Search NASA⌕ Search

SEARCH · Search NASA

Results for “Advanced Distribution Management System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Improving snow albedo modeling in the E3SM land model (version 2.0) and assessing its impacts on snow and surface fluxes over the Tibetan Plateau

With the highest albedo of the land surface, snow plays a vital role in Earth's surface energy budget and water cycle. Snow albedo is primarily controlled by snow grain properties (e.g., size and shape) and light-absorbing particles (LAPs) such as black carbon (BC) and dust. The mixing state of LAPs in snow also has impacts on LAP-induced snow albedo reduction and surface radiative forcing (RF). However, most land surface models assume that snow grain shape is spherical and LAPs are externally mixed with the snow grains. This study improves the snow radiative transfer model in the Energy Exascale Earth System Model version 2.0 (E3SM v2.0) Land Model (ELM v2.0) by considering non-spherical snow grain shapes (i.e., spheroid, hexagonal plate, and Koch snowflake) and internal mixing of dust–snow, and it systematically evaluates the impacts on the surface energy budget and water cycle over the Tibetan Plateau (TP). A series of ELM simulations with different treatments of snow grain shape, mixing state of BC–snow and dust–snow, and sub-grid topographic effects (TOP) on solar radiation are performed. Compared with two remote sensing snow products derived from the Moderate Resolution Imaging Spectroradiometer, the control ELM simulation (ELM_Control) with the default configurations of spherical snow grain shape, internal mixing of BC–snow, external mixing of dust–snow, and without TOP as well as the ELM simulation with new model features (ELM_New) can both capture the overall snow distribution reasonably. Additionally, ELM_New overall shows smaller biases in snow cover fraction than ELM_Control in spring when snowmelt is important for water management. The estimated LAP-induced RF in ELM_New ranges from 0 to 19.3 W m -2 with the area-weighted average value of 1.5 W m -2 that is comparable to the reported values in existing studies. The Koch snowflake shape, among other non-spherical shapes, shows the largest difference from the spherical shape in spring when snow processes related to the surface energy budget and water cycle have high importance. The impacts of the mixing state of LAP in snow are smaller than the shape effects and depend on snow grain shape. Compared to external mixing, internal mixing of LAP–snow can lead to larger snow albedo reduction and snowmelt, which further affect the surface energy budget and water cycle. The individual contributions of non-spherical snow shape, mixing state of LAP–snow, and local topography impacts on the snow and surface fluxes have different signs and magnitudes, and their combined effects may be negative or positive due to complex and nonlinear interactions among the factors. Overall, the changes in net solar radiation in spring due to individual and combined effects range from -28.6 to 16.9 W m -2 and -29.7 to 12.2 W m -2 , respectively. This study advances understanding of the role of snow grain shape and mixing state of LAP–snow in land surface processes and offers guidance for improving snow simulations and RF estimates in Earth system models under climate change.

58 GEOSCIENCES↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guest Editorial: Special Section on Sustainable Energy for Enhancing Grid Resiliency

Extreme weather threatens lives, disables communities, and devastates energy generation, transmission, and distribution systems. These extreme events are likely to become more frequent or more intense due to climate change. Energy networks have shown significant vulnerability during record hurricanes, deadly heat waves, destructive wildfires, and winter storms in the past few years. Because of the energy transition process, modern power grids will feature a high penetration level of the use of renewable resources. The adoption of renewable energy and the rise of omnidirectional power delivery mean that our energy network is more decentralized than ever. In this new environment, grid operation becomes more complex, and achieving resiliency is more difficult than in the past. Many utilities are seeking the latest technologies to improve energy security and responsiveness to severe events. On the one hand, sustainable energy resources can provide emergency power and assist grid restoration in disastrous events. On the other hand, their volatility, susceptibility, interdependency, and other unique features must be carefully considered when being used for grid resilience enhancement. This special section brings together 22 papers that range from innovative research advances tackling fundamental challenges of achieving more resilient grids to real-world demonstrations of leveraging sustainable energy resources to enhance grid resiliency. These papers can be categorized into three groups.

climate change↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Aeronautical-Satellite-Assisted Process Being Developed for Information Exchange Through Network Technologies (Aero-SAPIENT)

