At least 667 records · Page 37

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High Energy Storage Capacity Low Cost Iron Flow Battery

A new flow battery was proposed that utilizes low cost materials: iron as the only active element, cheap aqueous electrolytes, and inexpensive separators. During charging, ferrous iron (Fe 2+ ) is oxidized to ferric iron (Fe 3+ ) at the positive electrode while it (Fe 2+ ) is reduced to form iron metal (Fe 0 ) at the negative electrode. Because iron is plated at the negative electrode during charging, conventional electrode structures couple the energy storage capacity and the power rating of the battery. In order to decouple the energy and power ratings and regain the economic advantages of a flow battery, a slurry electrode design was proposed for use as the negative electrode. The slurry electrode is made by flowing electrically conductive particles in an electrolyte containing the dissolved iron species. On charging, iron is plated onto the particles. The particles can then carry the iron metal out of the cell to be stored in external reservoirs. This project looked to develop a slurry for the negative electrode of the all-iron flow battery that can operate at 200 mA/cm 2 with <100 mV overpotential, be pumped with parasitic energy costs < 10%, and promote plating on the particles. A scalable and stackable cell design of 1100 cm 2 was developed. The project was initially under contract in mid-January 2013. The project was converted from a one-year proof of concept seedling to an additional two-year program, then extended with an 18-month plus-up, and finally with an additional 6-month approved cost-overrun. During the seeding project, the concept of plating on carbon particles in a slurry was demonstrated. However, this was accomplished with high-cost multi-walled carbon nanotubes as the slurry material. The following two-year program discovered several low-cost carbon blacks that could also be used in this application. These findings were supported by an analysis that demonstrated the effectiveness of the carbon that takes into account not just the effective electronic conductivity of the slurry, but also the surface area per volume of the slurry. It was demonstrated that stable, flowable slurries could be created with these carbons, even when the carbons where fully loaded with iron during charging. During the two-year program, laboratory-scale 50 cm 2 single-cells demonstrated charge-discharge cycling at current densities of 150 mA/cm 2 and energy efficiencies of >50%. Meanwhile, cost modeling continued to show promise for this energy storage approach. Following the conversion period, the overall objective of the nominally 18-month plus up period was to close the technical gap of a 25X scale-up and reduce risk to enable commercial investment required to develop a slurry iron flow battery product. A specific objective was to demonstrate 150 cycles of performance exceeding 70% energy efficiency with a 10-cell stack of 1156 cm 2 cells operating at 100 mA/cm 2 . The 10-cell short stack was designed to have a power delivery rating of approximately 1 kW, which represents a size commensurate with the requirements of our commercialization partner at that time. A complete battery support system for the full-size cell was designed, fabricated, and tested. This includes pumps (multiple types were considered, and constant volume hose pumps were found to be acceptable for performance and cost), electrolyte rebalance reactor, and sensors and control systems. The support system proved to be well-behaved and worked well. A new low-cost membrane was developed for this system based on a microporous polymer support with a layer of hydrogel polymer. The membrane had low resistivity, and significantly reduced pressure driven fluid flow across the membrane (as compared to the un-coated microporous support). This membrane approach was scaled-up in conjunction with a commercial toll coating company, and a large amount of membrane was manufactured to support large cell and stack testing. A new concept for an electrolyte rebalance reactor to react hydrogen gas from the negative electrolyte (from plating inefficiency) with excess ferric ion in the positive electrolyte was developed. This design was very simple, low cost, and effective. The full scale 1156 cm 2 single-cell was designed, modeled, fabricated and tested. Modeling showed that uniform flow-distribution should be obtained with the designed flow distributor. The design took into consideration the need to stack the cells, and components were fabricated for a ten-cell stack. Testing of the cell for charge and discharge demonstrated current densities of 50 mA/cm 2 with efficiencies of 50%. However, optimization and long cycling could not be accomplished because the slurry electrode would plug within the cell and block the flow. This would shut down the cell after several charge-discharge cycles. Various approaches were pursued to address this problem with some progress. However, there was not adequate time to find solutions to the problem although several promising approaches were identified for future work. The final deliverable for this proposed 18-month effort was to be a 1 kW, 6 kWh slurry flow battery, with complete balance of plant, ready for testing at an ARPA-E ‘Charges’ site with an estimated capital cost less than $\$ $45/kWh for a six-hour system (excluding power electronics). The deliverable milestone was not achieved for reasons mentioned above related to the slurry plugging. At the completion of this project, it was determined that the cost targets are achievable. The cost estimate for a 1 MW system with a one-hour capacity was estimated at $\$ $140/kWh (including power electronics) and for a six-hour system was estimated at $\$ $40/kWh (including power electronics). These costs include the battery, the balance of plant, the power conditioning and a concrete pad. This program resulted in three patents including the slurry-based iron flow battery, the rebalance reactor, and the membrane separator. At the time of this report, slurry-based iron flow battery patents have been issued in the US, China, Japan, Korea, and Europe. The other patent applications were under various stages of examination. A licensee was identified and the company initiated a scale-up and development program to take this technology to the marketplace, and CWRU staff have transferred their know-how and knowledge base to the company. This technology will enhance the economic and energy security of the United States by enabling the use of intermittent renewable energy technology, such as wind and solar power, as dispatchable resources. This report summarizes the results of this research and development program.

