Search NASA⌕ Search

SEARCH · Search NASA

Results for “Digital Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Development of the Fast Scintillation Detector with Programmable High Voltage Adjustment Suitable for Moessbauer Spectroscopy

This work is focused on a development of a compact fast scintillation detector suitable for Moessbauer spectroscopy (low energy X-ray/{gamma}-ray detection) where high counting rates are inevitable. Optimization of this part was necessary for a reliable function, better time resolution and to avoid a detector pulses pile-up effect. The pile-up effect decreases the measurement performance, significantly depends on the source activity and also on the pulse duration. Our new detection unit includes a fast scintillation crystal YAP:Ce, an R6095 photomultiplier tube, a high voltage power supply socket C9028-01 assembly, an AD5252 digital potentiometer with an I2C interface and an AD8000 ultra fast operation preamplifier. The main advantages of this solution lie in a short pulse duration (less than 200 ns), stable operation for high activities, programmable gain of the high voltage supply and compact design in the aluminum housing.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The high energy astronomy observatories

The forthcoming NASA project of orbiting High Energy Astronomy Observatories (HEAO's) designed to probe the universe by tracing celestial radiations and particles is outlined. Solutions to engineering problems concerning HEAO's which are integrated, yet built to function independently are discussed, including the onboard digital processor, mirror assembly and the thermal shield. The principle of maximal efficiency with minimal cost and the potential capability of the project to provide explanations to black holes, pulsars and gamma-ray bursts are also stressed. The first satellite is scheduled for launch in April 1977.

Neighbors, A. K.↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

Geostationary Operational Environmental Satellite (GOES) Gyro Temperature Model

The geostationary Operational Environmental Satellite (GOES) 1/M series of spacecraft are geostationary weather satellites that use the latest in weather imaging technology. The inertial reference unit package onboard consists of three gyroscopes measuring angular velocity along each of the spacecraft's body axes. This digital integrating rate assembly (DIRA) is calibrated and used to maintain spacecraft attitude during orbital delta-V maneuvers. During the early orbit support of GOES-8 (April 1994), the gyro drift rate biases exhibited a large dependency on gyro temperature. This complicated the calibration and introduced errors into the attitude during delta-V maneuvers. Following GOES-8, a model of the DIRA temperature and drift rate bias variation was developed for GOES-9 (May 1995). This model was used to project a value of the DIRA bias to use during the orbital delta-V maneuvers based on the bias change observed as the DIRA warmed up during the calibration. The model also optimizes the yaw reorientation necessary to achieve the correct delta-V pointing attitude. As a result, a higher accuracy was achieved on GOES-9 leading to more efficient delta-V maneuvers and a propellant savings. This paper summarizes the: Data observed on GOES-8 and the complications it caused in calibration; DIRA temperature/drift rate model; Application and results of the model on GOES-9 support.

Rowe, J. N.↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

Direct Te Metallicity Calibration of R23 in Strong Line Emitters

The gas metallicity of galaxies is often estimated using strong emission lines such as the optical lines of [O iii] and [O ii]. The most common measure is "R23," defined as ([O ii]λλ3726, 3729 + [O iii]λλ4959,5007)/Hβ. Most calibrations for these strong-line metallicity indicators are for continuum selected galaxies. We report a new empirical calibration of R23 for extreme emission-line galaxies using a large sample of about 800 star-forming green pea galaxies with reliable Te -based gas-phase metallicity measurements. This sample is assembled from Sloan Digital Sky Survey (SDSS) Data Release 13 with the equivalent width of the line [O iii]λ5007 > 300 Å or the equivalent width of the line Hβ > 100 Å in the redshift range 0.011 < z < 0.411. For galaxies with strong emission lines and large ionization parameter (which manifests as log [O iii]λλ4959,5007/[O ii]λλ3726,3729 ≥0.6), R23 monotonically increases with log(O/H) and the double-value degeneracy is broken. Our calibration provides metallicity estimates that are accurate to within ~0.14 dex in this regime. Many previous R23 calibrations are found to have bias and large scatter for extreme emission-line galaxies. We give formulae and plots to directly convert R23 and [O iii]λλ4959,5007/[O ii]λλ3726,3729 to log(O/H). Since green peas are best nearby analogs of high-redshift Lyα emitting galaxies, the new calibration offers a good way to estimate the metallicities of both extreme emission-line galaxies and high-redshift Lyα emitting galaxies. We also report on 15 galaxies with metallicities less than 1/12 solar, with the lowest metallicities being 12+log(O/H) = 7.25 and 7.26.

