At least 649 records · Page 36

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Section 3 Reporting: Preserve America

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 37 R&D 100 Awards, and countless advances in science and technology. For over 75 years, the Laboratory has played a leading role in the Department of Energy (DOE) Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. The Laboratory is operated and managed by Brookhaven Science Associates (BSA), which was founded by the Research Foundation for the State University of New York on behalf of Stony Brook University, and Battelle, a non-profit applied science and technology organization. BNL is committed to longstanding partnerships with researchers, academic institutions, industry, students, teachers, and the surrounding community. BNL is located near the center of Suffolk County on Long Island, New York within Brookhaven Township, about 60 miles east of New York City. Most of BNL’s principal facilities are located near the center of the 5,265-acre (8.23 square mile) site (Figure 1). The developed area encompasses approximately 1,820 acres, consisting of: ▪ 500 acres originally developed by the Army (as part of WW II Camp Upton) and still used for offices and other operational buildings. ▪ 200 acres occupied by large, specialized research facilities. ▪ 520 acres occupied by outlying facilities, such as the Sewage Treatment Plant, research agricultural fields, housing facilities, and fire breaks. ▪ 400 acres of roads, parking lots, and connecting areas. ▪ 200 acres developed for the Long Island Solar Farm. The balance of the site, approximately 3,400 acres, is largely wooded and represents a native pine barrens ecosystem. In November 2000, DOE set aside 530 acres of undeveloped land at BNL as the Upton Ecological and Research Reserve. The Upton Reserve preserves this portion of the pine barrens ecosystem and provides an area for ecological research and education activities.

99 GENERAL AND MISCELLANEOUS↗

Aircraft canopy lock

A manually-operable lock for releasably securing a canopy in closed condition is described.

Nichols, G. H.↗

The Conference Proceedings of the 1998 Air Transport Research Group (ATRG) of the WCTR Society

Contents include the following: Airport choice in a multiple airport region: an empirical analysis for the San Francisco bay area. Liberalization of the westeuropian aviation: choice of a new hub airport for an airline. Austin Bergstrom airport traffic control tower establishment of a major activity level tower. A study to optimize the environmental capacity of Amsterdam airport schiphol.Airport performance in stakeholder involvement and communication strategies: a comparison of major Australian and North American air carrier and general aviation airports. Airport planning and location.Location of international airport and regional development. A simulation technique for analysis of Brasilian airport passanger terminal building.Multimodal airport access in Japan. Planning surface access provision at major airports Airline economics and the inclusion of environmental costs on airport hub pricing: a theoretical analysis. Airport financing and user charge systems in the USA. Optimal demand for operating lease of aircraft. Aircraft leasing industry and social welfare.The development of performance indicators for airports: a management perspective. Study about operational effect of the "security check-in" implantation in Brasilian international airports.Austin Bergstrom west loop cable system.and Optimal resource allocation model for airport passanger terminals.

Oum, Tae Hoon↗

Use of Virtual Mission Operations Center Technology to Achieve JPDO's Virtual Tower Vision

The Joint Program Development Office has proposed that the Next Generation Air Transportation System (NGATS) consolidate control centers. NGATS would be managed from a few strategically located facilities with virtual towers and TRACONS. This consolidation is about combining the delivery locations for these services not about decreasing service. By consolidating these locations, cost savings in the order of $500 million have been projected. Evolving to spaced-based communication, navigation, and surveillance offers the opportunity to reduce or eliminate much of the ground-based infrastructure cost. Dynamically adjusted airspace offers the opportunity to reduce the number of sectors and boundary inconsistencies; eliminate or reduce "handoffs;" and eliminate the distinction between Towers, TRACONS, and Enroute Centers. To realize a consolidation vision for air traffic management there must be investment in networking. One technology that holds great potential is the use of Virtual Mission Operations Centers to provide secure, automated, intelligent management of the NGATS. This paper provides a conceptual framework for incorporating VMOC into the NGATS.

