Search NASA⌕ Search

SEARCH · Search NASA

Results for “cabling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Fusion Development and Technology (Final Technical Report for FC02-93ER54186)

The project is divided into three major tasks: 1) Magnet R&D i) Magnets Task 1 - Development of HTS Twisted Stacked-Tape Cable (TSTC) conductors for high field, high current magnets ii) Magnets Task 2– Development of Cryogenic Magnet Cooling Technology iii) Magnets Task 3 - National and International Collaboration 2) Electron Cyclotron Heating (ECH) of plasmas 3) FNSF Liquid Metals Study.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Focal Fisheries Requirements for Floating Offshore Wind Co-Design in the Gulf of Maine and the Mid-Atlantic Bight

Floating offshore wind is an emerging renewable energy technology in U.S. waters and globally. Floating offshore wind technology is more complex than fixed-bottom installations, requiring platforms, moorings, and power cables that take up a larger footprint, both in the water column and along the seafloor. This complexity affects opportunities for compatibility between floating offshore wind and other ocean users, particularly fishermen, whose fishing gear also takes up space in the water column and along the seafloor. This report describes the results of semi-structured interviews with key fishing informants from two focal fisheries: (1) Gulf of Maine lobster (fixed gear) and (2) Mid-Atlantic Bight pelagic longline and recreational tuna (mobile gear). A total of six fishermen were interviewed: four from the Gulf of Maine and two from the Mid-Atlantic Bight. The interviews were designed to elicit information and opinions on the co-design of marine space for particular fishing gear and floating offshore wind infrastructure. Here, we provide an overview of participant fishing experience, the spatial requirements of specific gear types, self-reported comfort levels in different fishing scenarios, and concerns about accessing and operating within floating offshore wind arrays. This summary of fishermen s concerns around floating offshore wind infrastructure can guide future co-existence conversations.

17 WIND ENERGY↗

Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

NREL assessed the supply chain and workforce considerations for the OCG-Wind floater technology, a floating semi-submersible offshore wind substructure, as well sharing vessel needs to inform their installation strategy. This technical assistance was in support of the FLoating Offshore Wind ReadINess (FLOWIN) Prize Phase 2 submission. NREL provided an assessment of domestic supplier capabilities for the main components of their floating offshore wind platform design and analyzed US regional and national supply chain constraints and gaps. Thirteen interviews with companies including steel distributors, forges, foundries, ports, large component fabricators, subcomponent fabricators, and secondary suppliers provided key insights such as 1) assembly ports are the key infrastructure barrier standing in the way of unlocking the domestic assembly and component fabrication for steel-based FOW platforms, 2) domestic steel producers can supply the types and quantities of steel necessary for FOW platforms, and 3) coordination between stakeholders will be a vital part of successfully developing the supply chain and infrastructure needed to domestically produce FOW platforms. In the workforce assessment, NREL documented a step-by-step approach to conduct a place-based assessment of the foundational workforce consideration for recruiting, upskilling, and retaining a workforce, such as supportive local and state policy, nearby education and training programs, and existing relevant industry. This approach was applied to Tacoma, Washington. Tacoma was indicated to have the potential be a successful location for fabrication and assembly of floating offshore wind energy in terms of workforce development. To share data on vessel requirements to install the OCG-Wind floater, NREL compiled resources that help answer the questions related to anchor handling tug vessels, shared a database of cable laying vessels, and answered questions on complying with the Jones Act.

17 WIND ENERGY↗

Outgassing Screening of AE3030 & AE3030LS

AE3030 and AE3030LS conductive epoxy-based filler materials (products of ©Tatsuta Electric Wire & Cable Co., Ltd.) underwent cryo-focusing GC/MS headspace analysis. This study is intended to 1) evaluate the general outgassing characteristics of the materials and 2) screen for outgassing compounds suspected to increase the risk of corrosion reactions in closed systems (e.g., sulfur containing compounds).

