Simulation and measurement of the dynamic strain response in a prototypical spallation target

The Second Target Station (STS) at the Spallation Neutron Source (SNS) will address emerging scientific challenges by providing a source of intense cold neutrons to instruments optimized for this source. The STS target will use rotating tungsten blocks and will receive 1.3 GeV proton beam pulses from the SNS accelerator at a repetition rate of 15 Hz. The facility life is planned for 40 years, and each target assembly life is expected to be approximately 10 years. An accurate strain prediction is then critical for fatigue life assessment of STS target blocks because they will be subject to approximately 10 8 beam pulses per lifetime. As an R&D activity, the Los Alamos Neutron Science Center (LANSCE) Weapons Neutron Research (WNR) Target 2 (Blue Room) facility was used to test the strain response of prototypical target blocks to the thermal shock of a proton pulse. The blue room was well suited for a pulsed proton beam impact test of subscale STS target blocks; the 800 MeV proton energy is approximately 60 % of the 1.3 GeV proton energy expected from the SNS accelerator to the STS. The LANSCE Proton Storage Ring (PSR) and SNS are both short-pulse proton beam sources with nominal pulse widths of 250 ns and 661 ns, respectively, so the energy deposition in the target occurs in <1 μs pulse duration. Strain measurements on the outer surface of three target blocks (bare tungsten, tantalum-clad tungsten, niobium-clad tungsten) were recorded for comparison against neutronics and structural simulations. In conclusion, this experiment and the supporting simulations satisfied the following primary research goals for the STS target.

Dynamic strain response↗

RFQ Beam Loss and Shielding Consideration

The proposed novel RFQ-based injector for LANSCE operation includes two independent low energy transports merging beams at the entrance of a single RFQ, which accelerates simultaneously both protons and H- ions with multiple flavors of the beams. One of the design issues of the project is the estimation of shielding requirements for the injector. Continuous access to the injector components reduces the number of times required to open the linac tunnel and saves time for the operation. Estimation involves the evaluation of radiation generated by beam losses in the injector. In this paper, we present an overview of the shielding in existing RFQ injectors and discuss the aspects of shielding configuration for the LANSCE RFQ-based injector.

43 PARTICLE ACCELERATORS↗

LANSCE CCL Performance Limits

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). Many factors contribute to the performance limits of the CCL accelerator system. One performance limit is set by the CCL mechanical structure and available cooling. Heating of the structure is ultimately linked to the operating RF duty factor of the CCL. Another performance limit is set by the maximum RF and beam duty factors that can be supported by the 805-MHz klystrons and associated HVDC power supplies. The RF and HVDC systems also set limits for the maximum peak beam current that can be accelerated in the CCL. And finally, a maximum beam current limit is set by the beam dynamics determined by the details of the CCL physics design (number of cells per CCL tank, accelerating gradients, magnetic focusing lattice, beam losses, etc.). This limit can be informed by both simulation results and beam measurement data, if available. A detailed explanation of each performance limit is given in the sections below. The results are summarized in the table below. In all cases, it is assumed that the CCL and the RF system are operating in their nominal beam production configuration – nominal magnet set points and nominal cavity fields, unless otherwise specified.

43 PARTICLE ACCELERATORS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Results of the first implementation of RF phase signature matching at LANSCE

The LINAC at the Los Alamos Neutron Science Center (LANSCE) has been utilizing the Delta-t method to match the RF cavities to the design acceleration parameters since its commissioning in 1972. The differences in time-of-flight between two subsequent Beam Position and Phase Monitors (BPPMs) are measured with both accelerated and drifting beams, depending on the whether the module is set to on or off. The algorithm optimizes the module amplitude and phase via iterative measurements if the initial phase is in the vicinity of the design value. With an upgrade to a faster readout system, a scan over the whole RF cavity phase range requires relatively less time than the classical optimization procedure. The Phase Scan Signature Matching (PSSM) method provides a time-efficient method that ensures the phase selection lands on the bunching side and empowers future analyses to build module-specific models. The PSSM also utilizes a direct model to determine the correct amplitude to sub-percent level instead of using linearized matrices. Furthermore, lacking a reliable energy measurement method in the LINAC, we measure the beam phases at two downstream locations to increase the precision of energy measurements. In this letter, we also discuss the sensitivities of PSSM, error propagation, and the implementation results for the 2019 and 2020 beam cycles.

47 OTHER INSTRUMENTATION↗

Print or order a LANSCE 50th anniversary poster [Poster]

To mark the anniversary of LANSCE and its five decades of cutting-edge science, the National Security Research Center’s graphic designer Gabriella Smith (from CEA-CAS) illustrated a commemorative poster now available for display. The LANSCE (the Los Alamos Neutron Science Center) facility houses one of the nation’s most powerful linear accelerators, which are used to improve safety and security as well as advance technology in stockpile sustainment, modern materials and manufacturing, and threat mitigation, among other areas. Now-deceased Lab scientist Louis Rosen, who is featured prominently on the poster, first proposed creating this major experimental science facility, said NSRC Archivist-Historian Madeline Whitacre (WRS-NSRCMS)

99 GENERAL AND MISCELLANEOUS↗

Six-dimensional matching of intense beam with linear accelerating structure

Beam matching is a common technique that is routinely employed in accelerator design with the aim of minimizing beam losses and preservation of beam brightness. Despite being widely used, a full theoretical understanding of beam matching in 6D remains elusive. In this work, we present an analytical treatment of 6D beam matching of a high-intensity beam onto an RF structure. We begin our analysis within the framework of a linear model, and apply the averaging method to a set of 3D beam envelope equations. Accordingly, we obtain a matched solution that is comprised of smoothed envelopes and periodic terms, describing envelope oscillations with the period of the focusing structure. We then consider the nonlinear regime, where the beam size is comparable with the separatrix size. Stating with a Hamiltonian analysis in 6D phase space, we attain a self-consistent beam profile and show that it is significantly different from the commonly used ellipsoidal shape. Subsequently, we analyze the special case of an equilibrium with equal space charge depression between all degrees of freedom. Comparison of beam dynamics for equipartitioned, equal space charge depression, and equal emittances beams is given. Finally, we present experimental results on beam matching in the LANSCE linac.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LAMP Basis of Estimate Evaluation

The purpose of this document is to present the evaluation summary of the initial cost proposal of the mechanical beamline components and associated labor for the LANSCE Modernization Project (LAMP).

43 PARTICLE ACCELERATORS↗