as Energy Special Improvement Districts or ESIDs and what is nationally known as Property Assessed Clean Energy or PACE districts and PACE financing. The project methodology followed the identify, develop, implement, monitor and measure format. These districts began in Toledo and adjoining areas and are expanding to TLCPA’s 28 county financing agency geographic footprint. What began as the Toledo Ohio Advanced Energy Improvement Corporation is now doing business as the Northwest Ohio Advanced Energy Improvement District recognizing it expansion into creating and financing other districts in NW Ohio. The program has been sought out as an advisor by major communities and states in the process of developing similar legislation and programs and has become one of the largest most successful PACE energy improvement and financing districts in the US. The program and the energy district focused on transforming energy use, delivery, conservation and renewable energy as “options of first choice”. The significant energy savings paid for many of the improvements and created a financially viable program well beyond the grant period. The program has become a model within the State of Ohio and Nationally on how to implement and finance projects in broad energy districts including how to evolve and integrate several financing methodologies. It is a unique utilization of revolving loan funds and energy bond pooling with revenue backing primarily from energy improvement special assessments on commercial properties along with some power purchase agreement (PPA) and loan agreement revenue. The program has also incorporated Qualified Energy Conservation Bonds, State of Ohio Energy Loans (SEP), utility rebates, solar and renewable energy certificates, renewable tax incentives and grants, and owner funded equity as additional program leverage and funding. Other keys to this success have been a continual simplification and refinement of the application and documentation process to make funding available easily and quickly to building owners when they are prepared to commit to the project as well as act as a trusted facilitator and advisor to both building owners and other stakeholders. Taking a flexible and pragmatic approach to project evaluation and implementation that matches time and expense to the complexity of the project has been another key learning. To date the program has closed 3 energy bond issues through the TLCPA sponsored and managed NW Ohio Bond Fund totaling $16.54 million (of which $3.34 million were QECB qualified). The program has turned over its $3.0 million revolving loan fund twice as construction financing in advance of bond issuance and currently has issued $1.25 million in revolving term loans. The program has $1.66 million of remaining capacity for QECB qualified bonds. The program can issue an additional $13.46 million in energy bonds continuing to utilize its DOE EECBG loan loss reserves. In addition, the program has available $3.6 million of loan loss reserves from the State of Ohio, as an eligible Port Authority, that can back the issuance of an additional $7.2 to $14.4 million of energy bonds. This does not include additional bond capacity is available from the NW Ohio Bond Fund. The program is the master escrow agent for $18 million of loan loss reserves from the State of Ohio for eligible Port Authorities that can be utilized to assist the formation of energy districts and financing programs in major metropolitan areas and regions around the State of Ohio. Other leveraged funds now total $10 million; placing the total project value completed and financed at over $30 million. In addition that program has generated an active pipeline of projects in various stages that total $25 – $30 million.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Panel Session 89: Progress on Deep Repository Around the World

This panel focused on the progress of deep repository programs, worldwide. While efforts on a deep geological repository for SNF/UNF and HLW in the USA were terminated in 2010, several other repository programs continue to make considerable progress 10 and deserve to be recognized. Panelists from national, multi-national, and international repository programs and organizations reported on the status and future plans as well as the perceived reasons underlying the success and the failure of components of their respective repository program. This session provided a forum for interested parties to present, exchange, and take advantage of, as appropriate, repository progress, challenges, concepts/designs and other lessons learned around the world, including site characterization, site selection, research and development, licensing, construction, operation, and public acceptance and participation. Panelists with presentations: Switzerland's Geological Repository Program for Radioactive Waste (Tim Vietor); Update on NWMO's Progress in Implementing Canada's Plan (Sarah Hirschorn); Cigeo Project Progress and Next Milestones (Corinne Bauer)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increasing Community Access to Solar: Designing and Developing a Shared Solar Photovoltaic System (Fact Sheet)

This document introduces the Energy Department's new Guide to Community Shared Solar: Utility, Private, and Nonprofit Project Development. The guide is designed to help those who want to develop community shared solar projects - from community organizers and advocates to utility managers and government officials - navigate the process of developing shared systems, from early planning toimplementation.

