Search NASA⌕ Search

SEARCH · Search NASA

Results for “test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew T.↗

Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The NML cryogenic plant cools two individually cryostated superconducting radio frequency (SRF) capture cavities and one prototype ILC cryomodule with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. The cryogenic plant is composed of two nitrogen precooled Tevatron satellite refrigerators, two Mycom 2016C compressors, a cryogenic distribution system, a Frick purifier compressor, two charcoal bed adsorber purifiers, and a liquid ring vacuum pump with a roots booster. The SRF cavities are immersed in a 2.0 K liquid helium bath, shielded with a 5 K gaseous helium shield and a liquid nitrogen cooled thermal shield. Since 2019, this R&D accelerator complex has gone through four science runs with an average duration of 12 months. Operational experience for each run, availability metrics, performance data and common outages are presented in this paper.

Wallace, Timothy [Fermilab] (ORCID:000900051589302↗

Unique Tuft Test Facility Dramatically Reduces Brush Seal Development Costs

Brush seals have been incorporated in the latest turbine engines to reduce leakage and improve efficiency. However, the life of these seals is limited by wear. Studies have shown that optimal sealing characteristics for a brush seal occur before the interference fit between the brush and shaft is excessively worn. Research to develop improved tribopairs (brush and coating) with reduced wear and lower friction has been hindered by the lack of an accurate, low-cost, efficient test methodology. Estimated costs for evaluating a new material combination in an engine company seal test program are on the order of $100,000. To address this need, the NASA Lewis Research Center designed, built, and validated a unique, innovative brush seal tuft tester that slides a single tuft of brush seal wire against a rotating shaft under controlled loads, speeds, and temperatures comparable to those in turbine engines. As an initial screening tool, the brush seal tuft tester can tribologicaly evaluate candidate seal materials for 1/10th the cost of full-scale seal tests. Previous to the development of the brush seal tuft tester facility, most relevant tribological data had been obtained from full-scale seal tests conducted primarily to determine seal leakage characteristics. However, from a tribological point of view, these tests included the confounding effects of varying contact pressures, bristle flaring, high-temperature oxidation, and varying bristle contact angles. These confounding effects are overcome in tuft testing. The interface contact pressures can be either constant or varying depending on the tuft mounting device, and bristle wear can be measured optically with inscribed witness marks. In a recent cooperative program with a U.S. turbine engine manufacturer, five metallic wire candidates were tested against a plasma-sprayed Nichrome-bonded chrome carbide. The wire materials used during this collaboration were either nickel-chrome- or cobaltchrome-based superalloys. These tests corroborated full-scale seal test results and provided insight into previously untested combinations. As the cycle temperature for improved efficiency turbine engines increases, new brush seal materials combinations must be considered. Future brush seal tuft testing will include both metallic and ceramic bristles versus commercial and NASA-developed shaft coatings. The ultimate goal of this work is to expand the current data base so that seal designers can tailor brush seal materials to specific applications.

Fellenstein, James A.↗

Development of a digital control system for a spacecraft propulsion test facility

A digital computer control and abort system which is used at NASA-Lewis research center is described. The system was designed to control test operations such as rocket engine testing, structure testing, and wind tunnel tests. Because of the nature of spacecraft system testing, particularly rocket engine testing, the unique features of the system are, control function updating at a 20 millisecond rate, continuous abort monitoring and a software system designed for short duration tests rather than continuous on-line control. To accomplish these system requirements, special hardware was designed. The presentation includes a description of the computer system and special interface hardware as well as a general description of the software used.

Smalley, R. R.↗

Ames T-3 fire test facility - Aircraft crash fire simulation

There is a need to characterize the thermal response of materials exposed to aircraft fuel fires. Large scale open fire tests are costly and pollute the local environment. This paper describes the construction and operation of a subscale fire test that simulates the heat flux levels and thermochemistry of typical open pool fires. It has been termed the Ames T-3 Test and has been used extensively by NASA since 1969 to observe the behavior of materials exposed to JP-4 fuel fires.

Fish, R. H.↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The New Muon Laboratory (NML) cools two individually cryostated superconducting radio frequency (SRF) capture cavities (CC) and one prototype ILC cryomodule (CM) with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. Since 2019, this R&D accelerator complex has gone through four science runs.