36 MATERIALS SCIENCE↗

A section 110 evaluation of the huron king test chamber, area 3, nevada national security site, nye county, nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office tasked Desert Research Institute (DRI) with the identification and evaluation of the Huron King Test Chamber as part of their cultural resources program obligations under Section 110 of the National Historic Preservation Act. The Huron King nuclear test was a vertical line-of-sight weapons effects test that took place in Area 3 on June 24, 1980. Unique to this event was a specially designed aboveground test chamber that held a model defense communications satellite in a vacuum tank meant to replicate the space environment. Sponsored by the Defense Nuclear Agency, the purpose of the experiment was to understand the response of the satellite and its materials and equipment to an electromagnetic pulse and attendant radiation. Between July and August 2022, DRI conducted an archival review on the Huron King experiment and its associated test chamber. Subsequently, pedestrian fieldwork was undertaken at the Huron King Test Chamber by DRI on September 29, 2022. During fieldwork, the outside of the test chamber was documented using a Nevada State Historic Preservation Office Architectural Resource Assessment form. This effort included verifying the substructures that compose the test chamber as determined by the archival review, as well as obtaining a detailed photographic recordation of the exterior and assessing its current condition. Notably, the site where the Huron King test took place has been abandoned and almost entirely naturalized. All of the portable instrumentation trailers, communications and data cabling, and winch systems used to retract the test chamber following the detonation were removed after completion of the experiment in 1980. Only the subsidence crater and the test chamber remain as physical evidence of this experiment. Based on these findings, DRI recommends that the Huron King Test Chamber is eligible for listing in the National Register of Historic Places (NRHP) at the local level under Significance Criteria A and C and that it meets Criteria Consideration G for properties less than 50 years old.

54 ENVIRONMENTAL SCIENCES↗

Seismic DAS Observations of a large underground chemical explosion in dry tuff

On 18 October 2023 a 16.3-ton TNT equivalent chemical explosion was detonated underground at the Nevada National Security Site, generating a seismic event (Meyers et al., 2024). The associated seismic wavefield was measured on a Distributed Acoustic Sensing (DAS) array with slant range distances from 27 m – 1123 m. The first arriving phase traveled at an apparent velocity of about 2640 m s -1 from 27 m to 420 m slant range and about 2470 m s -1 from 505 m to 1123 m slant range according to the first arrival moveouts on the DAS data. The first arrival from the explosion temporarily saturated the cable from a slant range of 27 m – 186 m and 0.009 s to 0.084 s post detonation. From 186 m slant range to 420 m slant range, peak strain rates of 5.6 x 10 6 nm m -1 s -1 were observed for the first arrival phase. For the first arrival from 505 m slant range to 1123 m slant range, peak strain rates reduced to 8.0 x 10 4 nm m -1 s -1 . A comparison of the scaled accelerations computed from DAS, the geophone pairs, and the measurements of co-located accelerometer pairs show common agreement at the scaled ranges of the single point sensors. This study adds to the body of work reporting near-source DAS observations of the seismic wavefields generated by underground chemical explosions. These results indicate that near-source DAS observations can refine interpretations of phase identification from single-point sensor observations. Phase identification could be one mechanism that contributes scatter to single point seismic measurements which would confound the performance of empirical relationships for small explosions. Removing that mechanism may therefore reduce interstation variability and increase empirical relationship performance for small explosions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Seismic DAS observations of a large underground chemical explosion in dry tuff

On 18 October 2023 a 16.3-ton TNT equivalent chemical explosion was detonated underground at the Nevada National Security Site, generating a seismic event with a magnitude of 1.7 (Meyers et al., 2024). The associated seismic wavefield was measured on a Distributed Acoustic Sensing (DAS) array with slant range distances from 27 m – 1123 m. The first arriving phase traveled at an apparent velocity of about 2640 m s -1 from 27 m to 420 m slant range and about 2470 m s -1 from 505 m to 1123 m slant range according to the first arrival moveouts on the DAS data. The first arrival from the explosion temporarily saturated the cable from a slant range of 27 m – 186 m and 0.009 s to 0.084 s post detonation. From 186 m slant range to 420 m slant range, peak strain rates of 5.6 x 10 6 nm m -1 s -1 were observed for the first arrival phase. For the first arrival from 505 m slant range to 1123 m slant range, peak strain rates reduced to 8.0 x 104 nm m -1 s -1 . A comparison of the scaled accelerations computed from DAS, the geophone pairs, and the measurements of co-located accelerometer pairs show common agreement at the scaled ranges of the single point sensors. This study adds to the body of work reporting near-source DAS observations of the seismic wavefields generated by underground chemical explosions. These results indicate that near-source DAS observations can refine interpretations of phase identification from single-point sensor observations. Phase identification could be one mechanism that contributes scatter to single point seismic measurements which would confound the performance of empirical relationships for small explosions. Removing that mechanism may therefore reduce interstation variability and increase empirical relationship performance for small explosions.

