Search NASA⌕ Search

SEARCH · Search NASA

Results for “FINALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Development and Characterization of Densified Biomass-plastic Blend for Entrained Flow Gasification (Final Technical Report)

Supported by the U.S. DOE NETL Award DE-FE0032043, this project was a collaborative effort. Project participants included the University of Kentucky Institute for Decarbonization and Energy Advancement (UK IDEA), Biosystems and Agricultural Engineering department (UK BAE), and Wabash Valley Resources, LLC. The goal of this final technical project report is to comprehensively summarize the work conducted on project DE-FE0032043. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) (Project Prime Recipient) has developed and studied a biomass/plastic fuel with a hydrophobic surface area less than 10 m 2 /m 3 that is suitable for oxygen-blown entrained flow gasification with slurry feed. The project involved the utilization of an existing thermogravimetric analysis (TGA)-mass spectrometer (MS), 1.5” drop tube furnace, 1 ton per day (TPD) coal gasifier, and high-pressure extruder operated at UK. The pilot-scale production of blended material was done at the Polymers Technology Center in Charlotte, North Carolina. Parametric testing and solid fuel blend slurry performance validation was completed using the UK entrained flow gasifier with multiple opposed burners to narrow the major near-term technical gaps that impede gasification of biomass and carbonaceous mixed wastes such as plastics in order to achieve net-negative CO 2 emissions. Project results validated the UK approach to address the major technical challenges on the biomass/plastic pretreatment and gasification. Previously, this has been limited in application to fluidized-type or moving bed-type gasifiers due to the high-water uptake of porous biomass containing hydroxyl groups during the conventional slurry preparation, resulting in a highly viscous, un-pumpable slurry. The biomass pretreatment with plastic developed for this project demonstrates advantages in cost and flexibility, which include: 1) the development of a blended solid fuel slurry with 55-60 wt% solids and comparable heating value to 100% coal-based water slurry; 2) the collection of gasification kinetic data and identification of preliminary operating conditions by performing thermogravimetric analysis, gasification experiments by using a 1.5” drop tube furnace; and finally 3) the demonstrated gasification of the blended solid fuel in the UK entrained flow gasifier with a long-lasting stable solid fuel blend slurry, dataset detailing operating conditions, and characterization of slag phase formation and solidification. The lab-scale data and experience obtained during this project encourages the development of technologies and commercial approaches to enable a hydrogen-based energy economy while achieving net-negative CO 2 emissions through gasification of coal, biomass, and carbonaceous mixed wastes such as plastics.

01 COAL, LIGNITE, AND PEAT↗

IER-499 Final Design of a TEX Variant: Chlorine to Support NNSA Operations [Slides]

This presentation concludes the final design of TEX with chlorine absorbers is complete. 5 configurations were identified, expected to down select to three experimental configurations. Great comparison to Y-12 and good comparison to INL sensitivities. Fastest configuration touches on the 35 Cl(n,p) cross section (continuing to work with Terrapower for faster configurations). Extensive density studies performed to ensure understanding of the salt in the plates. Reactivity studies performed to assist with experiment. Finally, the fabrication of the chlorine absorbers is ongoing (with LANL), and the experiment is scheduled to be completed this year.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measuring Muon Antineutrino Charged-Current Interactions Without Mesons in the Final State, in the NOvA Near Detector

NOvA is a long-baseline neutrino experiment based at Fermilab in the US, with the primary aim of measuring neutrino and antineutrino oscillations. This will enhance our understanding of electroweak interactions by measuring the neutrino mixing angles, CP-violating phase and neutrino mass ordering. To measure these oscillations, we first need to have a deep understanding of how neutrinos and antineutrinos interact with matter. Antineutrino interaction cross sections are, at present, particularly poorly constrained, and processes such as meson exchange currents are not well understood in the antineutrino sector. This analysis will develop a cross-section measurement of muon antineutrino interactions without mesons (e.g. pions or kaons) in the final state, in the NOvA near detector. A high-statistics, high-purity sample is obtained through a cut-based selection process implementing machine learning techniques. The sample is dominated by quasi-elastic and meson exchange current interactions which are sensitive to nuclear effects such as Final-State Interactions. The cross section will be extracted as a function of the incoming neutrino energy and the kinematics of the outgoing particles.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Dynamic and Responsive Distributed Energy Resource Education Solutions for Building, Fire, and Safety Department Officials (Final Technical Report)

