At least 73 records · Page 4

Evaluation of Underwater Adhesives and Friction Coatings for In Situ Attachment of Fiber Optic Sensor System for Subsea Applications

Integrity and performance monitoring of subsea pipelines and structures provides critical information for managing offshore oil and gas production operation and preventing environmentally damaging and costly catastrophic failure. Currently pipeline monitoring devices require ground assembly and installation prior to the underwater deployment of the pipeline. A monitoring device that could be installed in situ on the operating underwater structures could enhance the productivity and improve the safety of current offshore operation. Through a Space Act Agreement (SAA) between the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) and Astro Technology, Inc. (ATI), JSC provides technical expertise and testing facilities to support the development of fiber optic sensor technologies by ATI. This paper details the first collaboration effort between NASA JSC and ATI in evaluating underwater applicable adhesives and friction coatings for attaching fiber optic sensor system to subsea pipeline. A market survey was conducted to examine different commercial ]off ]the ]shelf (COTS) underwater adhesive systems and to select adhesive candidates for testing and evaluation. Four COTS epoxy based underwater adhesives were selected and evaluated. The adhesives were applied and cured in simulated seawater conditions and then evaluated for application characteristics and adhesive strength. The adhesive that demonstrated the best underwater application characteristics and highest adhesive strength were identified for further evaluation in developing an attachment system that could be deployed in the harsh subsea environment. Various friction coatings were also tested in this study to measure their shear strengths for a mechanical clamping design concept for attaching fiber optic sensor system. A COTS carbide alloy coating was found to increase the shear strength of metal to metal clamping interface by up to 46 percent. This study provides valuable data for assessing the feasibility of developing the next generation fiber optic senor system that could be retrofitted onto existing subsea pipeline structures.

Tang, Henry H.↗

Installation Torque Tables for Noncritical Applications

The objective of this project is to define torque values for bolts and screws when loading is not a concern. Fasteners require a certain torque to fulfill its function and prevent failure. NASA Glenn Research Center did not have a set of fastener torque tables for non-critical applications without loads, usually referring to hand-tight or wrench-tight torqueing. The project is based on two formulas, torque and pullout load. Torque values are calculated giving way to preliminary data tables. Testing is done to various bolts and metal plates, torqueing them until the point of failure. Around 640 torque tables were developed for UNC, UNF, and M fasteners. Different lengths of thread engagement were analyzed for the 5 most common materials used at GRC. The tables were put together in an Excel spreadsheet and then formatted into a Word document. The plan is to later convert this to an official technical publication or memorandum.

installation↗

Cryogenic testing of the first HL-LHC Q1/Q3 cryo-assembly at Fermilab

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 cryo-assembly for the high-luminosity LHC upgrade (HL-LHC). The cryo-assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from this first test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cryogenic testing of HL-LHC Q1/Q3 cryo-assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvement for subsequent tests.

Rabehl, R. [Fermilab] (ORCID:0000000311130030)↗

Bolt installation and tensioning system

A bolt installation and removal (BIR) system is used for assembling and disassembling a nuclear vessel. The BIR system includes a platform with a stand for supporting the nuclear vessel. A track extends around an outside perimeter of the platform and multiple tool carts include wheels that roll on the track. Tool towers are located on the carts and include tool assemblies configured to install and remove bolts on the nuclear reactor vessel. Magazine towers also extend up from the tool carts next to the tool towers and include magazines that hold bolts for exchanging with the tool assemblies. Drive mechanisms move tool heads in the tool assemblies around a first vertical axis, vertically up and down, and laterally to more simply and reliably install and remove the bolts in a radioactive underwater environment.

Shaw, Steven W.↗

Thermocouple installation

A thermocouple assembly which includes a plug having a pair of small diameter holes near one end thereof which are spaced a small distance apart to leave a thin quantity of plug material between the holes is presented. There are a pair of thermocouple wires extending through the different holes and with the outer ends of the wires joined to the thin quantity of plug material which lies between the holes to form a thermocouple junction.

Powell, W. B.↗

Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. Here this paper summarizes the construction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.

43 PARTICLE ACCELERATORS↗

Exciter switch

A new exciter switch assembly has been installed at the three DSN 64-m deep space stations. This assembly provides for switching Block III and Block IV exciters to either the high-power or 20-kW transmitters in either dual-carrier or single-carrier mode. In the dual-carrier mode, it provides for balancing the two drive signals from a single control panel located in the transmitter local control and remote control consoles. In addition to the improved switching capabilities, extensive monitoring of both the exciter switch assembly and Transmitter Subsystem is provided by the exciter switch monitor and display assemblies.

Mcpeak, W. L.↗

Payload spin assembly for the commercial Titan launch vehicle

A contract was completed to design, build, and test a Payload Spin Assembly (PSA) for installation onto the Martin Marietta Titan 3 Commercial launch vehicle. This assembly provides launch support for satellite payloads up to 5783 kilograms (6.37 tons) and controls release, spin-up, and final separation of the satellite from the second stage. Once separated, the satellite's Perigee Kick Motor (PKM) boosts the satellite into its transfer orbit. The first successful flight occurred December 31, 1989. Requirements, design, test, and problems associated with this mechanical assembly are discussed.