25 ENERGY STORAGE↗

Optimal electric-distribution-grid planning considering the demand-side flexibility of thermal building systems for a test case in Singapore

The planning of district-scale electric grids, i.e., distribution grids, has traditionally relied on finding the most cost-effective design such that they are able to supply the peak loads in a district. With the advent of electric demand side flexibility (DSF), there is the opportunity to reshape peak loads such that the investment cost of the electric grid decreases in exchange for a minor increase in the operation cost. This paper formulates an optimal planning approach for the electric grid at the district scale, which incorporates the DSF from thermal building systems, e.g., heating ventilation and air-conditioning (HVAC) systems. The problem is formulated as a mixed-integer linear program (MILP) and aims at minimizing the investment cost for the grid along with the operation cost of the flexible loads. This is subjected to the fixed electricity demand and thermal comfort constraints of building occupants. To this end, linear models for the thermal comfort in the buildings and the power flow in electric grid are considered. The approach is tested on a district planning test case based in Singapore, where the results show up to 30.9 % reductions in investment cost and up to 3.7 % reduction in total annualized cost. Urban planning authorities, developers and utility companies can all benefit from the presented approach to make optimized investment decisions. For building operators, the results point to the need of adopting their control systems for DSF.

Troitzsch, Sebastian↗

Analyzing the Inflation Reduction Act and the Bipartisan Infrastructure Law for Their Effects on Nuclear Cost Data

Decarbonizing to meet aggressive climate change mitigation targets requires energy transition within all sectors. In the industrial sector, emissions will need to decrease by 65–90% by 2050 to avert global warming greater than 1.5°C (IPCC 2022). The Inflation Reduction Act (IRA), Bipartisan Infrastructure Law (BIL), and Defense Production Act (DPA) have clean energy requirements and provide financial incentives to accelerate the use of clean energy technologies in the industrial sector. It is important to note that IRA is the most extensive action ever taken by Congress and the U.S. government to combat climate change (US CBO 2021, 2022). The energy system provisions comprise most of the estimated climate and energy support. A better understanding of those provisions in the above mentioned acts and laws is crucial to assessing their impact on the equivalent energy costs to the power plant owners (impact on net revenue in $/MWh) across different energy technologies, market deployment potential offered to different energy technologies applications, and energy system research modeling. The purpose of the report is to shed light on IRA and BIL provisions with particular attention to impacts on the nuclear industry. The report also seeks to understand potential equivalent energy cost savings for nuclear energy technologies from other laws and programs in conjunction with IRA, BIL, loan program guarantees, and DPA. The report reviews recent legislation on energy policy and translates that policy to impacts on equivalent nuclear costs for the purpose of modeling policy in energy scenarios.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nevada Test Site-Directed Research and Development, FY 2007 Report

The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving from SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.

