Search NASA⌕ Search

SEARCH · Search NASA

Results for “ACO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Application of the NASA Advanced Concepts Office, Launch Vehicle Team Design Process and Tools for Modeling Small Responsive Launch Vehicles

The Advanced Concepts Office (ACO) Launch Vehicle Team at the NASA Marshall Space Flight Center (MSFC) is recognized throughout NASA for launch vehicle conceptual definition and pre-phase A concept design evaluation. The Launch Vehicle Team has been instrumental in defining the vehicle trade space for many of NASA s high level launch system studies from the Exploration Systems Architecture Study (ESAS) through the Augustine Report, Constellation, and now Space Launch System (SLS). The Launch Vehicle Team s approach to rapid turn-around and comparative analysis of multiple launch vehicle architectures has played a large role in narrowing the design options for future vehicle development. Recently the Launch Vehicle Team has been developing versions of their vetted tools used on large launch vehicles and repackaged the process and capability to apply to smaller more responsive launch vehicles. Along this development path the LV Team has evaluated trajectory tools and assumptions against sounding rocket trajectories and air launch systems, begun altering subsystem mass estimating relationships to handle smaller vehicle components, and as an additional development driver, have begun an in-house small launch vehicle study. With the recent interest in small responsive launch systems and the known capability and response time of the ACO LV Team, ACO s launch vehicle assessment capability can be utilized to rapidly evaluate the vast and opportune trade space that small launch vehicles currently encompass. This would provide a great benefit to the customer in order to reduce that large trade space to a select few alternatives that should best fit the customer s payload needs.

Threet, Grady E.↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth to Orbit (ETO) Team of the Advanced Concepts Office (ACO) at NASA Marshal Space Flight Center (MSFC) is considered the preeminent group to go to for prephase A and phase A concept definition. The ACO team has been at the forefront of a multitude of launch vehicle studies determining the future direction of the Agency as a whole due, in part, to their rapid turnaround time in analyzing concepts and their ability to cover broad trade spaces of vehicles in that limited timeframe. Each completed vehicle concept includes a full mass breakdown of each vehicle to tertiary subsystem components, along with a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. Additionally, a structural analysis of the vehicle based on material properties and geometries is performed as well as an analysis to determine the flight loads based on the trajectory outputs. As mentioned, the ACO Earth to Orbit Team prides themselves on their rapid turnaround time and often need to fulfill customer requests within limited schedule or little advanced notice. Due to working in this fast paced environment, the ETO team has developed some finely honed skills and methods to maximize the delivery capability to meet their customer needs. This paper will describe the interfaces between the 3 primary disciplines used in the design process; weights and sizing, trajectory, and structural analysis, as well as the approach each discipline employs to streamline their particular piece of the design process.

Waters, Eric D.↗

2015 Annual Report for the Flight Opportunities Program

Welcome to this third edition of the Flight Opportunities program annual report. In this edition, we continue our story of pathfinding NASA's role in the partnership with the U.S. commercial space and space technology R&D communities to advance national space interests and develop technologies critical to NASA's future missions. 2015 was the year in which a planned change to our payload solicitation strategy saw its first tangible result. As you might remember from our 2014 annual report, in 2015 we set out to facilitate a more direct interaction between flight providers and technology developers by providing fixed funding awards to researchers to directly purchase the flight service(s) that best meet their needs. The selection and award of the first six REDDI-F1 flight grants to non-U.S. government researchers was an important milestone in this regard. From now on, using the REDDI-F1 solicitation appendix, the program will enable non-U.S. government researchers to directly purchase flight services on the emerging suborbital market. The same (or similar) commercial flight services will be available to NASA and other U.S. government agencies (OGA) through commercial contracts that NASA has established through our program. For the latter, our program is available to provide campaign management services, similar to the role we play(ed) for technology payloads remaining in our pool from earlier selections. The full impact of this broader strategic change will likely become more visible in the years ahead as our legacy pool gets depleted and we have implemented a new NASA- and OGA-specific call for proposals. One observation that can already be made after two rounds of REDDI-F1 solicitations is that through this change, the list of commercial flight service providers of interest to non-U.S. government researchers has grown from five in 2014 to nine in 2015. On the industry development front, our Announcement of Collaborative Opportunities (ACO) solicitation was promoted to an STMD-wide solicitation and released in 2015 in combination with the Tipping Point solicitation. A total of 22 awards was announced in November 2015, 12 of which are ACO awards, and six of these are funded by Flight Opportunities. Through these ACO awards, the program funds NASA technical expertise and NASA test facilities to aid industry partners in maturing key space technologies, in our case focusing on small launch vehicle technology development. Flight test activity in 2015 saw a steady 13 campaigns with 31 payload-flights (29 unique payloads). Thirteen new payloads were selected into the program in FY2015, and 14 payloads completed flight testing, bringing the total number of completed technology demonstration payloads to 69. Overall, we are pleased with the evolution and growth of the Flight Opportunities program and look forward to continued success in our partnership with the technology R&D community and the commercial space sector.