58 GEOSCIENCES↗

Seismic monitoring of underground vibration: database of seismic data and ground truth

Seismic waves provide valuable insights into underground activities, serving as an essential tool for monitoring anomalies that could signal containment breaches in geological repositories. We aim to test and refine underground detection and geolocation techniques to identify anomalous vibration signals indicative of potential breaches, thereby strengthening georepository safeguards. We evaluate the effectiveness of two distinct, low-maintenance sensing technologies (surface geophones and underground distributed acoustic sensing (DAS) fiber optic cable) leveraging existing datasets. This report details the experimental designs, instrumentation, and data characteristics for both seismic and DAS arrays. Additionally, we provide a ground truth database documenting relevant operational activities for each experiment.

58 GEOSCIENCES↗

NRIC DOME Crane Trade Study and Recommendation

The National Reactor Innovation Center (NRIC) is a national program that was established as part of the Nuclear Energy Innovation Capabilities Act (NEICA). NRIC’s mission is to accelerate the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the nation’s most promising advanced nuclear reactors into commercial applications. The NRIC Demonstration of Microreactor Experiments (DOME) facility, formerly known as Experimental Breeder Reactor II (EBR II), located at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL) is intended to allow industrial and other partners the opportunity to test Advanced Microreactors up to 20MW thermal power. The 75-ton capacity polar crane located in the EBR II facility was rendered inoperable to support planned facility demolition in 2015; small holes were flame cut in the girders; hoists and cables were removed; oil was drained from gear boxes; trolley drive, and then filled with absorbent; and the electrical and control umbilical’s were disconnected, removed and disposed. Subsequently, the decision was made to convert the EBR II facility into the DOME test bed.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Cable/Antenna Bounds Connecting Field Levels To Personnel Safety And Electronic Upset Thresholds

We use bounding models to estimate the power delivered to interior ordnance as well as the pin level voltages along a cable at interior electronic components. The procedures underlying these estimates are described in some detail. Conservation of steady-state power in a linear passive system underpins the power estimate, whereas, losses and quality factor limits underpin the limits on voltage transformations. The final levels are compared to no-fire threshold power and to minimum upset voltage levels in an example using a canonical slot aperture and cavity to estimate interior fields.

42 ENGINEERING↗

Synthesis and Characterization of Enhanced Conductivity Copper Composites [Abstract]

In this project, PNNL will extrude and characterize copper alloy wires embedded with graphene additives using the billets provided by NAECO via the shear assisted processing and extrusion (ShAPE TM ) technology. PNNL will measure the electrical properties of the extruded wires and also perform multimodal imaging to determine the microstructural features as required. These activities will be performed as part of a voucher service provided by PNNL for the CABLE Manufacturing Prize stewarded by DOE Advanced Manufacturing Office. This 6-month effort will be executed at PNNL with a budget of $100,000.00 (USD).

36 MATERIALS SCIENCE↗

New Mobility Technology Assessment - Benefits, Risks, and Safety

The age of vehicle automation is upon us. The fundamental perception and control technology is maturing as we speak (and write) with robo-taxis proliferating in select US cities. The news cycle is no longer filled with technological skepticism, but rather societal commentary on our collective response and use of the technology. This maturing of the technology is also accompanied by a renaissance in new types of urban movement technology to more effectively link people with goods, services, and employment, particularly in dense development areas where vehicle congestion (even automated vehicles) prevents high quality mobility. The National Renewable Energy Laboratory, through the DOE Clean Energy to Communities (C2C) program has worked with two jurisdictions to assess the benefits, risks, and safety concerns for a new product offering based on suspended cable technology which is fully automated and proposes an aerial network of self-propelled gondolas. The recognized need, independent of the technology, is to fairly assess the benefits of the proposed transportation system, assess its technical maturity, as well as risks and safety concerns. Using this new technology as an example, a technology represented by Swyft Cities, NREL developed a succession of mini-studies that characterized the technical maturity level, assessed the proposed benefits for Greenville, SC, examined the risks involved in moving forward with an emerging mobility technology, and determined the governing safety protocols and standards that are applicable to the space. These mini-case studies, though centered on Swyft Cities aerial automated gondola technology, are highly transferable to any type of new mobility technology and lays out a repeatable process for assessing new technology within an city or community context.

33 ADVANCED PROPULSION SYSTEMS↗

Southern Company Services: Project 2: Tall Tower Wind Technical Potential for the Southeast (Modifications 4, 5), Project 4: Offshore Wind Potential for Southern Company Services (Modifications 7, 8)

Project 2: The National Laboratory of the Rockies (NLR) and Southern Company Services (SCS) seek to establish an agreement to assess the technical potential for wind energy in the Southeastern U.S. SCS has requested that NLR conduct a detailed assessment of system performance, available capacity, transmission distance, and levelized cost of electricity (LCOE) at turbine hub heights of 100m to 160m within the SCS service territory. NLR will also provide an assessment of utility photovoltaic (PV) technical potential within the SCS service territory. NLR has unique modeling capabilities to assist SCS with high spatial and temporal resolution assessment of wind and PV technical potential, considering geospatial constraints. Project 4: NLR and SCS seek to develop a spatially explicit techno-economic assessment for offshore wind energy in the Southeastern U.S. The analysis aims to characterize the regional sensitivities of offshore wind plant costs and performance, underwater cabling, potential siting constraints, and landfall spur transmission costs.