Jiang, Tianxing↗

Active microphonic noise cancellation in radiation detectors

A new adaptive filtering technique to reduce microphonic noise in radiation detectors is presented. The technique is based on system identification that actively cancels the microphonic noise. A sensor is used to measures mechanical disturbances that cause vibration on the detector assembly, and the digital adaptive filtering estimates the impact of these disturbances on the microphonic noise. The noise then can be subtracted from the actual detector measurement. In this paper the technique is presented and simulations are used to support this approach.

47 OTHER INSTRUMENTATION↗

Supervised Autonomous Assembly to Create and Evolve Persistent Assets

Supervised autonomous assembly (SAA) will create a paradigm shift in the planning and design of future persistent assets (PAs), both in near zero-g environments and on planetary surfaces. SAA refers to an autonomy approach that has the benefits of autonomous assembly as well as the benefits provided by a supervisor (operator) who is available to resolve unexpected situations. SAA provides both increased design freedom as well as reduced programmatic risk. SAA enables evolution of future PAs over decades as in-space operations transition from single purpose missions to creation of PAs, such as laboratories and experimental stations which more closely resembling terrestrial laboratories that can easily adapt and evolve to new missions leveraging repeated visits to the PA. The ability to evolve enables PAs to rapidly respond to changing objectives resulting from new questions as our understanding improves. A recently initiated National Aeronautics and Space Administration (NASA) project in the Space Technology Mission Directorate (STMD) Game Changing Development (GCD) Program called the Precision Assembled Space Structure (PASS), leverages the advantages of SAA to develop technologies that enable efficient creation and evolution of hexagonal topologies; both planar (example: fuel depots) and curved (examples: telescopes and shelters). PASS will be used to provide context for the philosophy and concepts discussed as well as the decision and selections made. PASS objectives are: a) Develop confidence in SAA and on-orbit servicing, assembly and manufacturing (OSAM) technologies by executing a test campaign that uses a path-to-flight autonomous precision assembly process directly applicable to future space telescopes. b) Test autonomous technologies including automated path planning and error recovery, to emphasize a robust approach that relies on generic robots and special purpose tools. c) Validate critical component models using a digital twin that includes the assembled primary mirror support structure and assembly process. A digital twin is a high-fidelity simulation of the asset capable of predicting the on-orbit performance. The paper concludes after identifying the critical need for a modest assembly flight experiment to validate and develop confidence in the SAA paradigm, thus accelerating adoption of the benefits described. SAA is a game changing paradigm that enhances the ability of an organization to infuse new technology through rapid evolution of PAs while leveraging OSAM technologies.

Structural Modeling↗

Tunable plasmonic color device and method of making the same

A plasmonic system is disclosed. The system includes at least one polarizer that is configured to provide at least one linearly polarized broadband light beam, an anisotropic plasmonic metasurface (APM) assembly having a plurality of nanoantennae each having a predetermined orientation with respect to a global axis representing encoded digital data, the APM assembly configured to receive the at least one linearly polarized broadband light beam and by applying localized surface plasmon resonance reflect light with selectable wavelengths associated with the predetermined orientations of the nanoantennae, and at least one analyzer that is configured to receive the reflected light with selectable wavelength, wherein the relative angles between each of the at least one analyzers and each of the at least one polarizers are selectable with respect to the global axis, thereby allowing decoding of the digital data.

Kildishev, Alexander V.↗

CSM docked DAP/orbital assembly bending interaction-axial case

A digital autopilot which can provide attitude control for the entire Skylab orbital assembly using the service module reaction control jets is described. An important consideration is the potential interaction of the control system with the bending modes of the orbital assembly. Two aspects of this potential interaction were considered. The first was the possibility that bending induced rotations feeding back through the attitude sensor into the control system could produce an instability or self-sustained oscillation. The second was whether the jet activity commanded by the control system could produce excessive loads at any of the critical load points of the orbital assembly. Both aspects were studied by using analytic techniques and by running simulations on the all-digital simulator.

