Search NASA⌕ Search

SEARCH · Search NASA

Results for “timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Draft Feasibility Assessment for Use of AI in Preparing Transportation Safety Analysis Reports

Preparing transportation safety analysis reports for microreactors is time and labor intensive, requiring extensive cross referencing to Federal regulations, previously approved documents, and expert review comments across structural, thermal, criticality, shielding, containment, and security. These burdens are magnified by the novelty of microreactor technologies and the evolving regulatory landscape, as well as current workforce constraints. Generative AI and supporting machine learning tools present an opportunity to accelerate drafting timelines, lift generalized writing burdens, and systematically enforce regulatory adherence through retrieval augmented generation and other knowledge retrieval and mapping methods. This draft report presents a preliminary feasibility assessment of the use of AI to expedite the preparation of microreactor transportation safety analysis reports and proposes an initial methodology for doing so.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stepped hosting capacity for maximizing distributed solar on Guam

Guam Power Authority (GPA) sought national lab assistance through the Energy Technology Innovations Partnership Project as part of the second cohort of applicants (i.e. the program’s second year). GPA is leading an effort to evolve the island’s energy generation portfolio to 50% renewable by 2030, and 100% renewable by 2040. These goals for renewable penetration are a function of public law and GPA is legally required to comply, though GPA’s timeline is more aggressive by five years in each case than the law requires.

14 SOLAR ENERGY↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Novel PV Array System Design to Accelerate Solar Deployment, Reduce LCOE, Reduce Land Use Competition, and Increase Siting Flexibility

The increasing demand for solar energy faces significant barriers, including inefficient construction processes, high project costs limiting LCOE reductions, and diminishing availability of "good" sites with favorable interconnection. Conventional solar installations are often constrained by long construction timelines and the need for flat, large plots. Furthermore, the industry struggles with a shortage of skilled labor. Planted Solar aims to address these challenges by fundamentally transforming solar deployment from a construction project into a streamlined manufacturing process. Our novel approach combines high-density racking, integrated terrain-following design software, and installation automation. Unlike competing solutions that either assist with standard array assembly or offer dense packing without terrain adaptability or automation, Planted's technology uniquely brings together a new array product with in-place automated manufacturing to achieve the lowest possible cost, greater site flexibility, and accelerated deployment.

14 SOLAR ENERGY↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations. This report summarizes the Fiscal Year 2024 (FY24) ARM radar-related activities and outlines the strategic plan for FY25. It presents a comprehensive radar plan that includes detailed activities, priorities, and a projected timeline aligned with the ARM radar roadmap. Key tasks, detailed in Table 1, cover various radar operational stages and coordinated efforts among ARM teams.

54 ENVIRONMENTAL SCIENCES↗

Ceramic Composite Experimental Testing Status

Over recent years, ceramic matrix materials such as SiC–SiC and C–C have been gaining interest for use in fusion reactors, light water reactors (LWRs), and high-temperature reactors (HTRs). These materials are good candidates to operate in very high temperature and moderate to high radiation environments. The evaluation of composite materials, in general, is challenging because of variations in precursor materials, variations in the fabrication process across fabricators, and the wide range of potential fiber architectures, to name a few. However, the need to evaluate neutron-irradiated properties adds another layer of complexity, which includes cost, timeline, and specimen size limitations (often associated with irradiation testing). A qualification methodology for the use of ceramic composites is provided in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section III-5-HHB. The methodology is supported by ASTM International (ASTM) guides, which provide a pathway to accomplish this effort. Part of the qualification strategy is for the designer to collect material property data on environmental conditions representative of its design envelope. These data include irradiation effects. This report presents an experimental study and test campaign developed to partially address this gap by providing initial mechanical and physical property data required for design. A variety of different materials using different manufacturing techniques are considered as part of this campaign. The test plan suggests performing a screening or partial irradiation study to assist the designer during the material selection process. The designer can then perform a more comprehensive qualification study if the material performance is promising. This work focuses on the status of the specimen preparations (machining of samples), the current test methods and failure analysis as well as the preparation of irradiation vehicles for the irradiation campaign. The irradiation will be performed at Oak Ridge National Laboratory (ORNL) in the High Flux Isotope Reactor (HFIR) and at Idaho National Laboratory (INL) in the Advanced Test Reactor (ATR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Emergency vacuum repairs in an aging accelerator: Case studies and lessons learned

Jefferson Lab operates the CEBAF electron accelerator at energies to 12 GeV for the Department of Energy Nuclear Physics program. The CEBAF injector beamline was designed and built in the early 1990s. Although we’ve upgraded and replaced many of the vacuum systems, we still have unique original components installed which operate daily. Over the past 3 years, we have had several vacuum leaks in ageing components leading to emergency repairs on a tight timeline. I’ll discuss the nature of these vacuum component failures, the difficulties in repair due to their ages, the lessons we’ve learned, and how we hope to minimize similar failures going forward.