Flight Testing↗

Developing and Testing a Common Space Systems Ontology using the Ontological Modeling Language

This paper describes the development and testing of the initial version of a common space systems ontology (CoSSO) for use by the Advanced Concepts Office (ACO) at NASA's Marshall Space Flight Center. The ontology provides a shared conceptualization of concepts of interest to the ACO for modeling aerospace systems concepts in a pre-phase A context to aid with the transition to a more model-based paradigm. The ontological concepts and relations, as well as the anticipated use cases, were developed through interactions with the relevant subject matter experts at the ACO and implemented in the Ontological Modeling Language (OML). The ontology builds on the Basic Formal Ontology (BFO) and the Common Core Ontologies (CCO). While most of the ontology is still in the initial stages, an Environmental Control and Life Support System (ECLSS) ontology is being built on top of the main CoSSO and heavily developed as a proof of concept. The ECLSS ontology is designed with different use cases in mind, namely predicting and diagnosing errors in ECLS systems on long-duration missions, with a focus on the Four-Bed CO$_2$ carbon dioxide scrubber currently on board the ISS. The ECLSS ontology is being developed in a similar manner to the CoSSO, and designed to be compatible with it. The current state of both ontologies is presented and discussed, along with plans for future development and testing.

Conceptual Design↗

Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms

Job scheduling and machine layout are interrelated in improving energy consumption (EC) and productivity measures such as tardiness and represent two important decisions that must be made by manufacturers. This interdependency can be explained by transportation time, which connects scheduling and layout. Scheduling and layout, however, have not been thoroughly studied in conjunction using an integrated model in the context of sustainable manufacturing. Hence, we propose an energy-aware optimization model in which scheduling is integrated with layout in a single-level framework. More specifically, a single objective function is defined to minimize the facility energy cost and the job tardiness penalty, which control EC and tardiness respectively in a flexible job shop system. In order to model machine EC more accurately, we also consider three different machine states: a processing state and two idle states. Our case studies show that the integrated model exhibits better performance in controlling manufacturing EC and job tardiness than a non-integrated model in which machine locations are uncontrollable and transportation times between machines are unchangeable. To deal with large-sized problems, we also introduce four new metaheuristics. The performances of these new metaheuristics are compared in terms of objective function values and CPU times using various case studies. The results indicate that a hybrid ant colony optimization and simulated annealing (ACO-SA) algorithm provides better performance than the other algorithms. Specifically, our case studies show that the integrated model using ACO-SA can improve the objective function value by around 5% when compared to the non-integrated model.

42 ENGINEERING↗

Dumb-bell galaxies in southern clusters: Catalog and preliminary statistical results

The dominant galaxy of a rich cluster is often an object whose formation and evolution is closely connected to the dynamics of the cluster itself. Hoessel (1980) and Schneider et al. (1983) estimate that 50 percent of the dominant galaxies are either of the dumb-bell type or have companions at projected distances less than 20 kpc, which is far in excess of the number expected from chance projection (see also Rood and Leir 1979). Presently there is no complete sample of these objects, with the exception of the listing of dumb-bell galaxies in BM type I and I-II clusters in the Abell statistical sample of Rood and Leir (1979). Recent dynamical studies of dumb-bell galaxies in clusters (Valentijn and Casertano, 1988) still suffer from inhomogeneity of the sample. The fact that it is a mixture of optically and radio selected objects may have introduced an unknown biases, for instance if the probability of radio emission is enhanced by the presence of close companions (Stocke, 1978, Heckman et al. 1985, Vettolani and Gregorini 1988) a bias could be present in their velocity distribution. However, this situation is bound to improve: a new sample of Abell clusters in the Southern Hemisphere has been constructed (Abell et al., 1988 hereafter ACO), which has several advantages over the original northern catalog. The plate material (IIIaJ plates) is of better quality and reaches fainter magnitudes. This makes it possible to classify the cluster types with a higher degree of accuracy, as well as to fainter magnitudes. The authors therefore decided to reconsider the whole problem constructing a new sample of dumb-bell galaxies homogeneously selected from the ACO survey. Details of the classification criteria are given.