14 SOLAR ENERGY↗

Implementation of a volumetric modulated arc therapy treatment planning solution for kidney and adrenal stereotactic body radiation therapy

To develop a volumetric modulated arc therapy (VMAT) treatment planning solution in the treatment of primary renal cell carcinoma and oligometastatic adrenal lesions with stereotactic body radiation therapy. Single-arc VMAT plans (n = 5) were compared with clinically delivered step-and-shoot intensity-modulated radiotherapy (IMRT) with planning target volume coverage normalized between techniques. Target volume conformity, organ-at-risk (OAR) dose, treatment time, and monitor units were compared. A VMAT planning solution, created from a combination of arc settings and optimization constraints, auto-generated treatment plans in a single optimization. The treatment planning solution was evaluated on 15 consecutive patients receiving kidney and adrenal stereotactic body radiation therapy. Treatment time was reduced from 13.0 ± 2.6 to 4.0 ± 0.9 minutes for IMRT and VMAT, respectively. The VMAT planning solution generated treatment plans with increased target homogeneity, improved 95% conformity index, and a reduced maximum point dose to nearby OARs but with increased intermediate dose to distant OARs. The conformity of the 95% isodose improved from 1.32 ± 0.39 to 1.12 ± 0.05 for IMRT and VMAT treatment plans, respectively. Evaluation of the planning solution showed clinically acceptable dose distributions for 13 of 15 cases with tight conformity of the prescription isodose to the planning target volume of 1.07 ± 0.04, delivering minimal dose to OARs. The introduction of a stereotactic body radiation therapy VMAT treatment planning solution improves the efficiency of planning and delivery time, producing treatment plans of comparable or superior quality to IMRT in the case of primary renal cell carcinoma and oligometastatic adrenal lesions.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-F-T-156: Monte Carlo Simulation Using TOPAS for Synchrotron Based Proton Discrete Spot Scanning System

Purpose: This study provides an overview of the design and commissioning of the Monte Carlo (MC) model of the spot-scanning proton therapy nozzle and its implementation for the patient plan simulation. Methods: The Hitachi PROBEAT V scanning nozzle was simulated based on vendor specifications using the TOPAS extension of Geant4 code. FLUKA MC simulation was also utilized to provide supporting data for the main simulation. Validation of the MC model was performed using vendor provided data and measurements collected during acceptance/commissioning of the proton therapy machine. Actual patient plans using CT based treatment geometry were simulated and compared to the dose distributions produced by the treatment planning system (Varian Eclipse 13.6), and patient quality assurance measurements. In-house MATLAB scripts are used for converting DICOM data into TOPAS input files. Results: Comparison analysis of integrated depth doses (IDDs), therapeutic ranges (R90), and spot shape/sizes at different distances from the isocenter, indicate good agreement between MC and measurements. R90 agreement is within 0.15 mm across all energy tunes. IDDs and spot shapes/sizes differences are within statistical error of simulation (less than 1.5%). The MC simulated data, validated with physical measurements, were used for the commissioning of the treatment planning system. Patient geometry simulations were conducted based on the Eclipse produced DICOM plans. Conclusion: The treatment nozzle and standard option beam model were implemented in the TOPAS framework to simulate a highly conformal discrete spot-scanning proton beam system.

60 APPLIED LIFE SCIENCES↗

Quality Assurance With Plan Veto: Reincarnation of a Record and Verify System and Its Potential Value