Stutzman, Marcy [Thomas Jefferson National Acceler↗

White-Rabbit-Disciplined FPGA Readout for Fermilab Timing Events

Fermilab's accelerator timing links broadcast short event codes to thousands of devices at once, but the links themselves carry no absolute notion of time; that comes separately from a White Rabbit reference. This work builds the piece that ties the two together on a single board. On a Xilinx Kria KR260 (Zynq UltraScale+), the programmable logic decodes a real Fermilab TCLK link, stamps every event with an absolute White-Rabbit \{sec, ns\} UTC time, and reads the timestamped stream out over AXI4-Lite; a thin Linux process on the same die publishes each event into a Redis stream on the control network. To exercise the full chain on one board, the decoded events are re-encoded as gigabit ACLK, transmitted out an SFP+ optical port, looped back over a short fiber jumper, and decoded again on the same timeline, and are additionally mirrored as an ACLK-Lite Manchester waveform for benchtop probing. Across sustained, multi-day testing against real Fermilab TCLK, the pipeline has decoded, timestamped, and published hundreds of millions of events with practically zero loss, and folding the timestamped stream on the 60-second accelerator supercycle recovers the machine's periodic structure directly from the published data.

Rossel, Jacob [Fermilab; UC, Berkeley (main)] (ORC↗

Port scanner and Testing Suite

This project addresses the challenge of identifying and managing open network ports across physical and virtual hosts. The current form of verifying ports in use required manually searching individual ports - a process that was both time- consuming and a potential bottleneck for deployment timelines. To resolve this, an automated port scanning tool was developed in Python. The tool supports simultaneous multiple port scans. To ensure functionality and long-term maintainability, a comprehensive testing suite was implemented using Python’s unittest framework. Edge cases, including valid port numbers, reversed ranges, and closed ports, were explicitly tested to ensure robust handling of real-world scenarios. The resulting tool reduces the time required to verify port security across a network, supporting both targeted and host checks and broader Classless Inter-Domain Routing (CIDR) -based network scans. This work demonstrates the value of automation and test-driven development in strengthening network security practices, and provides a foundation for future enhancements.

Rivera, Linda [Fermilab]↗

A Review of the Research on Response to Improvised Nuclear Device Events

Following the events of September 11, a litany of imaginable horribles was trotted out before an anxious and concerned public. To date, government agencies and academics are still grappling with how to best respond to such catastrophes, and as Senator Lieberman's quote says above, now is the time to plan and prepare for such events. One of the nation's worst fears is that terrorists might detonate an improvised nuclear device (IND) in an American city. With 9/11 serving as the catalyst, the government and many NGOs have invested money into research and development of response capabilities throughout the country. Yet, there is still much to learn about how to best respond to an IND event. Understanding the state of knowledge, identifying gaps, and making recommendations for how to fill those gaps, this paper will provide a framework under which past findings can be understood and future research can fit. The risk of an improvised nuclear device (IND) detonation may seem unlikely; and while this is hopefully true, due to its destructive capability, IND events must be prepared for. Many people still live under the Cold War mentality that if a city is attacked with a nuclear weapon, there is little chance of survival. This assumption, while perhaps true in the case of multiple, thermonuclear weapons exchanges, does not hold for the current threat. If a single IND were detonated in the United States, there would be many casualties at the point of impact; however, there would also be many survivors and the initial response by two major groups will mean the difference between life and death for many people. These groups are the first responders and the public. Understanding how these two groups prepare, react and interact will improve response to nuclear terrorism. Figure 1 provides a visualization of the response timeline of an IND event. For the purposes of this assessment, it is assumed that to accurately inform the public, three functions need to be fulfilled by response personnel, namely planning, developing situational awareness, and developing a public message. Planning varies widely from city to city, and to date no comprehensive study has been completed to assess how individual cities are progressing with preparation plans. Developing situational awareness about an IND detonation has been well researched over the years, yet it is far from fully understood. While messaging is an integral component to response, it is one that suffers from a dearth of knowledge. The public will have a certain level of education and preparation. After the detonation the public will respond naturally and upon receiving the responders message will react to the message and may modify their behavior accordingly. Reviewing the nodes under both headings, responders and public will help better prepare the country to meet the challenges of an IND attack.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Calculating the Errors on the Feynman Variance,Y2F