From April 2021 through March 2024, the Interstate Renewable Energy Council (IREC) led a collaborative project to develop a free online clearinghouse of educational resources about solar photovoltaics (PV), energy storage systems (ESS), electric vehicle supply equipment (EVSE), and grid-interactive efficient building (GEB) technologies. Two websites—the Clean Energy Clearinghouse and CleanEnergyTraining.org—housed over 70 educational resources. Over the course of the three-year project, 154,272 unique visitors accessed the learning materials. Learner feedback was overwhelmingly positive. Even through the end of the project, there was sustained demand for education and communication. A primary innovation of the project was to drive multiple complementary audiences to the same place. Building owners, designers, installation contractors and developers, authorities having jurisdiction (AHJs), and fire service personnel all benefit from a shared understanding of clean energy technologies, including safety and code-related requirements. When considering the impact on the target audience, the project team worked with partners and advisors to inform resource creation and delivery in such a way as to address key motivational factors of the target audience and compel each user to seek additional information on the topic and return to the Clean Energy Clearinghouse website as their central location for more information. Resources were intentionally developed to be concise—five to 15 minutes—and accessible, meaning not overly technical. Providing basic information demystified the technologies and invited the professional to explore additional learning opportunities. Awardee and partner collaboration was key to project success. IREC facilitated collaboration among the other Topic 2 awardees, Southface and New Buildings Institute (NBI). The three awardees shared relevant information gained through discovery and validation questionnaires that informed product development and reduced duplication of effort by coordinating the development of complementary, and not competing, educational resources. Inspired by this collaboration, IREC brought on additional partners even in the final year of the project. Five regional energy efficiency organizations were part of the project, which expanded the connection between efficiency and distributed energy resources. We also included resources on the Clearinghouse that were developed through other federally funded projects, such as the Buildings Energy Efficiency Frontiers & Innovation Technologies (BENEFIT) program. The website was developed with the learner in mind, and not solely the funding source. Feedback from stakeholders throughout the project, and especially in its final year, indicated the need for continued education and facilitated communication among stakeholders to further the safe and widespread adoption of clean energy.

14 SOLAR ENERGY↗

Thermopile Energy Harvesting for Subsurface Wellbore Sensors (Final Report)

Robust in situ power harvesting underlies all efforts to enable downhole autonomous sensors for real-time and long-term monitoring of CO 2 plume movement and permeance, wellbore health, and induced seismicity. This project evaluated the potential use of downhole thermopile arrays, known as thermoelectric generators (TEGs), as power sources to charge sensors for in situ real-time, long-term data capture and transmission. Real-time downhole monitoring will enable “Big Data” techniques and machine learning, using massive amounts of continuous data from embedded sensors, to quantify short- and long-term stability and safety of enhanced oil recovery and/or commercial-scale geologic CO 2 storage. This project evaluated possible placement of the TEGs at two different wellbore locations: on the outside of the casing; or on the production tubing. TEGs convert heat flux to electrical power, and in the borehole environment, would convert heat flux into or out of the borehole into power for downhole sensors. Such heat flux would be driven by pumping of cold or hot fluids into the borehole—for instance, injecting supercritical CO 2 —creating a thermal pulse that could power the downhole sensors. Hence, wireless power generation could be accomplished with in situ TEG energy harvesting. This final report summarizes the project’s efforts that accomplished the creation of a fully operational thermopile field unit, including selection of materials, laboratory benchtop experiments and thermal-hydrologic modeling for design and optimization of the field-scale power generation test unit. Finally, the report describes the field unit that has been built and presents results of performance and survivability testing. The performance and survivability testing evaluated the following: 1) downhole power generation in response to a thermal gradient produced by pumping a heated fluid down a borehole and through the field unit; and 2) component survivability and operation at elevated temperature and pressure conditions representative of field conditions. The performance and survivability testing show that TEG arrays are viable for generating ample energy to power downhole sensors, although it is important to note that developing or connecting to sensors was beyond the scope of this project. This project’s accomplishments thus traversed from a low Technical Readiness Level (TRL) on fundamental concepts of the application and modeling to TRL-5 via testing of the fully integrated field unit for power generation in relevant environments. A fully issued United States Patent covers the wellbore power harvesting technology and applications developed by this project.