Communications technologies are being developed to address safety issues during aviation travel. Some of these technologies enable the aircraft to be in constant bidirectional communications with necessary systems, people, and other aircraft that are not currently in place today. Networking technologies, wireless datalinks, and advanced avionics techniques are areas of particular importance that the NASA Glenn Research Center has contributed. Glenn, in conjunction with the NASA Ames Research Center, NASA Dryden Flight Research Center, and NASA Langley Research Center, is investigating methods and applications that would utilize these communications technologies. In mid-June 2000, the flight readiness of the network and communications technologies were demonstrated via a simulated aircraft. A van simulating an aircraft was equipped with advanced phased-array antennas (Advanced Communications/Air Traffic Management (AC/ATM) Advanced Air Transportation Technologies (AATT) project) that used commercial Ku-band satellite communications to connect Glenn, Dryden, and Ames in a combined system ground test. This test simulated air-ground bidirectional transport of real-time digital audio, text, and video data via a hybrid network configuration that demonstrated the flight readiness of the network and communications technologies. Specifically, a Controller Pilot Data Link Communications application was used with other applications to demonstrate a multiprotocol capability via Internet-protocol encapsulated ATN (Aeronautical Telecommunications Network) data packets. The significance of this combined ground test is its contribution to the Aero Information Technology Base Program Level I milestone (Software Technology investment area) of a real-time data link for the National Airspace System. The objective of this milestone was to address multiprotocol technology applicable for real-time data links between aircraft, a satellite, and the ground as well as the ability to distribute flight data with multilevel priorities among several sites.

Zernic, Michael J.↗

The design of a petabyte archive and distribution system for the NASA ECS project

The NASA EOS Data and Information System (EOSDIS) Core System (ECS) will contain one of the largest data management systems ever built - the ECS Science and Data Processing System (SDPS). SDPS is designed to support long term Global Change Research by acquiring, producing, and storing earth science data, and by providing efficient means for accessing and manipulating that data. The first two releases of SDPS, Release A and Release B, will be operational in 1997 and 1998, respectively. Release B will be deployed at eight Distributed Active Archiving Centers (DAAC's). Individual DAAC's will archive different collections of earth science data, and will vary in archive capacity. The storage and management of these data collections is the responsibility of the SDPS Data Server subsystem. It is anticipated that by the year 2001, the Data Server subsystem at the Goddard DAAC must support a near-line data storage capacity of one petabyte. The development of SDPS is a system integration effort in which COTS products will be used in favor of custom components in very possible way. Some software and hardware capabilities required to meet ECS data volume and storage management requirements beyond 1999 are not yet supported by available COTS products. The ECS project will not undertake major custom development efforts to provide these capabilities. Instead, SDPS and its Data Server subsystem are designed to support initial implementations with current products, and provide an evolutionary framework that facilitates the introduction of advanced COTS products as they become available. This paper provides a high-level description of the Data Server subsystem design from a COTS integration standpoint, and discussed some of the major issues driving the design. The paper focuses on features of the design that will make the system scalable and adaptable to changing technologies.

Caulk, Parris M.↗

Power Management and Distribution (PMAD) Model Development: Final Report

Power management and distribution (PMAD) models were developed in the early 1990's to model candidate architectures for various Space Exploration Initiative (SEI) missions. They were used to generate "ballpark" component mass estimates to support conceptual PMAD system design studies. The initial set of models was provided to NASA Lewis Research Center (since renamed Glenn Research Center) in 1992. They were developed to estimate the characteristics of power conditioning components predicted to be available in the 2005 timeframe. Early 90's component and device designs and material technologies were projected forward to the 2005 timeframe, and algorithms reflecting those design and material improvements were incorporated into the models to generate mass, volume, and efficiency estimates for circa 2005 components. The models are about ten years old now and NASA GRC requested a review of them to determine if they should be updated to bring them into agreement with current performance projections or to incorporate unforeseen design or technology advances. This report documents the results of this review and the updated power conditioning models and new transmission line models generated to estimate post 2005 PMAD system masses and sizes. This effort continues the expansion and enhancement of a library of PMAD models developed to allow system designers to assess future power system architectures and distribution techniques quickly and consistently.