17 WIND ENERGY↗

Cost Analysis of Heavy-Duty Vehicle Proton Exchange Membrane Fuel Cell Stationary Power Plants

Heavy-duty PEM fuel cells could be a low-cost, low emission alternative to combustion turbines for re-electrifying hydrogen if used as part of a long duration grid energy storage systems. Many studies expect heavy duty PEM fuel cell production costs to reduce as manufacturing volumes ramp up and their expected durability of 25,000-30,000 hours aligns well with a 30-year life for hydrogen seasonal energy storage plants that would likely operate less than 10% of the year. The labor, material, and equipment costs associated with installing PEM fuel cells and their required balance of plant for stationary applications have not been thoroughly explored, however. This study performs a detailed design and cost analysis of a 100 MW stationary PEM fuel cell power plant, capturing costs such as cooling, power electronics, pipes, valves, fittings, cabling, conduit, concrete foundations, buildings, and land. It employs methods consistent with NLR's solar PV benchmarking cost analysis and annual technology baseline to derive the total installed costs of stationary PEM fuel cell plants that utilize heavy duty PEM fuel cells.

08 HYDROGEN↗

Fermilab PIP-II Master Oscillator and Precision Reference Line Design and Construction

The phase averaging reference line system pro- vides the RF phase reference, LO and clock sig- nals to the LLRF and other accelerator sub- systems. The PIP-II linac has RF systems at three frequencies – 162.5 MHz, 325 MHz and 650 MHz. A temperature-stabilized, low-phase- noise oscillator is used as the master oscil- lator. Phase reference signals at 162.5 MHz, 325 MHz, and 650 MHz, along with LO signals at 182.5 MHz, 345 MHz, 670 MHz and LLRF clocks at 1320 MHz and 1300 MHz, are generated in temperature-controlled RF modules at each fre- quency section. A phase reference from each module travels to the next section, where it is doubled to produce required frequencies. The reference also travels alongside the accelerating cavities in the tunnel, allowing cavity probe and reference cables to temperature track and reduce measurement errors from temperature changes or phase drift.

Syed, Ahmed [Fermilab]↗

Booster Cavity Damper Redesign for PIP-II

A new Higher Order Mode (HOM) damper was designed and tested for the Booster accelerator cavity at Fermilab. In anticipation of the PIP-II upgrade, it was discovered that the higher beam intensity of PIP-II may cause beam instability due to an excited mode at 106 MHz. This unfortunately corresponds with the cavity s 2nd order harmonic mode, which will sweep from 86-105.7 MHz. The new damper is a modification of an existing damper that was designed to reduce an existing static HOM at 83 MHz, with the new design intending to cover the 2nd order HOM as well. The existing damper uses an inductive coupling loop to extract RF energy from the cavity which then goes through a filter in order to reflect the fundamental frequency back into the cavity while passing HOMs to a dump load. The new damper intends to replace the filter portion of the system with a wider band variant while also changing the topology from a coaxial cable loop filter to a componentized PCB-based design. Primary design challenges include bandwidth coverage, impedance matching of the various modes, long term thermal and mechanical stability, radiation hardness, and high voltage handling. Initial designs achieved the desired damping but were found to quickly succumb to destructive arcing due to the voltages present. More finalized designs intend to address this problem through circuit design modifications as well as the use of hardier components.

Pieper, Dustin [Fermilab]↗

Reese Housing Power Project (Final Technical Report)

The Reese Housing Power Project is located on Tribal trust land in Colusa, CA and expands existing medium-voltage distribution to seven new households with the addition of medium-voltage cabling, step down transformers, smart meters, and street lighting for the new development. The Tribe utilized their existing Co-Generation power plant and micro grid to supply the new homes with highly reliable power with fewer interruptions and at a reduced rate compared with the local utility. The project gives the Tribe greater independence from traditional power sources and provides jobs for the community. The project reduces electric energy costs, increases Tribe self-reliance, and provides highly reliable electric power to seven tribal members’ homes. Construction of the project also provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