Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

CEBAF Photo Gun RF System

During the CEBAF 12 GeV Upgrade at Jefferson Lab, a fourth experimental hall, ?D?, was added to the existing three halls. To produce four beams and deliver them to all halls concurrently requires new frequencies and a new timing pattern of the electron bunches. Since a photo-gun is used to produce electron bunches, the gun?s drive laser pulses need to be synchronized with the required bunch rate frequencies of 499 MHz or 249.5 MHz. To meet these new operational requirements, the new LLRF system has been proposed. Very specific requirements (dual frequency operation) on one side and the simple RF drive mode operation on the other imply the use of a commercial off-the-shelf digital platform rather than a system typical for RF cavity field control. We have chosen the Texas Instruments FPGA board along with a high-speed 8-Channel, 14-Bit board, and a 4-Channel, 16-Bit board. The DAC board includes the clock generator for clocking ADCs, DACs and the FPGA. The only custom design section of the system is the RF Front End board. The complete Gun Laser LLRF system has been designed, built, and recently commissioned in the CEBAF Injector. This paper will detail the design and report on commissioning activities.

Plawski, Tomasz↗

Linear Extrusion 400 Tons/Day Dry Solids Pump

Pratt & Whitney Rocketdyne (PWR) has developed an innovative gasifier concept that uses rocket engine experience to significantly improve gasifier performance, life, and cost compared to current state-of-the-art systems. The PWR gasifier concept uses a compact and highly efficient (>50%) dry solids pump that has excellent availability (>99.5%). PWR is currently developing this dry solids pump under a U.S. Department of Energy (DOE) cooperative agreement. The conceptual design on two dry solids pumps were completed under this agreement and one pump concept was selected for preliminary design. A preliminary design review (PDR) of the selected pump was presented on September 20, 2007 to PWR management and numerous technical specialists. Feedback from the PDR review team has been factored into the design and a Delta-PDR was held on April 9, 2008.

42 ENGINEERING↗

Development of Residential Prototype Building Models and Analysis System for Large-Scale Energy Efficiency Studies Using EnergyPlus

ABSTRACT: Recent advances in residential building energy efficiency and codes have resulted in increased interest in detailed residential building energy models using the latest energy simulation software. One of the challenges of developing residential building models to characterize new residential building stock is to allow for flexibility to address variability in house features like geometry, configuration, HVAC systems etc. Researchers solved this problem in a novel way by creating a simulation structure capable of creating fully-functional EnergyPlus batch runs using a completely scalable residential EnergyPlus template system. This system was used to create a set of thirty-two residential prototype building models covering single- and multifamily buildings, four common foundation types and four common heating system types found in the United States (US). A weighting scheme with detailed state-wise and national weighting factors was designed to supplement the residential prototype models. The complete set is designed to represent a majority of new residential construction stock. The entire structure consists of a system of utility programs developed around the core EnergyPlus simulation engine to automate the creation and management of large-scale simulation studies with minimal human effort. The simulation structure and the residential prototype building models have been used for numerous large-scale studies, one of which is briefly discussed in this paper.

Mendon, Vrushali V.↗

Double-Shell Tank Primary Bottom Inspection Development - 19067

Double-Shell Tank (DST) integrity at Hanford is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods [1]. A pressing need for the Double-Shell Tank Integrity Program is the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, WRPS has been unable to conduct inspections of the tank bottoms due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and the annulus space for all of the DSTs has been inspected twice with UT. The annulus region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to the lack of under-tank inspection technology, degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012 [2]. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. In total, two remote visual inspection tools were produced by two vendors. The first tool was designed to leverage existing ultrasonic testing magnetic wall crawler technology in use within the double-shell tank annuli at Hanford. This resulted in a cost savings, immediate familiarization with the equipment, and a more streamlined shop to field experience. The second tool was developed from the ground up, and represents a more tailored and purpose-built solution to the problem. While costlier and more complex, it is also more versatile and capable of future growth or adaptation. Initial design of both tools began in early FY17 with fabrication and testing completed in early FY18. The tools were designed to be deployed alongside existing inspection operations and expand coverage. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, continuously seeking to expand understanding of asset integrity and remaining useful life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Update on the Colossus mK platform at Fermilab

As part of the efforts of the Superconducting Quantum Materials and Systems National Quantum Center at Fermilab, we will construct a large millikelvin refrigeration platform known as Colossus. The Colossus platform will be used for quantum computing applications, along with physics and sensing experiments. At the preceding CEC/ICMC meeting in 2021, we reported on the conceptual design of the platform. In the intervening time, the design of the system has been completed and passed through review, with construction now underway. This paper provides an update on the overall design of the system, and the status of and timeline for construction.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Process Testing Results and Scaling for the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Engineering Platform - 10173

