Search NASASearch

SEARCH · Search NASA

Results for “LECTURES CROSS SECTIONS-- ISOTOPES-- NUCLEAR REACTIONS-- NUCLEI- - RADIOACTIVITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

657 records · Page 37

Engineering the Interface: Advanced Surface Technologies for Lunar Dust Management and Equipment Longevity

Through the Artemis program, NASA intends to develop a sustainable human foothold on the Moon, ultimately paving the way for crewed exploration of Mars. The Moon's hostile environment poses numerous obstacles, including exposure to radiation, temperature extremes, micrometeoroid threats, and particularly the persistent problem of lunar dust. Lunar dust impacts nearly every aspect of surface operations through adhesion and abrasion mechanisms, with contamination from anthropogenic activities (landing, rovers) far outweighing natural phenomena. Multiple adhesion pathways contribute to surface contamination in the lunar environment, including van der Waals forces, electrostatic forces, chemical reaction, and magnetic forces from elemental iron deposits. Sharp asperities from micrometeoroid bombardment and atmospheric absence increase interaction potential and enable mechanical interlocking. Low cohesion between dust particles exacerbates these challenges, as minimal interaction potential between dust and nearby surfaces overcomes particle cohesion, causing contamination. Lunar dust adhesion mitigation technologies can be categorized as either active, requiring external energy, or passive, relying on intrinsic material properties. Ultrasonic and electrodynamic technologies have been developed to the highest technology readiness level for active approaches. Passive strategies primarily focus on surface chemistry and topography modifications. At NASA Langley Research Center, approaches include surface migration agents to reduce surface energy, topographical modification using laser ablation patterning, and tailored surface conductivity to reduce intrinsic adhesion force. Performance has been evaluated using custom-built ultrasonic and centrifuge instruments. Plume-surface interactions from lunar landers can propel micrometer-sized particles at velocities up to 1000 m s-1.8 These particles pose risks to landers, habitats and infrastructure, leading to erosion, degradation, and reduced component lifespan. A panel recovered from Surveyor III was determined to have been severely abraded because of lunar dust displaced from the Apollo 12 lunar module that landed 160 m away. The performance of metallic surfaces has been evaluated via high velocity single particle impact using the laser-induced project impact test (LIPIT) facility at the University of Utah. Peridynamics modeling, a form of continuum mechanics that uses a nonlocal approach enabling greater simulation capabilities of crack initiation and fracture, has also been utilized to gain greater insight into material response during impact events. Lunar dust contamination challenges extend to power generation systems and moving equipment. Cables, rotation stages, and other mechanisms may experience limited range of motion and reduced lifetime due to dust infiltration. NASA Langley Research Center has evaluated traditional aerospace alloys, softgoods, wear resistant ceramics, and several polymer and polymer composite materials. Test methods have included traditional techniques like Taber abrasion testing, as well as designed test configurations developed in the DUSTE (dust, ultraviolet radiation, and space thermal environmental) chamber that reproduce mechanism functions in operational environment. Beyond laboratory experiments, several flight experiments have been conducted. Materials were exposed to the low Earth orbit environment on the Materials International Space Station Experiment (MISSE) and to the lunar surface environment through the Aegis Aerospace Regolith Adherence Characterization (RAC) payload and the Honeybee Robotics PlanetVac payload. Determining lunar dust's impact on surface exploration and habitation requires comprehensive experimental and computational capabilities combined with lessons learned from initial lunar activities. Identifying the greatest environmental challenges and developing mitigation technologies provides the clearest path toward successfully, expeditiously, and efficaciously completing NASA's mission. This presentation will discuss ongoing efforts at NASA Langley Research Center and collaborator contributions to these critical objectives.

Surface Engineering

The Dark Energy Survey supernova program: a reanalysis of cosmology results and evidence for evolving dark energy with an updated Type Ia supernova calibration

We present improved cosmological constraints from a re-analysis of the Dark Energy Survey (DES) 5-year sample of Type Ia supernovae (DES-SN5YR). This re-analysis includes an improved photometric cross-calibration, recent white dwarf observations to cross-calibrate between DES and low-redshift surveys, retraining the salt3 light-curve model and fixing a numerical approximation in the host-galaxy colour law. Our fully recalibrated sample, which we call DES-Dovekie, comprises ~1600 likely Type Ia SNe from DES and ~200 low-redshift SNe from other surveys. With DES-Dovekie, we obtain Ω m = 0.330 ± 0.015 in flat Lambda-cold dark matter (⁠ΛCDM) which changes Ω m by –0.022 compared to DES-SN5YR. Combining DES-Dovekie with cosmic microwave background data from Planck, Atacama Cosmology Telescope, and South Pole Telescope and the DESI DR2 measurements in a flat CDM cosmology, we find ω 0 = –0.803 ± 0.054 and ω a = –0.72 ± 0.21⁠. Our results hold a significance of 3.2σ, reduced from 4.2σ for DES-SN5YR, to reject the null hypothesis that the data are compatible with the cosmological constant. This significance is equivalent to a Bayesian model preference odds of approximately 5:1 in favour of the flat ω 0 ω a CDM model. Using generally accepted thresholds for model preference, our updated data exhibits only a weak preference for evolving dark energy.

