Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Estimating the Need for Medical Intervention due to Sleep Disruption on the International Space Station

During ISS and shuttle missions, difficulties with sleep affect more than half of all US crews. Mitigation strategies to help astronauts cope with the challenges of disrupted sleep patterns can negatively impact both mission planning and vehicle design. The methods for addressing known detrimental impacts for some mission scenarios may have a substantial impact on vehicle specific consumable mass or volume or on the mission timeline. As part of the Integrated Medical Model (IMM) task, NASA Glenn Research Center is leading the development of a Monte Carlo based forecasting tool designed to determine the consumables required to address risks related to sleep disruption. The model currently focuses on the International Space Station and uses an algorithm that assembles representative mission schedules and feeds this into a well validated model that predicts relative levels of performance, and need for sleep (SAFTE Model, IBR Inc). Correlation of the resulting output to self-diagnosed needs for hypnotics, stimulants, and other pharmaceutical countermeasures, allows prediction of pharmaceutical use and the uncertainty of the specified prediction. This paper outlines a conceptual model for determining a rate of pharmaceutical utilization that can be used in the IMM model for comparison and optimization of mitigation methods with respect to all other significant medical needs and interventions.

Myers, Jerry G.↗

SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can generate flights enables humans to assess and analyze complex tradeoffs between fuel consumption, estimated science quality and the percentage of scheduled observations. Due to the changing nature of SOFIA scheduling problems, this functionality will play a crucial role in optimizing science and minimizing costs during operations. In the full paper, we will summarize the technical challenges that have been met in order to build this system. These include: design of the search algorithm, design of appropriate heuristics and approximations, and reduction in the size of the search space. We will also describe technical challenges that are currently being addressed, including the extension of the existing approach to handle new solution criteria. Finally, we will describe a variety of cultural challenges that the astronomical community must address in order to successfully use SOFIA, and describe how the AFT can be used to address some of these challenges. Specifically, many of the intended science users are accustomed to using ground-based or space-based observatories; we will identify some differences that arise due to the nature of airborne observatories, and how the AFT can be extended to provide useful services to ease these cultural differences.

Frank, Jeremy↗

Evaluation of the Validity of Bio-Mathematical Models in Predicting Fatigue in an Operational Environment

During long-duration spaceflight missions, crewmembers and ground-support staff experience irregular sleep schedules, erratic natural light patterns, and high workload due to mission demands. Such conditions can cause circadian misalignment and sleep loss, which in turn cause deficits in cognitive performance. While bio-mathematical models have been implemented within workplace settings to predict fatigue profiles, the accuracy of sleep-wake models under conditions of non-traditional shiftwork is little known. Thus, the present study aims to evaluate the validity of four sleep-wake models (e.g., SAFTE-FAST, the Unified Model of Performance, the Adenosine-Circadian Model, and the State-Space Model) designed to predict human performance and fatigue levels against objective measures of performance in a spaceflight analog. To accomplish this aim, we will collect Psychomotor Vigilance Task (PVT) data from four crews (n=16) in the Human Exploration Research Analog (HERA) over 45 days. HERA is a closed, 3-story habitat at Johnson Space Center where inhabitants are exposed to extreme space exploration scenarios under varying sleep-wake conditions. The PVT is a simple reaction time test that involves minimal learning, making it sensitive to the effects of sleep loss and circadian misalignment. Findings from this study will help inform work scheduling and implementation of effective countermeasures (e.g., caffeine, lighting) to improve work efficiency and combat fatigue, as well as offer valuable insight into the applicability of bio-mathematical fatigue models in future space exploration missions.

fatigue↗

V/STOL propulsion control analysis: Phase 2, task 5-9

Typical V/STOL propulsion control requirements were derived for transition between vertical and horizontal flight using the General Electric RALS (Remote Augmented Lift System) concept. Steady-state operating requirements were defined for a typical Vertical-to-Horizontal transition and for a typical Horizontal-to-Vertical transition. Control mode requirements were established and multi-variable regulators developed for individual operating conditions. Proportional/Integral gain schedules were developed and were incorporated into a transition controller with capabilities for mode switching and manipulated variable reassignment. A non-linear component-level transient model of the engine was developed and utilized to provide a preliminary check-out of the controller logic. An inlet and nozzle effects model was developed for subsequent incorporation into the engine model and an aircraft model was developed for preliminary flight transition simulations. A condition monitoring development plan was developed and preliminary design requirements established. The Phase 1 long-range technology plan was refined and restructured toward the development of a real-time high fidelity transient model of a supersonic V/STOL propulsion system and controller for use in a piloted simulation program at NASA-Ames.