Purpose: To quantify the potential impact of the Integrating the Healthcare Enterprise–Radiation Oncology Quality Assurance with Plan Veto (QAPV) on patient safety of external beam radiation therapy (RT) operations. Methods and Materials: An institutional database of events (errors and near-misses) was used to evaluate the ability of QAPV to prevent clinically observed events. We analyzed reported events that were related to Digital Imaging and Communications in Medicine RT plan parameter inconsistencies between the intended treatment (on the treatment planning system) and the delivered treatment (on the treatment machine). Critical Digital Imaging and Communications in Medicine RT plan parameters were identified. Each event was scored for importance using the Failure Mode and Effects Analysis methodology. Potential error occurrence (frequency) was derived according to the collected event data, along with the potential event severity, and the probability of detection with and without the theoretical implementation of the QAPV plan comparison check. Failure Mode and Effects Analysis Risk Priority Numbers (RPNs) with and without QAPV were compared to quantify the potential benefit of clinical implementation of QAPV. Results: The implementation of QAPV could reduce the RPN values for 15 of 22 (71%) of evaluated parameters, with an overall average reduction in RPN of 68 (range, 0-216). For the 6 high-risk parameters (>200), the average reduction in RPN value was 163 (range, 108-216). The RPN value reduction for the intermediate-risk (200 > RPN > 100) parameters was (0-140). With QAPV, the largest RPN value for “Beam Meterset” was reduced from 324 to 108. The maximum reduction in RPN value was for Beam Meterset (216, 66.7%), whereas the maximum percentage reduction was for Cumulative Meterset Weight (80, 88.9%). Conclusion: This analysis quantifies the value of the Integrating the Healthcare Enterprise–Radiation Oncology QAPV implementation in clinical workflow. We demonstrate that although QAPV does not provide a comprehensive solution for error prevention in RT, it can have a significant impact on a subset of the most severe clinically observed events.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-E-T-25: A Dosimetric Comparison of Three-Dimension Conformal and Intensity-Modulated Radiation Therapy in Esophageal Cancer

Purpose: dosimetric comparison of 3DCRT and IMRT in 9 esophageal cancer. The aim of this paper is to know which of these two techniques is dosimetrically more favorable dosimetrically at both the CTV coverage and dose obtained in the relevant organs at risk, in this case, lungs and heart, as the spinal cord received in all cases below 45 Gy. Methods: we chose 9 patients from our center (CHN) with the same type of esophageal cancer and in which the prescribed dose was the same, 54 Gy. For these treatments we have used the same fields and the same angles (AP (0 °), OPD (225°–240°) and OPI (125°–135°)).All plans have been implemented using Eclipse (version 11.0) with AAA( Analytical Anisotropic Algorithm )(Version 11.0.31). Results: To analyze the coverage of the CTV, we have evaluated the D99% and found that the average dose received by 99% of CTV with IMRT is 53.8 ± 0.4 Gy (99.6% of the prescribed dose) and the mean value obtained with 3DCRT is 52.3 ± 0.6 Gy (96.8% of the prescribed dose).The last data analyzed was the D2% of PTV, a fact that gives us information on the maximum dose received by our PTV. D2% of the PTV for IMRT planning is 55.4 ± 0.4 Gy (102.6% of the prescribed dose) and with 3DCRT is 56.8 ± 0.7 Gy (105.2% of the prescribed dose).All parameters analyzed at risk organs (V30, V40, V45 and V50 for the case of heart and V5, V10, V15 and V20 for the case of the lungs) provide us irradiated volume percentages lower in IMRT than 3DCRT. Conclusion: IMRT provides a considerable improvement in the coverage of the CTV and the doses to organs at risk.

60 APPLIED LIFE SCIENCES↗

Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities for Polarized He-3 in RHIC and EIC [Slides]

The workshop on opportunities for polarized He-3 in RHIC and EIC was targeted at finding practical ways of implementing and using polarized He-3 beams. Polarized He-3 beams will provide the unique opportunity for first measurements, i.e, to a full quark flavor separation measuring single spin asymmetries for p + , p - and p 0 in hadron-hadron collisions. In electron ion collisions the combination of data recorded with polarized electron proton/He-3 beams allows to determine the quark flavor separated helicity and transverse momentum distributions. The workshop had sessions on polarized He-3 sources, the physics of colliding polarized He-3 beams, polarimetry, and beam acceleration in the AGS Booster, AGS, RHIC, and ELIC. The material presented at the workshop will allow making plans for the implementation of polarized He-3 beams in RHIC.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pilot Implementation of a Field Study Design to Evaluate the Impact of Source Control Measures on Indoor Air Quality in High Performance Homes