Vettolani, G.↗

Launch Vehicle Demonstrator Using Shuttle Assets

The Marshall Space Flight Center Advanced Concepts Office (ACO) has the leading role for NASA s preliminary conceptual launch vehicle design and performance analysis. Over the past several years the ACO Earth-to-Orbit Team has evaluated thousands of launch vehicle concept variations for a multitude of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). NASA plans to continue human space exploration and space station utilization. Launch vehicles used for heavy lift cargo and crew will be needed. One of the current leading concepts for future heavy lift capability is an inline one and a half stage concept using solid rocket boosters (SRB) and based on current Shuttle technology and elements. Potentially, the quickest and most cost-effective path towards an operational vehicle of this configuration is to make use of a demonstrator vehicle fabricated from existing shuttle assets and relying upon the existing STS launch infrastructure. Such a demonstrator would yield valuable proof-of-concept data and would provide a working test platform allowing for validated systems integration. Using shuttle hardware such as existing RS-25D engines and partial MPS, propellant tanks derived from the External Tank (ET) design and tooling, and four-segment SRB s could reduce the associated upfront development costs and schedule when compared to a concept that would rely on new propulsion technology and engine designs. There are potentially several other additional benefits to this demonstrator concept. Since a concept of this type would be based on man-rated flight proven hardware components, this demonstrator has the potential to evolve into the first iteration of heavy lift crew or cargo and serve as a baseline for block upgrades. This vehicle could also serve as a demonstration and test platform for the Orion Program. Critical spacecraft systems, re-entry and recovery systems, and launch abort systems of Orion could also be demonstrated in early test flights of the launch vehicle demo. Furthermore, an early demonstrator of this type would provide a stop-gap for retaining critical human capital and infrastructure while affording the current emerging generation of young engineers opportunity to work with and capture lessons learned from existing STS program offices and personnel, who were integral in the design and development of the Space Shuttle before these resources are no longer available. The objective of this study is to define candidate launch vehicle demonstration concepts that are based on Space Shuttle assets and determine their performance capabilities and how these demonstration vehicles could evolve to a heavy lift capability to low earth orbit.

Threet, Grady E., Jr.↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth-to-Orbit Team (ETO) of the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) is considered the pre-eminent go-to group for pre-phase A and phase A concept definition. Over the past several years the ETO team has evaluated thousands of launch vehicle concept variations for a significant number of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Augustine Report, Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). The ACO ETO Team is called upon to address many needs in NASA s design community; some of these are defining extremely large trade-spaces, evaluating advanced technology concepts which have not been addressed by a large majority of the aerospace community, and the rapid turn-around of highly time critical actions. It is the time critical actions, those often limited by schedule or little advanced warning, that have forced the five member ETO team to develop a design process robust enough to handle their current output level in order to meet their customer s needs. Based on the number of vehicle concepts evaluated over the past year this output level averages to four completed vehicle concepts per day. Each of these completed vehicle concepts includes a full mass breakdown of the vehicle to a tertiary level of subsystem components and a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. A structural analysis of the vehicle to determine flight loads based on the trajectory output, material properties, and geometry of the concept is also performed. Due to working in this fast-paced and sometimes rapidly changing environment, the ETO Team has developed a finely tuned process to maximize their delivery capabilities. The objective of this paper is to describe the interfaces between the three disciplines used in the design process: weights and sizing, trajectory, and structural analysis. The tools used to perform such analysis are INtegrated Rocket Sizing (INTROS), Program to Optimize Simulated Trajectories (POST), and Launch Vehicle Analysis (LVA) respectively. The methods each discipline uses to streamline their particular part of the design process will also be discussed.

Waters, Eric D.↗

DEPLOYTECH: Mars Sample Return Concept Study Delta Results

Agenda for this presentation is Exhaust options to reduce the launch numbers from 3 to 2: (1) Mass Reduction of Max-C Rover, ACO Orbiter, and or ACO ERS (2) Eliminate Max-C Rover (3) Launch vehicle options (4) Solar Sail for all interplanetary propulsion, chemical for maneuvering Goal would be to: (1) Brainstorm any other alternatives we have not considered (2) Eliminate any of the options listed above (3) Go forward with a possible viable option that is identified.