Source record↗

A Feasible Approach for an Early Manned Lunar Landing. Part II: Detailed Report of Ad Hoc Task Group

This report, in two parts, presents a program development plan for attempting a first manned lunar landing in 1967. The two parts consist of a Summary Report and a Detailed Report representing the coordinated output of the Ad Hoc Task Group assigned to the study. The study was started in response to the request for such a study by the Associate Administrator in his memorandum of May 2, 1961 establishing the Ad Hoc Task Group. The purpose of the study was to take a first cut at the tasks associated with the design, development and construction of the equipment and facilities as well as the development of the crews, and to show the time phasing 6f these tasks. Included are the space sciences, life science and advanced technology tasks whose data and results are needed for designing and developing the systems required in carrying out the mission. The plan presented in the two reports does not presume to be a firm plan. Its basic purpose is, by choosing one feasible method, to size up the scope, schedule and cost of the job, discover the main problems, pacing items and major decisions and provide a threshold from which a firm and detailed project development plan can be jointly formulated by the various elements of NASA.

Fleming, William A.↗

A Concept for Robust, High Density Terminal Air Traffic Operations

This paper describes a concept for future high-density, terminal air traffic operations that has been developed by interpreting the Joint Planning and Development Office s vision for the Next Generation (NextGen) Air Transportation System and coupling it with emergent NASA and other technologies and procedures during the NextGen timeframe. The concept described in this paper includes five core capabilities: 1) Extended Terminal Area Routing, 2) Precision Scheduling Along Routes, 3) Merging and Spacing, 4) Tactical Separation, and 5) Off-Nominal Recovery. Gradual changes are introduced to the National Airspace System (NAS) by phased enhancements to the core capabilities in the form of increased levels of automation and decision support as well as targeted task delegation. NASA will be evaluating these conceptual technological enhancements in a series of human-in-the-loop simulations and will accelerate development of the most promising capabilities in cooperation with the FAA through the Efficient Flows Into Congested Airspace Research Transition Team.

Isaacson, Douglas R.↗

Coordinating Multiple Spacecraft Assets for Joint Science Campaigns

This paper describes technology to support a new paradigm of space science campaigns. These campaigns enable opportunistic science observations to be autonomously coordinated between multiple spacecraft. Coordinated spacecraft can consist of multiple orbiters, landers, rovers, or other in-situ vehicles (such as an aerobot). In this paradigm, opportunistic science detections can be cued by any of these assets where additional spacecraft are requested to take further observations characterizing the identified event or surface feature. Such coordination will enable a number of science campaigns not possible with present spacecraft technology. Examples from Mars include enabling rapid data collection from multiple craft on dynamic events such as new Mars dark slope streaks, dust-devils or trace gases. Technology to support the identification of opportunistic science events and/or the re-tasking of a spacecraft to take new measurements of the event is already in place on several individual missions such as the Mars Exploration Rover (MER) Mission and the Earth Observing One (EO1) Mission. This technology includes onboard data analysis techniques as well as capabilities for planning and scheduling. This paper describes how these techniques can be cue and coordinate multiple spacecraft in observing the same science event from their different vantage points.

automated commanding↗

Analysis of San Francisco Bar Pilot Dispatch Records: Preliminary Report

Maritime pilots licensed by the San Francisco Board of Pilot Commissioners perform safety-critical tasks in a demanding environment, working in all weather and at all times of day and night. Since 1850, San Francisco maritime pilots have been known as Bar Pilots because their duties include guiding ships safely across the large sand bar that lies west of the Golden Gate. Schedules and Work Hours Records for San Francisco Bay Bar Pilots were analyzed to determine the minimum and maximum work periods, the frequency of extended work hours, the frequency of night work and the rotation of work hours. A mathematical model is being applied to predict fatigue in order to identify schedules that may have a high likelihood of fatigue. This presentation provides a progress report on the research thus far.

marine pilots↗

Changes in Alertness and Performance Over Time During Long-Haul Flying Across Multiple Time Zones