The U.S. Department of Energy-Office of River Protection’s Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks at Richland, Washington. In support of this effort, engineering-scale tests at the Pretreatment Engineering Platform (PEP) have been completed to confirm the process design and provide improved projections of system capacity. The PEP is a 1/4.5-scale facility designed, constructed, and operated to test the integrated leaching and ultrafiltration processes being deployed at the WTP. The PEP replicates the WTP leaching processes with prototypic equipment and control strategies and non-prototypic ancillary equipment to support the core processing. The testing approach used a nonradioactive aqueous slurry simulant to demonstrate the unit operations of caustic and oxidative leaching, cross-flow ultrafiltration solids concentration, and solids washing. Parallel tests conducted at the laboratory scale with identical simulants provided results that allow scale-up factors to be developed between the laboratory and PEP performance. This paper presents the scale-up factors determined between the laboratory and engineering-scale results and presents arguments that extend these results to the full-scale process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PINCH WELD TESTING TO SUPPORT CHANGE IN MANUFACTURING OIL AT THE KCP

This task supports the change from an oil mixture termed 50:50 oil (an equal parts mixture of Milpro 634 and Pennex N47) to a new oil mixture (Castrol Illocut 334). This change was necessitated by a KCP vendor no longer supplying the Pennex N47 component of the 50-50. In order to continue production of machined parts, a detailed process was followed to ensure that high quality parts could be manufactured and that the cutting oil selected would provide acceptable human performance characteristics, e.g., skin irritability, smell, etc. A prime consideration in changing the oil was that no apparent change in the pinch weldability of the fill stems fabricated using the new oil and process parameters, if any, be observed. A two part approach, as detailed in the plan shown in Appendix B, was used to qualify the effect of the process on pinch weld characteristics. In the first phase, ref. 1., the weld parameter window was defined using fill stems made from 304L, 21-6-9, and 316 stainless steel. These weld conditions were then subsequently used for the Castrol Illocut 334 machined fill stems. The results of this activity are reported in this document. A follow-on task of welding in the facility was requested by one of the design agencies and this will be completed and reported separately.

36 MATERIALS SCIENCE↗

Cigeo Design Options, Risks and Opportunities Management: A Continuous Project Management Goal - 20015

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo, the French HLW and IL-LLW Deep Geological Repository. If licensed in the coming years, Cigeo's progressive construction, industrial operation and closure will last over more than a century. Such a duration, associated with the requirements in terms of reversibility, lead to the choice of an incremental design that allows, for next operator generations, to integrate improvements derived from scientific and technical progress as well as from experience feedback from its operation. This incremental design approach, associated with a permanent risks and opportunities management process, will continue after licensing of Cigeo as a tool for the governance of the reversibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Envelope Research for Factory Built Housing, Phase 3. Whole-House Prototyping

The Advanced Envelope Research effort will provide factory homebuilders with high performance, cost-effective envelope designs that can be effectively integrated into the plant production process while meeting the thermal requirements of the 2012 IECC standards. This work is part of a multiphase effort. Phase 1 identified seven envelope technologies and provided a preliminary assessment of three methods for building high performance walls. Phase 2 focused on developing viable product designs, manufacturing strategies, addressing code and structural issues, and cost analysis of the three selected options. An industry advisory committee helped narrow the research focus to perfecting a stud wall design with exterior continuous insulation (CI). This report describes Phase 3, which was completed in two stages and continued the design development effort, exploring and evaluating a range or methods for applying CI to factory built homes. The scope also included material selection, manufacturing and cost analysis, and prototyping and testing. During this phase, a home was built with CI, evaluated, and placed in service. The experience of building a mock up wall section with CI and then constructing on line a prototype home resolved important concerns about how to integrate the material into the production process. First steps were taken toward finding least expensive approaches for incorporating CI in standard factory building practices and a preliminary assessment suggested that even at this early stage the technology is attractive when viewed from a life cycle cost perspective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Applying QMU to Nuclear Weapon Stewardship

Quantification of Margins and Uncertainty (QMU) is a principle means and metric by which nuclear weapons performance is measured. At Lawrence Livermore National Laboratory (LLNL), Nuclear weapon QMU is predominately a Physics assessment of the performance margin and associated uncertainties of not achieving the designed nuclear performance. To more completely apply QMU to Nuclear Weapon Stewardship, a Systems Engineering or systematic approach is being employed to identify and define requirements, allowing assessment of performance with QMU. This paper describes the basics of QMU and how it is applied below the highest level nuclear performance function down and throughout the nuclear weapon design architecture. The intended audience for this paper is a novice QMU practitioner at LLNL. The application of QMU to the entire set of nuclear weapon functions demands a broad engagement of Science and Engineering disciplines. Using a hierarchical flow-down requirements structure, performance functions and failure modes are identified for all levels of system requirements. There can be multiple failure modes per functional requirement. For each function there is a spectrum of possible outputs that can vary from outright failure to excellent performance. The possible consequences and impacts on the next higher level functions will also vary. Since performance variations exist in a weapon functional hierarchy, the assessment process needs and benefits from a system perspective. Incorporating QMU into assessments using a Systems Engineering approach to stockpile management provides a means to quantify weapon performance risks against a multitude of possible failure modes and from the highest level functions down to the lowest level component functionality. Performance risk management is a core practice of nuclear weapon management. Assessing the likelihood and consequences of the many possible failure modes is done yearly as part of Annual Assessment Reviews (AAR). When annual surveillance discovers an anomaly defect as part of weapon surveillance, investigations are launched and QMU is a key tool for quantifying performance impacts. QMU assessments are separated into two pieces, failure mode assessments and QMU analysis.