47 OTHER INSTRUMENTATION↗

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY↗

High Yield Xray Imager Final Design Review

The High Yield Xray Imager (HYXI) is a new NIF target diagnostic system currently under development. The goal of HYXI is to provide high-fidelity, high temporal resolution x-ray imaging capability on high yield NIF implosions at 10MJ and above. The HYXI instrument design concept is based on the combination of two technologies that have been successfully utilized at the NIF on previous instruments, electron pulse-dilation and hybrid-CMOS sensor imaging. The combination of these two techniques will give HYXI sufficient data quality to ascertain differences in hot spot formation dynamics between high and low yield implosions. This information will highlight the critical hot spot conditions needed for ignition and burn. The HYXI design leverages the successful operation of the PDIXI x-ray imager at the NIF on multi MJ yield shots. A new radiation tolerant CMOS imaging array (HYPERION) is being developed to eliminate the significant background noise which limits the data quality of PDIXI. We successfully placed the contract with Advanced hCMOS Systems (AHS) to develop the HYPERION sensor, which fulfils our criteria to place long lead time item procurements by end of FY24. The HYXI Final Design Review was completed at the end of Q4 FY24 (Sep 24 th and Sep 30 th ). The HYXI project is a multi-year effort with a phased approach to be bring up system functionality over time in parallel with the development and fabrication effort of the HYPERION CMOS imaging array. In Phase 1, time-integrated x-ray images on NIF DT experiments will be collected starting in Q3 FY25. In Phase 2 of the project, time-resolved imaging with HYXI utilizing a spare microchannel plate detector back-end will begin in Q3 FY26. Phase 3 concludes the project with the installation of the HYPERION sensor array and the final performance qualification of the HYXI instrument which is scheduled for Q3 FY27 as discussed in the PDR and MRT report on this project in FY23.

42 ENGINEERING↗

Illinois Basin Carbon Ore, Rare Earth, and Critical Minerals (IB-CORE-CM) Initiative (Final Report (Redacted)(Public))

Final Report; Illinois Basin - Carbon Ore, Rare Earth and Critical Mineral (IB-CORE-CM) project team has conducted a comprehensive basin-wide assessment of CORE-CM presence in coal, coal-based, and waste stream resources, as well as a thorough examination of mining practices, separation technologies, and the local infrastructure necessary for producing and providing the needed CORE-CM resources for U.S. industry. This final report details the research, methods, and results of the project.

01 COAL, LIGNITE, AND PEAT↗

Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improved greenhouse gas inventories. The GTI Energy (“GTI”) project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This final report summarizes and integrates the project tasks' results and outputs.

03 NATURAL GAS↗

Supporting Information for the Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improvedgreenhouse gas inventories. The GTI Energy (“GTI”)project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This document provides additional information supporting the findings in the final report.

03 NATURAL GAS↗

CalWave's xWave Design for PacWave (Final Technical Report)