BACKGROUND: Long-haul pilots experience high levels of fatigue and circadian disruptions due to long work hours and flying over multiple time zones. The aim of this study was to describe changes in alertness and performance among flight crews during long-haul flights crossing multiple time zones. METHODS: All pilots flying long-haul operations from a single airline were eligible to participate. All participants collected data for ~2 weeks of their normal work schedule within airline operations, with at least two long-haul rotations, including rest days and layovers. Participants wore an Actiwach throughout the entire study period and completed a sleep diary (at bedtime, upon waking up and after each nap). Each participant completed a 5-min Psychomotor Vigilance Task (PVT) and a Karolinska Sleepiness Scale (KSS) pre-flight, on top-of-descent (TOD; inflight) and at the end of each flight (post-flight). Response speed (1/RT x 1000), lapses (RT > 500 ms), and alertness were assessed over time pre-flight, TOD, post-flight, using mixed-effects models with participant as a random factor. Linear models were assumed for response speed and alertness, while a negative binomial distribution was specified for lapses due to overdispersion. RESULTS: Forty-four long-haul pilots participated in the study (5 female; mean age 44.25 ± 10.06 yrs; mean flight hours 9834.3; ± 5334.1 hrs). Lapses increased post-flight relative to pre-flight (F(2, 665) = 3.67, p < 0.05). There was a main effect of response speed (F(2, 665) = 21.45, p < 0.001) with slower speed inflight and postflight compared to preflight (p < 0.001). The KSS increased over time from M = 4.02 (± 1.35) preflight to M = 5.15 (± 1.58) inflight, to M = 6.7 (± 1.51) postflight (F(2, 701) = 182.63, p < 0.001). DISCUSSION: Our preliminary analyses showed that both performance and subjective alertness worsened from the beginning to the end of a flight. Additional analyses will be conducted to investigate the changes in alertness and performance by direction of travel, sleep history, and flight timing and duration.

long-haul↗

Aerodynamics support of research instrument development

A new velocimetry system is currently being developed at NASA LaRC. The device, known as a Doppler global velocimeter (DGV), can record three velocity components within a plane simultaneously and in near real time. To make measurements the DGV, like many other velocimetry systems, relies on the scattering of light from numerous small particles in a flow field. The particles or seeds are illuminated by a sheet of laser light and viewed by two CCD cameras. The scattered light from the particles will have a frequency which is a function of the source laser light frequency, the viewing angle, and most importantly the seed velocities. By determining the scattered light intensity the velocity can be measured at all points within the light sheet simultaneously. Upon completion of DGV component construction and initial check out a series of tests in the Basic Aerodynamic Research (wind) Tunnel (BART) are scheduled to verify instrument operation and accuracy. If the results are satisfactory, application of the DGV to flight measurements on the F-18 High Alpha Research Vehicle (HARV) are planned. The DGV verification test in the BART facility will utilize a 75 degree swept delta wing model. A major task undertaken this summer included evaluation of previous results for this model. A specific series of tests matching exactly the previous tests and exploring new DGV capabilities were developed and suggested. Another task undertaken was to study DGV system installation possibilities in the F-18 HARV aircraft. In addition, a simple seeding system modification was developed and utilized to make Particle Imaging Velocimetry (PIV) measurements in the BART facility.

Miller, L. Scott↗

STS-103 Crew Activity Report/Flight Day 4 Highlights

Live footage of the first of the three-scheduled space walks is seen. Mission Specialists Steven L. Smith and John M. Grunsfeld are seen setting up tools, and replacing the Rate Sensor Units. Grunsfeld then replaces Hubble's batteries in the instrument bay, while Smith places covers on the handrails. Grunsfeld and Smith then perform their second task of installing six Voltage/Temperature Improvement Kits. They are also seen taking pictures, and putting away the equipment.

Source record↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability for Orion. The EVAs will involve a two-person crew for approximately four hours. Currently, two EVAs are planned with one contingency EVA in reserve. Providing this EVA capability is very challenging due to system level constraints and a new and unknown environment. The goal of the EVA architecture for ARCM is one that builds upon previously developed technologies and lessons learned, and that accomplishes the ARCM mission while providing a stepping stone to future missions and destinations. The primary system level constraints are to 1) minimize system mass and volume and 2) minimize the interfacing impacts to the baseline Orion design. In order to minimize the interfacing impacts and to not perturb the baseline Orion schedule, the concept of adding "kits" to the baseline system is proposed. These kits consist of: an EVA kit (converts LEA suit to EVA suit), EVA Servicing and Recharge Kit (provides suit consumables), the EVA Tools, Translation Aids & Sample Container Kit (the tools and mobility aids to complete the tasks), the EVA Communications Kit (interface between the EVA radio and the MPCV), and the Cabin Repress Kit (represses the MPCV between EVAs). This paper will focus on the trade space, analysis, and testing regarding the space suit (pressure garment and life support system). Historical approaches and lessons learned from all past EVA operations were researched. Previous and current, successfully operated EVA hardware and high technology readiness level (TRL) hardware were evaluated, and a trade study was conducted for all possible pressure garment and life support options. Testing and analysis was conducted and a recommended EVA system architecture was proposed. Pressure garment options that were considered for this mission include the currently in-use ISS EVA Mobility Unit (EMU), all variations of the Advanced Crew Escape Suit (ACES), and the Exploration Z-suit. For this mission, the pressure garment that was selected is the Modified ACES (MACES) with EVA enhancements. Life support options that were considered included short closed-loop umbilicals, long open-loop umbilicals, the currently in-use ISS EMU Portable Life Support System (PLSS), and the currently in development Exploration PLSS. For this mission, the life support option that was selected is the Exploration PLSS. The greatest risk in the proposed architecture is viewed to be the comfort and mobility of the baseline MACES and the delicate balance between adding more mobility features while not compromising landing safety. Feasibility testing was accomplished in low fidelity analogs and in the JSC Neutral Buoyancy Laboratory (NBL) to validate the concept before a final recommendation on the architecture was made. The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work and further definition of the remaining kits will be conducted in government fiscal year 14.