Russell, Tiffany↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth-to-Orbit Team (ETO) of the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) is considered the pre-eminent "go-to" group for pre-phase A and phase A concept definition. Over the past several years the ETO team has evaluated thousands of launch vehicle concept variations for a significant number of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Augustine Report, Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). The ACO ETO Team is called upon to address many needs in NASA's design community; some of these are defining extremely large trade-spaces, evaluating advanced technology concepts which have not been addressed by a large majority of the aerospace community, and the rapid turn-around of highly time critical actions. It is the time critical actions, those often limited by schedule or little advanced warning, that have forced the five member ETO team to develop a design process robust enough to handle their current output level in order to meet their customer's needs. Based on the number of vehicle concepts evaluated over the past year this output level averages to four completed vehicle concepts per day. Each of these completed vehicle concepts includes a full mass breakdown of the vehicle to a tertiary level of subsystem components and a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. A structural analysis of the vehicle to determine flight loads based on the trajectory output, material properties, and geometry of the concept is also performed. Due to working in this fast-paced and sometimes rapidly changing environment, the ETO Team has developed a finely tuned process to maximize their delivery capabilities. The objective of this paper is to describe the interfaces between the three disciplines used in the design process: weights and sizing, trajectory, and structural analysis. The tools used to perform such analysis are INtegrated Rocket Sizing (INTROS), Program to Optimize Simulated Trajectories (POST), and Launch Vehicle Analysis (LVA) respectively. The methods each discipline uses to streamline their particular part of the design process will also be discussed.

Waters, Eric D.↗

Desert Test Site Uniformity Analysis

Desert test sites such as Railroad Valley (RRV) Nevada, Egypt-1, and Libya-4 are commonly targeted to assess the on-orbit radiometric performance of sensors. Railroad Valley is used for vicarious calibration experiments, where a field-team makes ground measurements to produce accurate estimates of top-of-atmosphere (TOA) radiances. The Sahara desert test sites are not instrumented, but provide a stable target that can be used for sensor cross-comparisons, or for stability monitoring of a single sensor. These sites are of interest to NASA's Atmospheric Carbon Observation from Space (ACOS) and JAXA's Greenhouse Gas Observation SATellite (GOSAT) programs. This study assesses the utility of these three test sites to the ACOS and GOSAT calibration teams. To simulate errors in sensor-measured radiance with pointing errors, simulated data have been created using MODIS Aqua data. MODIS data are further utilized to validate the campaign data acquired from June 22 through July 5, 2009. The first GOSAT vicarious calibration experiment was conducted during this timeframe.

Vicarious calibration↗

Near-Term Options for a Nuclear Thermal Propulsion Flight Demonstrator

The Appropriations Bill passed by the US Congress in February 2019 instructed NASA to direct “not less than $100,000,000 for the development of nuclear thermal propulsion, of which not less than $70,000,000 shall be for the design of a flight demonstration by 2024 for which a multi-year plan is required by both the House and the Senate within 180 days of enactment of this agreement." As part of NASA’s response to this direction, the Advanced Concepts Office (ACO) at the Marshall Space Flight Center (MSFC) was tasked with leading a study to develop a nuclear thermal propulsion (NTP) flight demonstration (FD) concept and evaluate its feasibility with respect to the near-term schedule goal. During formulation for the NTP FD study, two perspectives emerged with regards to FD concept design. The first seeks to strictly observe the immediate near-term schedule goal, embracing a completely “off-the-shelf,” high-TRL approach to subsystem design and component selection. The downside to this approach is that the propulsion performance to be expected from such a design is significantly lower than what NTP promises for operational systems, and the value of the flight demo is potentially reduced due to a lack of traceability. The second approach advocates for an FD concept that shows increased traceability to the projected designs of operational systems, providing risk reduction for future NTP-enabled missions. This option comes at the cost of schedule and development risks, as it requires some new investments in nuclear reactor fuels and design. In order to understand the implications and differences between these two approaches, the ACO team elected to perform a concept design of each type, labeling the immediate near-term concept Flight Demo 1 (FD1), and the higher traceability concept Flight Demo 2 (FD2). This paper will present a summary of the mission profiles and system designs for both FD1 and FD2, identifying key drivers and challenges for each design.