dark energy

Dark Energy Survey year 6 results: Magnification modeling and its impact on galaxy clustering and galaxy-galaxy lensing cosmology

Gravitational lensing magnification alters the observed spatial distribution of galaxies and must be accounted for to prevent biases in cosmological probes of the large-scale structure. We investigate its effects on the Dark Energy Survey Year 6 galaxy clustering and galaxy-galaxy lensing analyses using the fiducial lens (position tracer) sample M ag L im++. Magnification bias is parameterized by a coefficient that describes the response of the number of selected objects per unlensed area element to a change in the lensing convergence. We quantify this coefficient using the BALROG synthetic source injection catalog to account for the complexity of the selection function, and compare these results with simplified estimates. The resulting values of the magnification coefficients for each redshift bin are [3.16 ± 0.08, 2.76 ± 0.21, 4.09 ± 0.15, 4.42 ± 0.16, 4.90 ± 0.29, 4.83 ± 0.25]. Relative to Year 3, this analysis provides more precise and accurate magnification bias estimates through a larger BALROG area and reweighting to better match the data properties. Here, the cosmological results are robust when tested against various magnification parameter prior choices and also when adding cross-clustering between lens redshift bins. Neglecting magnification, however, introduces significant systematic shifts: relative to the fiducial analysis with Gaussian priors centered on the BALROG -derived estimates, we observe shifts of 1.37σ in S 8 and -0.84σ in Ω m (with cosmic shear included: -0.61σ in S 8 and -0.71σ in Ω m ), in agreement with findings from simulated data, demonstrating that magnification must be modeled to avoid biases. Freeing the magnification bias in lens bin 2 leads to unphysical negative values, further justifying its exclusion from the fiducial Year 6 analysis.

Cosmological parameters

High-Order Methods in NASA’s Next Generation of Computational Fluid Dynamics Tools

The missions of the National Aeronautics and Space Administration (NASA) routinely produce unique requirements and challenges for development and application of Computational Fluid Dynamics (CFD) methods. NASA presently embodies four distinct Mission Directorates: Aeronautics Research, Exploration Systems, Science, and Space Operations. These missions generate requirements for systems that operate in a wide variety of environments. They range from the high-speed flight of aerodynamically optimized vehicles operating in the earth’s atmosphere to spacecraft designed for missions that don’t favor aerodynamic optimization, some operating in the atmosphere of planets and planetary moons such as Mars and Venus or Saturn’s moon Titan. Systems supporting these vehicles, such as rocket and jet propulsion, reaction control systems, fluid and thermal transfer systems, etc. can also generate their own unique set of flow phenomena that challenge today’s CFD methodology. Through the NASA Engineering and Safety Center (NESC), NASA annually conducts state-of-the-discipline assessments in fifteen distinct engineering disciplines. These assessments are performed by the NASA Technical Fellows that lead Technical Discipline Teams (TDT) of recognized experts in these fifteen areas. In the Aerosciences discipline, three topics have been identified as the top challenges for the discipline: aero-plume interaction prediction, unsteady separated flows, and aerothermodynamic prediction. These challenge areas are defined by the Agency’s high-risk projects and problems on which the NESC is requested to perform independent testing, analysis, and assessments. When viewed as a whole, these tests, analyses, and assessments provide a clear view of the recurring technical challenges facing Agency engineers and researchers and can be used to guide future research and technology development. The present state-of-the-art in the application of CFD at NASA is the use of Reynolds-Averaged Navier- Stokes (RANS) solvers, primarily executed in a steady-state mode of operation. In isolated cases, Unsteady RANS (URANS) solvers have been employed when steady RANS solutions produce poorly converging or oscillating results or in cases, such as aeroelastic analysis, which require unsteady aerodynamic simulation. For most traditional external and internal aerodynamic flows, structured overset grids or unstructured grids are employed to minimize geometric modeling and grid generation times. Grid adaptation, primarily as a series of coarse-grain intermediate processing steps is also seeing use on particularly complex flow problems and configurations. In the case of aerothermodynamic flows, engineers have been forced to continue to employ structured grid techniques as the present unstructured grid methodology has proven inadequate in the prediction of surface heating. In the area of aero-plume interaction modeling, two-gas, frozen chemistry simulation is generally the state-of-the- art, with some production solvers capable of predicting flows with only a single gas component. Prediction of flows falling into the afore-mentioned top Aerosciences technical challenges have severely stressed the present state-of-the-art in CFD prediction and for some problems, such as unsteady separated flows and aero-plume interaction cases, engineers have begun employing Large Eddy Simulation (LES) and Hybrid RANS/LES techniques. In some isolated aero-propulsion interaction cases, chemically reacting flow simulations have been applied. These methods are highly evolutionary and engineers have little experience in their application, so they cannot be heavily relied upon in today’s application environment. Therefore, this leads one to muse over which numerical technologies will be included in the CFD tools that will be employed 30 years in the future. This presentation will describe specific technical problems that have stressed NASA’s traditional CFD methods to their breaking point and will link these issues to the Agency’s top Aerosciences technical challenges. The discussion will then shift to the characteristics of future CFD solvers that will be required to attack these challenges and how these characteristics differ from the present state-of-the- art. High-order methods certainly appear to have a place in the development of future CFD tools and some of the physical characteristics of our most challenging problems suggest that high-order methods are the only way to effectively solve them. But there are some relatively severe implementation issues that face these methods, particularly in the area of general applicability and robust operation as an engineering tool. Desired characteristics of next-generation CFD solvers will be discussed and the author’s view of which emerging numerical technologies might be employed to address these attributes will also be presented