In a multi-channel detector we record the time of arrival of detected counts. We divide the timeline into separate gates of width T, and ask how many counts arrived in each gate. Finally, we form the count distribution histogram, B, a tally of how many gates had zero counts, how many had one count, ... For illustration, we'll use the gamma block data from NTS Run 20071114224434, RTO 1.2, which was RF1-24, 13.7 kg HEU with 2-inch Pb shielding. The count distribution for a gate width of 416 {micro}s is shown in Figure 1. Note that B is a vector across multiplicity, n. B also depends on the gate time, B = B(T) = B (T{sub i}), so we could just as well think of B as a rectangular matrix. For the moment we'll work with a fixed T, and use a single column of the full count distribution matrix. We'll leave the T dependence implicit.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Research Needs for Magnetic Fusion Energy Sciences. Report of the Research Needs Workshop (ReNeW) Bethesda, Maryland, June 8-12, 2009

Nuclear fusion - the process that powers the sun - offers an environmentally benign, intrinsically safe energy source with an abundant supply of low-cost fuel. It is the focus of an international research program, including the ITE R fusion collaboration, which involves seven parties representing half the world's population. The realization of fusion power would change the economics and ecology of energy production as profoundly as petroleum exploitation did two centuries ago. The 21st century finds fusion research in a transformed landscape. The worldwide fusion community broadly agrees that the science has advanced to the point where an aggressive action plan, aimed at the remaining barriers to practical fusion energy, is warranted. At the same time, and largely because of its scientific advance, the program faces new challenges; above all it is challenged to demonstrate the timeliness of its promised benefits. In response to this changed landscape, the Office of Fusion Energy Sciences (OFES ) in the US Department of Energy commissioned a number of community-based studies of the key scientific and technical foci of magnetic fusion research. The Research Needs Workshop (ReNeW) for Magnetic Fusion Energy Sciences is a capstone to these studies. In the context of magnetic fusion energy, ReNeW surveyed the issues identified in previous studies, and used them as a starting point to define and characterize the research activities that the advance of fusion as a practical energy source will require. Thus, ReNeW's task was to identify (1) the scientific and technological research frontiers of the fusion program, and, especially, (2) a set of activities that will most effectively advance those frontiers. (Note that ReNeW was not charged with developing a strategic plan or timeline for the implementation of fusion power.) This Report presents a portfolio of research activities for US research in magnetic fusion for the next two decades. It is intended to provide a strategic framework for realizing practical fusion energy. The portfolio is the product of ten months of fusion-community study and discussion, culminating in a Workshop held in Bethesda, Maryland, from June 8 to June 12, 2009. The Workshop involved some 200 scientists from Universities, National Laboratories and private industry, including several scientists from outside the US. Largely following the Basic Research Needs model established by the Office of Basic Energy Sciences (BES ), the Report presents a collection of discrete research activities, here called 'thrusts.' Each thrust is based on an explicitly identified question, or coherent set of questions, on the frontier of fusion science. It presents a strategy to find the needed answers, combining the necessary intellectual and hardware tools, experimental facilities, and computational resources into an integrated, focused program. The thrusts should be viewed as building blocks for a fusion program plan whose overall structure will be developed by OFES , using whatever additional community input it requests. Part I of the Report reviews the issues identified in previous fusion-community studies, which systematically identified the key research issues and described them in considerable detail. It then considers in some detail the scientific and technical means that can be used to address these is sues. It ends by showing how these various research requirements are organized into a set of eighteen thrusts. Part II presents a detailed and self-contained discussion of each thrust, including the goals, required facilities and tools for each. This Executive Summary focuses on a survey of the ReNeW thrusts. The following brief review of fusion science is intended to provide context for that survey. A more detailed discussion of fusion science can be found in an Appendix to this Summary, entitled 'A Fusion Primer.'

02 PETROLEUM↗

Status of China's Energy Efficiency Standards and Labels for Appliances and International Collaboration