Ivancic, William D.↗

Knowledge Preservation at the Fast Flux Test Facility

The Fast Flux Test Facility (FFTF) is the most recent Liquid Metal Reactor (LMR) to operate in the United States, from 1982 to 1992. The technologies employed in designing and constructing this reactor, along with information obtained from tests conducted during its operation, are currently being secured and archived by the Department of Energy's Office of Nuclear Energy. This report is one in a series documenting the overall project efforts to retrieve and preserve critical information related to advanced reactors

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Knowledge Preservation at the Fast Flux Test Facility

The Fast Flux Test Facility (FFTF) is the most recent Liquid Metal Reactor (LMR) to operate in the United States, from 1982 to 1992. The technologies employed in designing and constructing this reactor, along with information obtained from tests conducted during its operation, are currently being secured and archived by the Department of Energy's Office of Nuclear Energy. This report provides a status update documenting the overall project efforts to retrieve and preserve critical information related to advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Barcode Automation (BCAuto) for Los Alamos Material Control and Accountability System

The plutonium facility is actively processing material on a daily basis at LANL (4000-5000 transactions/month): (1) Physical operations, material transformations, material mixing, splitting, etc.; and (2) Electronic manipulations resulting primarily from updated NDA measurements. Improvements in efficiency and effectiveness are essential due to impacts of recent Voluntary Separation Program and the need to meet mission requirements with fewer personnel. New storage requirements (DOE M 441.1-1, Nuclear Material Packaging Manual) to protect worker safety require tracking of material and its corresponding container over long periods of time. Material at Risk tracking is essential to protect public safety and to ensure continuous operations to meet national security mission needs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Obfuscated authentication systems, devices, and methods

Embodiments of the present invention are directed toward authentication systems, devices, and methods. Obfuscated executable instructions may encode an authentication procedure and protect an authentication key. The obfuscated executable instructions may require communication with a remote certifying authority for operation. In this manner, security may be controlled by the certifying authority without regard to the security of the electronic device running the obfuscated executable instructions.

97 MATHEMATICS AND COMPUTING↗

2015 Enterprise Strategic Vision

This document aligns with the Department of Energy Strategic Plan for 2014-2018 and provides a framework for integrating our missions and direction for pursuing DOE’s strategic goals. The vision is a guide to advancing world-class science and engineering, supporting our people, modernizing our infrastructure, and developing a management culture that operates a safe and secure enterprise in an efficient manner.

Source record↗

X-Ray Toolkit

Radiographic Image Acquisition & Processing Software for Security Markets. Used in operation of commercial x-ray scanners and manipulation of x-ray images for emergency responders including State, Local, Federal, and US Military bomb technicians and analysts.

Source record↗

This is Brookhaven Lab

Brookhaven National Laboratory delivers discovery science and transformative technology to power and secure America’s future. Operated by Brookhaven Science Associates for the U.S. Department of Energy’s Office of Science, Brookhaven Lab is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 36 R&D 100 Awards, and more than 70 years of pioneering research.

99 GENERAL AND MISCELLANEOUS↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Y-12 Nuclear Criticality Safety Program Health Model: Development, Use and Benefits

The Y-12 National Security Complex (Y-12) operates seven diverse enriched uranium processing facilities and maintains a comprehensive nuclear criticality safety (NCS) program. Given the magnitude of the hazard, the NCS program receives significant oversight. Describing the scope and health of the Y-12 NCS program to sometimes non-expert stakeholders with limited time had historically focused on recent events and “hot topics” which did not always convey sufficient context (i.e., how to differentiate between an individual performance issue and a systemic concern). Y-12 created the NCS Program Health (NCSPH) Model to provide a complete and holistic framework to quantify and communicate NCS program health. The model is constructed in a tiered fashion with the top tier broken into three (3) Tier 2 elements, fourteen (14) Tier 3 elements, and 104 Tier 4 and 5 elements. This granularity ensures every feature of the NCS Program is accounted for and stakeholders can see how these features support the collective whole. The model is used as the framework for NCS communications including program plans, reports, health surveys, and meeting agendas. The model has substantially improved stakeholder appreciation for the entirety of the NCS program and how events and assessment results factor into an overarching conclusion on NCS program health. While some details are Y-12 specific, the NCSPH model can easily be tailored for any other site with an NCS program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