Wallace, T. [Fermilab]↗

Modeling Potential Carbon Monoxide Exposure Due to Operation of a Major Rocket Engine Altitude Test Facility Using Computational Fluid Dynamics

This viewgraph presentation reviews computational fluid dynamics as a tool for modelling the dispersion of carbon monoxide at the Stennis Space Center's A3 Test Stand. The contents include: 1) Constellation Program; 2) Constellation Launch Vehicles; 3) J2X Engine; 4) A-3 Test Stand; 5) Chemical Steam Generators; 6) Emission Estimates; 7) Located in Existing Test Complex; 8) Computational Fluid Dynamics; 9) Computational Tools; 10) CO Modeling; 11) CO Model results; and 12) Next steps.

Blotzer, Michael J.↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

Monitoring Helium Cryogen Usage with iFix Software at IB1 Test Facility

At the IB1 facility of the Applied Physics and Superconducting Technology Directorate within the Cryogenic Division at Fermilab, liquid helium is essential to the testing activities. The test stands used require large amounts of Helium to test the thermal and superconducting cavities and magnets. The liquid helium that enters the test stand is monitored through a series of valves and controls to determine the start and stop for monitoring time. There are 3 phases of cryogen usage that must be considered for each stand, cooldown, warming and overnight mode. With a new system in place, cold hour tracking will be more objective and precise within each test stand ensuring better calculations for user s fees that will provide funding for the replenishment of helium and continual operation at IB1.

Trillo, Angelica↗

The impact of CFD on development test facilities - A National Research Council projection

The results of a National Research Council study on the effect that advances in computational fluid dynamics (CFD) will have on conventional aeronautical ground testing are reported. Current CFD capabilities include the depiction of linearized inviscid flows and a boundary layer, initial use of Euler coordinates using supercomputers to automatically generate a grid, research and development on Reynolds-averaged Navier-Stokes (N-S) equations, and preliminary research on solutions to the full N-S equations. Improvements in the range of CFD usage is dependent on the development of more powerful supercomputers, exceeding even the projected abilities of the NASA Numerical Aerodynamic Simulator (1 BFLOP/sec). Full representation of the Re-averaged N-S equations will require over one million grid points, a computing level predicted to be available in 15 yr. Present capabilities allow identification of data anomalies, confirmation of data accuracy, and adequateness of model design in wind tunnel trials. Account can be taken of the wall effects and the Re in any flight regime during simulation. CFD can actually be more accurate than instrumented tests, since all points in a flow can be modeled with CFD, while they cannot all be monitored with instrumentation in a wind tunnel.

Korkegi, R. H.↗

Monitoring System for Storm Readiness and Recovery of Test Facilities: Integrated System Health Management (ISHM) Approach

Severe weather events are likely occurrences on the Mississippi Gulf Coast. It is important to rapidly diagnose and mitigate the effects of storms on Stennis Space Center's rocket engine test complex to avoid delays to critical test article programs, reduce costs, and maintain safety. An Integrated Systems Health Management (ISHM) approach and technologies are employed to integrate environmental (weather) monitoring, structural modeling, and the suite of available facility instrumentation to provide information for readiness before storms, rapid initial damage assessment to guide mitigation planning, and then support on-going assurance as repairs are effected and finally support recertification. The system is denominated Katrina Storm Monitoring System (KStorMS). Integrated Systems Health Management (ISHM) describes a comprehensive set of capabilities that provide insight into the behavior the health of a system. Knowing the status of a system allows decision makers to effectively plan and execute their mission. For example, early insight into component degradation and impending failures provides more time to develop work around strategies and more effectively plan for maintenance. Failures of system elements generally occur over time. Information extracted from sensor data, combined with system-wide knowledge bases and methods for information extraction and fusion, inference, and decision making, can be used to detect incipient failures. If failures do occur, it is critical to detect and isolate them, and suggest an appropriate course of action. ISHM enables determining the condition (health) of every element in a complex system-of-systems or SoS (detect anomalies, diagnose causes, predict future anomalies), and provide data, information, and knowledge (DIaK) to control systems for safe and effective operation. ISHM capability is achieved by using a wide range of technologies that enable anomaly detection, diagnostics, prognostics, and advise for control: (1) anomaly detection algorithms and strategies, (2) fusion of DIaK for anomaly detection (model-based, numerical, statistical, empirical, expert-based, qualitative, etc.), (3) diagnostics/prognostics strategies and methods, (4) user interface, (5) advanced control strategies, (6) integration architectures/frameworks, (7) embedding of intelligence. Many of these technologies are mature, and they are being used in the KStorMS. The paper will describe the design, implementation, and operation of the KStorMS; and discuss further evolution to support other needs such as condition-based maintenance (CBM).