Metcalf, Kenneth J.↗

Advancing Grid Resilience through Smart Charge Management: Findings from Maryland’s Pilot

This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Management of Risk and Uncertainty Through Optimized Co-Operation of Transmission Systems and Microgrids with Responsive Loads (Final Report)

The evolution of the power system to the reliable, efficient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. Ambitious national and state-level goals around the decarbonization of electricity relies on the integration of very high levels of renewable resources, most of which are variable and intermittent. The use of demand response is an ideal approach to counterbalance the intermittency of renewable generation and brings the consumer into the spotlight. Until recently, very little research had been conducted on the co-optimization of these two systems due to computational limitations. However, advances in computational capabilities, and the judicious use of decomposition methods and innovative approximation methods for high-dimension dynamic programming made this goal a viable objective for this project, leading to a fundamental shift in the ability to integrate and fully utilize demand-side resources. To this end, the modeling framework developed introduces a novel co-optimization framework, to include the operations of both the transmission and distribution systems (or microgrids) in operational decision making. This framework was used to analyze renewable and distributed generation along with responsive demand and to compare the capability of co-optimized systems to perform with higher levels of variable renewables. Results show that the use of a bi-level optimization approach is an appropriate structure, capable of co-optimizing a transmission system with multiple distribution systems and microgrids. While increasing the number of connected systems provides increasing flexibility for renewables integration this can also the economic benefits to the low-voltage subsystems with each additional system connected. Comparison of a traditional single-level decision structure with the co-optimization approach illustrates a reduction in overall system cost under co-optimization, while specific cost allocations to transmission and distribution systems are changed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing green infrastructure placement under precipitation uncertainty

Increased urbanization, infrastructure degradation, and climate change threaten to overwhelm stormwater systems across the nation, rendering them ineffective. Green Infrastructure (GI) practices are low cost, low regret strategies that can contribute to urban runoff management. However, questions remain as to how to best distribute GI practices through urban watersheds given precipitation uncertainty and the variable hydrological responses to them. We develop stochastic programming models to determine the optimal placement of GI practices across a set of candidate locations in a watershed to minimize the total expected runoff under medium-term precipitation uncertainties. Specifically, we first develop a two-stage stochastic programming model. Next, we reformulate this model using perturbed parameters to reduce the requisite computational time and extend it to multi-stage. In addition, we introduce constraints that allow for incorporating sub-catchment-level runoff reduction considerations. Furthermore, we account for hydrological connectivity in the watershed using an underlying acyclic connectivity graph of sub-catchments and incorporate various practical considerations into the models. In addition, we develop a systemic approach to downscale the existing daily precipitation projections into hourly units and efficiently estimate the corresponding hydrological responses. These advancements are brought together in a case study for an urban watershed in a mid-sized city in the U.S., where we perform sensitivity analyses, evaluate the importance of the considered constraints, and provide insights.

54 ENVIRONMENTAL SCIENCES↗

Solar Power System Evaluated for the Human Exploration of Mars

The electric power system is a crucial element of any mission for the human exploration of the Martian surface. The bulk of the power generated will be delivered to crew life support systems, extravehicular activity suits, robotic vehicles, and predeployed in situ resource utilization (ISRU) equipment. In one mission scenario, before the crew departs for Mars, the ISRU plant operates for 435 days producing liquefied methane and oxygen for ascent-stage propellants and water for crew life support. About 200 days after ISRU production is completed, the crew arrives for a 500-day surface stay. In this scenario, the power system must operate for a total of 1130 days (equivalent to 1100 Martian "sols"), providing 400 MW-hr of energy to the ISRU plant and up to 18 kW of daytime user power. A photovoltaic power-generation system with regenerative fuel cell (RFC) energy storage has been under study at the NASA Glenn Research Center at Lewis Field. The conceptual power system is dominated by the 4000- m2 class photovoltaic array that is deployed orthogonally as four tent structures, each approximately 5 m on a side and 100-m long. The structures are composed of composite members deployed by an articulating mast, an inflatable boom, or rover vehicles, and are subsequently anchored to the ground. Array panels consist of thin polymer membranes with thin-film solar cells. The array is divided into eight independent electrical sections with solar cell strings operating at 600 V. Energy storage is provided by regenerative fuel cells based on hydrogen-oxygen proton exchange membrane technology. Hydrogen and oxygen reactants are stored in gaseous form at 3000 psi, and the water produced is stored at 14.7 psi. The fuel cell operating temperature is maintained by a 40-m2 deployable pumped-fluid loop radiator that uses water as the working fluid. The power management and distribution (PMAD) architecture features eight independent, regulated 600-Vdc channels. Power management and distribution power cables use various gauges of copper conductors with ethylene tetrafluoroethylene insulation. To assess power system design options and sizing, we developed a dedicated Fortran code to predict detailed power system performance and estimate system mass. This code also modeled the requisite Mars surface environments: solar insolation, Sun angles, dust storms, dust deposition, and thermal and ultraviolet radiation. Using this code, trade studies were performed to assess performance and mass sensitivities to power system design parameters (photovoltaic array geometry and orientation) and mission parameters (landing date and landing site latitude, terrain slope, and dust storm activity). Mission analysis cases were also run. Power results are shown in this graph for an analysis case with a September 1, 2012, landing date; 18.95 North latitude landing site; two seasonal dusts storms; and tent arrays. To meet user load requirements and the ISRU energy requirement, an 8-metric ton (MT) power system and 4000-m2 photovoltaic array area were required for the assumed advanced CuInS2 thin-film solar cell technology. In this figure, the top curve is the average daytime photovoltaic array power, the middle curve is average daytime user load power, and the bottom curve is nighttime power. At mission day 1, daytime user power exceeds 120 kW before falling off to 80 kW at the end of the mission. Throughout the mission, nighttime user power is set to the nighttime power requirement. In this analysis, "nighttime" is defined as the 13- to 15-hr period when array power output is below the daytime power requirement. During dust storms, power system capability falls off dramatically so that by mission day 900, a daily energy balance cannot be maintained. Under these conditions, the ISRU plant is placed in standby mode, and the regenerative fuel cell energy storage is gradually discharged to meet user loads.