China first adopted minimum energy performance standards (MEPS) in 1989. Today, there are standards for a wide range of domestic, commercial and selected industrial equipment. In 1999, China launched a voluntary endorsement label, which has grown to cover over 40 products including water-saving products (See Figure 1). Further, in 2005, China started a mandatory energy information label (also referred to as the 'Energy Label'). Today, the Energy Label is applied to four products including: air conditioners; household refrigerators; clothes washers; and unitary air conditioners (See Figure 2). MEPS and the voluntary endorsement labeling specifications have been updated and revised in order to reflect technology improvements to those products in the market. These programs have had an important impact in reducing energy consumption of appliances in China. Indeed, China has built up a strong infrastructure to develop and implement product standards. Historically, however, the government's primary focus has been on the technical requirements for efficiency performance. Less attention has been paid to monitoring and enforcement with a minimal commitment of resources and little expansion of administrative capacity in this area. Thus, market compliance with both mandatory standards and labeling programs has been questionable and actual energy savings may have been undermined as a result. The establishment of a regularized monitoring system for tracking compliance with the mandatory standard and energy information label in China is a major area for program improvement. Over the years, the Collaborative Labeling and Appliance Standards Program (CLASP) has partnered with several Chinese institutions to promote energy-efficient products in China. CLASP, together with its implementing partner Lawrence Berkeley National Laboratory (LBNL), has assisted China in developing and updating the above-mentioned standards and labeling programs. Because of the increasing need for the development of a monitoring system to track compliance with standards and labeling, CLASP, with support from Japan's Ministry of Economy, Trade and Industry (METI), has expanded its ongoing collaboration with the China National Institute of Standards (CNIS) to include enforcement and monitoring. CNIS has already begun working on the issue of compliance. CNIS has conducted modest sample testing in 2006 for refrigerators, freezers and room air-conditioners, and repeated the same task in 2007 with a similar sample size for three products (refrigerators, freezers, air-conditioners and clothes washers). And, CNIS, with technical support from LBNL, has analyzed the data collected through testing. At the same time, parallel effort has also been paid to look at the potential impact of the label to 2020. In conjunction with CNIS, CLASP technical experts reviewed the standards development timeline of the four products currently subject to the mandatory energy information label. CLASP, with the support of METI/IEEJ, collaborated with CNIS to develop the efficiency grades, providing: technical input to the process; comment and advice on particular technical issues; as well as evaluation of the results. In addition, in order to effectively evaluate the impact of the label on China's market, CLASP further provided assistance to CNIS to collect data on both the efficiency distribution and product volume distribution of refrigerators on the market. This short report summarizes the status of Standards and Labeling program, current enforcement and monitoring mechanism in China, and states the importance of international collaborations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Study to Develop an Industrial-Scale, Computer-Controlled High Magnetic Field Processing (HMFP) System to Assist in Commercializing the Novel, Enabling HMFP Manufacturing Technology

As the original magnet designer and manufacturer of ORNL’s 9T, 5-inch ID bore magnet, American Magnetics Inc. (AMI) has collaborated with ORNL’s Materials Processing Group’s and this partnership has been instrumental in the development of our unique thermo-magnetic facilities and expertise. Consequently, AMI and ORNL have realized that the commercial implementation of the High Magnetic Field Processing (HMFP) technology will require the evolution of robust, automated superconducting (SC) magnet systems that will be cost-effective and easy to operate in an industrial environment. The goal of this project and CRADA is to significantly expedite the timeline for implementing this revolutionary and pervasive cross-cutting technology for future US produced industrial components. The successful completion of this project is anticipated to significantly assist in the timely commercialization and licensing of our HMFP intellectual property for a broad spectrum of industries; and to open up a new market for AMI. One notable outcome of this project is that the ThermoMagnetic Processing Technology WON a prestigious 2009 R&D 100 Awards. This award acknowledges and recognizes our TMP Technology as one of the top 100 innovative US technologies in 2009. By successfully establishing the design requirements for a commercial scale magnetic processing system, this project effort has accomplished a key first step in facilitating the building and demonstration of a superconducting magnetic processing coil, enabling the transition of the High Magnetic Field Processing Technology beyond a laboratory novelty into a commercially viable and industrially scalable Manufacturing Technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Study to Develop an Industrial-Scale, Computer-Controlled High Magnetic Field Processing (HMFP) System to Assist in Commercializing the Novel, Enabling HMFP Manufacturing Technology

As the original magnet designer and manufacturer of ORNL s 9T, 5-inch ID bore magnet, American Magnetics Inc. (AMI) has collaborated with ORNL s Materials Processing Group s and this partnership has been instrumental in the development of our unique thermo-magnetic facilities and expertise. Consequently, AMI and ORNL have realized that the commercial implementation of the High Magnetic Field Processing (HMFP) technology will require the evolution of robust, automated superconducting (SC) magnet systems that will be cost-effective and easy to operate in an industrial environment. The goal of this project and CRADA is to significantly expedite the timeline for implementing this revolutionary and pervasive cross-cutting technology for future US produced industrial components. The successful completion of this project is anticipated to significantly assist in the timely commercialization and licensing of our HMFP intellectual property for a broad spectrum of industries; and to open up a new market for AMI. One notable outcome of this project is that the ThermoMagnetic Processing Technology WON a prestigious 2009 R&D 100 Awards. This award acknowledges and recognizes our TMP Technology as one of the top 100 innovative US technologies in 2009. By successfully establishing the design requirements for a commercial scale magnetic processing system, this project effort has accomplished a key first step in facilitating the building and demonstration of a superconducting magnetic processing coil, enabling the transition of the High Magnetic Field Processing Technology beyond a laboratory novelty into a commercially viable and industrially scalable Manufacturing Technology.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