Blanco, Raul A.↗

Light as a Reactive Countermeasure to Sleep Inertia: Translating Laboratory Findings to the Field

Sleep inertia describes the brief period of impaired alertness, mood, and cognitive performance experienced after waking. Under laboratory settings, light exposure upon waking during a habitual sleep period has been shown to improve sleep inertia symptoms. We investigated whether a field-deployable light-emitting device would help to mitigate sleep inertia in a real-world setting. Thirty-six participants (18 female; 26.6 years ± 6.1) completed an at-home, within-subject, randomized crossover study. Participants followed their habitual sleep-wake schedule for five nights before an adaptation and experimental night. Forty-five minutes after bedtime on the experimental night, participants received a phone call and were instructed to wear light-emitting glasses with the light either on (light condition) or off (control). A 5-minute psychomotor vigilance task (PVT), the Karolinska Sleepiness Scale (KSS), visual analog scales of mood (VASmood), and a 3-minute descending subtraction task (DST) were performed starting at +2, +12, +22, and +32 minutes after the call. Participants then went back to sleep and were called 45 minutes after lights out for the opposite condition. A series of mixed-effects models were performed with fixed effects of test bout, condition, test bout × condition, and a random effect of participant. Covariates included pre-sleep baseline scores, randomization order, sex, and sleep history. Participants rated themselves as more alert and energetic in the light condition compared to the control condition (VASalert-sleepy p = .01; VASlethargic-energetic p = .001). There was no effect of condition for DST outcomes, but there was a significant improvement in DST total responses in the light condition in a subset of participants waking from N3 (p = .03). There was a significant effect of condition for PVT outcomes, with faster responses (p < .001) and fewer lapses (p < .001) in the control condition. Our results under naturalistic at-home settings suggest that, similar to the in-laboratory study findings, the light intervention improved subjective alertness and mood, while working memory improved after waking from N3. Future studies of light interventions should include measures of visual acuity and comfort to assess the full feasibility and efficacy of interventions in real-world environments.

sleep inertia↗

Light as a Reactive Countermeasure to Sleep Inertia: Translating Laboratory Findings to the Field

Sleep inertia describes the brief period of impaired alertness, mood, and cognitive performance experienced after waking. Under laboratory settings, light exposure upon waking during a habitual sleep period has been shown to improve sleep inertia symptoms. We investigated whether a field-deployable light-emitting device would help to mitigate sleep inertia in a real-world setting.\ Thirty-six participants (18 female; 26.6 years ± 6.1) completed an at-home, within-subject, randomized crossover study. Participants followed their habitual sleep-wake schedule for five nights before an adaptation and experimental night. Forty-five minutes after bedtime on the experimental night, participants received a phone call and were instructed to wear light-emitting glasses with the light either on (light condition) or off (control). A 5-minute psychomotor vigilance task (PVT), the Karolinska Sleepiness Scale (KSS), visual analog scales of mood (VASmood), and a 3-minute descending subtraction task (DST) were performed starting at +2, +12, +22, and +32 minutes after the call. Participants then went back to sleep and were called 45 minutes after lights out for the opposite condition. A series of mixed-effects models were performed with fixed effects of test bout, condition, test bout × condition, and a random effect of participant. Covariates included pre-sleep baseline scores, randomization order, sex, and sleep history. Participants rated themselves as more alert and energetic in the light condition compared to the control condition (VASalert-sleepy p = .01; VASlethargic-energetic p = .001). There was no effect of condition for DST outcomes, but there was a significant improvement in DST total responses in the light condition in a subset of participants waking from N3 (p = .03). There was a significant effect of condition for PVT outcomes, with faster responses (p < .001) and fewer lapses (p < .001) in the control condition. Our results under naturalistic at-home settings suggest that, similar to the in-laboratory study findings, the light intervention improved subjective alertness and mood, while working memory improved after waking from N3. Future studies of light interventions should include measures of visual acuity and comfort to assess the full feasibility and efficacy of interventions in real-world environments.