Robinson, Wilf↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve assembly quality of prefabricated components, we developed a sealant that can be installed at the plant and triggered at the jobsite. Additionally, we used this opportunity to lower the use of fossil fuel derived feedstocks and introduced bio-based alternatives to decrease the embodied carbon of the new sealant. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of biogenic carbon, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one part sealant allowing shelf stability to an otherwise fast curing system. When the microcapsules are broken and activated by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The shelf stability of these sealants and the on-demand triggering of the curing reactions enable installation on prefabricated components and storage prior to delivery and assembly at a jobsite, which could result in consistent sealant application with lower installation time than tapes and caulks at the construction site.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Large platform assembler non-structural system requirements

The impact on the design and operation of an automated structure assembler of requiring the assembler to also install the platform electrical and/or fluid utility circuits was examined. Possible utility requirements were defined and examined in conjunction with the automated assembler. Preliminary concepts are presented which permit the electrical and fluid circuits to be installed with the structural elements.

Vernon, R. M.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Parabolic Trough Collector Cost Update for Industrial Process Heat In The United States

Despite great potential, the worldwide adoption of concentrating solar thermal (CST) collectors for solar industrial process heat (SIPH) is modest. Industrial process heat (IPH) demands for heat and steam are typically below 300 degrees C, where CST collectors can provide the needed heat. Parabolic trough collectors (PTCs) are the most deployed CST technology for SIPH applications. This paper is focused on the United States, and a summary of known operating parabolic trough plants is shown. A previous analysis of a modern PTC in 2016 found that for SIPH applications, the installed solar field cost could be $200/m2 (2016$). Recent advances in PTC design and manufacturing have led to reduced cost per square meter of aperture area, and for a field of 510 solar collector assemblies (SCAs), the installed cost was $120/m2 (2020$). On one hand, the results from this study showed that the solar field cost for large solar fields (510 SCAs or ~804,000 m2) would increase to $184/m2 (2023$) due to post pandemic inflation and increase in metal prices. On the other hand, medium SIPH sized fields (90 SCAs or ~142,000 m2) cost analysis indicated an installed cost could be $197/m2 (2023$). When small SIPH fields (12 SCAs or ~19,000 m2) are considered, this jumps to $297/m2 (2023$). These are cost estimates for the Installed Cost of the solar fields using the United States 2023$ steel prices. When Chinese steel is used for comparison, the installed cost could be between $162 - $210/m2 for the range of SIPH sizes.

concentrating solar thermal↗

Operation and maintenance, fire rescue air-pack. Volume 2: Communications

The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.

Source record↗

Structural assembly in space

A cost algorithm for predicting assembly costs for large space structures is given. Assembly scenarios are summarized which describe the erection, deployment, and fabrication tasks for five large space structures. The major activities that impact total costs for structure assembly from launch through deployment and assembly to scientific instrument installation and checkout are described. Individual cost elements such as assembly fixtures, handrails, or remote minipulators are also presented.

Stokes, J. W.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: METSAT Phase Locked Oscillator Assembly, P/N 1334360-1, S/N's F03 and F04

Two Flight Model AMSU-A Phase Locked Oscillators (P/N 1348360-1, S/Ns F03 and F04) have been tested per AES Test Procedure AE-26758. The tests included vibration testing, thermal cycle testing, AM/FM Noise testing, and full functional testing. EMI/REO 2 Testing was not performed. (See test data for S/N F01). Both AMSU-A Phase Locked Oscillators satisfactorily passed all performance requirements of the AE-26633 Product specification. During thermal cycling of PLO serial number F03, the oven and data logger momentarily lost power, including a loss of data. The unit did not experience any thermal stress. TAR 003134 describes the corrective action. Prior to testing PLO serial number FO4, power was applied to the unit. (+15v,-15v) the unit did not display the proper phase lock. Upon test equipment check out a connector was found to be defective. TAR 003133 describes the corrective action. After completion of testing of PLO serial number F04 was installed into Receiver Assembly F02. Upon testing F02 Receiver Assembly the unit was found not to phase lock at ambient temperature. Removal of PLO Assembly F04 was required. R2 was the real issue. Solithane was secondary. Troubleshooting revealed excessive solithane on inner PLL Assembly cover inhibiting optimum grounding. Also, R2 was reselected which increased the lock range from -30 C to +60 C. TAR 002737 describes the corrective action.

Pines, D.↗

Development and construction status of the Mu2e electromagnetic calorimeter mechanical structures

Abstract The Mu2e experiment at Fermilab will search for the CLFV neutrino-less coherent conversion of a muon into an electron in the field of an aluminum nucleus. The observation of this process would be the evidence of physics beyond the Standard Model. Mu2e comprises a straw-tracker, an electromagnetic calorimeter and an external veto for cosmic rays. The calorimeter provides electron identification, a fast trigger and aids track reconstruction. It is a state-of-the-art crystal calorimeter and employs 1340 pure CsI crystals readout by UV-extended SiPM and fast electronics. The design consists of two identical annular disks positioned at the relative distance of 70 cm downstream the target.The hostile Mu2e conditions (total ionizing dose of 12 krad and a neutron fluence of 5 × 10 10 n/cm 2 @ 1 MeVeq (Si)/y, 1 T magnetic field and vacuum level of 10 −4 Torr) posed tight constraints on the mechanical structures and materials choice. The support structure of the two crystal matrices employs two aluminum hollow rings and parts made of open-cell vacuum-compatible carbon fiber. SiPMs and front-end electronics for each crystal are assembled in one mechanical unit inserted in a machined copper holder. The units are supported by a plate made of vacuum-compatible material. The plate integrates the cooling system made of a network of copper lines flowing a low temperature fluid and placed in thermal contact with the copper holders. The DAQ is hosted in aluminum crates positioned on the lateral surface of the disks. The crates also integrate the DAQ electronics cooling system. We review the constraints on the calorimeter structures design, the development of all the structural components, including the simulations that have determined the materials and technological choices and the specifications of the cooling station, components production and quality assurance tests, the procedures for detector assembly, transportation and installation in the experimental area.