43 PARTICLE ACCELERATORS↗

Technology to Facilitate the Use of Impaired Waters in Cooling Towers

The project goal was to develop an effective silica removal technology and couple that with existing electro-dialysis reversal (EDR) technology to achieve a cost effective treatment for impaired waters to allow for their use in the cooling towers of coal fired power plants. A quantitative target of the program was a 50% reduction in the fresh water withdrawal at a levelized cost of water of $3.90/Kgal. Over the course of the program, a new molybdenum-modified alumina was developed that significantly outperforms existing alumina materials in silica removal both kinetically and thermodynamically. The Langmuir capacity is 0.11g silica/g adsorbent. Moreover, a low cost recycle/regeneration process was discovered to allow for multiple recycles with minimal loss in activity. On the lab scale, five runs were carried out with no drop in performance between the second and fifth run in ability to absorb the silica from water. The Mo-modified alumina was successfully prepared on a multiple kilogram scale and a bench scale model column was used to remove 100 ppm of silica from 400 liters of simulated impaired water. Significant water savings would result from such a process and the regeneration process could be further optimized to reduce water requirements. Current barriers to implementation are the base cost of the adsorbent material and the fine powder form that would lead to back pressure on a large column. If mesoporous materials become more commonly used in other areas and the price drops from volume and process improvements, then our material would also lower in price because the amount of molybdenum needed is low and no additional processing is required. There may well be engineering solutions to the fine powder issue; in a simple concept experiment, we were able to pelletize our material with Boehmite, but lost performance due to a dramatic decrease in surface area.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 3

This project is a collaborative research effort between PKMJ Technical Services LLC, Idaho National Laboratory, and Public Service Enterprise Group (PSEG) Nuclear, LLC. The collaboration, led by PKMJ Technical Services LLC, is part of the industry Funding Opportunity Announcement (FOA) award under Advanced Nuclear Technology Development FOA #DE-FOA-0001817. The pilot demonstration focuses on the Circulating Water System (CWS), an important non-safety-related system that impacts the power generation capability of the plant site. Achieving riskinformed condition-based Predictive Maintenance (PdM) on the CWS will result in significant economic benefits, and the developed methodologies can also be applied to other plant systems. This approach supports an industry goal of ensuring that nuclear power generation remains a viable, economically competitive option in the energy market. Operation and Maintenance (O&M) costs include labor-intensive Preventive Maintenance (PM) programs that involve manually performed inspection, calibration, testing, and maintenance of plant assets at periodic frequencies as well as time-based replacement of assets, irrespective of condition. This project offers an alternative by focusing on riskinformed condition-based maintenance to reduce O&M costs while still maintaining plant health and safety. This report summarizes the progress made toward achieving a risk-informed condition-based maintenance approach. The research and development (R&D) activities presented in this report are associated with development of a nuclear digital platform application, integration of fault signature models, and automated work management processes. The fault signatures and Machine Learning (ML) models are key components in predictive analytics and are heavily leveraged to improve the insights received by existing plant process data sources. Availability of the analysis results within a centralized digital platform enhances efficiency by enabling automation of activities otherwise performed manually. Personnel are presented with enhanced information that can be used to evaluate plant status and risks. Utilizing the enhancements to data analytics supports automated responses, (i.e. issuance of work orders) to address developing equipment faults and thus preventing forced, unplanned shutdowns of components or systems. The R&D activities described within this report lay the foundation for developing and demonstrating a digital automated platform to centralize the implementation of condition monitoring and response to equipment faults. The digital automated platform is cloud-based and designed to enable improved efficiency of plant processes. The digital platform includes content related to maintenance optimization, fault signature analysis, and plant records, which can all be used to support efficiencies when located within a centralized digital platform. These efficiencies could be further enhanced when deployed through industry-wide deployment of the technology to improve insights and processes based upon economies of scale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

33 ADVANCED PROPULSION SYSTEMS↗

IN2 Profile: Go Electric Provides Grid Stabilizing Energy Service Solutions to Utilities

Through the Wells Fargo Innovation Incubator (IN²) program, Go Electric will validate their Link DR technology, which is an advanced, uninterruptable power supply that provides secure power, lowers facility energy costs, integrates renewables, and generates income from utility demand response programs. The IN² program launched in October 2014 and is part of Wells Fargo’s 2020 Environmental Commitment to provide $100 million to environmentally-focused nonprofits and universities. The goal is to create an ecosystem that fosters and accelerates the commercialization of promising commercial buildings technologies that can provide scalable solutions to reduce the energy impact of buildings. According to the Department of Energy, nearly 40 percent of energy consumption in the U.S. today comes from buildings at an estimated cost of $413 billion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating Residential Appliance Lifetime for Energy Efficient Policy Analysis

Accurate knowledge of appliance lifetimes helps policy makers set effective energy efficiency policy. The cost-effectiveness of an appliance efficiency measure depends on the length of time consumers will use an appliance. National shipments projections depend on the rate of replacement in the installed appliance stock. Furthermore, early retirement programs need an accurate understanding of the remaining useful life in order to calculate lifetime savings and cost-effectiveness of a program. This paper uses a method for calculating lifetime of appliances based on the most recent data available on appliance shipments, total appliance stock, and the fraction of surviving appliances by age bins. An example of the calculation methodology is provided for residential gas boilers. This paper concludes by comparing the results to other available data on gas boiler lifetime.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Greenhouse gas emission reduction and cost from the United States biofuels mandate