Kerslake, Thomas W.↗

A Transparent Translation from Legacy System Model into Common Information Model

Advances in the smart grid are forcing utilities toward better monitoring, control, and analysis of distribution systems, and require extensive cyber-based, intelligent systems and applications to realize various functionalities. The ability of systems, or components within systems, to interact and exchange services or information with each other is the key to the success of smart grid technologies, and it requires efficient information exchanging and data sharing infrastructure. The Common Information Model (CIM) is a standard that allows different applications to exchange information about an electrical system, and it has become a widely accepted solution for information exchange among different platforms and applications. However, most existing legacy systems were developed using their own languages rather than CIM. Integrating such legacy systems is a challenge for utilities, and the appropriate use of the integrated legacy systems is even more intricate. Thus, this paper describes an approach and open-source tool developed to translate legacy system models into CIM format. The developed tool was tested for a commercial distribution management system and simulation results have proved its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Proof-of-Concept of a Networked Validation Environment for Distributed Air/Ground NextGen Concepts

The National Airspace System (NAS) must be improved to increase capacity, reduce flight delays, and minimize environmental impacts of air travel. NASA has been tasked with aiding the Federal Aviation Administration (FAA) in NAS modernization. Automatic Dependent Surveillance-Broadcast (ADS-B) is an enabling technology that is fundamental to realization of the Next Generation Air Transportation System (NextGen). Despite the 2020 FAA mandate requiring ADS-B Out equipage, airspace users are lacking incentives to equip with the requisite ADS-B avionics. A need exists to validate in flight tests advanced concepts of operation (ConOps) that rely on ADS-B and other data links without requiring costly equipage. A potential solution is presented in this paper. It is possible to emulate future data link capabilities using the existing in-flight Internet and reduced-cost test equipment. To establish proof-of-concept, a high-fidelity traffic operations simulation was modified to include a module that simulated Internet transmission of ADS-B messages. An advanced NASA ConOp, Flight Deck Interval Management (FIM), was used to evaluate technical feasibility. A preliminary assessment of the effects of latency and dropout rate on FIM was performed. Flight hardware that would be used by proposed test environment was connected to the simulation so that data transfer from aircraft systems to test equipment could be verified. The results indicate that the FIM ConOp, and therefore, many other advanced ConOps with equal or lesser response characteristics and data requirements, can be evaluated in flight using the proposed concept.