To improve the indoor air quality in new, high performance homes, a variety of standards and rating programs have been introduced to identify building materials that are designed to have lower emission rates of key contaminants of concern and a number of building materials are being introduced that are certified to these standards. For example, the U.S. Department of Energy (DOE) Zero Energy Ready Home program requires certification under the U.S. Environmental Protection Agency (EPA) Indoor airPLUS (IaP) label, which requires the use of PS1 or PS2 certified plywood and OSB; low-formaldehyde emitting wood products; low- or no-VOC paints and coatings as certified by Green Seal Standard GS-11, GreenGuard, SCS Indoor Advantage Gold Standard, MPI Green Performance Standard, or another third party rating program; and Green Label-certified carpet and carpet cushions. However, little is known regarding the efficacy of the IAP requirements in measurably reducing contaminant exposures in homes. The goal of this project is to develop a robust experimental approach and collect preliminary data to support the evaluation of indoor air quality (IAQ) measures linked to IAP-approved low-emitting materials and finishes in new residential homes. To this end, the research team of Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) developed a detailed experimental plan to measure IAQ constituents and other parameters, over time, in new homes constructed with materials compliant with IAP’s low-emitting material and ventilation requirements (i.e., section 6.1, 6.2, 6.3, and 7.2) and similar homes constructed to the state building code with conventional materials. The IAQ in IAP and conventional homes of similar age, location, and construction style is quantified as the differences in the speciated VOC and aldehyde concentrations, normalized to dilution rates. The experimental plan consists of methods to evaluate the difference between low-emitting and “conventional” materials as installed in newly constructed residential homes using both (1) highly controlled, short-term active samples to precisely characterize the building-related chemical emissions and building contents and (2) a week-long passive sample designed to capture the impact of occupant behavior and related activities on measured IAQ contaminant levels indoors. The combination of detailed short-term measurements with the home under controlled/consistent conditions during pre- and post-occupancy and the week-long passive sampling data provide the opportunity to begin to separate the different emission sources and help isolate and quantify variability in the monitored homes. Between April and August 2014, the research team performed pre-occupancy and post-occupancy sampling in one conventional home and two homes built with low-emitting materials that were generally consistent with EPA’s Indoor airPLUS guidelines. However, for a number of reasons, the full experimental plan was not implemented. The project was intended to continue for up to three years to asses long-term changes in IAQ but the project was limited to one calendar year. As a result, several of the primary research questions related to seasonal impacts and the long-term trends in IAQ could not be addressed. In addition, there were several unexpected issues related to recruiting, availability of home types, and difficulty coordinating with builders/realtors/homeowners. Several field monitoring issues also came up that provide “lessons learned” that led to improvements to the original monitoring plan. The project produced a good experimental plan that is expected to be be useful for future efforts collecting data to support answering these same or similar research questions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-T-47: MRI T2 Exclusive Based Planning Using the Endocavitary/interstitial Gynecological Benidorm Applicator: A Proposed TPS Library and Preplan Efficient Methodology

Purpose: ABS and GEC-ESTRO have recommended MRI T2 for image guided brachytherapy. Recently, a new applicator (Benidorm Template, TB) has been developed in our Department (Rodriguez et al 2015). TB is fully MRI compatible because the Titanium needles and it allows the use of intrauterine tandem. Currently, TPS applicators library are not currently available for non-rigid applicators in case of interstitial component as the TB.The purpose of this work is to present the development of a library for the TB, together with its use on a pre-planning technique. Both new goals allow a very efficient and exclusive T2 MRI based planning clinical TB implementation. Methods: The developed library has been implemented in Oncentra Brachytherapy TPS, version 4.3.0 (Elekta) and now is being implemented on Sagiplan v 2.0 TPS (Eckert&Ziegler BEBIG). To model the TB, free and open software named FreeCAD and MeshLab have been used. The reconstruction process is based on three inserted A-vitamin pellets together with the data provided by the free length. The implemented preplanning procedure is as follow: 1) A MRI T2 acquisition is performed with the template in place just with the vaginal cylinder (no uterine tube nor needles). 2) The CTV is drawn and the required needles are selected using a developed Java based application and 3) A post-implant MRI T2 is performed. Results: This library procedure has been successfully applied by now in 25 patients. In this work the use of the developed library will be illustrated with clinical examples. The preplanning procedure has been applied by now in 6 patients, having significant advantages: needle depth estimation, needle positions and number are optimized a priori, time saving, etc Conclusion: TB library and pre-plan techniques are feasible and very efficient and their use will be illustrated in this work.

60 APPLIED LIFE SCIENCES↗