Edwards, S. J.↗

Towards a Common Basis of Comparison Across a Broad Trade Space of Mars Architecture Options

Humanity’s fascination with Mars predates the advent of space access, but the coming-of-age of rocket propulsion in the mid-20th century provided the technological foundation for considering a human visit to the red planet. Werner von Braun’s “The Mars Project,” published in 1953, is acknowledged as the first integrated Mars mission architecture plan [1]; since then, the reformulation and refinement of Mars architectures and system concepts has been an ongoing activity, as continued study and planning for human Mars missions is necessary in order to incorporate evolving mission objectives, technology advancements, and the increasing body of knowledge regarding human factors and the various environments of space. Historical Mars architecture studies represent an enormous body of work, but apart from a couple of high-level reviews [2], tapping into the findings and philosophies of these varied works entails a tedious and time-consuming individual effort. The unfortunate result of the widely scattered corpus of Mars architectures is that knowledge and understanding acquired in previous studies is not consistently and effectively brought to bear in the studies of today. The primary vehicle for bringing forward past learning is human recall, which both is imperfect and experiences significant attrition. An effort is underway in the Advanced Concepts Office (ACO) at NASA’s Marshall Space Flight Center to recapture and re-baseline previous architecture studies in order to establish a broad basis of comparison for future Mars architecture studies. Recapturing involves gathering and organizing data and documentation from previous efforts; re-baselining entails developing models capable of reproducing the original results, and then utilizing these models to implement a common set of ground rules and assumptions across the resulting trade space of Mars architecture options. This paper will present the methodology ACO is employing in performing this architecture meta-study, including a discussion on the challenges involved in re-baselining without losing the intent behind previous concepts. As part of this discussion some initial results will be presented, along with a list of studies targeted for inclusion. It is expected that the completed basis of comparison results will be presented as a follow-on paper in the following year.

Stephen James Edwards↗

STMD-GCD Reactive Additive Manufacturing for Fourth Industrial Revolution Exploration Systems (RAMFIRE)

Elementum 3D, in partnership with NASA-MSFC under an ACO, seeks to help further increase launch performance and reduce launch and mission cost by advancing novel additively manufactured (AM) aluminum materials for large-scale complex rocket components and launch vehicle structures. The proposed outcome of this ACO is to advance large-scale directed energy deposition (DED) of highstrength aluminum alloys through process development, characterization, and testing.

RAMFIRE↗

An Integrated Architecture Study for Autonomous Lunar Construction

Lunar construction is an expanding field within NASA’s Moon to Mars objectives that presents many challenges and requires innovative and reliable forms of autonomous operations on the surface of the Moon to further the technologies needed for human space exploration. Marshal Space Flight Center’s (MSFC) Advanced Concepts Office (ACO) addressed Lunar Infrastructure Objective LI-4 l by developing a Pre-Phase A, integrated architecture to inform a demonstration for lunar construction operations. The ACO study traded three architectures that would survey and prepare a construction area to build a landing pad out of lunar regolith using MMPACT (Moon-to-Mars Planetary Autonomous Construction Technology) platforms, rovers, and navigation outposts. The main trades examined navigation for the system/architecture, options for rover navigation, battery vs continuous tether power for the MMPACT robotic arm, and assigning site prep functionality to the rovers vs the platforms. Results of the study determined that the best options for the scenario provided would be local navigation (more accurate and continuous), a combination of Light Detection and Ranging (LiDAR) for initial site mapping with subsequent Smart Video Guidance Sensors (SVGS) to save power for construction, and using tethered power to decrease mission duration. The team also concluded that assigning site prep functionality to either the rovers or the platforms has benefits and challenges; future studies could explore having that functionality on both the rovers and platforms. Lastly, the team provided a Concept of Operations (ConOps) timeline that can be used in real-time ground demonstrations to explore the mission timeline, construction processes, autonomous operations, and communication systems that can be tested using MSFC’s lunar regolith field and Lunar Utilization Control Area (LUCA).

Sarah Triana↗

Space Nuclear Propulsion for Space Applications: Multi-Mission Nuclear Thermal Propulsion Vehicle Design

This NASA Technical Memorandum (TM) is intended to capture design work that the Advanced Concepts Office (ACO) at NASA’s Marshall Space Flight Center (MSFC) performed on behalf of the Space Nuclear Propulsion (SNP) Project during an SNP-driven design and mission analysis initiative in FY2025. Specifically, this TM focuses on several spacecraft design concepts intended to explore the feasibility of nuclear thermal propulsion (NTP) for use in a selection of notional, unmanned space missions. While references to the missions will be made in this TM, the primary focus will be on the spacecraft design concepts themselves, the ground rules and assumptions used for designing the spacecraft, a description of the various subsystems and their performance parameters, and the methodologies used to design them. The TM will also highlight areas of future work and additional considerations that may need to be taken into account when evaluating the feasibility of NTP space systems for other applications. The report will discuss the results from ACO’s analysis as they pertain to the different vehicle concepts that were evaluated. Each discipline section in this report will discuss the discipline-specific ground rules and assumptions, the methodology and design approaches employed, and present the results along with any relevant discussion, and highlight areas of future work where applicable.

Mitchell A Rodriguez↗

Alchemy: A Model-Based Approach for 2D to 3D Autonomous Nuclear System Design

Engineering design of nuclear power plant (NPP) piping and equipment systems frequently bypasses crucial 2D system planning, instead moving straight to 3D modeling. This often leads to designs that exceed building envelope constraints, forcing expensive and time-consuming redesigns. When 2D modeling is employed, it typically involves labor-intensive manual workflows that convert 2D drawings into 3D models, resulting in inefficiencies and errors across design iterations. These workflows further suffer from poor software interoperability and dependence on proprietary software ecosystems, thereby contributing to schedule delays and cost overruns. This paper presents Alchemy, an autonomous framework that transforms 2D system definitions into Industry Foundation Classes (IFC)-compliant 3D building information models (BIMs) for expediting nuclear facility design at the conceptual preliminary phase. Using a model-based approach, the framework treats the 2D system diagram as the central reference model employed to automatically generate all subsequent outputs, ensuring consistency between the system definition and the resulting physical design. A web-based interface enables engineers to define hierarchical system topologies including associated equipment, geometric properties, and connectivity requirements. A two-phase equipment layout optimization algorithm automatically computes collision-free spatial configurations within predefined building envelopes. An artificial intelligence (AI)-assisted pipe routing module then generates orthogonal, collision-free routing paths, allowing the user to select either an A* search-based method or an Ant Colony Optimization (ACO)-based method. All outputs are authored natively in IFC format, relying on open-source technologies and standardized formats in order to ensure extensibility and eliminate proprietary software dependencies. The proposed framework is validated on two representative pressurized-water reactor (PWR)-based case studies, for which it autonomously generates IFC-compliant 3D models in minutes, drastically reducing workflows that typically require hours of manual effort. The generated model demonstrates topologically correct equipment placement, physically plausible spatial relationships, and collision-free pipe routing consistent with known PWR loop configurations. This work represents a foundational step toward digital engineering for nuclear facility preliminary design, with future ongoing development targeting design code compliance and expanded system complexity.

97 - MATHEMATICS AND COMPUTING↗

Comparisons of the v11.1 Orbiting Carbon Observatory‐2 (OCO‐2) X CO2 Measurements With GGG2020 TCCON

The Orbiting Carbon Observatory 2 (OCO-2) is NASA's first Earth observation satellite mission dedicated to studying the sources and sinks of carbon dioxide (CO 2 ) on a global scale. The observations of reflected sunlight are inverted in a retrieval algorithm to produce estimates of the dry air mole-fractions of CO 2 (X CO2 ). The OCO-2 Level 2 data release, version 11.1 (v11.1) retrievals from the Atmospheric Carbon Observations from Space (ACOS) algorithm, includes significant improvements in the X CO2 data product compared to older OCO-2 data versions. This work compares the v11.1 X CO2 from OCO-2 against X CO2 estimates collected from a global ground-based network known as the Total Carbon Column Observing Network (TCCON), OCO-2's primary validation source. The OCO-2 project provides a version of the Level 2 data product, called “lite” files that include calibrated and bias-corrected XCO2 values, accessible together with all OCO-2 data products through the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC). This work shows that OCO-2 X CO2 observations made between September 2014 and December 2023, after quality filtering and the application of an averaging kernel correction, agree well with coincident TCCON data for all OCO-2 observational modes of land (nadir, glint, target) and ocean (glint). The aggregated, bias-corrected, and quality-filtered absolute average bias values are less than or equal to 0.20 parts per million (ppm) globally for all OCO-2 observation modes, where the biases do not indicate a statistically significant time dependence. The land nadir/glint mode has the lowest bias value of −0.03 ± 0.85 ppm.

54 ENVIRONMENTAL SCIENCES↗