Grisham, James↗

NASA's Earth Science Flight Program Meets the Challenges of Today and Tomorrow

NASA's Earth science flight program is a dynamic undertaking that consists of a large fleet of operating satellites, an array of satellite and instrument projects in various stages of development, a robust airborne science program, and a massive data archiving and distribution system. Each element of the flight program is complex and present unique challenges. NASA builds upon its successes and learns from its setbacks to manage this evolving portfolio to meet NASA's Earth science objectives. NASA fleet of 16 operating missions provide a wide range of scientific measurements made from dedicated Earth science satellites and from instruments mounted to the International Space Station. For operational missions, the program must address issues such as an aging satellites operating well beyond their prime mission, constellation flying, and collision avoidance with other spacecraft and orbital debris. Projects in development are divided into two broad categories: systematic missions and pathfinders. The Earth Systematic Missions (ESM) include a broad range of multi-disciplinary Earth-observing research satellite missions aimed at understanding the Earth system and its response to natural and human-induced forces and changes. Understanding these forces will help determine how to predict future changes, and how to mitigate or adapt to these changes. The Earth System Science Pathfinder (ESSP) program provides frequent, regular, competitively selected Earth science research opportunities that accommodate new and emerging scientific priorities and measurement capabilities. This results in a series of relatively low-cost, small-sized investigations and missions. Principal investigators whose scientific objectives support a variety of studies lead these missions, including studies of the atmosphere, oceans, land surface, polar ice regions, or solid Earth. This portfolio of missions and investigations provides opportunity for investment in innovative Earth science that enhances NASA's capability for better understanding the current state of the Earth system. ESM and ESSP projects often involve partnerships with other US agencies and/or international organizations. This adds to the complexity of mission development, but allows for a greater scientific return on NASA's investments. The Earth Science Airborne Science Program provides manned and unmanned aircraft systems that further science and advance the use of satellite data. NASA uses these assets worldwide in campaigns to investigate extreme weather events, observe Earth system processes, obtain data for Earth science modeling activities, and calibrate instruments flying aboard Earth science spacecraft. The Airborne Science Program has six dedicated aircraft and access to many other platforms. The Earth Science Multi-Mission Operations program acquires, preserves, and distributes observational data from operating spacecraft to support Earth Science research focus areas. The Earth Observing System Data and Information System (EOSDIS), which has been in operations since 1994, primarily accomplishes this. EOSDIS acquires, processes, archives, and distributes Earth Science data and information products. The archiving of NASA Earth Science information happens at eight Distributed Active Archive Centers (DAACs) and four disciplinary data centers located across the United States. The DAACs specialize by topic area, and make their data available to researchers around the world. The DAACs currently house over 9 petabytes of data, growing at a rate of 6.4 terabytes per day. NASA's current Earth Science portfolio is responsive to the National Research Council (NRC) 2007 Earth Science Decadal Survey and well as the 2010 NASA Response to President Obama's Climate Plan. As the program evolves into the future it will leverage the lessons learned from the current missions in operations and development, and plan for adjustments to future objectives in response to the anticipated 2017 NRC Decadal Survey.

Flight Program↗

Faster-than-real-time Simulation with Demonstration for Resilient DER Integration

The US electric grid is facing operational, stability, and security challenges. Transmission system operators need some measure of visibility into distribution system renewable generation. Distribution system generation needs to support transmission system voltage. The grid is experiencing an expansion in measurement systems. How to take full advantage of this expansion and defend against attacks, both cyber and physical, poses additional challenges. The Faster-than-real-time Simulation with demonstration for Resilient DER Integration project set out to do the following: a. Flatten the voltage profile through the feeders and system for cost saving and voltage stabilization needs. b. Increase the amount of intermittent distributed energy resources (IDERs) that could be deployed on a utility feeder and provide 100% or more energy needed for the demands on that feeder, and c. based on an accurate model (Digital Twin) of the utilities system, be able to detect any abnormalities on the utilities distribution system. To manage the voltage and increase IDER penetration (a,b), Graph Trace Analysis is employed in a time-series, optimal power flow to coordinate the time-varying feedback control setpoints of a distribution feeder’s utility control devices. Under the coordinated control are a Load Tap Changing Transformer, a voltage regulator, and five switched capacitor banks. The feeder serves over 2000 customers, the feeder secondaries are modeled, and the feeder has 2.3 MW of PV generation, corresponding to a 17.4% penetration of PV generation. The feeder model has over 12,000 components, where every customer load bus and PV generator are modeled. The accuracy of the power flow solution is compared against historical meter voltage measurements, the improvement in conservation voltage reduction energy savings as a function of the coordinated control desired voltage profile is investigated, and the increase in PV penetration of the coordinated control over the existing control is presented. To achieve improved control performance while observing system operation constraints, bellwether Advanced Metering Infrastructure (AMI) voltage measurements are used to adjust the desired voltage profile used by the optimal power flow analysis. To detect and alleviate or negate attacks or failures on the distribution and transmission utility grids (c) the grid needs to be resilient and self-healing. In this project software was designed to do just that. At the center of the software is an Integrated System Model (ISM) that spans from transmission to secondary distribution. The ISM is employed in real-time abnormality detection, voltage stability forecasting, and multi-mode control. Testing results are presented for: 1—attacks on utility infrastructure; 2—energy savings from optimal control; 3—distribution system control response during a low voltage transmission system event; 4—cyber-attacks on PV inverters, where physical inverters are used in hard-ware-in-the-simulation-loop studies. Contributions of this work include real-time analysis that spans from three-phase transmission through secondary distribution; an approach for detecting abnormalities that employs measurements from three independent measurement systems; and a multi-mode distribution system control that responds to cyber-attacks, physical attacks, equipment failures, and transmission system needs.