42 ENGINEERING↗

Applying QMU to Nuclear Weapon Stewardship

Quantification of Margins and Uncertainty (QMU) is a principle means and metric by which nuclear weapons performance is measured. At Lawrence Livermore National Laboratory (LLNL), Nuclear weapon QMU is predominately a Physics assessment of the performance margin and associated uncertainties of not achieving the designed nuclear performance. To more completely apply QMU to Nuclear Weapon Stewardship, a Systems Engineering or systematic approach is being employed to identify and define requirements, allowing assessment of performance with QMU. This paper describes the basics of QMU and how it is applied below the highest level nuclear performance function down and throughout the nuclear weapon design architecture. The intended audience for this paper is a novice QMU practitioner at LLNL.

42 ENGINEERING↗

Gripper Test Assembly Status of Fabrication and Assembly Report – FY2023

The Gripper Test Assembly (GrTA) is an experimental test article designed for use at the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The GrTA will test mechanical components intended for use in compact in-vessel fuel handling machines (FHM) for sodium cooled fast reactors (SFR). The GrTA will test radial and thrust ball bearings, radial and thrust roller bearings, ball screws and nuts, spline shafts and ball nuts, radial spur gears, and universal joints submerged in liquid sodium at high temperatures (250°C-650°C). These components will be tested in a prototypic, full-scale gripper head and under prototypic SFR fuel handling loads. The design of the GrTA was completed in FY2022 and has progressed into fabrication and initial assembly. All custom manufactured components have been fabricated and delivered to ANL following inspection. All custom gears have been fabricated and delivered to ANL. Bearings, ball screws, and spline shafts have been purchased to allow for initial assembly in air, and sodium compatible versions have either been purchased or are in design at appropriate manufacturers. The drive motor systems that operate the various functions of the GrTA have been purchased and delivered to ANL. Instrumentation and control hardware has been purchased and delivered to ANL as well. All sodium facing components of the GrTA have been assembled and show proper fit. The three main functions of the GrTA are to raise or lower a gripper head under prototypic fuel handling loads, rotate the gripper head while carrying a fuel handling load, and extend or retract gripper jaws that lock a fuel assembly to the gripper head. All three functions have been demonstrated in air, while under no load. The GrTA project will move forward next fiscal year by completing the initial assembly, incorporating the drive system and I&C, and preparing the assembly for introduction to sodium.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Fluxless Flip Chip Bonding Process for Optical Military Electronics

As military electronics tend to become lighter, smaller, thinner, and lower cost, the use of flip chip technology is becoming more common place to meet system requirements, yet survive environments. This paper explores the development of an optical flip chip application and details the selection/qualification of the substrate. The selected assembly consists of a procured 1x12 Vertical Cavity Surface Emitting Laser (VCSEL) die, having 80um diameter eutectic AuSn solder bumps at 250um pitch and flip chip bonded to a .006” thick 99.6% alumina substrate with .006” diameter thru holes and metallized with 500Å WTi, under minimum 2.0-3.0μm (80-120μ”) thin film deposited Au. An 8 run, 3 factor, 2 level Full Factorial Design of Experiments (DOE) was completed on procured detector arrays and procured ceramic substrates using the Suss Microtec FC150. The optimum settings for the peak temperature, peak time and final die z-height were selected using the ANOVA results and interaction plots. Additional studies were completed to qualify in-house produced substrates. An epoxy glob-top encapsulant was selected to dissipate stress on the flip chip solder joints and to enhance thermal shock performance.

42 ENGINEERING↗

Observations and Lessons Learned from Testing of the Hanford Waste Treatment Plant Standard High Solids Vessel Design - 18635

The Hanford Waste Treatment and Immobilization Plant (WTP) recently completed qualification testing of the mixing system for the standard high solids vessel design the U.S. Department of Energy (DOE) proposed to replace several vessels in the design of the plant Pretreatment Facility. Testing was split into two phases. The first phase exercised the pulse jet mixer control system to ensure that the control software could accommodate fluids across the complete range of expected densities and viscosities within the vessel for all operational modes. The second phase of testing was focused on the mixing performance of the vessel, specifically, whether mixing was adequate to support the transfer, de-inventory, throughput, and sampling functions of the vessel. Key observations and lessons learned from testing include: - Successful transfer of waste within and beyond the design basis slurry solids concentration; - Successful resuspension and transfer of large, heavy particles; - Effective performance of multi-level bubblers for process control and monitoring; - Effective controls performance; - Reduction of sparger flowrate from nominal design flow; - Liquid blending within about 15 minutes; - Insights into sample representativeness and uniformity of transfers to inform process control strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of $3.5\cdot 10^{-6}$ is presented from thermal, structural and fatigue lifetime perspectives.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