High Efficiency Stirling Power Conversion Technologies for Radioisotope and Fission Nuclear Power Systems
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This minitrack is on topics related to the monitoring, control, and protection of electric power systems for real-time operations and short-term operations planning. This year the emphasis has been on recent developments in the area of large-scale dynamic research for power systems and on hybrid and distributed control concepts for decentralized command and control of existing critical energy infrastructures.
An integration study was performed by coupling an SP-100 reactor to either a Brayton or Stirling power conversion subsystem. The application was for a surface power system to supply power requirements to a lunar base. A power level of 550 kWe was selected based on the NASA Space Exploration Initiative 90-day study. Reliability studies were initially performed to determine optimum power-conversion redundancy. This study resulted in selecting three operating engines and one standby unit. Integratiaon-design studies indicated that either the Brayton or Stirling power conversion subsystem could be integrated with the SP-100 reactor. The Stirling system had an integration advantage because of smaller piping size and fewer components. The Stirling engine, however, is more complex and heavier than the Brayton rotating unit, which tends to offset the Stirling integration advantage. From a performance consideration, the Brayton had a 9-percent mass advantage and the Stirling a 50-percent radiator-area advantage.
Power system planning is the process of forecasting load demand and ensuring sufficient generation and reserve capacities over some planning horizon. This process includes investigation of steady-state and dynamic operation of power system of interest. This paper addresses the transient stability (also known as large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability and frequency response for all fault types for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted components present and is applicable to the study of both short term and long term faults, though only short term faults are considered here (long term faults are treated sequentially in a companion paper). Furthermore, this paper considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.
Not Available
The purpose of this paper is to describe the design of the Space Station Electrical Power System. This includes the Photovoltaic and Solar Dynamic Power Modules as well as the Power Management and Distribution System (PMAD). In addition, two programmatic options for developing the Electrical Power System will be presented. One approach is defined as the Enhanced Configuration and represents the results of the Phase B studies conducted by the NASA Lewis Research Center over the last two years. Another option, the Phased Program, represents a more measured approach to reaching about the same capability as the Enhanced Configuration.
The purpose of this paper is to describe the design of the Space Station Electrical Power System. This includes the Photovoltaic and Solar Dynamic Power Modules as well as the Power Management and Distribution System (PMAD). In addition, two programmatic options for developing the Electrical Power System will be presented. One approach is defined as the Enhanced Configuration and represents the results of the Phase B studies conducted by the NASA Lewis Research Center over the last two years. Another option, the Phased Program, represents a more measured approach to reaching about the same capability as the Enhanced Configuration.
The uncontrolled intermittent availability of renewable energy sources makes integration of such devices into today's grid a challenge. Thus, it is imperative that dynamic simulation tools used to analyze power system performance are able to support systems with high amounts of photovoltaic (PV) generation. Additionally, simulation durations expanding beyond minutes into hours must be supported. This report aims to identify the path forward for dynamic simulation tools to accom- modate these needs by characterizing the properties of power systems (with high PV penetration), analyzing how these properties affect dynamic simulation software, and offering solutions for po- tential problems. We present a study of fixed time step, explicit numerical integration schemes that may be more suitable for these goals, based on identified requirements for simulating high PV penetration systems. We also present the alternative of variable time step integration. To help determine the characteristics of systems with high PV generation, we performed small signal sta- bility studies and time domain simulations of two representative systems. Along with feedback from stakeholders and vendors, we identify the current gaps in power system modeling including fast and slow dynamics and propose a new simulation framework to improve our ability to model and simulate longer-term dynamics.
The design of a hybrid deployable/erectable solar dynamic box truss power generation system for the initial operation capability (IOC) of the Space Shuttle is examined. An organic Rankine cycle heat engine for IOC solar power generation is studied. The design configuration is a simple parabolic concentration where the receiver is located in the focal plane with its aperture at the focal point. The relationship between concentrator size and collection efficiency is analyzed. The geometry of the deployable graphite/epoxy box truss ring and the reflective panels of the system are described. Mass properties and dynamic analyses are performed to evaluate the center of gravity location and moments of inertia characteristics of the energy conversion subsystem (ECS). The deployable/erectable truss is applicable for large IR space telescopes and center and offset fed ECSs.
Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.
The major requirements and guidelines that affect the NASA Space Station configuration and the power system are explained. The evolution of the Space Station power system from the NASA program development-feasibility phase through the preliminary design phase is described. Early station concepts, both fanciful and feasible, are described and linked to the present concept. The Phase B trade study selections of photovoltaic system technologies are detailed. Solar dynamic and power management and distribution systems are summarized.