Integrated System Model, Graph Trace Analysis, Adv↗

Power System Options Evaluated for the Radiation and Technology Demonstration Mission

The Radiation and Technology Demonstration (RTD) Mission is under joint study by three NASA Centers: the NASA Johnson Space Center, the NASA Goddard Space Flight Center, and the NASA Glenn Research Center at Lewis Field. This Earth-orbiting mission, which may launch on a space shuttle in the first half of the next decade, has the primary objective of demonstrating high-power electric thruster technologies. Secondary objectives include better characterization of Earth's Van Allen trapped-radiation belts, measurement of the effectiveness of the radiation shielding for human protection, measurement of radiation effects on advanced solar cells, and demonstration of radiation-tolerant microelectronics. During the mission, which may continue up to 1 year, the 2000-kg RTD spacecraft will first spiral outward from the shuttle-deployed, medium-inclination, low Earth orbit. By the phased operation of a 10-kW Hall thruster and a 10-kW Variable Specific Impulse Magneto-Plasma Rocket, the RTD spacecraft will reach a low-inclination Earth orbit with a radius greater than five Earth radii. This will be followed by an inward spiraling orbit phase when the spacecraft deploys 8 to 12 microsatellites to map the Van Allen belts. The mission will conclude in low Earth orbit with the possible retrieval of the spacecraft by the space shuttle. A conceptual RTD spacecraft design showing two photovoltaic (PV) array wings, the Hall thruster with propellant tanks, and stowed microsatellites is presented. Early power system studies assessed five different PV array design options coupled with a 120-Vdc power management and distribution system (PMAD) and secondary lithium battery energy storage. Array options include (1) state-of-the-art 10-percent efficient three-junction amorphous SiGe thin-film cells on thin polymer panels deployed with an inflatable (or articulated) truss, (2) SCARLET array panels, (3) commercial state-of-the-art, planar PV array rigid panels with 25-percent efficient, three-junction GaInP2/GaAs/Ge solar cells, (4) rigid panels with 25-percent efficient, three-junction GaInP2/GaAs/Ge solar cells, in a 2 -concentrator trough configuration, and (5) thin polymer panels with 25-percent efficient, three-junction GaInP2/GaAs/Ge solar cells deployed with an inflatable (or articulated) truss. To assess the relative merits of these PV array design options, the study group developed a dedicated Fortran code to predict power system performance and estimate system mass. This code also modeled Earth orbital environments important for accurately predicting PV array performance. The most important environmental effect, solar cell radiation degradation, was calculated from electron-proton fluence input from the industry standard AE8/AP8 trapped radiation models and the concept of damage equivalence. Power systems were sized to provide 10 kW of thruster power and approximately 1 kW of spacecraft power at end of life. Of the five PV array design options, the option 1 (thin-film cells) power system was the most massive 590 kg, whereas the option 4 (trough concentrator) power system was the lightest 260 kg. Arguably, the lowest cost would come from the option 3 (commercial array panels) power system with an acceptable, albeit greater, system mass of 320 kg. Predicted power system performance during the spiral-out mission phase is shown the preceding graph for the option 5 (flexible-panel) array. From the results, the radiation-induced power loss over time is evident as the spacecraft slowly spirals outward through the trapped proton belt. The importance of the spiral trip time is also evident in the two curves representing 74-day and 182-day spiral-out periods. The longer spiral time introduces a beginning-of-life power oversizing penalty greater than 1 kW. Future studies will analyze power system performance and mass with a 50-Vdc power management and distribution architecture favorable to the VASIMR thruster and longer missions.

Kerslake, Thomas W.↗