Figueroa, Fernando↗

Calibration for Thrust and Airflow Measurements in the CE-22 Advanced Nozzle Test Facility

CE-22 facility procedures and measurements for thrust and airflow calibration obtained with choked-flow ASME nozzles are presented. Six calibration nozzles are used at an inlet total pressure from 20 to 48 psia. Throat areas are from 9.9986 to 39.986 sq. in.. Throat Reynolds number varies from 1.8 to 7.9 million. Nozzle gross thrust coefficient (CFG) uncertainty is 0.25 to 0.75 percent, with smaller uncertainly generally for larger nozzles and higher inlet total pressure. Nozzle discharge coefficient (CDN) uncertainty is 0.15 percent or less for all the data. ASME nozzle calibrations need to be done before and after research model testing to achieve these uncertainties. In addition, facility capability in terms of nozzle pressure ratio (NPR) and nozzle airflow are determined. Nozzle pressure ratio of 50 or more is obtainable at 40 psia for throat areas between 20 and 30 sq. in.. Also presented are results for two of the ASME nozzles vectored at 10deg, a dead-weight check of the vertical (perpendicular to the jet axis) force measurement, a calibration of load cell forces for the effects of facility tank deflection with tank pressure, and the calibration of the metric-break labyrinth seal.

Werner, Roger A.↗

Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

The Advanced Stirling Radioisotope Generator (ASRG) is being considered to power deep space missions. An engineering unit, the ASRG-EU, was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently on an extended operation test at NASA Glenn Research Center to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for testing the ASRG-EU. Details of the test facility design are discussed. The facility can operate the convertors under AC bus control or with the ASRG-EU controller. It can regulate input thermal power in either a fixed temperature or fixed power mode. An enclosure circulates cooled air around the ASRG-EU to remove heat rejected from the ASRG-EU by convection. A custom monitoring and data acquisition system supports the test. Various safety features, which allow 2417 unattended operation, are discussed.

Lewandowski, Edward J.↗

Bunch Extinction Measurements at PIP-II Injector Test Facility

The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.

43 PARTICLE ACCELERATORS↗

Payload bay atmospheric vent airflow testing at the Vibration and Acoustic Test Facility

Several concerns related to venting the Space Shuttle Orbiter payload bay during launch led to laboratory experiments with a flight-type vent box installed in the wall of a subsonic wind tunnel. This report describes the test setups and procedures used to acquire data for characterization of airflow through the vent box and acoustic tones radiated from the vent-box cavity. A flexible boundary-layer spoiler which reduced the vent-tone amplitude is described.

Johnston, James D., Jr.↗

Meeting today's requirements for large thermal vacuum test facilities

The Lockheed Thermal Vacuum Facility at Sunnyvale, California, completed in late 1986, one of the largest multi-program facilities constructed to date is described. The horizontal 12.2 m diameter by 24.4 m long chamber has removable heads at each end and houses a thermal shroud providing a test volume 10.4 m diameter by 24.4 m long. The chamber and thermal shroud are configured to permit the insertion of a 6.1 m wide by 24.4 m long vibration isolated optical bench. The pumpimg system incorporates an internal cryopumping array, turbomolecular pumps and cryopumps to handle multi-program needs and ranges of gas loads. The high vacuum system is capable of achieving clean, dry and empty pressures below 1.3 times 10 to the minus 6 power Pa (10 to the minus 8 power torr.)

Corinth, R. L.↗

Method of predicting radiation heat transfer in turbine cooling test facilities

A method is presented for calculating the average net radiation heat flux to turbine vanes and blades. The net radiation heat flux at a vane leading edge calculated by this method was compared with heat flux values independently determined from experimental tests on a vane in a cascade. The spectral emissivities of the turbine vane and the cascade wall were also measured.

Gladden, H. J.↗