sleep inertia↗

Light as a Reactive Countermeasure to Sleep Inertia: Translating Laboratory Findings to the Field

Sleep inertia describes the brief period of impaired alertness, mood, and cognitive performance experienced after waking. Under laboratory settings, light exposure upon waking during a habitual sleep period has been shown to improve sleep inertia symptoms. We investigated whether a field-deployable light-emitting device would help to mitigate sleep inertia in a real-world setting. Thirty-six participants (18 female; 26.6 years ± 6.1) completed an at-home, within-subject, randomized crossover study. Participants followed their habitual sleep-wake schedule for five nights before an adaptation and experimental night. Forty-five minutes after bedtime on the experimental night, participants received a phone call and were instructed to wear light-emitting glasses with the light either on (light condition) or off (control). A 5-minute psychomotor vigilance task (PVT), the Karolinska Sleepiness Scale (KSS), visual analog scales of mood (VASmood), and a 3-minute descending subtraction task (DST) were performed starting at +2, +12, +22, and +32 minutes after the call. Participants then went back to sleep and were called 45 minutes after lights out for the opposite condition. A series of mixed-effects models were performed with fixed effects of test bout, condition, test bout × condition, and a random effect of participant. Covariates included pre-sleep baseline scores, randomization order, sex, and sleep history. Participants rated themselves as more alert and energetic in the light condition compared to the control condition (VASalert-sleepy p = .01; VASlethargic-energetic p = .001). There was no effect of condition for DST outcomes, but there was a significant improvement in DST total responses in the light condition in a subset of participants waking from N3 (p = .03). There was a significant effect of condition for PVT outcomes, with faster responses (p < .001) and fewer lapses (p < .001) in the control condition. Our results under naturalistic at-home settings suggest that, similar to the in-laboratory study findings, the light intervention improved subjective alertness and mood, while working memory improved after waking from N3. Future studies of light interventions should include measures of visual acuity and comfort to assess the full feasibility and efficacy of interventions in real-world environments.

sleep inertia↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

A computer program for the generation of logic networks from task chart data

The Network Generation Program (NETGEN), which creates logic networks from task chart data is presented. NETGEN is written in CDC FORTRAN IV (Extended) and runs in a batch mode on the CDC 6000 and CYBER 170 series computers. Data is input via a two-card format and contains information regarding the specific tasks in a project. From this data, NETGEN constructs a logic network of related activities with each activity having unique predecessor and successor nodes, activity duration, descriptions, etc. NETGEN then prepares this data on two files that can be used in the Project Planning Analysis and Reporting System Batch Network Scheduling program and the EZPERT graphics program.

Herbert, H. E.↗

Production and quality assurance automation in the Goddard Space Flight Center Flight Dynamics Facility

The Flight Dynamics Facility (FDF) at the NASA Goddard Space Flight Center (GSFC) generates numerous products for NASA-supported spacecraft, including the Tracking and Data Relay Satellites (TDRS's), the Hubble Space Telescope (HST), the Extreme Ultraviolet Explorer (EUVE), and the space shuttle. These products include orbit determination data, acquisition data, event scheduling data, and attitude data. In most cases, product generation involves repetitive execution of many programs. The increasing number of missions supported by the FDF has necessitated the use of automated systems to schedule, execute, and quality assure these products. This automation allows the delivery of accurate products in a timely and cost-efficient manner. To be effective, these systems must automate as many repetitive operations as possible and must be flexible enough to meet changing support requirements. The FDF Orbit Determination Task (ODT) has implemented several systems that automate product generation and quality assurance (QA). These systems include the Orbit Production Automation System (OPAS), the New Enhanced Operations Log (NEOLOG), and the Quality Assurance Automation Software (QA Tool). Implementation of these systems has resulted in a significant reduction in required manpower, elimination of shift work and most weekend support, and improved support quality, while incurring minimal development cost. This paper will present an overview of the concepts used and experiences gained from the implementation of these automation systems.

Chapman, K. B.↗