CalWave Inc. (CalWave) is developing a wave energy converter (WEC) technology that can generate electricity from ocean waves. CalWave’s design offers a unique approach to wave energy conversion that operates fully submerged and can actively adjust the wave excitation. This capability gives the architecture enhanced survivability in ocean storms without adding significant costs. Prior to this project, CalWave had completed a demonstration of a fully functional WEC system in an open ocean demonstration at nominal 1:5 scale under FOA 1663. The goal of this project was the detailed design, following relevant standards and industry best-practices, of a variant of the xWave WEC technology that can safely and efficiently operate at the DOE’s PacWave South test site for a targeted deployment of up two years. The WEC design and associated review processes proceeded in two distinct project phases: a ‘Preliminary’ and a ‘Final’ design phase. The first phase of the project consisted of the systematic design of the WEC’s key features with regards to appropriate IEC standards. The work resulted in a preliminary design of the xWave hull including structural and Power Take-Off (PTO) load estimates, as well as performance estimates for all ocean conditions the WEC would operate in at PacWave South. Following the first open-water demonstration of CalWave’s small-scale “x1” device under FOA 1663, lessons learned were fed directly into a comprehensive review of the xWave design in the second design phase of this FOA project. CalWave’s work was supported by Sandia National Lab (SNL) and the National Renewable Energy Lab (NREL) on the holistic WEC design, and detailed feedback from specialized partners on hull design, mooring and anchoring specification, and electrical grid interconnection. Optimization of the WEC system was performed using a novel numerical optimization tool developed by Sandia and optimization trends were confirmed via an experimental model scale tank test campaign. Performance estimates for PacWave and a detailed xWave design including integration of all relevant system components were concluded. The mooring design was also concluded in the Final design phase using the most up to date sea floor characterization (CPT) data.

16 TIDAL AND WAVE POWER↗

Advancing Development of Emissions Detection (Final Report)

This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.

42 ENGINEERING↗

Effect of Anoxic Iron Corrosion on WIPP Brine Geochemistry FY23 Final Report (U)

A 280-day study was completed to evaluate the effect of zero-valent iron (Fe 0 ) on the Waste Isolation Pilot Plant (WIPP) brine geochemistry under anticipated reducing conditions. Hydrogen (H 2 ) gas is expected to be present in the repository after closure due to the anoxic corrosion of a vast quantity of iron contained in the waste forms disposed at WIPP; therefore, a background argon atmosphere containing H 2 was chosen for this study. WIPP groundwater brine pH and E h will impact the mobility and fate of plutonium within the repository. Modeling and laboratory results for Castile WIPP brine indicate that equilibrium fa values relative to the standard hydrogen electrode (SHE) are 40 mV more reducing (i.e., more negative) than those for Salado WIPP brine (-480 mV vs. -440 mV, respectively) because of the higher pH of the Castile brine (pH 9 .3 for Castile vs. pH 8.8 for Salado). The E h and pH data were corrected for the effects of high ionic strength. The experimental results for both brines are consistent with thermodynamic predictions using OLI Systems' Mixed Solvent Electrolyte chemical equilibrium model. The measured and corrected pH and E h data from this study are provided in Table ES-I and Table ES-2, respectively. The experimental study, with four test conditions in triplicate, was performed in a dual glovebox with a nominally 3 vol.% H 2 in argon atmosphere (target H 2 range: 3 ± I vol.%). Simulants containing MgO only ( experimental control) and MgO+Fe 0 (WIPP base case) were prepared for both the Salado and Castile brines. MgO was included in all simulants to account for the use of bulk magnesium oxide in the WIPP repository. Fe 0 was included in some simulants to incorporate the effects of the anoxic corrosion of iron and in-situ hydrogen generation in the study. The brine compositions were developed by Sandia National Laboratory (SNL; Xiong, 2008) and have been used in previous WIPP evaluations. The test method (agitation, etc.) is partially based on ASTM D3987-12. Twelve rounds of periodic measurements of pH and E h were performed over the course of the study. Chemical analysis results for liquids and solids (ICP-MS, ICP-ES, IC Anion, TIC, SEM-EDX) are consistent with the pH, E h , and thermodynamic modeling results. This study included the following conditions that deviate from anticipated post-closure conditions following brine intrusion, but were selected to facilitate bench-scale testing to validate modeling of pH and E h for the post-closure WIP P repository: an anoxic glove box atmosphere containing ≤ 4 vol. % H 2 vs. substantially higher H 2 gas concentrations assumed in the WIPP Performance Assessment (PA); a significantly higher liquid-to-solid test ratio compared to the much lower phase ratio anticipated in the WIP P repository; agitation of the simulant bottles to maximize mass transfer; and finally the use of Fe 0 reagents having a much greater surface area than expected in the WIP P repository. Non-representative conditions were chosen for various reasons such as: to provide bounding conservative results, to provide a margin of safety for testing, or to facilitate simulant sub-sampling and analysis. In a parallel effort, aqueous electrolyte thermodynamic models were developed for the synthetic Salado and Castile brines to inform the experimental design, facilitate laboratory data interpretation, and allow extension of evaluations beyond the parameters tested. Thermodynamic modeling simulations including the MgO and Fe 0 additives that are directly relevant to the experimental measurements (e.g., pH calibration curve, ORP corrections) are included in this report. The measured fa of the simulants was close to the OLI model predictions for both brines and was largely controlled by the background H 2 partial pressure in the vapor phase as well as H 2 generated in situ in the aqueous phase by the Fe 0 corrosion. The H 2 gas-phase concentration tested and thermodynamically evaluated was much lower than is assumed in the WIPP PA; however, H 2 (g) concentrations significantly below this level are still predicted to result in very reducing conditions. In conclusion: • The experimental results are consistent with thermodynamic model predictions for fa, pH, and the effects of high ionic strength. • Evidence to date suggests that the H2 concentration in the glovebox atmosphere ultimately determined the final E h values of the simulants and resulted in highly reducing conditions. As a result, little difference was observed between the control simulants containing only MgO and the WIPP base-case simulants that contained MgO and Fe 0 . • This test methodology is recommended for future studies evaluating WIPP repository conditions. The methodology includes: (1) background H 2 in argon with agitation ( or could alternatively include in-situ-generated H 2 in sealed bottles); (2) carefully measured and corrected ORP data ( with much effort focused on allowing the probes to fully stabilize); and (3) ionic-strength-corrected pH data. Other best practices, such as simulant sparging/handling, ORP probe replacement, etc., should also be considered. • The coupling of experimental studies and thermodynamic modeling is also highly recommended because these methods inform and direct one another leading to greater confidence in and understanding of the results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research in Neutrino Physics (Final Technical Report)

The goal of the experimental neutrino efforts at Louisiana State University is to measure the properties of neutrinos and to improve our understanding of neutrino interactions. In pursuit of this goal, the group will continue its Intensity Frontier work on the DUNE experiment at Fermilab and the T2K experiment at J-PARC, Japan. The current work is focused on understanding how neutrinos change flavor and on the possibility for asymmetry between neutrinos and anti-neutrinos. The effort on T2K includes physics measurements using the collected T2K data and preparation for the second phase T2K-II data with an increased beam power and the newly upgraded ND280 detector, featuring a novel 3D fine grained scintillation tracker with 4π acceptance and 3D readout. T2K is in a position to improve our understanding of neutrino nucleus interactions which continue to be one of the largest systematic uncertainties for neutrino oscillation measurements. On DUNE, the effort is on analyzing the data collected by the ProtoDUNE-SP prototype at CERN and on the design, installation, and commissioning of ProtoDUNE-II and later the DUNE Far Detector cold electronics. The final DUNE Module-1 components will be fully characterized by ProtoDUNE-II and the collected data will be used to improve and tune simulation and reconstruction algorithms, and to measure hadron scattering cross section, used to improve the modeling of neutrino final state interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Deliverable 6.7-Final Technical Report: Development Summary and Evaluation of the Solar Uncertainty Integrator (SUNI) Software

The Data Quality and Uncertainty Integration Project was a three-year effort to address stakeholder needs for assessing solar radiation resource data quality based on existing tools for estimating radiometer measurement uncertainties and assessing post-measurement data quality. The annual research objectives for the project addressed a logical progression of effort needed to achieve the ultimate project goal of developing the Solar Uncertainty Integrator (SUNI) software. This final technical report summarizes the development process for achieving these key research objectives and addresses the outreach and code development efforts in the final year of the project to develop a new solar irradiance data uncertainty integration software package.

14 SOLAR ENERGY↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

COnfirmation using Gamma-ray Non-Imaging Zero-knowledge ANti-mask Time-encoding (COGNIZANT) Final Summary Report

In potential future arms reduction treaties in which the numbers of nuclear warheads may approach small numbers, using delivery systems as a proxy for the warheads themselves may be insufficient. Therefore, a technical means of verifying the presence of a nuclear warhead may become necessary. Verifying that a declared item actually is a warhead is technically challenging within a verification regime: providing assurance to the monitoring party that a presented item is a warhead while protecting sensitive information about that warhead may be required. It is generally believed that strong assurance will require the confirmation of key attributes that may reveal closely-guarded critical design information. This provides high confidence to the monitoring party, but presents a risk of information loss to the host. A verification system must overcome this hurdle. Over the last several decades, systems have been developed that balance host and monitoring partner needs by using sensitive information to confirm treaty accountable items (TAI) as warheads while sequestering that information behind an information barrier (1). These are designed to meet the needs of the host but places the onus on the monitor to authenticate the hardware, firmware, and software. Authentication requires that the monitor confirm that all components of the system have not been modified and work as intended. In 2014, Glaser et al. proposed applying the concept of “zero knowledge protocols” (ZKP) from the field of cryptography to the problem of warhead verification (2). In mathematical cryptography, ZKP is accomplished by challenging one party to solve a problem that is only possible if that party possesses the information being authenticated. After repeated challenges, the party provides confidence that it possesses this information without revealing any details about the information itself. Systems have been in development based on this idea at both Princeton and MIT (2) (3) (4). The final measurement results produced by these systems can be viewed by both the host and the monitoring party without the worry of revealing sensitive information. However, in both of these physical implementations, there remains an information barrier within the system. The need for a digital information barrier to protect a measurement result is eliminated, but it has been replaced with the need to sequester physical components of the system, potentially obfuscating the measurement process itself. Both implementations physically insert information into the system that requires protection to prevent undesired disclosure of sensitive information: in the Princeton method, one must physically load the complement of the expected image of a true warhead into the system, and in the MIT technique, one loads a collection of spectator foils whose thicknesses physically encrypt a measured spectrum. This complicates authentication of the hardware and measurement process. The CONFIDANTE/COGNIZANT concept developed in this project do not load sensitive information into the system at any time, and could therefore open the possibility of allowing the inspector to not only view the final data but also the measurement as it is being performed and all associated equipment.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines (Final Report)

This is the final report for project DE-FE0031924 titled “High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines.” The report provides a summary of the entire project efforts from October 2020 through December 2024 including the high-temperature commercial dry gas seal (DGS) tests and thermal modeling of Task 2, as well as the high-temperature, large-diameter seal design and high-temperature tests of large-diameter seals in Task 3. A key outcome of Task 2 was the testing completion of specially instrumented commercial DGS in the GE-SwRI Apollo sCO 2 compressor (27,000 rpm). Test data from the DGS showed elevated temperatures upwards of 350 o F, which are close to the higher operating temperature limit of the DGS. The temperature measurements provide insight into the expected thermal loads on DGS operating in high-speed sCO 2 compressor and provided test data for validation of an in-house thermal model of the compressor/seal. Under Task 2.0, this report also presents the development of a steady-state conjugate heat-transfer model of the DGS operating in the sCO 2 compressor – a first of its kind model for modeling heat transfer of sCO 2 in an actual operating compressor. The findings of the thermal model show a reasonable match between temperature predictions of the model and the measured temperature data, also pointing out the validity of the approach and assumptions made in modeling the flows, heat transfer coefficients and windage modeling in the rig. Under Task 3.0, this report presents the preliminary design of a large-diameter hybrid face seal (14 inch and 26-inch diameter) for field testing in a land-based GE turbine. The preliminary seal design effort presented in this report under project DE-FE0031924 builds on the development and successful laboratory testing for such large diameter hybrid face seal under the prior DE-FE0024007 project. Key aspects of seal fluid analyses with CFD, mechanical design considerations and assembly considerations in a land-based turbine are presented. Finally, under Task 3.0, this report also presents the continued high-temperature testing of the 14-inch diameter hybrid face seal developed previously under the DE-FE0024007 program. Specifically, test data demonstrating successful non-contact seal operation and seal effective leakage of 0.001-inch with seal inlet temperatures above 700 o F are presented in this report. Successful hybrid seal operation in a laboratory environment for a large diameter (14-inch) seal at temperatures above 700 o F is a major technological milestone for this technology.

01 COAL, LIGNITE, AND PEAT↗