The United States biofuel mandate might be the largest operating program to reduce greenhouse gas (GHG) emissions. Our paper uses regulatory information about abatement and compliance cost estimates to measure the greenhouse gas abatement cost curve of the mandate. Historical compliance costs per unit of biofuel appear readily available, yet findings here show that using these data along with observed biofuel quantities biases biofuel mandate abatement cost estimates upward. Unbiased estimation requires that related biofuel mandate costs and emissions are estimated along with associated market effects, including on fuel use, using an economic model. Moreover, this approach relates greenhouse gas abatement to the implications for crop prices and land use, taking account of interactions within the crop sector. Results show that the United States biofuel mandate causes up to 20 million metric tons of carbon dioxide equivalent abatement for compliance costs that are equivalent to carbon prices ranging up to $20 per ton, with a large part coming from reductions in petroleum product use as the mandate encourages substitution to biofuels. Abatement costs are reduced if ethanol is made at new facilities with fewer emissions or if petroleum output expansion causes greater emissions than the historical average. Results also indicate that GHG abatement via the mandate is initially costly due to the nature of biofuel demand, there can be a trade-off between corn price increase and GHG reduction, and the increase in total area planted to crops in the U.S. is less important than the reallocation of land among crops.

09 BIOMASS FUELS↗

An interval-parameter stochastic robust optimization model for supporting municipal solid waste management under uncertainty

A stochastic robust interval linear programming model (IPRO) was developed for supporting municipal solid waste management under uncertainty. The model improves upon the existing stochastic robust optimization (SRO) and interval linear programming (ILP) methods by allowing evaluations of trade-offs among expected costs, cost variability, and risk of violating relax constraints simultaneously, as well as reflections of complex uncertainties through both interval and stochastic theories. A long-term waste management problem was used to demonstrate the applicability of IPRO model. The results indicated that IPRO normally led to interval solutions, where waste-management alternatives could be generated by adjusting the decision-variable values within their intervals. The model could also help waste managers to identify desired policies that under various environmental, economic, system-feasibility and system-reliability constraints.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Desktop Instructions for LLNL W80-4 WDCR Schedule and Cost Risk Analysis

As part of Weapon Design Cost Report (WDCR), LLNL will be performing site Schedule Risk and Cost Risk Analysis. This analysis uses statistical techniques to predict a level of confidence in meeting the program’s completion date. This document includes the process and steps to conduct the Schedule Risk and Cost Risk Analysis to determine the likelihood that the program completion date are met, how much management reserve is needed to provide the acceptable certainty of completion by a specific date, risks most likely to delay the project, and the paths or activities that are most likely to delay the program. The analysis focuses on uncertainty and key risks and how they affect the schedule’s activity durations and established a management reserve.

99 GENERAL AND MISCELLANEOUS↗

Analytical Modeling of Cache Behavior for Affine Programs

Modern optimizing compiler design integrates program transformation strategies aimed at reducing data movement to/from main memory by exploiting the data cache hierarchy. But in reality, the effect of these transformations on the actual cache miss count is ignored in compilers due to the lack of precise compile-time models of misses for hierarchical caches. The current state of practice for cache miss analysis is based on accurate simulation. However, simulation requires time proportional to the dataset/problem size as well as the number of distinct cache configurations of interest to be evaluated. This paper takes a fundamentally different approach, made possible by focusing on polyhedral programs with static control flow: instead of relying on costly simulation, this paper develops the first closed-form solution for exact modeling of misses in a set-associative cache hierarchy. It enabling simulation-less selection of program transformations at compile-time to optimize cache misses. A push-button tool implementing the approach is developed and used for extensive validation of the complete framework.

affine programs, cache modeling, set associativity↗

EIC-related Generic Detector R&D Program

This program will support advanced R&D on innovative, cost-effective detector concepts which reduce risk and that either the one detector in the project scope or a second detector could incorporate. (The term "generic" conveys this duality.) The program is supported through R&D funds provided to Jefferson Lab by the DOE Office of Nuclear Physics, and is open to all segments of the EIC community. It is expected to be funded at an annual level of $2M, subject to availability of funds from DOE NP.

Mack, David↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.