David M Schuster

Dark Energy Survey Year 6 results: Clustering redshifts and importance sampling of self-organized-maps 𝑛⁡(𝑧) realizations for 3 × 2 ⁢pt samples

This work is part of a series establishing the redshift framework for the 3 × 2 ⁢pt analysis of the Dark Energy Survey Year 6 (DES Y6). For DES Y6, photometric redshift distributions are estimated using self-organizing maps (SOMs), calibrated with spectroscopic and many-band photometric data. To overcome limitations from color-redshift degeneracies and incomplete spectroscopic coverage, we enhance this approach by incorporating clustering-based redshift constraints (clustering-z, or WZ) from angular cross-correlations with BOSS and eBOSS galaxies and eBOSS quasar samples. We define a WZ likelihood and apply importance sampling to a large ensemble of SOM-derived 𝑛⁡(𝑧) realizations, selecting those consistent with the clustering measurements to produce a posterior sample for each lens and source bin. The analysis uses angular scales corresponding to 1.5–5 Mpc to optimize signal-to-noise ratio while mitigating modeling uncertainties and marginalizes over redshift-dependent galaxy bias and other systematics informed by the N-body simulation CARDINAL . While a sparser spectroscopic reference sample limits WZ constraining power at 𝑧 >1.1, particularly for source bins, we demonstrate that combining SOM with WZ improves redshift accuracy and enhances the overall cosmological constraining power of DES Y6. As a result, we estimate an improvement in 𝑆 8 of approximately 10% for cosmic shear and 3 ×2⁢pt analysis, primarily due to the WZ calibration of the source samples.

Cosmological parameters

An Overview of Experiments and Modeling of Polysiloxane-Coated Thermal Protection Systems for Missions to Mars, Titan, and Beyond.