This paper describes a computer code which provides a significant advance in the systems analysis capabilities of solar dynamic power modules. While the code can be used to advantage in the preliminary analysis of terrestrial solar dynamic modules its real value lies in the adaptions which make it particularly useful for the conceptualization of optimized power modules for space applications. In particular, as illustrated in the paper, the code can be used to establish optimum values of concentrator diameter, concentrator surface roughness, concentrator rim angle and receiver aperture corresponding to the main heat cycle options - Organic Rankine and Brayton - and for certain receiver design options. The code can also be used to establish system sizing margins to account for the loss of reflectivity in orbit or the seasonal variation of insolation. By the simulation of the interactions among the major components of a solar dynamic module and through simplified formulations of the major thermal-optic-thermodynamic interactions the code adds a powerful, efficient and economic analytical tool to the repertory of techniques available for the design of advanced space power systems.
Power system mode shapes are key indication of how dynamic components participate in low-frequency oscillations. Traditionally, mode shapes are calculated from a linearized dynamic model. For large-scale power systems, obtaining accu-rate dynamic models is very difficult. Therefore, measurement-based mode shape estimation methods have certain advantages, especially for the application of real-time small signal stability monitoring. In this paper, a measurement-based mode shape iden-tification method is proposed. The general relationship between transfer function (TF) and mode shape is derived. As an example, a least square (LS) method is implemented to estimate mode shape using an autoregressive exogenous (ARX) model. The per-formance of the proposed method is evaluated by Monte-Carlo studies using simulation data from a 17-machine model. The re-sults indicate the validity of the proposed method in estimating mode shapes with reasonably good accuracy
The extensive installation of gas-fired power plants in many parts of the world has led electric systems to depend heavily on reliable gas supplies. The use of gas-fired generators for peak load and reserve provision causes high intraday variability in withdrawals from high-pressure gas transmission systems. Such variability can lead to gas price fluctuations and supply disruptions that affect electric generator dispatch, electricity prices, and threaten the security of power systems and gas pipelines. These infrastructures function on vastly different spatio-temporal scales, which prevents current practices for separate operations and market clearing from being coordinated. Here in this article, we apply new techniques for control of dynamic gas flows on pipeline networks to examine day-ahead scheduling of electric generator dispatch and gas compressor operation for different levels of integration, spanning from separate forecasting, and simulation to combined optimal control. We formulate multiple coordination scenarios and develop tractable physically accurate computational implementations. These scenarios are compared using an integrated model of test networks for power and gas systems with 24 nodes and 24 pipes, respectively, which are coupled through gas-fired generators. The analysis quantifies the economic efficiency and security benefits of gas-electric coordination and dynamic gas system operation.
The increasing penetration of inverter-based resources (IBRs) introduces new challenges to power system simulations, particularly with the emergence of fast electromagnetic transient (EMT) dynamics and sub-synchronous oscillations (SSO) that require time-consuming EMT simulations. To reduce the time cost for simulating a large-scale power grid with IBRs, this paper proposes a novel participation factor-based approach for defining a critical zone for detailed EMT modeling and simulations, which includes the IBRs, synchronous generators, and the network components participating significantly in simulated contingencies. Both model-based and response-based methods are introduced for the estimation of participation factors (PFs). The case study on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrates that the EMT zone determined by the proposed approach can effectively capture power system dynamics involving IBRs.
High performance computing (HPC) systems frequently produce large dynamic power swings, even under typical operating conditions, that can present a significant challenge for their direct-liquid cooling systems. Further, the primary cooling loops that must remove this waste heat have response times measured in minutes while the underlying HPC component thermal stress is measured in seconds. The per-socket power demand for both compute processing units (CPUs) and graphic processing units ( GPUs) continues to increase with each successive generation while case temperatures are declining. New HPC systems are expected to exacerbate the challenge of these dynamic power swings and the impact on effective and timely cooling systems. This paper describes the cooling and controls system for Oak Ridge National Laboratory’s Frontier Supercomputer, the first sustained exascale system, as a case study for this situation. The cooling and control system for Frontier demonstrates specific success, but with a number of trade-offs and decisions that suggest further design and operating optimizations for the community at large to consider.
Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.
The results of a dynamic interaction investigation to characterize any disturbances caused by interfacing the Mod 0A wind turbine (150 kW configuration) with the Block Island utility diesel generator grid are reported. The tests were run when only two diesel generators were on line, and attention was given to power, frequency, and voltage time profiles. The interconnected system was examined in the start-up and synchronization phase, normal shutdown and cut-out of the wind turbine, during fixed pitch generation, and during variable pitch operation. Governors were installed on the diesel generators to accommodate the presence of wind-derived electricity. The blade pitch control was set to maintain power at 150 kW or below. Power and voltage transients were insignificant during start-up and shutdown, and frequency aberrations were within the range caused by load fluctuations. It is concluded that wind turbine generation can be successfully implemented by an isolated utility, even with a significant penetration to the total grid output.