Turnbull, J. F.↗

ADONIS, high count-rate HP-Ge {gamma} spectrometry algorithm: Irradiated fuel assembly measurement

ADONIS is a digital system for gamma-ray spectrometry, developed by CEA. This system achieves high count-rate gamma-ray spectrometry with correct dynamic dead-time correction, up to, at least, more than an incoming count rate of 3.10{sup 6} events per second. An application of such a system at AREVA NC's La Hague plant is the irradiated fuel scanning facility before reprocessing. The ADONIS system is presented, then the measurement set-up and, last, the measurement results with reference measurements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Digital circuits using universal logic gates

According to the invention, a digital circuit design embodied in at least one of a structural netlist, a behavioral netlist, a hardware description language netlist, a full-custom ASIC, a semi-custom ASIC, an IP core, an integrated circuit, a hybrid of chips, one or more masks, a FPGA, and a circuit card assembly is disclosed. The digital circuit design includes first and second sub-circuits. The first sub-circuits comprise a first percentage of the digital circuit design and the second sub-circuits comprise a second percentage of the digital circuit design. Each of the second sub-circuits is substantially comprised of one or more kernel circuits. The kernel circuits are comprised of selection circuits. The second percentage is at least 5%. In various embodiments, the second percentage could be at least 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, or 95%.

Whitaker, Sterling R.↗

Parallel Processing with Digital Signal Processing Hardware and Software

The assembling and testing of a parallel processing system is described which will allow a user to move a Digital Signal Processing (DSP) application from the design stage to the execution/analysis stage through the use of several software tools and hardware devices. The system will be used to demonstrate the feasibility of the Algorithm To Architecture Mapping Model (ATAMM) dataflow paradigm for static multiprocessor solutions of DSP applications. The individual components comprising the system are described followed by the installation procedure, research topics, and initial program development.

Swenson, Cory V.↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Meso-Scale Digital Materials: Modular, Reconfigurable, Lattice-Based Structures

We present a modular, reconfigurable system for building large structures. This system uses discrete lattice elements, called digital materials, to reversibly assemble ultralight structures that are 99.7% air and yet maintain sufficient specific stiffness for a variety of structural applications and loading scenarios. Design, manufacturing, and characterization of modular building blocks are described, including struts, nodes, joints, and build strategies. Simple case studies are shown using the same building blocks in three different scenarios: a bridge, a boat, and a shelter. Field implementation and demonstration is supplemented by experimental data and numerical simulation. A simplified approach for analyzing these structures is presented which shows good agreement with experimental results.

Reconfigurable↗

Current interrupt method for calculating the electrochemical impedance in a solid oxide electrolysis stack

Here, in this work the time domain response of Solid Oxide Electrolysis Cells (SOEC) to a current interruption was transformed into the frequency domain using a carrier function Laplace transform, which is fit to the experimental data using a MATLAB Complex Nonlinear Least Squares (CNLS) solver. The hardware implementation, consisting principally of a high-speed switch and a fast-logging Analog to Digital Converter (ADC), was assembled and tested using a calibration module to assess the accuracy, repeatability, and speed of acquisition of the prototype device as compared against a calibrated commercial impedance spectrometer. Additionally, the current interrupt device and commercial FRA were used to acquire the impedance spectra of a four cell SOEC stack with a large, 300 cm 2 , active cell area.

SOEC↗

Theory and experiment research for ultra-low frequency maglev vibration sensor

A new maglev sensor is proposed to measure ultra-low frequency (ULF) vibration, which uses hybrid-magnet levitation structure with electromagnets and permanent magnets as the supporting component, rather than the conventional spring structure of magnetoelectric vibration sensor. Since the lower measurement limit needs to be reduced, the equivalent bearing stiffness coefficient and the equivalent damping coefficient are adjusted by the sensitivity unit structure of the sensor and the closed-loop control system, which realizes both the closed-loop control and the solving algorithms. A simple sensor experimental platform is then assembled based on a digital hardware system, and experimental results demonstrate that the lower measurement limit of the sensor is increased to 0.2 Hz under these experimental conditions, indicating promising results of the maglev sensor for ULF vibration measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