Phenolic Impregnated Carbon Ablator (PICA) gained heritage during the historic Stardust mission, where it successfully returned samples from a comet’s tail and has since been instrumental in delivering payloads to the surface of Mars [1-3]. Most recently, PICA enabled the safe return of samples collected from asteroid Bennu as part of the OSIRIS-REx mission. This rich legacy underscores PICA’s critical role in allowing NASA’s most ambitious exploration missions. However, the friable nature of its phenolic phase presents challenges during handling and pre-launch activities. To mitigate this issue, PICA is coated with a polysiloxane resin system, which serves to suppress particulate dispersion and thereby safeguard spacecraft components. A comprehensive understanding of the polysiloxane resin’s behavior is imperative, as it profoundly shapes the material response of PICA during atmospheric entry by influencing its thermal and oxidative stability. This influence extends to thermocouple plugs embedded within thermal protection systems. These plugs have demonstrated their significance in missions such as Mars Science Laboratory (MSL) and Mars 2020, where the MEDLI and MEDLI2 instrumentation suites delivered in-valuable insights into the performance of thermal protection systems during entry into the Martian atmosphere [4]. Looking ahead, missions such as Dragonfly, set to descend into Titan’s dense atmosphere, aim to leverage advanced sensor technologies to further refine our understanding of thermal protection response [5]. Moreover, thermocouple plugs play an essential role in validating cutting-edge material response models, such as those pioneered under NASA’s Entry Systems Modeling Project (ESM), designed, in-part, to predict the operational integrity of thermal protection systems under the extreme stresses of atmospheric entry. To achieve these modeling goals, ground-based experiments are crucial to provide the foundational data necessary for developing and refining these predictive tools. To this end, an extensive test campaign was conducted at the Hypersonic Materials Environmental Test System (HyMETS) to investigate the high-temperature behavior of the polysiloxane resin in an air environment [6]. These experiments revealed critical phenomena, including the formation of a silicon oxycarbide layer that enhances oxidation resistance, moderates surface temperatures, and alters in-depth thermal response. Building on these findings, subsequent tests were designed to simulate atmospheric entry conditions in reactive gases, such as CO2 and N2, to mimic the environments of Mars and Titan, respectively, as well as non-reactive gases representing the atmospheres of the Ice Giants (Neptune and Uranus). A heating rate dependent decomposition mechanism has been identified for the polysiloxane resin under oxidizing conditions (Fig. 1). In the initial stage, the resin and the underlying thermal protection system undergo pyrolysis, rapidly generating a thin amorphous silicon oxycarbide interwoven with carbonaceous char and residual fibers from PICA. During the second stage, the nascent oxide layer establishes a robust, oxidation-resistant thermal barrier coating, which significantly impedes heat transfer to the underlying carbonaceous char, resulting in a stagnation of the surface temperature. A key factor contributing to this thermal resistance is the low recombination efficiency of atomic oxygen (γ), which further diminishes the heat load on the material’s interior layers [7]. Moreover, as the surface temperature stagnates, the silicon oxycarbide phase separates into distinct regions of silica and free graphite. Ultimately, when the heat flux reaches a critical threshold, a third stage is triggered, leading to the breakdown of the coating through carbothermal reduction, exposing the underlying char layer. This exposure leads to a dramatic surface temperature spike, driven by highly exothermic reactions between atomic oxygen and the char layer, further accelerating material degradation. A detailed mass and heat transfer model of PICA coated with polysiloxane resin was implemented in the Porous material Analysis Toolbox based on OpenFOAM, PATO [8]. The initial stage was considered negligible in this model because the resin decomposition occurs rapidly within a thin surface layer. Instead, the coating was directly considered as an oxygen-resistant thermal barrier coating. For the second stage, the thin amorphous silicon oxycarbide was treated as a pure silica surface to simplify the thermochemical behavior. The model ac-counts for surface equilibrium processes using representative elements of the coating-environment system. For the third stage, specific boundary conditions were developed to estimate the onset and progression of the coating removal. Two-dimensional material response simulations were conducted to compare uncoated and coated PICA using boundary conditions calibrated with HyMETS data. Fig. 2 illustrates that the simulations closely align with experimental data, successfully reproducing measured temperature profiles. This work will include the latest advancements in the coating model, including the calibration of recombination of atomic oxygen at the surface during the second phase. These simulated results will be further validated against additional CO2 data points from HyMETS, reinforcing the models’ predictive capabilities. These mechanisms and their effects on thermal protection systems, including thermochemical behavior and thermocouple probe performance in extreme environments, provide crucial insights for optimizing spacecraft designs that safeguard scientific payload and ensure mission success in future planetary exploration endeavors.

Active Oxidation

Constraining primordial non-Gaussianity from DESI DR1 quasars and Planck PR4 CMB lensing

We present the first measurement of local-type primordial non-Gaussianity from the cross-correlation between 1.2 million spectroscopically confirmed quasars from the first data release (DR1) of the Dark Energy Spectroscopic Instrument (DESI) and the Planck PR4 CMB lensing reconstructions. The analysis is performed in three tomographic redshift bins covering 0.8 < z < 3.5, covering a sky fraction of ∼20%. We adopt a catalog-based pseudo-C ℓ estimator and apply linear imaging weights validated on noiseless mocks. Compared to previous analyses using photometric quasar samples, our results benefit from the high purity of the DESI spectroscopic sample, the reduced noise of PR4 lensing, and the absence of excess large-scale power in the spectroscopic quasar auto-correlation. Fitting simultaneously for the non-Gaussianity parameter f NL and the linear bias amplitude in each redshift bin, we obtain f NL = 2 +28 -34 for a response parameter p = 1.6, and f NL = 6 +20 -24 for p = 1.0. These results improve the constraints on f NL by ∼35% compared to the previous analysis based on the Legacy Imaging Survey DR9. Additionally, we derive an optimal weighting scheme to maximize the constraining power. In this case, and assuming p = 1.6, we obtain f NL = 19 +25 -31 . Our results demonstrate the statistical power of DESI quasars for probing inflationary physics, and highlight the promise of future DESI data releases.

cosmological parameters from CMBR

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI